3C. Details of abnormal operation including failure of E-1- The link ceases to exist now.
List of important issues which need immediate attention of the Zonal office/ Directorate:-
(A)
S. no. Station Details of Date of Current status Steps taken by the
problem occurrence station.
1. Rainbow No UPS at Since March New UPS is Being processed.
present. 2108 under taking by
project wing.
2. Gold No UPS at Since a long Installation of the
present. time. As above. new 125 KVA UPS
- is under taking by
project wing.
3. Vividh No UPS at Since April As above. Being processed.
Bharati present. 2018
Rainbow, Spare C- C- Band used as Requisition sent to
Gold, band standby audio the central store
Vividh receivers are source.
Bharati required
Report of transmitter—FM
(C)Shutdown (Hrs:mins)
Transmitter Shutdown Duration
Rainbow 02:49
Gold 02:51
Vividh Bharati 00:00
(D) Performance of transmitters
(1) AM/SW transmitters- Not applicable
S. no. Description Qty. Make& model SNR at 80% modulation at THD at 30, Frequency
of equips. 1kHz(without filter) 60 & 90% response
modulation 63Hz- 10kHz
at 60%
modulation ±
Hz
- - - - - - -
*(a) 63Hz-7.5 for valve type Xtr. (b) 63Hz-10KHz for solid state txr.
*Station may take the measurements in sweep mode & preferably send graphical printouts,
if required measuring equipments are available.
(2) FM transmitters
s. no. Description Qty. Make& SNR THD Frequency
of equips. model response
- - - - - - -
- - - - - - -
- - - - - - -
THD, SNR & Frequency Response as per AIR standard measurement pro forma (with
both exciters).
(i)
(ii)
DG for the Txr Diesel in tank Diesel Total Diesel in Diesel Difference %
at beginning added (ltrs) tank at consumed (H-C) Difference
of the during the (D+E) end (ltrs) during the “I” (I/C) X100
month(ltrs) month(ltrs) “G” “F” month
“D” “E” (G-F)
“H”
Rainbow 240 100 340 280 60 0 0
Gold 196 - 196 188 8 0 0
Special points:-
1 Conductivity of the water of Not applicable
transmitters one reading each month
2 The latest date when the different filters of the transmitters As per schedule
washed/cleaned.
3 The date on which the water of the Cooling system of the transmitter was Not applicable
changed last
4 Mast base impedance Not applicable
5 Antenna Current Not applicable
6 Feeder Current Not applicable
7 PA Grid Current Not applicable
8 PA screen Grid current Not applicable
9 H.T. Voltage Not applicable
10 Pressure level of water of different water flow meters provided in Not applicable
the transmitters.
14 Working condition of various high speed fans provided for cooling Not applicable
thyristors stacks thycon unit and other equipment at the
station.
15 Date of cleaning of Mast Base Insulator, Feeder hut, Spark gape, Not applicable
Horn gape.
General
(A)Site Data -- Studio Not applicable
Studio Site coordinate Not applicable
Studio Site area Not applicable
HAMSL Not applicable
Date of Commissioning Not applicable
(B)Transmitter
Tx. site coordinate 28.6944˚N, 77.1529˚E
Tx. site area Data not available
HAMSL Data not available
Date of Commissioning Data not available
2. Report of Salient technical activities/Maintenance Work done at the Studio & Control Room,
Transmitter during the month & Points for attention of ADG (E) -NZ (AVM).
1. On 2/4/18 the FM Rainbow and FM Vividh Bharati transmitters were cleaned.
2. On 8/4/18, 12/4/18 and 25/4/18 the 250KVA DG set was thoroughly checked. It was found to
be OK.
3. On 09/04/18, the frequencies of the FM Gold and FM Vividh Bharati services were
interchanged. Now FM Gold is available on 100.MHz and FM Vividh Bharati service is available
on 106.4MHz.
4. On 10/4/18, the 6 1/8” rigid line at the private FM transmitter site which was getting hot from
a few days was looked into by the private FM broadcasters. After the repair work the power of
the new transmitters of DB Electronica make has been raised to 20KW.
5. On 17/4/18, the Nautel make transmitter was thoroughly cleaned.