Professional Documents
Culture Documents
A Issued for Review 9/3/18 N. D. BIEN SAVELEV L.C. THUY B. T. HAN L.V. DZUNG
TABLE OF CONTENTS
1 GENERAL ................................................................................................................. 3
2.8 Option 8 “Sherwin William Paint” for interior of high pressure vessels .................... 20
2.9 Option 9 “Ceramic Polymer Gmbh” for interior of high pressure vessels ................ 21
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION
CAPACITY AT BLOCK 09-1. INSTALL TRAIN A
ON MKS Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING
Page 3 of 21
MATERIALS
1 GENERAL
1.1 Background
The gas compression platform MKS was built in 1996. It is located next the oil
production
platform MSP4 at White Tiger Oil Field of the Block 09-1, approximately 145 km South-
East of Vung Tau City, offshore of the Socialist Republic of Vietnam. The MKS and
MSP4
platforms are connected via linking bridge. There are 04 high pressure gas
compression
modules (BM100, BM200, BM300, BM400) operating on the MKS platform with 315
MSCMD each day.
In order to increase gas compression capacity at block 09-1 Vietsovpetro is developing
the
project “Extension of gas compression capacity at block 09-1. Install Train A on MKS”.
Project scope of work includes:
- Installation a new high pressure gas compression module Train A with capacity 1.7
MMSCMD on the MKS platform;
- Modification of structure, process and utility systems on the MKS and MSP4
platforms to support for installation and operation of the Train A.
Before installation of Train A on the MKS platform, two existing gas compression
modules (BM300 and BM400) shall be removed. Removing of these two existing gas
compression modules is not in scope of the project “Extension of gas compression
capacity at block 09-1. Install Train A on MKS”.
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION
CAPACITY AT BLOCK 09-1. INSTALL TRAIN A
ON MKS Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING
Page 4 of 21
MATERIALS
1.2 Purpose
This document defines estimated volume of paint materials and thinners for
corrosion protection of MKS modification project, including steel structures of
topside modification, structures of train A, Piping system, shelters and pressure
vessels, for purchasing.
1.4 Definitions
DESIGNER: The party which carries out all or part of the design,
engineering, procurement, construction and
commissioning of the project. Here the DESIGNER is a
joined Team between Research and Engineering
Institute (R&EI), a subsidiary of VSP, and an outside
contractor.
1.5 Abbreviations
RP Recommended Practice.
1.6 Units
1.7 Language
Requirement of paint
Total (liters)
Requirement
№ Painting materials of paint Remarks
(liters) Train A Topside Piping Pressed
Shelters
structures Modification system vessels
1 2 3 4 5 6 7 8 9
1. Paints:
1 Epicon Zinc HB-2, grey 1430 525 150 565 145 45
2 Galvanite No.200 primer, white 45 15 10 5 15 0
3 Haiumeguard HB, redbrown 2225 830 210 915 205 65
4 Haiumeguard HB, light grey 1025 20 70 655 215 65
5 Haiumeguard HB, light green 1340 860 165 315 0 0
6 Haiuny Finish, white RAL 9010 245 0 0 245 0 0
7 Haiuny Finish, green RAL 6002 790 540 115 135 0 0
8 Haiuny Finish, grey RAL 7042 200 0 0 0 150 50
9 Haiuny Finish, red signal RAL 3020 25 0 0 0 25 0
10 Haiuny Finish, yellow signal RAL 1003 90 30 55 5 0
11 Epicon T-800, red 80 45 35
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1. INSTALL TRAIN A ON MKS
Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING MATERIALS Page 7 of 21
Requirement of paint
Total (liters)
Requirement
№ Painting materials of paint Remarks
(liters) Train A Topside Piping Pressed
Shelters
structures Modification system vessels
1 2 3 4 5 6 7 8 9
12 Epicon T-800, grey 75 0 0 0 45 30
13 Epicon T-800, white or bright color 30 0 0 0 0 30
Total paint volume: 7600 2820 775 2840 845 320
2. Thinners
(for paint, clean equipment and oil & grease remove)
14 Haipoxy Thinner 465 170 45 190 45 15
15 Haiuny Thinner 145 60 20 40 20 5
16 Epoxy Thinner A 150 55 15 60 15 5
17 Epicon T-800 thinner 20 0 0 0 10 10
18 Oil and grease remove thinner 130 50 15 40 25 5
Total thinner volume: 915 335 95 330 115 40
Total paints and thinners: 8515 3155 870 3170 960 360
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1. INSTALL TRAIN A ON MKS
Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING MATERIALS Page 8 of 21
Requirement of paint
Total (liters)
Requiremen
№ Painting materials t of paint Remarks
(liters) Train A Topside Piping Pressed
Shelters
structures Modification system vessels
1 2 3 4 5 6 7 8 9
1. Paints:
Requirement of paint
Total (liters)
Requiremen
№ Painting materials t of paint Remarks
(liters) Train A Topside Piping Pressed
Modification
Shelters
structures system vessels
1 2 3 4 5 6 7 8 9
12 Metapox RC 320, grey 60 0 0 0 35 25
13 Metapox RC 320, white or bright color 25 0 0 0 0 25
Total paint volume: 7480 2790 765 2795 825 305
2. Thinners
(for paint, clean equipment and oil & grease remove)
14 Thinner ME 098 460 170 45 185 45 15
15 Thinner 086 PU 140 55 20 40 20 5
16 Thinner 044 EP 140 50 15 55 15 5
17 Thinner 066 EP 35 5 5 5 10 10
18 Oil and grease remover thinner 135 50 15 40 25 5
Total thinner volume: 910 330 100 325 115 40
Total paints and thinners: 8390 3120 865 3120 940 345
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1. INSTALL TRAIN A ON MKS
Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING MATERIALS Page 10 of 21
Requirement of paint
Total (liters)
Requirement
№ Painting materials of paint Remarks
Topside
(liters) Train A Piping Pressed
Modificatio Shelters
structures n system vessels
1 2 3 4 5 6 7 8 9
1. Paints:
Requirement of paint
Total (liters)
Requirement
№ Painting materials of paint Remarks
Topside
(liters) Train A Piping Pressed
Modificatio Shelters
structures n system vessels
1 2 3 4 5 6 7 8 9
12 Tankguard Storage, grey 70 0 0 0 40 30
13 Tankguard Storage, white or bright color 30 0 0 0 0 30
Total paint volume: 6910 2555 700 2595 765 295
2. Thinners
(for paint, clean equipment and oil & grease remove)
14 Jotun thinner No.10 110 45 15 30 15 5
15 Jotun thinner No.17 570 210 55 230 55 20
16 Jotun Thinner No.23 20 0 0 0 10 10
17 Oil and grease remover thinner 135 50 15 40 25 5
Total thinner volume: 835 305 85 300 105 40
Total paints and thinners: 7745 2860 785 2895 870 335
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1. INSTALL TRAIN A ON MKS
Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING MATERIALS Page 12 of 21
Requirement of paint
Total (liters)
Requirement
№ Painting materials of paint Remarks
(liters) Train A Topside Piping Pressed
Modification
Shelters
structures system vessels
1 2 3 4 5 6 7 8 9
1. Paints:
Requirement of paint
Total (liters)
Requirement
№ Painting materials of paint Remarks
(liters) Train A Topside Piping Pressed
Modification
Shelters
structures system vessels
1 2 3 4 5 6 7 8 9
12 Sigmaguard 730, grey 55 0 0 0 30 25
13 Sigmaguard 730, white or bright color 25 0 0 0 0 25
Total paint volume: 7020 2615 710 2645 770 280
2. Thinners
(for paint, clean equipment and oil & grease remove)
1 Thinner 91-92 290 105 30 115 30 10
2 Thinner 90-53 355 130 35 135 40 15
3 Thinner 21-06 70 25 10 20 10 5
4 Oil and grease remover thinner 135 50 15 40 25 5
Total thinner volume: 850 310 90 310 105 35
Total paints and thinners: 7870 2925 800 2955 875 315
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1. INSTALL TRAIN A ON MKS
Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING MATERIALS Page 14 of 21
Requirement of paint
Total
(liters)
Requirement
№ Painting materials of paint Remarks
(liters) Train A Topside Piping Pressed
Shelters
structures Modification system vessels
1 2 3 4 5 6 7 8 9
1. Paints:
Requirement of paint
Total
(liters)
Requirement
№ Painting materials of paint Remarks
(liters) Train A Topside Piping Pressed
Modification
Shelters
structures system vessels
1 2 3 4 5 6 7 8 9
3020
Total paints and thinners: 7885 2955 805 2940 870 315
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1. INSTALL TRAIN A ON MKS
Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING MATERIALS Page 16 of 21
Requirement of paint
Total
(liters)
Requirement
№ Painting materials of paint Remarks
Train A
(liters) Topside Piping Pressed
structure Modification
Shelters
system vessels
s
1 2 3 4 5 6 7 8 9
1. Paints:
Requirement of paint
Total
(liters)
Requirement
№ Painting materials of paint Remarks
Train A
(liters) Topside Piping Pressed
structure Modification
Shelters
system vessels
s
1 2 3 4 5 6 7 8 9
12 Intertherm 228, grey 65 0 0 0 35 30
13 Intertherm 228, red 30 0 0 0 0 30
Total paint volume: 7005 2600 710 2625 775 295
2. Thinners
(for paint, clean equipment and oil & grease remove)
14 International GTA 220 75 25 10 25 10 5
15 International GTA 007 215 80 20 90 20 5
16 International GTA 713 120 50 15 35 15 5
17 International GTA 822 295 105 30 115 30 15
18 Oil and grease remover thinner 135 50 15 40 25 5
Total thinner volume: 840 310 90 305 100 35
Total paints and thinners: 7845 2910 800 2930 875 330
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1. INSTALL TRAIN A ON MKS
Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING MATERIALS Page 18 of 21
Requirement of paint
Total
(liters)
Requirement
№ Painting materials of paint Remarks
(liters) Train A Topside Piping Pressed
Modification
Shelters
structures system vessels
1 2 3 4 5 6 7 8 9
1. Paints:
1 Fast Zinc Reinforced, violet grey 1035 380 110 405 105 35
2 Seaguard 5000 HS, grey 50 20 10 5 15
3 Macropoxy 860, red 2205 820 215 895 210 65
4 Macropoxy 860, light grey 1075 20 70 690 225 70
5 Macropoxy 860, light green 1320 865 170 285 0 0
6 Acrolon 890, whitel RAL 9010 185 0 0 185 0 0
7 Acrolon 890, yellow signal RAL 1003 60 15 40 5 0 0
8 Acrolon 890, green RAL 6002 595 405 85 105 0 0
9 Acrolon 890, grey RAL 7042 150 0 0 0 115 35
10 Acrolon 890, red signal RAL 3020 15 0 0 0 15
11 Phenicon HS, offwhite 60 0 0 0 35 25
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1. INSTALL TRAIN A ON MKS
Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING MATERIALS Page 19 of 21
Requirement of paint
Total
(liters)
Requirement
№ Painting materials of paint Remarks
(liters) Train A Topside Piping Pressed
Modification
Shelters
structures system vessels
1 2 3 4 5 6 7 8 9
12 Phenicon HS, grey 60 0 0 0 35 25
13 Phenicon HS 25 0 0 0 25
Total paint volume: 6835 2525 700 2575 755 280
2. Thinners
(for paint, clean equipment and oil & grease remove)
14 Thinner R7K15 295 105 30 115 30 15
15 Thinner R7K130 20 5 5 5 5
16 Thinner R8KP1 55 20 5 15 10 5
17 Oil and grease remover thinner 135 50 15 40 25 5
Total thinner volume: 505 180 55 175 70 25
Total paints and thinners: 7340 2705 755 2750 825 305
Doc. No MKS-112-GEN-AZ7-RQ-03
EXTENSION OF GAS COMPRESSION
CAPACITY AT BLOCK 09-1. INSTALL TRAIN A
ON MKS Rev. No A
MKS MODIFICATION
PURCHASE REQUISITION FOR PAINTING
MATERIALS Page 20 of 21
2.8 Option 8 “Sherwin William Paint” for interior of high pressure vessels
Requirement of
№ Paint Name Remarks
paint (liters)
1 2 3 4
1. Paints:
1. Nova Plate 325, grey 75
2.9 Option 9 “Ceramic Polymer Gmbh” for interior of high pressure vessels
Requirement
№ Paint Name of paint Remarks
(liters)
1 2 3 4
1. Paints:
Notes: the options 8 and 9 applied for internal surface of vessels: V – 201A, V –