Task 1

Student:
 Jose Armando Cajahuaringa Paulino
Resource planning:
Personal
Own personal
 Coordinator.
 Field supervisors.
Contractor’s personal
 01 Responsible supervisor.
 01 Security Supervisor.
Typical quadrille
 01 Group leader (Operator).
 08 Operators (Linemen).
 01 Winche operator.
 04 Helpers.
Mobility
 4x4 trucks.
 Minibus or similar (Coaster) for transfer of personnel.
 Truck for transportation of equipment and tools.
Equipment and tools
 01 Tension developer.
 01 Insulating pole for developer.
 02 Pairs of dielectric gloves class 3 or 4.
 02 Grounding pole.
 06 Grounding Sets temporary for 220 kV lines.
 02 Service Sogas.
 01 Tool case.
 12 Pulleys maneuver 1.5 TN.
 06 Tirfor of 3 TN.
 01 Aluminum pen.
 06 Driver's clamp.
 03 Guard cable clamp.
 02 Service pulley.
 02 Service rope section 100 m c / u.
 01 Winch of 1.0 TN.
 04 Trico of 3 TN.
 20 shackles ¾ of maneuver.
 04 Fiber anchor stairs glass.
 Wooden blocks 4 "x 40 cm.
 16 AWG wire (mooring).
 01 Soga ¾ "x 150 m.
 02 Soga ½ "x 150 m.
 06 Eyebolt 2 "x 1.20 m.
 02 Comba of 20 lbs.
 08 Steel Stroke 1.20 m - 1.0 m.
 02 ½ "rope for feather wind - 10.
 06 trunks 1.5TN.
 8 steel struts 5/8 "- 3,0 m.
 Service pulleys.
Personal protection equipment – EPP
 Dielectric helmet.
 Dielectric safety footwear, with bakelite tip.
 Work uniform.
 Safety glasses.
 Sheepskin gloves
 Auditive protectors.
 Full body harness and double anchor line.
Collective protection equipment
 Fall arrest system (vertical and / or horizontal lifeline).
 First aid kit.
 Evacuation couch (for the work area).
 Table water (to minimize the risk of dehydration).
 Signaling according to the work signage procedure.
 Fire extinguisher.
Communication equipment
 Portable radios.
 Mobilephones.

Materials
 Insulators, line post, etc.
 Hardware.
 Profiles.
 Grounding material.
 Conductors.
 Guard cable.
Formats
 Light inspection format.
 Detailed inspection format.
 Insulator inspection format.
 Structure inspection format (posts and / or towers).
 Pole inspection format.
 Tool inspection format.
 Report format of the executed works.