95.

970 (312'-1')

CLEAR SPACE 7.829 12.380 45.317 28.500 CLEAR SPACE

WATER , DRAIN
45.317 (*CRANE*)
N

WASHING Helicopters Airframe and airframe Helicopters assembly


& FLUSHING disassembly removable equipment repair Maintenance

2.000
12.244
2.000
COATING AREA
24.887(81'-8")

(GATE)
6.000

24.887
14.250 14.250
189 sq.m

17
16

8
15

14
WASH
ROOM
13
9
12
10 11

10.000

2.000
10.000
1.600

2.000

12.244
SERVER ROOM

17

WASH WASH
16

15

14

ROOM ROOM 8

9
10 11
12
13

7.000 12.000 15.0 15.0 7.000


MILESTONES:
4.4 2.2 2.0 2.0 8.229 3.0 2.0
(GATE) (GATE) (GATE) (GATE) (GATE) 1) Base for Simulators:10/06
2) Columns:01/07
3) Roof(Construction):01/07
4) Panels + Gates + Windows : 14/07
SPACEERA HANGER PLAN
5) Crane: 10/07
6) Power supply: 11/07
7) Date of completion: 15/07
24-05-18 ATL-ADIBATLA + 6 days for
W.C.+2nd floor + Extra work: 21/07

Final date of completion with all


communications and electricity: 21/07