Each 40kg bag or regular cement cost from.00 to P215.00 to P230.00 to government controlled price.
Each 40kg bag of white cement (used for tiles in bathroom and kitchens) cost from P550.00 to
P580.00 a bag depending on the brand. One bag of white cement is usually more than enough for a
house.
LUMBER
The most readily available type for lumber is tanguile and apitong that cost around P37.00 rough to
P50.00 S4S per board foot.
• Gypsum Board
Primarily for ceiling and wall partitions. Gypsum Board is non-combustible has thermal and acoustic
insulating properties is asbestos-free and does not wrap. The price for 9mm x 4” x 8” is P220.00 to
P61 0.00 SRP per piece and 12mm x 4” x 8” is P235.00 to P900.00 SRP per piece.
• Particle Board
With its quality and with size being the same as plywood (4” x 8”). Particle has now gained wide
acceptance as superior substitute for plywood. And more importantly, it is cheaper than plywood. Unit
price are as follows:
6mm (1/4”) is P260.00;
9mm (3/8”) is P400.00;
12mm (1/2”) is P480.00;
15mm (5/8”) is P550.00;
18mm (3/4”) is P650.00 and
25mm (1”) is P780.00.
• Hollow Blocks
For the walling of the house "Allied Concrete Hollow Blocks" are used. Each 3 core stretcher block
150mm x 200mm x 400mm, LB-700 cost about P11,400.00.
FLOOR FINISHES
• Pebble Washout
Black pebble washout is the cheapest at
P95,00 per sack. Boracay shall washout is
P330.00 per sack.
• Ceramic Tiles
The plainest white 4” x 4” ceramic tile cost P2.50 per piece. The price of the colored tiles with design
vary from P4.00 up per piece. To cover an area of one square meter you need about 86 pieces
• Marble Tiles
They usually come in tiles with the size of 0,20m x 0.40m. marble tile cost around P220.00 per square
meter. Italian marble and other high quality marble tiles start at P900,00 per square meter. Crazy cut
marble tiles are the least costly
version at P220.00 per square meter.
• Granolithic
Granolithic is a combination of marble chips with a plus copper lining and last as long as marble. Cost
start at P325.00 per square meter including installation.
ROOFING
Prices vary according to the different (thickness or gauges) of the sheets. Government controlled cost
about P45.00 per linear foot.
for long term economy and beauty, there is COlorsheet prepainted corrugated G.I sheets which cost
about P188.57 per linear. That is painted both on the top side and underside making it more resistant
to corrosion. Another features is that it is made of annealed steel that is tempered for flexibility. This
means that the sheet will not crack even if walked on or mishandled during installation. Colorsheet is
available 8ft., 10ft. and 12ft., lengths.
these come in standard corrugation and in special rib and loop design to suit residential and
commercial needs. Material cost about P195.57 LF of P232.87 to P296.04 per linear meter. Actually
hardly any maintenance is needed plus they come painted and t size as per specifications.
these can be used to cover most shapes in houses. They are incombustible, rust and cool due to its
high thermal insulation quality. Cost about P750.00 to P900.00 per sq.m
Clay Tile
these come in choice of brown, blue and green glazed. Like the Era Industries, Inc., Riviera Filipina,
Inc. New Kawara, Ondurra Clay Roof Tiles. also available in unglazed natural color. Cost about P61.60
per sq.m (unglazed to P71.00). The clay tile has a high resistance to climatic conditions.
Concrete Roof Tiles
a perfect weather covering for greater strength of tile like the CPAC Monier, ELABANA Bold roll
concrete roof tiles and the Prestige Flat concrete roof tiles. Materials cost about P235.00 per sq.m and
above. Tiles in this material are cheaper than clay tiles due to the avoidance of the expensive
resembling sandface and locally come in various monotone and two-tone.
• Lock Sets
Entrance locksets with key cost P400.00 and up, depending on the type and brand.
Bedroom and bathroom lockset cost much less, main door lock set of more expensive brand
(Hongkong)-P3,200.00 (Japan)- P25,000.00 (Germany).
• Door jambs
Standard models to choose from to satisfy even the most discriminating tastes. like the door jambs.
Can be obtain at around P1,224.00 a set to much more.
To
Calculations for Steel Rebars Weights Orde
r
Desi
gn
EBo
How to Calculate Weights of Steel Bar Reinforcement in oks
Reinforced Concrete Works Cont
act
Reinforcement for Concrete Works may consist of Round Bars, Deformed bars, and Us
Welded Mesh fabric and are used in concrete slabs, walls, beams, columns. For
estimation of quantities of rebars for the purpose of costing is based on total
weights in Kg or Tons.
RC
Wat
er
Unit weight for Mesh Rebars can be obtained from the manufacturer or based on the
Tank
British Standards typical fabric types given in the Table 2 below. Note that there
s
are several Fabric Types depending on the standard used, so a check with the
------
manufacturer is necessary.
------
-----
Table 2 To Obtain Total Weights, simply multiply
Ref No Unit Weight Fabric Type the Unit Weight by the Surface Area
(kg/m2) Covered.
A 393 6.17 Square 200x200
A 252 3.95 Square 200x200 Using a Spreadsheet in a table form and
B 785 8.14 Structural 100x200 a proper take-off sheet would make
B 503 5.93 Structural 100x200 quantities take-off easier, more
C 785 6.72 Long Mesh 100x400 organised and accurate. You
C 503 4.34 Long Mesh 100x400 can download a copy here
D 49 0.766 Wrapping 100x100
D 31 0.493 Wrapping 100x100
click to enlarge
Wastage in Rebars
For quantities estimation of rebars, due allowance should be made for wastage and
if you like can include a factor for site, locality & local practices. Quantities should
be taken to the nearest tons. For small projects, you may want to purchase in
Individual Bars and in this case you need to convert the total weights in kg to the
nearest standard delivery length, usually 12m.
Generally for wastage allow about 2.5% for standard cut and bent bars, 5% for
standard precut lengths, and 10% for random lengths. Again discretion is advised as
if site logistics is far and difficult then allow 20% or more, while for easier logistics,
purchase to closest 12m length or tons works fine.
click to enlarge
Back to Top
Expenses on Subcontractors
steel windows and glass P 24,000.00
doors and jambs P 18,000.00
gates and fence tops P 23,000.00
electrical layout and rough ins P 40,200.00
plumbing layout and rough ins P 21,000.00
paints and finishings P 54,000.00
roofing sheets & accs P 74,600.00
roof framing P 48,000.00
plans & bluprints P 10,000.00
permits P 8,800.00
professional fees P 5,000.00
miscellaneous P12,000.00
1. Two men can lay 100 pieces of concrete hollow blocks in a day.
2. Two men can plaster (palitada) 8 square meters of concrete hollow blocks in a day.
3. Two men can pour .5 cubic meter of concrete on forms for beams and columns in a
day.
4. Two men can lay 72 pieces of tiles (6" x 6") in a day
5. Two men can install 10 to 15 pcs of GI roofing in a day depending on roof frames.
6. Two men can install 15 pieces of plywood (4' x 8') in a day.
Coco
2x2x8 = P40 2x3x8 = P60 2x6x8 = P120
2x2x10= P50 2x3x10= P75 2x6x10= P150
2x2x12= P60 2x3x12= P90 2x6x12= P180
Lumber
Marine Plywood
3/4 inch
₱1,325.00
Ordinary Plywood
3/4 inch
₱1,195.00
http://www.kikshardware.ph/product/deformed-bars-pangasinan/
CORRUGATED ROOF YERO GUAGE .35 thickness Superlume Excel Brand Name of The Roof
Pvc Sanitary fittings Tee / generic brand / price below and sizes
Pvc Sanitary fittings Clean-Out Adapter with O-Ring / ordinary brand only / class b
Pvc Sanitary fittings Wye / prices sizes below / generic brand only / class b
Wilcon
P 2,981.35
COLORED LONG SPAN (RIB) ROOF PRICES (PHP)
MATERIAL ORIGIN THICKNESS 0.4mm 0.4mm 0.5mm
WIDTH 3 feet 4 feet 4 feet
Standard Local 56 72 92
LENGTH PER FOOT
Standard Imported 64 88
Undersized Local 60
Standard Local 184 236 302
Standard Imported LENGTH PER METER 210 289
Undersized Local 197
CHB
"4 Php 9.50
"5 Php 10.50
"6 Php 12.00
DIMENSIONS
Length (mm) Width (mm) Thickness (mm) Mass (kg/m2)
All dimensions and masses provided are approximate only and subject to manufacturing tolerances. Masses are based on
equilibrium moisture content of product.
- See more at: http://www.jameshardie.com.ph/products/senepa#sthash.HmsrWhyt.dpuf
MOBILIZATION
1/2 Plywood = 10 X 656.25 = 6,562.50
Ordinary Nails = 5 x 122.5 = 612.50
2X3 C. Lumbers = 40 x 105 = 4,200.00
Sakolin = 15 x 50 = 750.00
#16 GI Wires = 5 x 95.25 = 476.25
Gasoline = 3 x 44.25 = 132.75
Consumables = 1 x 2000 = 2,000.00
TOTAL 14,734.00
EXCAVAITION
60 sq. m. X 434.27 Pesos / sqm = 26,056.00
ROOFING WORKS
Roof = 1.2 x 500 = 60,000.00
Steel Deck Cap = 12 x 750 = 9,000.00
Roofing Nails= 2.4 x 250 = 600.00
TOTAL 69,600.00
ROOF FRAMING
Angle Bar = 60 x 450 = 27,000.00
Purlins = 60 x 350= 21,000.00
Anchor Bolt = 60 x 50= 3,000.00
(Welding Services) = 333.33333 x 20000= 20,000.00
TOTAL = 71,000.00
FLOOR WORKS
1st Floor
Tiles = 200 x 280 = 56,000.00
Adhesive = 12 x 220 = 2,640.00
Cement = 12 x 230 = 2,760.00
TOTAL = 61,400.00
2nd Floor
Tiles = 200 x 280 = 56,000.00
Adhesive = 12 x 220 = 2,640.00
Cement = 12 x 230 = 2,760.00
TOTAL = 61,400.00
REINFORECMENT
Footings
Rebar 12mm Type 1 (Long Bars) = 8 x 325 = 2,600.00
Rebar 12mm Type 2 (Long Bars) = 8 x 325 = 2,600.00
Rebar 10mm Type 1 (Alternating Bars) = 5 x 135= 675.00
Rebar 10mm Type 2 (Alternating Bars) = 5 x 135= 675.00
TOTAL = 6,550.00
Column
Rebar 12mm Type 1 (Long Bars) = 32 x 325 = 10,400.00
Rebar 16mm Type 2 (Long Bars) = 13 x 340= 4,200.00
Tie Wire = 13 x 90= 1,170.00
TOTAL = 143,910.00
Beam
Rebar 12mm Type 1 (Long Bars) = 24x 325 = 7,800.00
Rebar 16mm Type 2 (Long Bars) = 10x 340= 3,400.00
Tie Wire = 10x 90= 900.00
TOTAL = 108,900.00
FORMWORKS (1st Floor)
Column
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 6,557.24
Beam
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 19,906.15
Slab
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 24,857.12
Beam
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 19,906.15
Slab
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 24,857.12
CONCRETING
1st Floor
Ready Mix Concrete (7days curing, 3500 psi)
Pumpcrete
Consumables
TOTAL 80,235.00
2nd Floor
Ready Mix Concrete (7days curing, 3500 psi)
Pumpcrete
Consumables
TOTAL 80,235.00
MASONRY WORKS
1st Floor External Wall
6" CHB
Sand
Gravel
10 mm rebar
Cement
TOTAL 49,059.58
TOTAL 24,047.83
TOTAL 49,059.58
Text
MOBILIZATION
1/2 Plywood = 10 X 656.25 = 6,562.50
Ordinary Nails = 5 x 122.5 = 612.50
2X3 C. Lumbers = 40 x 105 = 4,200.00
Sakolin = 15 x 50 = 750.00
#16 GI Wires = 5 x 95.25 = 476.25
Gasoline = 3 x 44.25 = 132.75
Consumables = 1 x 2000 = 2,000.00
TOTAL 14,734.00
EXCAVAITION
60 sq. m. X 434.27 Pesos / sqm = 26,056.00
ROOFING WORKS
Roof = 1.2 x 500 = 60,000.00
Steel Deck Cap = 12 x 750 = 9,000.00
Roofing Nails= 2.4 x 250 = 600.00
TOTAL 69,600.00
ROOF FRAMING
Angle Bar = 60 x 450 = 27,000.00
Purlins = 60 x 350= 21,000.00
Anchor Bolt = 60 x 50= 3,000.00
(Welding Services) = 333.33333 x 20000= 20,000.00
TOTAL = 71,000.00
FLOOR WORKS
1st Floor
Tiles = 200 x 280 = 56,000.00
Adhesive = 12 x 220 = 2,640.00
Cement = 12 x 230 = 2,760.00
TOTAL = 61,400.00
2nd Floor
Tiles = 200 x 280 = 56,000.00
Adhesive = 12 x 220 = 2,640.00
Cement = 12 x 230 = 2,760.00
TOTAL = 61,400.00
REINFORECMENT
Footings
Rebar 12mm Type 1 (Long Bars) = 8 x 325 = 2,600.00
Rebar 12mm Type 2 (Long Bars) = 8 x 325 = 2,600.00
Rebar 10mm Type 1 (Alternating Bars) = 5 x 135= 675.00
Rebar 10mm Type 2 (Alternating Bars) = 5 x 135= 675.00
TOTAL = 6,550.00
Column
Rebar 12mm Type 1 (Long Bars) = 32 x 325 = 10,400.00
Rebar 16mm Type 2 (Long Bars) = 13 x 340= 4,200.00
Tie Wire = 13 x 90= 1,170.00
TOTAL = 143,910.00
Beam
Rebar 12mm Type 1 (Long Bars) = 24x 325 = 7,800.00
Rebar 16mm Type 2 (Long Bars) = 10x 340= 3,400.00
Tie Wire = 10x 90= 900.00
TOTAL = 108,900.00
Beam
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 19,906.15
Slab
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 24,857.12
Beam
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 19,906.15
Slab
Plywood
Cocolumber
Ordinary Nails
Tie wire #16
TOTAL = 24,857.12
CONCRETING
1st Floor
Ready Mix Concrete (7days curing, 3500 psi)
Pumpcrete
Consumables
TOTAL 80,235.00
2nd Floor
Ready Mix Concrete (7days curing, 3500 psi)
Pumpcrete
Consumables
TOTAL 80,235.00
MASONRY WORKS
1st Floor External Wall
6" CHB
Sand
Gravel
10 mm rebar
Cement
TOTAL 49,059.58
TOTAL 24,047.83
TOTAL 49,059.58
PLASTERING
1st floor
Cement
Sand
TOTAL 22,297.68
In most of the blogs that currently spreading in the Net world, it is very noticeable that many people that despite of the
Millions of Pesos that they pay from these Contractors, ended them with endless of sub-standard homes, giving them a lot of
maintenance in order for their house become livable.
Considering a lot of Contractors Nationwide, trough bench marking, the current Construction cost in the Philippines Ranges
from 23,000 Pesos to 35,000 Pesos per square meter, depending on the type of House Construction Type, Finishes, Location,
Clients Material Requirements and work items, it seems that a certain construction for an ordinary client will be too costly. And the
complaints of these clients are due to lack of knowledge on the kind of contract and costing they signed.
The prevailing Construction Range as per study could be one of the reason as to why a lot of clients in the country keep on
complaining from these contractors. Keeping in mind that these clients are not aware of the other additional charges on their
contracts at the top of the Bill of Materials (BOM) and Bill of Quantities (BOQ), commonly known as ESTIMATES, as for example
Contractors Mark Up (from 25%-35% of the Total Cost), VAT (12%) and other Hidden Charges. As for example see the below
computation:
At some contractors, the Design is another cost which is separated from the total cost of
construction as for example in some Architects, they are charging 7% to 10% of the Total Cost
of the House as the cost of their Design. As for example they if the Total is 1,000,000.00 they
will charge 70,000.00 pesos to 100,000.00 pesos as Design fee only, making the total cost of
your whole construction as 1,440,000.00 Pesos.
For Your Design & Construction Jobs, DESIGN & BUILD | RENOVATION | FULL
CONSTRUCTION | ESTIMATES | MANPOWER SERVICES - and other construction related
inquiries pls contact us at drilon.doctor@gmail.com | manila@aracco.com | (02) 557-7524 |
+639175536760 | +6309178089883 | DRILON & DOCTOR CONSTRUCTION COMPANY –
CREATING QUALITY LIVES
Since 2008
Overview
Your basket
Latest comments
03.04 | 07:27
31.03 | 08:48
28.03 | 12:28
23.03 | 14:02
Share on Facebook
Share on Twitter
Share on Google+
Try SimpleSite
160203