You are on page 1of 3

BOREHOLE N°:

Client: PACKER TEST MWH-08


BO R E H O L E N º :

Client: P A C KFORM
ER TEST
L u m ina C op p er S A C
Project Number:
Proje ct N um be r: 60500425 Task 2000
T ask 20 00 : Hydrogeological Investigation Tailing Facilities 8
G eotechnical and Hydrogeological Subsurfa ce Investigation
FORM PT-
P T-1
GENERAL INFORMATION BOREHOLE INFORMATION TEST INFORMATION
G E N E R A L IN FO R M A TIO N B O R E H O LE IN FO R M ATIO N TE S T IN F O R M A TIO N
Contractor Company:
C ontra ctor C om p a ny: Progeo N oNorth
rth (m ):(m): 7823591.0 Inclination/H
Inclin ation/H (α):
( ) : 90 Depth of the Test
D epth of th e Te st:
From (m):
Fro m (m )
35.00 to (m): 42.00
to (m )
RQD%: 80
Field
F ield Responsible
R esp on sib le oof
f CContractor:
ontractor: Luiz Carlos de SouzaE asEast
t (m ):(m): 299042.0 Location:
L oca tio n: Barragem 08 Initial Hour:
In itial H ou r: 10:00 d top: 35.00
d to p: m. h soil (m): 33.00
Field Engineer of MWH: Alex Ludeña Elevation
tio n(m ):(m): 1117.000 BarehoIe Diameter (2r): 9.6 End Hour: 11:00 d bottom: 42.00 m.:
d b o ttom h rock (m): 5.50
F ie ld E ng in ee r of M W H : E leva B oreho le D iam e ter (2 r) : cm En d H o ur:
Date:
D a te: 19-Oct-2011 Turn Day/Night: Day Azimuth:
A zim u th: GWI (m): 9.34 hm
h m (m):
(m ):
1.50 L (m): 7.00
L: a (m): 1.3
G W L (m ) :
P ac ker In flatio n P ressure = P p
Pre ssure G a uge F low m eter E xpansion C ylinder
V alves 1. Ph = (d top + a ) psi H ydrostatic P ress ure on the P ac ke r & C onvert 1psi = 0.7 m
P um p 2. Pw  200 psi P ac ker W ork ing Pressure
3. P p = (P h + P w)*1.2 psi P ac ker Inflatio n Pres sure
35.56 ft

4.92 ft

M ax im um A llo w ab le P re ssu re = P m ax
hm a 1.30 m 1.   t = (H so il x  s oil + H rock x  roc k) C orrec t for inclined holes & Convert 1 m = 3.28 feet
2. u = [ (H soil + H rock) - G W L ] x  w C orrec t for inclined holes & Convert 1 m = 3.28 feet
3.  ' =  t - u C onvert 1 psi = 144 psf ;
4. H g = H (G ra vity) x  w
H (G ravity)

C orre ct fo r in c lin ed hole s & Convert 1 m = 3.28 feet
C onvert 1 p si = 1 44 psf
90 5. Pm ax =  ' - H g
ft

131.20 ft
(sa tured test)
G .W .L .
H S oil 6. P M = % Pm ax w ich is de pe ndant on R Q D
If R Q D is > 75 % in the te st z one then: P M 1 = 2 5% P m ax P M 2 = 5 0% P m ax
30.64

108.24 ft P M 3 = 7 5% P m ax P M 4 = 5 0% P m ax
P M 5 = 2 5% P max
. If R Q D is < 75 % in the te st zone then: P M 1 = 20% P m ax P M 2 = 4 0% P m ax
d bottom

P M 3 = 60% P m ax P M 4 = 4 0% P m ax
d top

N o tes: P M 5 = 20% P m ax
H (G ravity) 1. M a xim u m A llow ab le P res sure (Pm ax) m ust not e xceed 1 p si/ft (convert m eters to ft)
18.04 ft
114.80 ft

(dry test) or 3.28 psi/m


2. Ac coun t for po re w ater pre ssu re if there is m easured w ater
P acker 3. Te st Z one (L ) sh ould no t be greater than 5m an d 3 m is recom m ended
H R ock 4. H soil, H ro ck an d H w sh ould be correc te d if tes t hole is inclined [ H xsen  ]
90.72 ft

Hw G .W .L 5. In crim in tal Pres sures d epend on RQ D


137.76 ft

(dry test) 6. Pa cker can o nly be s etted in rock tha t has a n R QD > 60%
7.  s oil = 100 pcf
126.28 ft

8.  roc k = 140 pcf


11.48 ft

L/2 9.  w = 62.4 pcf


22.96 ft

10 . 1m 3/m in = 100 0 L/m in


L 11 . W ait until flo w rate rem ains relativ ely con stant a nd re aches equilibrium (~5m in.)
be fo re s ta rting tests
12 . C alib rating th e F low m eter weekly.
hm : H e ig h t fo G a uge P ressure
GWL : G r ou nf W ater Lev el
H (G rav itiy) : D istan ce from G rou nd W ater Level to Sw iv el
2r d top : D epth from G rou nd s urface to top o f testing zone
M axim u m A llow ab le P res su re C alculatio n: d bottom : D epth from G rou nd s urface to bottom of testing zone
 : Inclina tion w ith the horizo ntal
L : L en g th of the portio n of the ho le tested
2r : D iam eter o f the hole tested
(108.24 x 100 + 18.04 x 140) PM
1.- σt = = 92.71 ft . Psi
: Su rface G auge P ressure
144 R F low m eter : Flow M eter Reading
q : C ha n ge in Flow M eter R eading
Hw : D e p t h f r o m G W L t o L / 2 ( S a t u r e d T e s t )

(108.24 + 18.04) - 30.64 a


2.- u = = 41.45 ft . Psi : H e igth of c asing above the ground (stick up)
144

6.- PM If RQD is > 75% in the test zone then: Packer Inflation Pressure
Calculation:
3.- σ' = 92.71 - 41.45 = 51.26 ft . Psi
PM1= 25%Pmax= 9 PM2= 50%Pmax= 18 PM3= 75%Pmax= 27
1.- Ph = (35 + 1.3) m = 51.86 p
35.56 x 62.4
4.- Hg = = 15.41 ft . Psi PM4= 25%Pmax= 18 PM5= 50%Pmax= 9
144 2.- Pw = 200 psi

3.- Pp = (51.86 + 200) x 1.2 psi


5.- Pmax = 51.26 - 15.41 = 35.85 ft . Psi PM If RQD is < 75% in the test zone then:

P A C KE R TES T P M 1 (psi) = P M 2 (psi) = P M 3 (psi)


PM1= 20%Pmax= 7
= PM2= 40%Pmax= P M14
4 (psi) =
PM3= 60%Pmax= 22
P M 5Pp ==
(psi) 302 psi

T im e R Flo wm eter q R Flo wm ete r q R Flow m ete r q R Flow m eter q R Flo wm ete r q
(M inutes) ( m3 ) (Liters) ( m3 ) (Liters) ( m14)
PM4= 40%Pmax=
3
P(Liters)
M5
= 20%Pmax= (7 m3 ) (Liters) ( m3 ) (Liters)

0 TEST PM1 (psi) =


_ PM2 (psi) =
_ PM3 (psi) =
_ PM4 (psi) =
_ PM5 (psi) =
_
PACKER 9 18 27 18 27
Time Rflowmeter q Rflowmeter q Rflowmeter q Rflowmeter q Rflowmeter q
1
(minutes) (m3) (Liters) (m3) (Liters) (m3) (Liters) (m3) (Liters) (m3) (Liters)

02 7.35 ------------- 7.72 ------------- 8.11 ------------- 8.56 ------------- 8.94 -------------
13 7.3809 30.90 7.7565 36.50 8.1542 44.20 8.5945 34.50 8.9662 26.20
24 7.4111 30.20 7.7838 27.30 8.1988 44.60 8.6278 33.30 8.9923 26.10
35 7.4412 30.10 7.8303 46.50 8.2428 44.00 8.6601 32.30 9.0184 26.10
46 7.4714 30.20 7.8668 36.50 8.2878 45.00 8.6945 34.40 9.0438 25.40
57 7.5014 30.00 7.9031 36.30 8.3292 41.40 8.7312 36.70 9.0694 25.60
68 7.5308 29.40 7.9387 35.60 8.3717 42.50 8.7618 30.60 9.0949 25.50
79 7.5605 29.70 7.9741 35.40 8.4148 43.10 8.7958 34.00 9.1203 25.40
8
10 7.5902 29.70 8.0088 34.70 8.4563 41.50 8.8294 33.60 9.145 24.70
9 7.6198 8.045 36.20 8.497 40.70 8.8638
P acke r Inflation P ressure: 29.60 34.40 9.171 26.00
10 8.0812 36.20 8.5378 40.80 8.8968
Lithology: 7.6488 29.00 33.00 9.1963 25.30
Lithology: Roca carbonática alterda a compacta.
R Q D (% ):
Comments: Permeabilidad , posiblemente dado por la roca carbonatada aaletrada de 35 a 38 m, 2.59 E-04 cm/s
C om m ents:
Revision Date: February 17, 2010
Revised by: K. Gudenkauf
Checked by: C. Brueckman PACKER TEST MWH-08
Reviewed by: H. Ramirez

PROJECT : 60500425 DEPTH OF THE TEST FROM: 35.00 to 42.00 m.


JOB N° : 2000 DATE: October 19, 2011 I.Hour: 10:00:00 AM E. Hour: 11:00 TEST NUMBER: 01
Supervisor: Alex Ludeña Ground Water Level (If no water is present
AZIMUTH: - 0 place a depth greater than middle of test m.
zone): 9.3

FLOW METER

hm = Height of the Gauge Pressure 1.50 m.


PRESSURE GAUGE
a = Height above of the surface 1.30 m.
G.W.L. = Ground Water Level 9.34 m.
Pump H(Gravity) 12.14
= Distance from ground-water level to swivel m.
hm dTOP = Depth from ground surface to top of testing zone 35.00 m.

H(Gravity)
a dBOTTOM = Depth from ground surface to bottom of testing zone 42.00 m.
If G.W.L. is above test zone  = Inclination with the horizontal 90 deg
G.W.L. H(Gravity) corrected = SIN  x H(Gravity) 12.14 m.
L = Length of the portion of the hole tested 7.00 m.
dTOP
H(Gravity) If G.W.L.is 2r = Two times the radius of hole tested (Diameter) 9.60 cm.
below test zone PM = Gauge Pressure

G.W.L. Dp = Head Loss


q = Volume in liters during the test

L
L/2 0.000E+005.000E-05 1.000E-04 1.500E-042.000E-042.500E-04 3.000E-04 3.500E-04
dBOTTOM K(cm/s)
1
2r
2

PM3 = Surface PM4 = Surface PM5 = Surface


4
PM1 = Surface Gauge PM2 = Surface Gauge Gauge Pressure Gauge Pressure Gauge Pressure
Pressure (psi) = 9.00 Pressure (psi) = 18.00 (psi) = 27.00 (psi) = 18.00 (psi) = 27.00
5

Change in Flow Change in Change in Change in Flow Change in Flow


Meter Reading Flow Meter Reading Flow Meter Flow Meter Reading Flow Meter Flow Meter Reading Meter Reading Flow Meter Meter Reading
Time (min) Flow Meter Reading (m3) q(l) (m3) Reading q(l) (m3) Reading q(l) (m3) q(l) Reading (m3) q(l)

0 7.350 7.720 8.110 8.560 8.940


0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0
1 7.381 30.90 7.757 36.50 8.154 44.20 8.595 34.50 8.966 26.20
1 Lugeons
2 7.411 30.20 7.784 27.30 8.199 44.60 8.628 33.30 8.992 26.10
2
3 7.441 30.10 7.830 46.50 8.243 44.00 8.660 32.30 9.018 26.10
3
4 7.471 30.20 7.867 36.50 8.288 45.00 8.695 34.40 9.044 25.40
5 7.501 30.00 7.903 36.30 8.329 41.40 8.731 36.70 9.069 25.60 4

6 7.531 29.40 7.939 35.60 8.372 42.50 8.762 30.60 9.095 25.50 5

7 7.561 29.70 7.974 35.40 8.415 43.10 8.796 34.00 9.120 25.40
8 7.590 29.70 8.009 34.70 8.456 41.50 8.829 33.60 9.145 24.70
9 7.620 29.60 8.045 36.20 8.497 40.70 8.864 34.40 9.171 26.00
10 7.649 29.00 8.081 36.20 8.538 40.80 8.897 33.00 9.196 25.30
Sum of q (l) = 298.8 361.2 427.8 336.8 256.3
Average q(l) from raw data=Q(l/min) = 29.88 36.12 42.78 33.68 25.63 K : 2.593E-04 cm/s
Average q(l) from raw data=Q (m3/sec) = 4.98E-04 6.02E-04 7.13E-04 5.61E-04 4.27E-04 Lugeon: 32.8
HP (psi) =
Differential Head of Water = H (m) =
26.24
18.48
35.24
24.82
44.24
31.15
35.24
24.82
44.24
31.15
H P=P Mn ( psi)+(Υ w (pcf) x H Gravity (Corrected)(ft)/144( psf))
Permeability = K(cm/s) =
Q L
()
3.053E-04 2.748E-04 2.593E-04 2.562E-04 1.553E-04
Lugeon = 68.8 41.6 32.8 38.8 19.7
KH = *ln
1 2 3 4 5
2π LH P r
For:L≥10r
Graphic P vs. Q
Lugeon= (liters/m/min ) x ( 10/ pressure(bars))
Permeability Interpretations (change reported K &
Notes & Observations: 50.00 References: Lugeon):
45.00
"Design of Small Dams," Bureau of P Q Turbulent
40.00
35.00 Reclamation, Third edition, 1987, pg. 177. 26.24 29.9
P(psi)
30.00 35.24 36.1
25.00
20.00
"Construction and Design of Cement 44.24 42.8

15.00 Grouting," A.C. Houlsby 35.24 33.7

10.00
44.24 25.6
5.00
0.00
Q (l/min)
24.0 26.0 28.0 30.0 32.0 34.0 36.0 38.0 40.0 42.0 44.0