You are on page 1of 1

Request Date : / /

PT. TAIYO SINAR RAYA TEKNIK Document No.: FM-FAB-01


Procurement Construction
PLANT DIV. Checked by Approved by Checked by Prepared by Revision : 01

Revised on : 19 OKT 2017


Request For Fabrication
TAIYO SINAR
Project Name
1.
Project Code Estimation No.

2. Product Name
3. Customer Name
4. Owner Name
5. Fabrication Budget
6. Production specification Overview(If you have any other notes, write here)

7. Production Specification Scope (Note : strike through or cross out if not necessary)

Material SS400 SUS304 Others (               )


Full size Temporary Machinery
Cutting Hole drilling Bending Welding Finishing Assembling
Fabrication marking -off assembling built-in
Contents Purchase Step welding Hanging
Purchase bolt / nut
built-in joint piece welding
Pipe protection with cap &
Finishing Pickling Flushing
vinyl
Piping product
Closing plate
Wrapping Rustproofing
mounting
Purchase
Machinery product Cutting Grinding Finishing Assembling Function check
built-in
Surface
Painting Primer Intermediate Top coat Others ( )
preparation
Colour(No.)
Development Write-in Write-in License /
Common item Mill sheet
drawing drawing No. production No. qualification
Full size Dimensional Temporary Non-
Test item Test record
inspection inspection assembly destructive
Test location Workshop CTC On site

8. Transportation
Owner Name

Address

Maximum size

Maximum weight/pcs

Scope Free on truck Till unloading Till install


Site delivery
schedule
Other

9. PIC On site
Name
Telp No. :

10. Self-check before "request" of "Production Requestor" (If the check mark "○" is not applied to all, the production request is not received).
①Is there any unclear content? Are all the details clear? OK NO
②Is the welding specification clear? OK NO
③Is it a size that can be transported? OK NO
④Is it a size that can be carried/transfered? OK NO
⑤In consideration of site installation, are you planning to be able to adjust? OK NO

You might also like