Professional Documents
Culture Documents
Sheet
1.25"copper 1.5"copper
pressure reducing valve
circulator
(w/ isolation
flanges)
SEE SHEET M4 FOR WIRING
gate OF VALVE ACTUATORS SEE SHEET M4 FOR WIRING
valve diff. pressure
bypass OF VALVE ACTUATORS
globe valve
3-way
ball valve thermostatic
swing-check pressure
valve gauge
flow-check valve
4-way motorized
spring-loaded check mixing valve
valve
TRV angle
Snowmelt
backflow circuit #1
preventer 1"copper 1.25"copper
1.25"copper
circuit
setter float 3/4" flowguard 1" copper
project
-type valve #2907 1" copper, (typical)
air vent 1.5" copper
manual 3-way union
valve Snowmelt tekmar 261 boiler supply sensor
3/4" flowguard Honeywell
manifold #4
valve #2907 3/4"
1.5"copper
zone heat 1.5" Spirovent
scale(s): as noted
supply
air primary loop sensor valve
separator
supply
1" flowguard P7
3/4" flowguard
sensor
P8 (UP26-64)
valve #2911 P4 UPS15-42
valve #2907
(each manifold) (UP15-42 FC) P6
356
diaphragm-type
1.5" copper
expansion tank 1/2" make-up water (UP26-99)
1.25" copper
radiant assembly
356
manifold
1.25"
1.25" copper
Spirovent
dots indicate tees as close as possible P5
(UP15-42)
3/4" copper
(typical)
Extrol purging
#60 valves
1.5" copper 3/4"
exp. tank
copper
caps
boiler return
temp. sensors drain plug fill/ Extrol #90 expansion tank
1.25" copper
1.25" copper
for tekmar 356 purging support piping directly adjacent
controls WMBP3-40 valves to tank connection
heat exchanger
route PRV drain
PI (UP15-42 FC) P2 (UP15-42 FC) within 6" of floor drain
3/4" flowguard #2907
HL HL
MRHL
MRHL
P4 - Grundfos UP15-42FC w/ 1.25" isol. flanges
P5 - Grundfos UP15-42, w/ 3/4" isol. flanges
P6 - Grundfos UP26-99, w/ 1.25" isol. flanges
P7 - Grundfos UP15-42, w/ 3/4" isol. flanges
P8 - Grundfos UP26-64 w/ 1.5" isol. flanges (or full port ball valves)
brass unions
(typical)
Buderus G115/34 Buderus G115/34
Appropriate Designs
All rights reserved
w/ Riello burner w/ Riello burner
©Copyright 2003
All circulators are cast-iron.
total boiler system output = 240,000 Btu/hr All circulators are120 VAC
5. All 1.25", 1.5", and 2" horizontal piping shall be supported at intervals not exceeding 8 ft.
Buderus Buderus 6. All vertical piping shall be supported at intervals not exceeding 6 ft.
G115 /34 G115 / 34 7. Piping shall be supported wherever possible using steel strut / clamp system.
MECH ROOM boiler boiler 8. Overhead piping to boiler shall be supported with 3/8" threaded rod / hanger system
9. All piping shall be installed plumb and level unless otherwise indicated.
10. All soldered joints shall be neatly wiped and cleaned of all flux / solder residue.
11. All primary / secondary connections must be made of copper tubing with tees as closely spaced as possible.
sleeves from snowmelt circuit