You are on page 1of 21

Project Job Ref.

CCECC Section Sheet no./rev.


1
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

ANALYSIS
Tedds calculation version 1.0.18

Geometry
Geometry (m) - Steel (BS5950)
5

7.54
7.548 8
3 4
2 r1 Raft 4
er 2
R fte
a
Column 1

Column 2
4.8

4.8
1

2
Z
1 3
X

Materials
Name Density Youngs Modulus Shear Modulus Thermal Coefficient
(kg/m3) kN/mm2 kN/mm2 C-1
Steel (BS5950) 7850 205 78.8 0.000012
Sections
Name Area Moment of inertia Shear area
Major Minor Ay Az
(cm2) (cm4) (cm4) (cm2) (cm2)
Column - UB 86 28927 913 42 41
457x152x67
Rafter - UB 86 28927 913 42 41
457x152x67
Nodes
Node Co-ordinates Freedom Coordinate system Spring
X Z X Z Rot. Name Angle X Z Rot.
(m) (m) () (kN/m) (kN/m) kNm/
1 0 0 Fixed Fixed Free 0 0 0 0
2 0 4.8 Free Free Free 0 0 0 0
3 14.5 0 Fixed Fixed Free 0 0 0 0
4 14.5 4.8 Free Free Free 0 0 0 0
5 7.25 6.9 Free Free Free 0 0 0 0
Elements
Element Length Nodes Section Material Releases Rotated
(m) Start End Start End Axial
moment moment
1 4.8 1 2 Column - UB Steel (BS5950) Fixed Fixed Fixed
457x152x67
Project Job Ref.

CCECC Section Sheet no./rev.


2
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Element Length Nodes Section Material Releases Rotated


(m) Start End Start End Axial
moment moment
2 4.8 3 4 Column - UB Steel (BS5950) Fixed Fixed Fixed
457x152x67
3 7.548 2 5 Rafter - UB Steel (BS5950) Fixed Fixed Fixed
457x152x67
4 7.548 5 4 Rafter - UB Steel (BS5950) Fixed Fixed Fixed
457x152x67
Members
Name Elements
Start End
Column 1 1 1
Column 2 2 2
Rafter 1 3 3
Rafter 2 4 4
Loading
Permanent - Loading (kN/m)
2. 47
2.47

2.47
2.47

r1 Raft
er 2
Ra fte
Column 1

Column 2

Z
Project Job Ref.

CCECC Section Sheet no./rev.


3
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Imposed - Loading (kN/m)

4.5
4.5

4.5
4.5

r 1 Rafte
Rafte r2
Column 1

Column 2
X

Wind 1 - Loading (kN/m)


1.22
3.22

r 1 Raft
er 2
Rafte
2.61 0.61

1.22
3.22
Column 1

Column 2

2.61 0.61
X

Z
Project Job Ref.

CCECC Section Sheet no./rev.


4
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

NHS - Loading (kN)

Rafte
er 1
0.8
Column 1 Raft r2

Column 2
X

WIND Suction - Loading (kN/m)


1.22
3.22

r1 Raft
er 2
Rafte
3.83 2.14

1.22
3.22
Column 1

Column 2
3.83 2.14
X

Load combination factors


WIND Suction
Permanent

Imposed

Wind 1

NHS

Load combination

ULS (Strength) 1.40 1.60


SLS (Service) 1.20 1.20 1.20
DL+IMP+NHS 1.40 1.60 1.00
RVSL (Service) 1.00 1.40
Node loads
Node Load case Force Moment
X Z
(kN) (kN) (kNm)
2 NHS 0.8 0 0
Project Job Ref.

CCECC Section Sheet no./rev.


5
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Member UDL loads


Member Load case Position Load Orientation
Type Start End
(kN/m)
Rafter 1 Permanent Ratio 0 1 2.47 LocalZ
Rafter 2 Permanent Ratio 0 1 2.47 LocalZ
Rafter 1 Imposed Ratio 0 1 4.5 LocalZ
Rafter 2 Imposed Ratio 0 1 4.5 LocalZ
Column 1 Wind 1 Ratio 0 1 2.61 GlobalX
Column 2 Wind 1 Ratio 0 1 0.61 GlobalX
Rafter 1 Wind 1 Ratio 0 1 -3.22 GlobalZ
Rafter 2 Wind 1 Ratio 0 1 -1.22 GlobalZ
Rafter 1 WIND Suction Ratio 0 1 -3.22 GlobalZ
Rafter 2 WIND Suction Ratio 0 1 -1.22 GlobalZ
Column 1 WIND Suction Ratio 0 1 3.83 GlobalX
Column 2 WIND Suction Ratio 0 1 -2.14 GlobalX

Results
Total deflection
ULS (Strength) - Total deflection
5

2 4

1 3
X

Member results
Load combination: ULS (Strength)
Member Deflection Axial deflection
Pos Max Pos Min Pos Max Pos Min
(m) (mm) (m) (mm) (m) (mm) (m) (mm)
Column 1 0 0 3.706 -7.9 0 0 4.8 -0.2
Column 2 3.706 7.9 0 0 0 0 4.8 -0.2
Rafter 1 7.511 23.3 0 -1.7 0 -6.5 7.548 -6.8
Rafter 2 0.037 23.3 7.548 -1.7 0 6.8 7.548 6.5
Project Job Ref.

CCECC Section Sheet no./rev.


6
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

SLS (Service) - Total deflection


5

2 4

1 3
X

Member results
Load combination: SLS (Service)
Member Deflection Axial deflection
Pos Max Pos Min Pos Max Pos Min
(m) (mm) (m) (mm) (m) (mm) (m) (mm)
Column 1 4.8 3.4 0 0 0 0 4.8 -0.1
Column 2 4.517 9.8 0 0 0 0 4.8 -0.1
Rafter 1 7.273 12.9 0 1 0 3.3 7.548 3.1
Rafter 2 0 9.2 7.548 -2.6 0 9.5 7.548 9.4
DL+IMP+NHS - Total deflection
5

2 4

1 3
X

Member results
Load combination: DL+IMP+NHS
Project Job Ref.

CCECC Section Sheet no./rev.


7
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Member Deflection Axial deflection


Pos Max Pos Min Pos Max Pos Min
(m) (mm) (m) (mm) (m) (mm) (m) (mm)
Column 1 0 0 3.64 -7.3 0 0 4.8 -0.2
Column 2 3.769 8.4 0 0 0 0 4.8 -0.2
Rafter 1 7.477 23.4 0 -1.5 0 -5.9 7.548 -6.1
Rafter 2 0.003 23.1 7.548 -1.8 0 7.3 7.548 7.1
RVSL (Service) - Total deflection
5

2 4

1 3
X

Member results
Load combination: RVSL (Service)
Member Deflection Axial deflection
Pos Max Pos Min Pos Max Pos Min
(m) (mm) (m) (mm) (m) (mm) (m) (mm)
Column 1 4.189 4.7 0 0 4.8 0 0 0
Column 2 4.8 1.6 0 0 0 0 4.8 0
Rafter 1 0 1.2 7.198 -3.9 0 4.4 7.548 4.4
Rafter 2 7.548 -0.5 0 -5.6 0 1.6 7.548 1.6
Node deflections
Load combination: ULS (Strength)
Node Deflection Rotation Co-ordinate
system
X Z
(mm) (mm) ()
1 0 0 -0.17809
2 -6.8 0.2 0.12872
3 0 0 0.17809
4 6.8 0.2 -0.12872
5 0 24.3 0
Project Job Ref.

CCECC Section Sheet no./rev.


8
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Load combination: SLS (Service)


Node Deflection Rotation Co-ordinate
system
X Z
(mm) (mm) ()
1 0 0 0.02271
2 3.4 0.1 0.09613
3 0 0 0.18468
4 9.8 0.1 -0.02641
5 6.6 11.5 -0.00642
Load combination: DL+IMP+NHS
Node Deflection Rotation Co-ordinate
system
X Z
(mm) (mm) ()
1 0 0 -0.16879
2 -6.1 0.2 0.13303
3 0 0 0.18644
4 7.4 0.2 -0.12395
5 0.6 24.2 -0.0022
Load combination: RVSL (Service)
Node Deflection Rotation Co-ordinate
system
X Z
(mm) (mm) ()
1 0 0 0.10172
2 4.6 0 -0.019
3 0 0 0.0032
4 1.6 0 0.03965
5 3.1 -5 0.00719
Total base reactions
Load case/combination Force
FX FZ
(kN) (kN)
ULS (Strength) 0 154.5
SLS (Service) -18.6 81.1
DL+IMP+NHS -0.8 154.5
RVSL (Service) -11.4 -11.1
Project Job Ref.

CCECC Section Sheet no./rev.


9
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Reactions
ULS (Strength) - Local node reactions - Node: (Horiz (kN), Vert (kN), Mom (kNm))
5

r1 Raft
er 2
2 Ra fte 4
Column 1

Column 2
1: (27.6,77.3,0) 3: (-27.6,77.3,0)

Load combination: ULS (Strength)


Node Force Moment
Fx Fz My
(kN) (kN) (kNm)
1 27.6 77.3 0
3 -27.6 77.3 0
SLS (Service) - Local node reactions - Node: (Horiz (kN), Vert (kN), Mom (kNm))
5

Raft
er 1 er 2
2 Raft 4
Column 1

Column 2

1: (1.6,32.9,0) 3: (-20.1,48.1,0)

Load combination: SLS (Service)


Node Force Moment
Fx Fz My
(kN) (kN) (kNm)
1 1.6 32.9 0
3 -20.1 48.1 0
Project Job Ref.

CCECC Section Sheet no./rev.


10
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

DL+IMP+NHS - Local node reactions - Node: (Horiz (kN), Vert (kN), Mom (kNm))
5

r1 Rafte
2 Column 1 Rafte r2 4

Column 2
1: (27.1,77,0) 3: (-27.9,77.5,0)

Load combination: DL+IMP+NHS


Node Force Moment
Fx Fz My
(kN) (kN) (kNm)
1 27.1 77 0
3 -27.9 77.5 0
RVSL (Service) - Local node reactions - Node: (Horiz (kN), Vert (kN), Mom (kNm))
5

1 Rafte
er
2 Raft r2 4
Column 1

Column 2

1: (-19.4,-12.7,0) 3: (8.1,1.6,0)

Load combination: RVSL (Service)


Node Force Moment
Fx Fz My
(kN) (kN) (kNm)
1 -19.4 -12.7 0
3 8.1 1.6 0
Element end forces
Load combination: ULS (Strength)
Element Length Nodes Axial force Shear force Moment
(m) Start/End (kN) (kN) (kNm)
1 4.8 1 -77.3 27.6 0
Project Job Ref.

CCECC Section Sheet no./rev.


11
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Element Length Nodes Axial force Shear force Moment


(m) Start/End (kN) (kN) (kNm)
2 77.3 -27.6 -132.3
2 4.8 3 -77.3 -27.6 0
4 77.3 27.6 132.3
3 7.548 2 -48 -66.6 132.3
5 48 -13.9 66.4
4 7.548 5 -48 -13.9 -66.4
4 48 -66.6 -132.3
Load combination: SLS (Service)
Element Length Nodes Axial force Shear force Moment
(m) Start/End (kN) (kN) (kNm)
1 4.8 1 -32.9 1.6 0
2 32.9 -16.6 -43.7
2 4.8 3 -48.1 -20.1 0
4 48.1 16.6 88.2
3 7.548 2 -25.1 -27 43.7
5 33.2 -8.1 27.6
4 7.548 5 -32.4 -10.9 -27.6
4 29.4 -41.6 -88.2
Load combination: DL+IMP+NHS
Element Length Nodes Axial force Shear force Moment
(m) Start/End (kN) (kN) (kNm)
1 4.8 1 -77 27.1 0
2 77 -27.1 -130.2
2 4.8 3 -77.5 -27.9 0
4 77.5 27.9 133.9
3 7.548 2 -48.2 -66.2 130.2
5 48.2 -14.2 66
4 7.548 5 -48.4 -13.7 -66
4 48.4 -66.7 -133.9
Load combination: RVSL (Service)
Element Length Nodes Axial force Shear force Moment
(m) Start/End (kN) (kN) (kNm)
1 4.8 1 12.7 -19.4 0
2 -12.7 -6.3 31.5
2 4.8 3 -1.6 8.1 0
4 1.6 6.3 -4.2
3 7.548 2 -2.5 14 -31.5
5 12 0.1 -21
4 7.548 5 -10.1 -6.5 21
4 6.5 0.2 4.2
Project Job Ref.

CCECC Section Sheet no./rev.


12
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Forces
Strength combinations - Moment envelope (kNm)

-132.3 -132.3

75.5 75.5
-132.3
132.3

Strength combinations - Shear envelope (kN)

13.9

66.6 -13.9

-66.6

27.6
-27.6 27.6
Project Job Ref.

CCECC Section Sheet no./rev.


13
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

All combinations - Axial force envelope (kN)


48.4

48.2

2.5 6.5

77.3 77.5
-12.7 1.6

Service combinations - Deflection envelope (mm)


-5.6
-3.9

9.2
12.9

9.8
4.7
Project Job Ref.

CCECC Section Sheet no./rev.


14
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Service combinations - Axial deflection envelope (mm)


9.5

4.4 -6.8
0
1.6
-0.2 -0.2

Member results
Envelope - Strength combinations
Member Shear force Moment
Pos Max abs Pos Max Pos Min
(m) (kN) (m) (kNm) (m) (kNm)
Column 1 0 -27.6 0 0 4.8 -132.3
Column 2 0 27.6 4.8 132.3 0 0
Rafter 1 0 66.6 6.244 75.5 0 -132.3
Rafter 2 7.548 -66.6 1.304 75.5 7.548 -132.3
Envelope - All combinations
Member Axial force
Pos Max Pos Min
(m) (kN) (m) (kN)
Column 1 0 77.3 0 -12.7
Column 2 0 77.5 0 1.6
Rafter 1 0 48.2 0 2.5
Rafter 2 0 48.4 7.548 6.5
Envelope - Service combinations
Member Deflection
Pos Max Pos Min
(m) (mm) (m) (mm)
Column 1 4.189 4.7 0 0
Column 2 4.517 9.8 0 0
Rafter 1 7.273 12.9 7.198 -3.9
Rafter 2 0 9.2 0 -5.6
Envelope - All combinations
Project Job Ref.

CCECC Section Sheet no./rev.


15
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Member Axial deflection


Pos Max Pos Min
(m) (mm) (m) (mm)
Column 1 4.8 0 4.8 -0.2
Column 2 0 0 4.8 -0.2
Rafter 1 0 4.4 7.548 -6.8
Rafter 2 0 9.5 7.548 1.6
ULS (Strength) - Moment (kNm)

-132.3 66.4 -132.3


66.4
75.5 75.5
-132.3
132.3

0
0

ULS (Strength) - Shear (kN)

13.9

66.6 -13.9

-27.6 27.6

-66.6

27.6
-27.6
Project Job Ref.

CCECC Section Sheet no./rev.


16
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

ULS (Strength) - Axial force (kN)


48 48

48 48

77.3 77.3

77.3 77.3

ULS (Strength) - Axial deflection


6.8

6.5
-6.8
-0.2 -0.2
-6.5

0 0

Member results
Load combination: ULS (Strength)
Member Shear force Moment
Pos Max abs Pos Max Pos Min
(m) (kN) (m) (kNm) (m) (kNm)
Column 1 0 -27.6 0 0 4.8 -132.3
Column 2 0 27.6 4.8 132.3 0 0
Rafter 1 0 66.6 6.244 75.5 0 -132.3
Rafter 2 7.548 -66.6 1.304 75.5 7.548 -132.3
Load combination: ULS (Strength)
Project Job Ref.

CCECC Section Sheet no./rev.


17
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Member Axial force


Pos Max Pos Min
(m) (kN) (m) (kN)
Column 1 0 77.3 0 77.3
Column 2 0 77.3 0 77.3
Rafter 1 0 48 0 48
Rafter 2 0 48 0 48
Load combination: ULS (Strength)
Member Axial deflection
Pos Max Pos Min
(m) (mm) (m) (mm)
Column 1 0 0 4.8 -0.2
Column 2 0 0 4.8 -0.2
Rafter 1 0 -6.5 7.548 -6.8
Rafter 2 0 6.8 7.548 6.5
SLS (Service) - Axial force (kN)
33.2 32.4

25.1 29.4
32.9 48.1

32.9 48.1

SLS (Service) - Deflection (mm)

9.2
-2.6
1 12.9
3.4
9.8

0 0
Project Job Ref.

CCECC Section Sheet no./rev.


18
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

SLS (Service) - Axial deflection


9.5

3.1

9.4
3.3

-0.1 -0.1

0 0

Member results
Load combination: SLS (Service)
Member Axial force
Pos Max Pos Min
(m) (kN) (m) (kN)
Column 1 0 32.9 0 32.9
Column 2 0 48.1 0 48.1
Rafter 1 7.548 33.2 0 25.1
Rafter 2 0 32.4 7.548 29.4
Load combination: SLS (Service)
Member Deflection
Pos Max Pos Min
(m) (mm) (m) (mm)
Column 1 4.8 3.4 0 0
Column 2 4.517 9.8 0 0
Rafter 1 7.273 12.9 0 1
Rafter 2 0 9.2 7.548 -2.6
Load combination: SLS (Service)
Member Axial deflection
Pos Max Pos Min
(m) (mm) (m) (mm)
Column 1 0 0 4.8 -0.1
Column 2 0 0 4.8 -0.1
Rafter 1 0 3.3 7.548 3.1
Rafter 2 0 9.5 7.548 9.4
Project Job Ref.

CCECC Section Sheet no./rev.


19
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

DL+IMP+NHS - Axial force (kN)


48.2 48.4

48.2 48.4
77 77.5

77 77.5

DL+IMP+NHS - Axial deflection


7.3

7.1
-6.1

-0.2 -0.2
-5.9

0 0

Member results
Load combination: DL+IMP+NHS
Member Axial force
Pos Max Pos Min
(m) (kN) (m) (kN)
Column 1 0 77 0 77
Column 2 0 77.5 0 77.5
Rafter 1 0 48.2 0 48.2
Rafter 2 0 48.4 0 48.4
Load combination: DL+IMP+NHS
Project Job Ref.

CCECC Section Sheet no./rev.


20
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

Member Axial deflection


Pos Max Pos Min
(m) (mm) (m) (mm)
Column 1 0 0 4.8 -0.2
Column 2 0 0 4.8 -0.2
Rafter 1 0 -5.9 7.548 -6.1
Rafter 2 0 7.3 7.548 7.1
RVSL (Service) - Axial force (kN)
12
10.1

-12.7 1.66.5
2.5

1.6
-12.7

RVSL (Service) - Deflection (mm)


-5.6
-3.9

4.6
-0.5 1.6
1.2
4.7

0 0
Project Job Ref.

CCECC Section Sheet no./rev.


21
Calc. by Date Chk'd by Date App'd by Date
A 5/21/2018

RVSL (Service) - Axial deflection


4.4
1.6

4.4

0 1.6
0

0
0

Member results
Load combination: RVSL (Service)
Member Axial force
Pos Max Pos Min
(m) (kN) (m) (kN)
Column 1 0 -12.7 0 -12.7
Column 2 0 1.6 0 1.6
Rafter 1 7.548 12 0 2.5
Rafter 2 0 10.1 7.548 6.5
Load combination: RVSL (Service)
Member Deflection
Pos Max Pos Min
(m) (mm) (m) (mm)
Column 1 4.189 4.7 0 0
Column 2 4.8 1.6 0 0
Rafter 1 0 1.2 7.198 -3.9
Rafter 2 7.548 -0.5 0 -5.6
Load combination: RVSL (Service)
Member Axial deflection
Pos Max Pos Min
(m) (mm) (m) (mm)
Column 1 4.8 0 0 0
Column 2 0 0 4.8 0
Rafter 1 0 4.4 7.548 4.4
Rafter 2 0 1.6 7.548 1.6
;

You might also like