B.W.S.S.B.

WATER SUPPLY, SANITARY


AND
BOREWELL RATES
BWSSB 3 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

EXCAVATION
FOR WATER SUPPLY AND SANITARY PIPELINE WORKS
1. Earth work excavation for pipeline trenches (except building works)
including depositing on bank upto a lead of 30 meters including
danger lighting and using sight rails and boning rods including
shoring, strutting, bailing out water at every 100 meters wherever
necessary as directed in the following starta
a) In all soils mixed with boulders of 30 cms size upto and
exclusive of disintegrated rock.
(1) 0 to 2 Mtr. depth Cum. 89.10
(2) 2 to 4 Mtr. depth Cum. 117.70
(3) 4 to 6 Mtr. depth Cum. 160.60
(4) 6 to 8 Mtr. depth Cum. 196.90
(5) 8 to 10 Mtr. depth Cum. 227.70
Note : For depth beyond 10 Mtr. add Rs. 33.00 per Cum. for every
additional 2 Mtr. depth or part thereof.
b) -do- in disintegrated rock, soft rock, soft shale and medium
hard rock comprising of Lime stone, sand stone hard shale,
schiest, fissured rock without resorting to blasting.
(1) 0 to 2 Mtr. depth Cum. 169.40
(2) 2 to 4 Mtr. depth Cum. 189.20
(3) 4 to 6 Mtr. depth Cum. 218.90
(4) 6 to 8 Mtr. depth Cum. 238.70
(5) 8 to 10 Mtr. depth Cum. 258.50
Note : For depth beyond 10 Mtr. add Rs. 33.00 per Cum. for every
additional 2 Mtr. depth or part thereof.
c) -do in hard laterite rock or hard laterite rock containing iron ore
upto 20% by chistelling and trimming to proper slope.
(1) 0 to 2 Mtr. depth Cum. 313.50
(2) 2 to 4 Mtr. depth Cum. 375.10
(3) 4 to 6 Mtr. depth Cum. 405.90
(4) 6 to 8 Mtr. depth Cum. 436.70
(5) 8 to 10 Mtr. depth Cum. 467.50
Note : For depth beyond 10 Mtr. add Rs. 53.90 per Cum. for every
additional 2 Mtr. depth or part thereof.
d) -do in hard laterite rock containing above 20% iron ore by
chistelling and trimming to proper slope.
(1) 0 to 2 Mtr. depth Cum. 660.00
(2) 2 to 4 Mtr. depth Cum. 693.00
(3) 4 to 6 Mtr. depth Cum. 726.00
(4) 6 to 8 Mtr. depth Cum. 792.00
(5) 8 to 10 Mtr. depth Cum. 858.00
BWSSB 4 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

Note : For depth beyond 10 Mtr. add Rs. 53.90 per Cum. for every
additional 2 Mtr. depth or part thereof.
e) -do in hard rock by chistelling :
(1) 0 to 2 Mtr. depth Cum. 828.30
(2) 2 to 4 Mtr. depth Cum. 888.80
(3) 4 to 6 Mtr. depth Cum. 918.50
(4) 6 to 8 Mtr. depth Cum. 948.20
(5) 8 to 10 Mtr. depth Cum. 1008.70
Note : For depth beyond 10 Mtr. add Rs. 89.10 per Cum. for every
additional 2 Mtr. depth or part thereof.
f) -do in hard rock by blasting :
(1) 0 to 2 Mtr. depth Cum. 466.40
(2) 2 to 4 Mtr. depth Cum. 536.80
(3) 4 to 6 Mtr. depth Cum. 561.00
(4) 6 to 8 Mtr. depth Cum. 607.20
(5) 8 to 10 Mtr. depth Cum. 654.50
Note :
1) For depth beyond 10 Mtr. add Rs. 89.10 per Cum. for every
additional 2 Mtr. depth or part thereof.
2) Where excavation has to be done in hard rock by controlled
blasting in residential areas or in the vicinity of vital structures,
where blasting is prohibited (to be certified by E.E.) an
additional rate of Rs. 220/- Cum. shall be paid over the rates
of Item 1(6)
Note :
1) In all Soils : this shall include
1. Soft clay soft murrum, gravel shale etc. including. Stiff heavy
clay, hard shale or compact murrum requiring drifting tool or
pick axe or both and shovel closely applied.
2. Gravel, soft laterite, kanakar and cobble stone having maximum
diameter in any one direction between 75 mm and 300 mm.
3. Soling of road paths etc., and hard core.
4. Macadam surfaces such as water-bound and bitumen/tar
bound.
5. Lime concrete, stone masonry in lime/cement mortar below
ground level.
6. Soft Conglomerate, where the stones may be detached from
the matrix with pick axe.
7. Generally any material which require the close application of
pickaxe or scarifiers to loosen and not offering resistance to
digging, greater than that offered by the hardest of any soil
mentioned in 1 to 6 above.

2) D.I.R. soft rock and medium hard rock


1. Ordinary rock comprising of lime stone, sand stone, hard
laterite fissured rock, conglomerate or other soft or disintegrated
rock which may be quarried or split with crow bars.
BWSSB 5 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

2. Un-reinforced cement concrete which may be broken up with


crow bars or pick axe and stone masonry in cement mortar
below ground level.
3. Boulders which do not require blasting having maximum
diameter in any direction of more than 300mm; found lying
loose on the surface or embeded in river bed, soil, talus, slope
wash; and terrace material of dissimilar origin.
Note : Hard laterite does not require blasting. It is to be classified under
ordinary rock which does not require blasting.

3) Hard Rock :

This shall comprise

1. Any rock or cement concrete or RCC, excavation of which


require the use of mechanical plant or blasting.
2. Boulders requiring blasting.
2. Refilling pipeline trenches and foundation with selected available Cum. 50.00
earth from trench excavation and foundation including watering,
consolidation in layers of 15cms., thickness including disposing off
the surplus earth with all leads & lifts.

Note :

1) In city limits disposing of surplus earth to be allowed for the


volume of pipe, duly got inspected by the higher officer.
2) In exceptional cases, earth may be obtained from borrow pit
with extra lead, duly reporting to higher officer.
3) Extra charges for excavation in all classifications in watery
situation or foul conditions may be paid as under towards
dewatering with an overnight recuperation upto one meter
depth and there of as below.
(1) 0 to 2 Mtr. depth Cum. 27.50
(2) 2 to 4 Mtr. depth Cum. 33.00
(3) 4 to 6 Mtr. depth Cum. 39.60
(4) 6 to 8 Mtr. depth Cum. 49.50
(5) 8 to 10 Mtr. depth Cum. 66.00
4. Cutting road surface for pipeline trenches and disposing of the
excavated stuff as directed including barricading, danger lighting
etc., in the following classifications.

(1) Cutting macadam road Cum. 140.80


(2) Cutting asphalt road Cum. 258.50
(3) Cutting cement concrete road Cum. 519.20
5. 1) Providing sand Bedding for the pipeline trenches including
watering and consolidation by punners etc., complete with an initial
lead of 50 meters. (In Black Cotton and rock reaches).
Cum. 385.00
(2) -do- Murrum/gravel bedding Cum. 110.00
BWSSB 6 S.R. 2013-14

Note :
1. The measurement of earth work for pipe trenches shall be confined only to the excavation
done below the classification of the road crest.
2. Payment for excavation of pipe trenches will be restricted to the dimensions show either in
the drawing or estimate irrespective of whether the excavation is done in earth or rock. In case
of variation in dimensions, the dimensions given at the time of markout will be final. (The
dimensions shall strictly confirm to I.S. No. 3114 of 1965).
3. Excavation for water supply pipe line trenches will be governed by the following condition. In
case of S & S, tyton or other types of pipes wherever required for lead joints, mechanical
Joints with rubber gasket or any other type of moulded joints etc., extra payment will be made
for caulking pits or collar pits at the same rate for excavation of pipe trenches. The condition
is also applicable for pipeline laid for U.G.D. works.
4. In case of excavation for trenches in hard rock by blasting, and hard laterite rock containing
iron ore, the quantity of rock removed will have to be stacked and shall be checked with the
actual section measurements and the lesser of the two will be paid for, duly deducting 40%
for voids in the stack measurements. The Executive Engineer should certify the classification
of hard laterite rock containing iron ore.
5. Shoring and strutting will be provided upto a depth of 2 meters beyond which depending upon
the nature of the soil, steps will be provided at every lift of 2.0 Mtr. including shoring and
strutting the steps width shall vary from 0.3 meters to 0.45 meters depending upon the nature
of the strata on either side of trench.
6. The minimum width of trench shall be as per the I.S.S.
7. In special circumstances where earth work excavable has to be done in hard rock by
chistelling in residential area where blasting is prohibited, the sectional measurement given
for chistelling shall be cent percent check measured by the E.E. Random checking shall be
done by the C.E. during the course of inspection of the works. If the cost of this items or
component in any tendered work, exceeds Rs. 2 lakhs, the E.E. shall however to make an
advance report to C.E. Wherever such item is to be taken up for execution.
8. When the overnight recurperation exceeds one Meter depth, a rate analysis may be worked
out based on actual observation and got approved by C.E.
9. Where earth work excavation has to be done in hard lateriate rock containing above 20% Iron
ore, by chistelling, the sectional measurements shall be cent percent check measured by the
concerned Executive Engineer. If the cost of this item or component in any tendered work,
exceeds or is likely to exceed Rs. 2.00 lakhs, random checking shall be done by the chief
Engineer in respect of this item, during the inspection of works. The Executive Engineer shall
have to make an advance report to Chief Engineer, when such chistelling work is to be done
or taken up for execution, with necessary soil test report.
10. Where earth work excavation has to be done in hard rock by controlled blasting, the sectional
measurements for controlled blasting shall be cent percent check measured by the concerned
Executive Engineer. If the cost of this item or component in any tendered work, exceeds or
is likely to exceed Rs. 2.00 Lakhs, random checking shall be done by the Chief Engineer in
respect of this item, during the inspection of works. The Executive Engineer shall have to
make an advance report to Chief Engineer, when such controlled blasting work is to be done
or is taken up for execution.
11. If shoring and strutting is done extra Rs. 2.00/Cum on the basic is applicable.
12. Area weightage to Earth work excavation in all types shall be applicable at 6% in BBMP
area & 3% in other areas. The rate should be rounded off to nearest Rupee.
BWSSB 7 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

WATER SUPPLY WORKS


1. Laying and Jointing GI Pipes including earth work in asphalted
paved macadamised or gravel roads upto 1.00 M deep including
fixing collars, elbows, tees, bends gland cocks and either fittings
and threads white lead paint wherever necessary and including all
conveyance of materials.

1.1 -do- 15mm to 25mm dia. Rmt 22.00


1.2 -do- 32mm to 80mm dia. Rmt 38.50
2. Removing the GI Pipes with earth work excavation and filling in all
soils including cutting tar road gravel road, metal road and cleaning
washing using at spot or conveying from workspot to office store
including removing of all fittings such as collers, elbows, tees,
bends gland cock etc., with cuts and threads.

1. -do- 15mm Rmt 4.10


2. -do- 20mm Rmt 4.70
3. -do- 25mm Rmt 6.80
4. -do- 40mm Rmt 7.90
5. -do- 50mm Rmt 9.10
6. -do- 55mm Rmt 10.60
7. -do- 80mm Rmt 12.10
3. Extra cuts and threads for GI Pipes for pumps fittings etc., where Each 47.00
the lengths of the line laid is less than 15.00 mts. (15.24 Mts)

1 -do- 15mm dia Each 2.05


2 -do- 20mm dia Each 3.00
3 -do- 25mm dia Each 4.10
4 -do- 40mm dia Each 6.05
5 -do- 50mm dia Each 8.00
6 -do- 65mm dia Each 11.95
7 -do- 80mm dia Each 13.90
4. Dismantling the GI Fountain and fittings and refixing after cleaning
pipe fittings etc., with cement concrete (1:2:4) as per specifications.

b) -do- C.C. (1:3:6) Each 29.15


5. Dismantling the cast iron fountain and returning the materials to the
Each 27.80
stores.

6. Removing gland cock with fittings and refixing size 15 mm to 65


Each 8.20
mm.
BWSSB 8 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

7. Providing and fixing brass stop cocks of 15 mm size. Each 141.60


8. Providing and fixing N.P. Stop cocks

1 -do- 15mm size. Each 207.10


2 -do- 20mm dia size. Each 242-90
9. Providing and fixing N.P. Bib-cocks

1 -do- 15mm size. Each 146-60


2 -do- 20mm size. Each 156-20
10. Providing and fixing N.P. Union

1 -do- 15mm size. Each 60-20


2 -do- 20mm size. Each 85-50
11. Providing & fixing bath tub NP cocks 20 mm size. Each 362-00
12. Providing and fixing NP waste union

1 -do- 32mm size. Each 149-50


2 -do- 40mm size. Each 189-80
3 -do- New washers to taps. Each 10-70

Note: Lift charges are applicable only for laying pipes. An additional
rate of Rs. 2.15 per Rmt. is applicable for every additional floor
over ground floor.

5. Labour charges laying and jointing C.I. pipes with earth work
including fixing, collars, elbows tees, bends, gland cocks and other
fittings with cuts and threads, white lead paints wherever necessary
conveying the materials from office to workspot and returning
surplus materials from workspot to stores (All G.I. pipes and
specials will be supplied by the Board free of cost).

1. -do- 15mm R.M. 4-20


2. -do- 20mm R.M. 5-00
3. -do- 25mm R.M. 8-50
4. -do- 40mm R.M. 10-60
5. -do- 50mm R.M. 14-50
6. -do- 65mm R.M. 12-70
7. -do- 80mm R.M. 13-90
8. -do- 100mm R.M. 24-50
BWSSB 9 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

5. a) Removing and G.I. pipe without earth work excavation and


filling in all soils including, cutting in tar road, gravel road,
metal road and clearing, washing and using at spot or conveying
from workspot to office store including removal of all fitting
such as collars, elbows, tees, bends gland cocks, etc., cuts
and threads.
1. -do- 15mm R.M. 3-00
2. -do- 20mm R.M. 3-00
3. -do- 25mm R.M. 4-00
4. -do- 40mm R.M. 5-20
5. -do- 50mm R.M. 6-80
6. -do- 65mm R.M. 8-80
7. -do- 80mm R.M. 9-70
6. Pipeline work : Cast Iron pipes (All classes) Conveying carefully
from sectional stores to site, rolling and lowering into trenches,
laying true to line level and perfect linking at joints including loading
and unloading at both destination with an initial lead of 5 K.M.

1. 80 mm R.M. 8-80
2. 100 mm R.M. 9-50
3. 150 mm R.M. 11-00
4. 200 mm R.M. 22-80
5. 225 mm R.M. 22-80
6. 250 mm R.M. 24-40
7. 300 mm R.M. 27-80
8. 375 mm R.M. 31-10
9. 400 mm R.M. 37-10
10. 450 mm R.M. 43-90
11. 525 mm R.M. 44-90
12. 600 mm R.M. 67-10
13. 675 mm R.M. 80-90
14. 700 mm R.M. 124-90
15. 750 mm R.M. 153-80
16. 825 mm R.M. 202-30
17. 900 mm R.M. 202-30
18. 1200 mm R.M. 311-70
BWSSB 10 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

6 a) Conveying carefully PSC pipes from sectional store to workspot


through transporting vehicle like lorry etc., including loading unloading
at both destinations, stacking at the site rolling, lowering into trench,
laying aligning true to line jointing the ends with rubber rings and
giving satisfactory hydraulic test etc., complete with an initial lead
of 15 km (PSC pipes and Rubber rings will be supplied free of cost
by the Board at stores).

1) 450 mm PSC pipes of 5 m long each R.M. 226-50

2) 600 mm PSC pipes of 7 m long each R.M. 312-40

3) 700 mm PSC pipes of 5 m long each R.M. 330-80

4) 750 mm PSC pipes of 5 m long each R.M. 344-00

6 a) (ii) Rolling lowering into trench laying aligning true to line jointing
the ends with rubber rings and giving satisfactory hydraulic
test etc., complete with an initial lead of 100 meter PSC pipes
will be supplied by the Board at the workspot rubber rings will
be supplied free of cost by the Board at the Stores.

a) 450 mm dia PSC Pipes upto 5 M length R.M. 137-90

b) 600 mm dia PSC Pipes upto 5 M length R.M. 167-10

c) 700 mm dia PSC Pipes upto 5 M length R.M. 196-50

6 b) (i) Conveying carefully Hume Steel specials like bend branches,


Tapers, Flanges etc., from sectional Store to work site through
transporting vehicle lorry etc., including loading, unloading at
both destinations, laying, jointing the ends with PSC Pipes
etc., with an initial lead of 15 Kms. (Hume Steel specials with
be supplied free of cost by Board at C.J.F. Stores).

a) 450 mm dia Each 456-30

b) 600 mm dia Each 593-00

c) 700 mm dia Each 640-40

d) 750 mm dia Each 640-40


BWSSB 11 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

6 b) (iii) Attending to leaky joints on prestressed concrete pipes after


removing the damaged Rubber gasket or cement mortar joint
materials and preparing the surface for fresh jointing with
cement mortar 1:1½ ratio mixed with rapadite solution at one
liter per bag of cement over well caulked spun yarn including
the cost of cement/rapadite solution/spun yarn charges towards
engaging dewatering pump with fuel and crew/tools and plants/
earth work excavation in all types of soils upto 2.50M, depth
but, excluding asphault cutting

a) 450 mm dia Per Joint 797-90


b) 600 & 700 mm dia Per Joint 932-60

7. Cuts of C.I. Pipes already laid in the ground (cutting charges only).

1. 50 mm size Each/Cut 4-10

2. 65 mm size Each/Cut 5-20

3. 80 mm Each/Cut 8-80

4. 100 mm Each/Cut 11-00

5. 125 mm Each/Cut 13-60

6. 150 mm Each/Cut 14-00

7. 175 mm Each/Cut 21-10

8. 200 mm Each/Cut 23-10

9. 225 mm Each/Cut 23-10

10. 250 mm Each/Cut 43-60

11. 300 mm Each/Cut 58-20

12. 375 mm Each/Cut 66-70

13a) 400 mm Each/Cut 78-50

13b) 450 mm Each/Cut 93-90

14. 600 mm Each/Cut 109-80

15. 700 mm Each/Cut 125-20

16. 750 mm Each/Cut 130-20


BWSSB 12 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

17a) 900 mm Each/Cut 175-80


17b) 1200 mm Each/Cut 331-80
18. To be cut neatly on the surface 50 mm (cutting charges only). Each/Cut 3-00
19. -do- 65 mm Each/Cut 3-60
20. -do- 80 mm Each/Cut 4-95
21. -do- 100 mm Each/Cut 8-80
22. -do- 125 mm Each/Cut 10-90
23. -do- 150 mm Each/Cut 13-90
24. -do- 175 mm Each/Cut 13-90
25. -do- 200 mm Each/Cut 16-00
26. -do- 225 mm Each/Cut 23-10
27. -do- 250 mm Each/Cut 28-50
28. -do- 300 mm Each/Cut 36-30
29. -do- 375 mm Each/Cut 40-80
30a) -do- 400 mm Each/Cut 44-00
30b) -do- 450 mm Each/Cut 47-70
31. -do- 600 mm Each/Cut 93-50
32. -do- 700 mm Each/Cut 101-90
33. -do- 750 mm Each/Cut 109-80
34. -do- 900 mm Each/Cut 124-90
35. -do- 1200 mm Each/Cut 219-20
8 Lead Jointing:

Labour charges for jointing the C.I. pipes and special with hemp
yarn and lead including caulking and giving satisfactory hydraulic
test corresponding to the required pressure etc., complete including
the cost of fuel for melting the lead (hemp yarn lead and pipes and
specials supplied by the Board free of cost at store).

1. 80 mm Per Joint 36-30


2. 100 mm Per Joint 39-30
3. 150 mm Per Joint 63-90
4. 200 mm Per Joint 91-90
5. 225 mm Per Joint 108-40
BWSSB 13 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

6. 250 mm Per Joint 129-30


7. 300 mm Per Joint 161-50
8. 375 mm Per Joint 225-30
9. 400 mm Per Joint 267-60
10. 450 mm Per Joint 339-50
11. 500 mm Per Joint 383-90
12. 525 mm Per Joint 406-20
13. 600 mm Per Joint 486-50
14. 675 mm Per Joint 556-90
15. 700 mm Per Joint 567-80
16. 750 mm Per Joint 626-20
17. 900 mm Per Joint 796-00
18. 1200 mm Per Joint 1283-50
Note: The contractor must make his own arrangements for procuring
water for testing and it will not be paid extra.

9. Making cement joints (1:1) proportion of C.I. pipes with hemp yarn
including cost of materials required for jointing comprising of
cement sand, hemp yarn and water proof cement including curing
for 10 days giving a satisfactory hydraulic test pressure of 60
meters head of water etc., complete.

Note: As above.

1. 80 mm Each 25-60
2. 100 mm Each 30-80
3. 150 mm Each 47-85
4. 200 mm Each 61-60
5. 225 mm Each 78-10
6. 250 mm Each 93-00
7. 300 mm Each 113-50
8. 350 mm Each 145-60
9. 375 mm Each 161-50
10. 400 mm Each 183-70
11. 450 mm Each 238-20
BWSSB 14 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

12. 525 mm Each 280-10


13. 600 mm Each 330-90
10. Jointing of C.I. Pipes with rubber gaskets including cleaning the
socket and spigot ends with Kerosene oil and applying grease to
the spigot and socket ends after insertion of rubber gasket, jacking
and fixing in perfect condition including giving satisfactory hydraulic
test for the pipeline (C.I. pipes and rubber gasket to be supplied by
the board free of cost).
Note: as above
Size of pipe
a) 80 mm Each 7-00
b) 100 mm Each 10-00
c) 150 mm Each 14-65
d) 200 mm Each 23-10
e) 250 mm Each 33-90
f) 300 mm Each 47-85
g) 400 mm Each 77-55
h) 450 mm Each 103-10
i) 500 mm Each 139-00
j) 600 mm Each 187-00
k) 700 mm Each 236-00
l) 750 mm Each 284-90
Note: The above rates hold good in case of rubber rings with screw type
gland joints for C.I. pipes.

11. Supplying and installation at site of work asbestos cement pressure Test Pressure
pipes and specials with C.I. detachable joints loading, unloading, 180 Mts. 100 Mts.
freight charges, lowering laying into trenches jointing the pipes and Class-I Class-II
specials etc., complete as per I.S. 1592 of 1960 R.M. R.M.

1) 80 mm dia Rmt 184-10 178-00


2) 100mm dia 256-30 241-80
3) 150 mm dia 394-90 385-00
4) 200 mm dia 427-90 398-80
5) 250 mm dia 571-10 541-50
6) 300 mm dia 713-60 684-30
BWSSB 15 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

Note: The measurements to be recorded along the centre line of the pipe
including all specials.

12 Removing the C.I. Valves and tail piece from the pipeline cleaning,
washing, painting and returning the same to stores.

1. -do- 50 mm Each 8-80

2. -do- 75 mm Each 10-90

3. -do- 100 mm Each 12-80

4. -do- 125 mm Each 13-90

5. -do- 150 mm Each 16-95

6. -do- 175 mm Each 23-10

7. -do- 200 mm Each 25-40

8. -do- 225 mm Each 29-90

9. -do- 250 mm Each 32-80

10. -do- 300 mm Each 35-90

11. -do- 375 mm Each 47-85

12. -do- 400 mm Each 70-60

13. -do- 450 mm Each 93-40

14. -do- 600 mm Each 141-50

15. -do- 700 mm Each 156-50

16. -do- 750 mm Each 157-90

17. -do- 900 mm Each 235-60

14. Making main bore in C.I. pipes

1 -do- 15 mm Each 23-10

2 -do- 20 mm Each 26-40

3 -do- 25 mm Each 46-20

4 -do- 40 mm Each 84-70

5 -do- 50 mm Each 93-50

6 -do- 65 mm Each 116-60

15. Removing and cleaning the C.I./D.I. Pipes including jointing materials,
washing (this includes the removal of C.I./D.I. specials except
valves)
BWSSB 16 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

1 -do- 80 mm R.M. 15-40

2 -do- 100 mm R.M. 18-70

3 -do- 150 mm R.M. 24-20

4 -do- 200 mm R.M. 27-50

5 -do- 250 mm R.M. 31-90

6 -do- 300 mm R.M. 36-30

7 -do- 375 mm R.M. 45-10

8 -do- 400 mm R.M. 51-70

9 -do- 450 mm R.M. 55-00

10 -do- 600 mm R.M. 64-90

11 -do- 700 mm R.M. 70-40

12 -do- 750 mm R.M. 77-00

13 -do- 900 mm R.M. 96-80

16 Painting the C.I. pipes and specials with two coats of bitumastic
paint both inside and outside

1 -do- 75 mm R.M. 13-20

2 -do- 100 mm R.M. 15-40

3 -do- 150 mm R.M. 24-20

4 -do- 200 mm R.M. 27-50

5 -do- 250 mm R.M. 31-90

6 -do- 300 mm R.M. 36-30

7 -do- 375 mm R.M. 40-70

8 -do- 400 mm R.M. 51-70

9 -do- 450 mm R.M. 67-10

10 -do- 600 mm R.M. 78-10

11 -do- 700 mm R.M. 100-10

12 -do- 750 mm R.M. 125-40

13 -do- 900 mm R.M. 150-70


BWSSB 17 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

17. Making drain bore and redoing as per specification in corner drain Each 25-30
across corners.

18. Construction of gland cock cistern with burnt brick in cement mortar Each 459-80
(1:6) and plastering with C.M. (1:3) inside and outside including
conveying and fixing 15 cms. size road, box size of cistern to be
25 cms internal (Road box will be supplied departmentally free of
cost)

19. Conveying 10 cms. to 0.46 meters road box and fixing granite jelly Each 47-85
C.C. 1:3:6 including plastering with C.M. (1:3) etc., complete as per
specifications.

20. Conveying RCC valve box and 15 cms. size road box and fixing Each 129-25
with earth work in all soils etc., complete 15 cms size road box to
be fixed in granite jelly CC 1:3:6 and plastered all over with C.M.
1:3 including, fixing barrel pipe road box to be supplied by the
Board.

21. Conveying and fixing RCC or CI manhole frame and cover 53 cms. Each 132-25
dia including cutting to the requited size for the opening in the slabs
and fixing the frame in granite jelly CC (1:2:4) with necessary bolts
nuts and C.M. (1:3) plastering to all exposed faces.

22. a) Supplying and fixing pipeline demarcation stones 25 cms. Each 119-25
square and 0.6 mtr. and deep with letters upto three Nos.
carved and painted on top etc., complete including one line
dressing for 25 cms height including top surface etc., complete.

b) Conveying and fixing demarcating stones (labour charges Each 30-80


only) excluding cost or stones.

23. Removing and restoring house connections (Labour charges only). Each 192-50

24. Labour charges for conveying and fixing C.I. valve box for metre Each 78-10
including fixing in C.C. (1:3:6) 23 cms thick with necessary bolts &
nuts etc., complete.

25. Removing the RCC Valve Box and 15 cms size road box and Each 67-10
conveying it to stores.

26. Conveying the 8.0 cms, G.I. pipe from office to workspot and fixing Each 70-60
in granite jelly CC 1:3:6 making two bores to take in fountain pipes
fitting the C.I. pipe with granite jelly cement of C.I. pipe with granite
jelly cement concrete 1:3:6 and painting outside 2 coats of approved
paint etc.

27. Dismantling the C.I. fountain and fittings and refixing after cleaning Each 30-40
pipe fitting etc., with cement concrete 1:3:6 as per specifications.
BWSSB 18 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

28. Dismantling C.I. fountain and returning the materials to the stores Each 25-30
and other materials of water supply and Sanitary works.

29. Conveying C.I. pipes and specials and other materials of water ntl./Km 33.00
supply and sanitary work carefully from store to workspot including
loading and unloading and vice verse by bullock carts 0 to 10 km.

30. Conveying C.I. pipes and specials (specifications as per item Qntl./Km 33.00
No. 30) through transporting vehicle like lorry etc.

0 to 10 km Qntl./Km 33.00
Beyond 10 KM Qntl./Km 3.30
b) Conveying C.I. pipes and specials through transporting vehicles
like lorry etc., excluding loading and unloading.

i) Beyond the initial lead of 5 Km Qntl./Km 3.30

ii) Beyond 10 KM Qntl./Km 3.30

31. Painting C.I. fountain stand and fittings with two coats of approved Each 28-60
paint.

32. Fixing C.I./.DI. specials of mechanical jointing of different sizes after


setting into the pipe line system. Including cleaning & introducing
rubber gasket to proper alignment & tighting with bolts & nuts. The
cost includes transportation of materials, tools & plants etc. complete,
(The CI / DI / mechanical specials with bolts, nuts, washers and
rubbergasket will be supplied departmentally at free of cost)

a) 100 to 200 mm Each 57-20


b) 250 mm to 400 mm Each 71-50
c) 450 mm to 700 mm Each 95-70
d) above 700 mm Each 125-40
33. Removing gland cock with fitting and repairing and refixing (Size 15 Each 6-10
mm to 65 mm).

34. Fixing gland cock of all sizes (15 mm to 65 mm) Each 4-00
35. Removing C.I. road box and refixing as per specifications. Each 21-10
36. -do- RCC Valve Box and refixing as per specifications. Each 43-20
37. Labour charges for conveying and fixing standard size fire hydrants as per Each 70-40
specifications including fixing duck foot bend any hydrants post.

38. Removing and refixing fire hydrants (after cleaning and repainting). Each 100-10
39. Supplying and fixing pot rest slab two line dressing and edges Each 167-20
rounded.
BWSSB 19 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

R.C.C. OVER HEAD RESERVOIRS


1. Providing & laying granite jelly CC 1:3:6 proportion for foundation Cum 2700.00
(Screed layer) with 40 mm down size of approved gradation hard
broken granite, trap basalt or with any other approved hard aggregate
including cost and conveyance of all material with an all lead & lifts
including plywood / steel form work, machine mixing, laying, tamping,
curing etc., complete

2. (1) Providing and laying vibrated C.C. 1:1½:3 proportion for RCC Cum 3745-50
work (excluding cost of reinforcement) with 20 mm and down size
of approved gradation hard broken granite, trap, basalt or with any
other approved hard aggregate including machine mixing cost and
conveyance of all materials with all lead & lift for RCC works laid
in 15cms, thick layers, well consolidated, vibrating, curing, smooth
finishing the exposed faces wherever necessary plywood / steel
form work, centering etc., complete for independent footing, raft,
combined footing below ground level.

(2) -do- smooth finishing the expose faces in CM 1:4, 12mm thick Cum 4131-60
etc., complete for beams below GL

3. Providing and laying vibrated C.C. 1:1½:3 proportion for RCC work
(excluding cost of reinforcement) with 20 mm and down size of
approved gradation hard broken granite, trap, basalt or any other
approved hard aggregate with smooth finishing the exposed faces
in C.M. 1:3 12mm thick including cost and conveyance of all
materials with all lead & lift including machine mixing, plywood /
steel form work, centering sacffolding, curing, as per designs etc.,
complete for columns, braces and ring beam above ground level.

1) Upto G.L. and 6 Mtr. Height Cum 6452-60


2) Above 6 Mtr. upto 9 Mtr. Height Cum 8715-30
3) Above 9 Mtr. upto 12 Mtr. Height Cum 9662-40
4) Above 12 Mtr. upto 15 Mtr. Height Cum 10844-90
4. Providing and laying vibrated C.C. 1:1½:3 proportion for RCC work
(excluding cost of reinforcement) with 20 mm and down size of
approved gradation hard broken granite, trap, basalt or any other
approved hard aggregate including cost and conveyance of all
materials with all lead & lift including machine mixing, plywood /
steel form work, centering sacffolding, curing, amooth finishing the
exposed faces in C.M. 1:3 12mm thick as per designs etc.,
complete for RCC Shafts.
1) Below G.L. Cum 6767-20
2) Above GL upto 6 Mtr. Height Cum 7246-80
3) Above 6 Mtr. upto 9 Mtr. Height Cum 7485-50
4) Above 9 Mtr. upto 12 Mtr. Height Cum 7725-30
5) Above 12 Mtr. upto 15 Mtr. Height Cum 7964-00
BWSSB 20 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

5 (1) Providing and laying vibrated C.C. 1:1½:3 proportion for RCC
work (excluding cost of reinforcement) with 20 mm and down size
of approved gradation hard broken granite, trap, basalt or any other
approved hard aggregate including cost and conveyance of all
materials with all lead & lift, plywood / steel form work, centering,
scaffolding, smooth finishing the exposed faces in C.M. 1:3 12mm
thick and CM plastering 1:3 proportion 20mm thick for inside with
an admixture of water proof compound of requisite proportion of
approved quality including machine mixing, curing etc., and reservoir
given satisfactory water proof testing as per directions, etc., complete
for shell portion, bottom dome, bottom slab and ribs over the
staging, (contractor will make his own arrangements for procuring
water for testing)

1) Upto 6 Mtr. Staging Cum. 8732-90


2) Above 6 Mtr. upto 9 Mtr. Staging Cum. 9500-00
3) Above 9 Mtr. upto 12 Mtr. Staging Cum. 10488-50
4) Above 12 Mtr. upto 15 Mtr. Staging Cum. 12057-00
(2) -do for side wall

1) Upto 6 Mtr. Staging Cum. 8898-00


2) Above 6 Mtr. upto 9 Mtr. Staging Cum. 9664-60
3) Above 9 Mtr. upto 12 Mtr. Staging Cum. 10653-50
4) Above 12 Mtr. upto 15 Mtr. Staging Cum. 12222-00
6 Providing and laying vibrated C.C. 1:1½:3 proportion for RCC work
(excluding cost of reinforcement) with 20 mm and down size of
approved gradation hard broken granite, trap, basalt or any other
approved hard aggregate including cost and conveyance of all
materials with all lead & lifts above staging including machine
mixing, centering, plywood / steel form work, scaffolding, tamping,
curing, cement mortar plastering 1:3 proportion 12 mm thick for both
inside and outside surface etc., complete

(1) For Top dome :


1) Upto 6 Mtr. Staging Cum. 9944-00
2) Above 6 Mtr. upto 9 Mtr. Staging Cum. 11095-70
3) Above 9 Mtr. upto 12 Mtr. Staging Cum. 11982-30
4) Above 12 Mtr. upto 15 Mtr. Staging Cum. 13425-50
(2) For Top Slab
1) Upto 6 Mtr. Staging Cum. 9470-00
2) Above 6 Mtr. upto 9 Mtr. Staging Cum. 10622-70
3) Above 9 Mtr. upto 12 Mtr. Staging Cum. 11509-30
4) Above 12 Mtr. upto 15 Mtr. Staging Cum. 12952-50
BWSSB 21 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

7 Providing and laying vibrated C.C. 1:1½:3 proportion for RCC work
spiral stair case (excluding cost of reinforcement) as per design
using 10mm and down size of approved gradation hard broken
granite, trap, basalt or any other approved hard aggregate including
cost and conveyance of all materials with all lead & lifts plywood /
steel form work, centering, scaffolding, and cement mortar plastering
1:3 proportion 12 mm thick for all exposed surfaces of stair case
including machine mixing, rounding all corners finished smooth
rendering curing etc., complete above ground level.

1) Upto 6 Mtr. Staging Cum. 13158-00


2) Above 6 Mtr. upto 12 Mtr. Staging Cum. 14665-00
3) Above 12 Mtr. upto 18 Mtr. Staging Cum. 16490-00
4) Above 18 Mtr. upto 24 Mtr. Staging Cum. 18632-00
8 Labour charges for fabricating mild steel or torsteel bars of all sizes
for reinforcements for RCC work including conveying steel to work
spot with all lead including cleaning, straightening, bending,
fabricating, placing in position and tieing as per design including
cost of binding wire hoisting etc., with all lifts etc., complete
(excluding cost of steel).
1) Upto 6 Mtr. Staging M.T. 5183-00
2) Above 6 Mtr. upto 9 Mtr. Staging M.T. 5458-30
3) Above 9 Mtr. upto 12 Mtr. Staging M.T. 5580-00
4) Above 12 Mtr. upto 15 Mtr. Staging M.T. 5845-40
9 Providing and fixing M.S. ladder between landing 45 cms. wide
using angle iron of following size and 20mm M.S. bars at 25 cms.
centre to centre with necessary supports of same angle iron as
directed including hand railing on both sides with 25mm dia G.I.
pipes with angle iron props at 2 mtrs, interval and 0.5 mtr, height
including fixing in ground with C.C. 1:2:4 and two coats of
nonpoisonous anticorrosive bituminous paint with all lead and lift
etc., complete
1) 65 x 65 x 8 mm angle iron Rmtr. 2695-00
2) 65 x 65 x 10 mm angle iron Rmtr. 3100-00
10 Providing and fixing R.C.C. final and ventialators as per approved
design and specification with form work and protected with wire
mesh. The plinth to be of R.C.C. circular pillars and canopy with an
ornamental finish at top. The first 22.50 cms. height to be covered
with RCC panelling as per detailed drawing with all lead and lifts
etc., complete.
1) For tanks upto 2.50 lakh liters capacity. Each 3114-00
2) For tanks upto 2.50 lakh liters and upto 5 lakh liters capacity. Each 3618-00
3) For tanks upto 5 lakh liters and upto 10 lakh liters capacity. Each 3917-00
BWSSB 22 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

11 Providing and fixing M.S. inspection door of size 60 cms x 60 cms, Each 1793-00
including M.S. frame, size 50 x 50 x 6 mm and shutters of 3mm
thickness with hinges at top and locking arrangements painting with
all lead and lifts etc., complete

12 (1) Providing and fixing guage with iron sheet of 3mm to 4mm
thickness, 0.23 Mtr. width with copper floats indicators and flexible
nylon wires, painting figures with approved enamelled paint with all
lead and lifts etc., complete
1) 0 to 1.5 Mtr. Depth Each 2695-00
2) 0 to 2 Mtr. Depth Each 3234-00
3) 0 to 2.5 Mtr. Depth Each 3685-00
Note : For depth beyond 2.50 Mtrs. add Rs. 400.00 for every 0.5 Mtrs. or
part thereof
(2) -do- enamelled gauge plate.
1) 0 to 1.5 Mtr. Depth Each 2804-00
2) 0 to 2 Mtr. Depth Each 3271-00
3) 0 to 2.5 Mtr. Depth Each 3739-00

Note : For depth beyond 2.5 Mtrs. add Rs. 425.00 for every 0.5 Mtrs. or
part thereof

13. Supplying & Fixing CI puddle flanges in position for R.C.C. walls
including hoisting and conveying them to work spot with all lead and
lift etc., complete.
CI puddle flanges pipe rates are based on Foundry grade Pig Iron
(S1 2% - 2.5%) of Rs. 32,050/- per MT.
Rate of puddle flanges are inclusive of 4.00% VAT
Dia of CI Puddle Flanges
1) 80 mm Each 2562-00
2) 100 mm Each 3114-00
3) 150 mm Each 4959-00
4) 200 mm Each 7160-00
5) 250 mm Each 9479-00
6) 300 mm Each 12145-00
7) 350mm Each 16217-00
8) 400mm Each 19724-00
9) 450mm Each 23632-00
10) 500 mm Each 27695-00
11) 600 mm Each 37017-00
BWSSB 23 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

14 Supplying, laying of CI flanged pipe true to line / hoisting of CI


flanged pipe in position and aligning to correct plumb including cost
of jointing material conveying to work spot with all lead and lifts etc.,
complete.
CI double flanged pipe rate are based on Foundry grade Pig Iron
(SI 2% - 2.5%) of Rs. 32,050/- per MT.
Rate of double flanged D pipes are inclusive of 4.00% VAT
Dia of CI D/F Pipe

1) 80 mm Each 2184-00
2) 100 mm Each 2717-00
3) 150 mm Each 4340-00
4) 200 mm Each 6206-00
5) 250 mm Each 8308-00
6) 300 mm Each 10644-00
7) 350mm Each 14353-00
8) 400mm Each 17380-00
9) 450mm Each 20911-00
10) 500 mm Each 24519-00
11) 600 mm Each 32881-00
15. Supplying and fixing lightening arrestor of aluminium strip 25mm x
3mm size including finial and grounding, aluminium strip is to be
embeded in one of the columns in and independent GI conduct of
40 mm dia pipe suitably jointed by collars with all specials with all
lead and lifts etc., complete.

1) For tanks upto 6 Mtr. Staging Each 8413-00


2) For tanks above 6 Mtr. upto 9 Mtr. Staging Each 10238-00
3) For tanks above 9 Mtr. upto 12 Mtr. Staging Each 12062-00
4) For tanks above 12 Mtr. upto 15 Mtr. Staging Each 13886-00
16 1) Providing two coats of water proof cement painting of approved
colour and shade over one coat of primer including scraping the
surface with wire brushes etc., before removal of scaffolding for new
R.C.C. over head tanks and cleaning of paint stains wherever
necessary with all lead & lift etc., complete.

1) For tanks upto 6 Mtr. Staging Sqm 94-60


2) For tanks above 6 Mtr. upto 9 Mtr. Staging Sqm 103-40
3) For tanks above 9 Mtr. upto 12 Mtr. Staging Sqm 113-30
4) For tanks above 12 Mtr. upto 15 Mtr. Staging Sqm 123-20
BWSSB 24 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

2) Providing two coats of water proof cement painting of approved


colour and shade over one coat of primer including necessary
scaffolding and scraping of old paint and stain with wire brushes
and cleaning of paint stains wherever necessary for old R.C.C. over
head tank, with all lead & lift etc., complete.

1) For tanks upto 6 Mtr. Staging Sqm 104-50


2) For tanks above 6 Mtr. upto 9 Mtr. Staging Sqm 114-40
3) For tanks above 9 Mtr. upto 12 Mtr. Staging Sqm 125-40
4) For tanks above 12 Mtr. upto 15 Mtr. Staging Sqm 136-40
17. Supplying & fixing 40mm dia G.I. medium duty pipes hand railing Per Mtr
3 rows fixed to 1:2:4 vibrated R.C.C. post of size 100 x 150 mm at of 3 rows 942-70
top and 150 x 150 mm at bottom placed at 2 Mtr. intervals for a
height of 750 mm including curing, painting G.I. pipes with two coats
of anticorrosive steel paint over a primer coat with all lead and lift
etc., complete (Rate per Mtr. is for 3 rows of G.I. pipes)

18. Providing plastering in C.M. 1:3 proportion including smooth finishing


with minimum 2% of approved quality of water proof compound
including curing with necessary scaffolding by removing the old
plaster wherever necessary for the existing R.C.C. over head tank
and giving satisfactory water proof testing as per directions etc.,
complete with all lead & lifts for side walls, shell portion, bottom
dome, bottom slab and ribs over the staging.

(1) -do- 12mm thick for exposed surface (outside)

1) For tanks upto 6 Mtr. Staging Sqm 168-30


2) For tanks above 6 Mtr. upto 9 Mtr. Staging Sqm 187-00
3) For tanks above 9 Mtr. upto 12 Mtr. Staging Sqm 206-80
4) For tanks above 12 Mtr. upto 15 Mtr. Staging Sqm 225-50
(2) -do- 12mm thick for exposed surface (outside)

1) For tanks upto 6 Mtr. Staging Sqm 184-80


2) For tanks above 6 Mtr. upto 9 Mtr. Staging Sqm 204-60
3) For tanks above 9 Mtr. upto 12 Mtr. Staging Sqm 223-30
4) For tanks above 12 Mtr. upto 15 Mtr. Staging Sqm 242-00

19 Providing plastering in C.M. 1:3 proportion including smooth finishing


with minimum 2% of approved quality of water proof compound
including curing with necessary scaffolding for RCC over head tank
and giving satisfactory water proof testing as per directions etc.,
BWSSB 25 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

complete with all lead & lifts for side walls, shell portion, bottom
dome, bottom slab and ribs over the staging

(1) -do- 12mm thick for exposed surface (outside)

1) For tanks upto 6 Mtr. Staging Sqm 156-20


2) For tanks above 6 Mtr. upto 9 Mtr. Staging Sqm 176-00
3) For tanks above 9 Mtr. upto 12 Mtr. Staging Sqm 194-70
4) For tanks above 12 Mtr. upto 15 Mtr. Staging Sqm 213-40
(2) -do- 12mm thick for exposed surface (outside)

1) For tanks upto 6 Mtr. Staging Sqm 171-60


2) For tanks above 6 Mtr. upto 9 Mtr. Staging Sqm 190-30
3) For tanks above 9 Mtr. upto 12 Mtr. Staging Sqm 210-60
4) For tanks above 12 Mtr. upto 15 Mtr. Staging Sqm 228-80
BWSSB 26 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

GROUND LEVEL SERVICE RESERVOIR


Rates is as per Pipe Line & Excavation
1. Earth work excavation for foundation

2. Providing and laying C.C. 1:3:6 proportion for foundation (Screed Cum 2700-00
layer) with 40mm and down size of approved gradation hard broken
granite, trap, basalt or with any other approved hard aggregate
including cost and conveyance of all materials with all lead & lift
including plywood/steel form work, machine mixing, laying, tamping,
curing etc., complete

3. (1) Providing and laying vibrated cement concrete of 1:1½:3 Cum 3746-00
proportion for RCC work using 20mm and down size metal of
approved gradation hard broken granite, trap, basalt or with any
other approved hard aggregate including machine mixing cost and
conveyance of all materials with all lead & lift for RCC works in 15
Cms. thick layers well consolidated, curing, smooth finishing exposed
faces wherever necessary plywood/steel form work, centring etc.,
complete (excluding cost of reinforcement) for raft, footings, below
floor level.

(2) Providing and laying vibrated cement concrete of 1:1½:3 Cum 4132-00
proportion for RCC work using 20mm and down size metal of
approved gradation hard broken granite, trap, basalt or with any
other approved hard broken granite, including machine mixing cost
and conveyance of all materials with all lead & lift for RCC works
in 15 Cms. thick layers well compacted curing, with necessary
plywood/steel form work, centring etc., smooth finishing to the
expose faces in CM 1:4 proportion. 12mm thick etc., complete for
main and secondary beams below & above floor level.

4. (1) Providing and laying vibrated cement concrete of 1:1½:3 Cum 4490-00
proportion for RCC work using 20mm and down size of approved
gradation hard broken granite, trap, basalt or with any other
approved hard aggregate including cost and conveyance of all
materials with all lead & lift including plywood/steel form work,
centering, scaffolding, cement mortar, plastering in CM 1:3 proportion,
20mm thick for inside with admixture of water proof compound of
requisite proportion of approved quality including machine mixing,
curing, making construction joints wherever necessary and giving
satisfactory water proof testing etc., complete (excluding cost of
reinforcement) for flat or sloping floor slab, resting on ground.
(contractor will make his own arrangements for procuring water for
testing)

(2) -do- for vertical side walls, alround effluent channel baffels etc., Cum 6971-00
complete with outside form finishing

5. Providing and laying vibrated cement concrete of 1:1½:3 proportion Cum 6694-00
for RCC columns below and above G.L. with 20mm and down size
BWSSB 27 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

of approved gradation hard aggregate including cost and conveyance


of all materials with all lead & lift with plywood or steel form work,
centering including machine mixing laying, vibrating and smooth
finishing the expoled faces in cm 1:3 12mm thick etc., complete
(excluding cost of reinforcement)

6. (1) Providing and laying vibrated cement concrete of 1:1½:3 Cum 6763-00
proportion for RCC work with 20mm and down size of approved
gradation hard broken granite, trap, basalt or with any other
approved hard aggregate including cost and conveyance of all
materials with all lead & lift including mixing, centreing plywood/
steel form work, scaffolding, tamping, curing, cement mortar,
plastering in CM 1:3 proportion, 12 mm thick for inside surface etc.,
complete (excluding cost of reinforcement) for RCC covering slab
(Flat slab)

(2) -do- for RCC Dome with plastering outside and inside with CM Cum 8264-00
1:3 proportion 12mm thick.

7. Providing and constructing granite, trap, basalt or any other approved Cum 1962-00
hard stone uncoursed rubble masonry in CM 1:4 proportion,
(excluding pointing) in course not less than 20cms high including
scaffolding curing etc., complete with all lead & lifts for all materials.

8. Providing and constructing granite, trap, basalt or any other approved Cum 1739-00
hard granite stone coursed rubble masonry, second sort/size stone
masonry in CM 1:4 proportion, (excluding pointing) in courses not
less than 20 cms high with bond stones 2 Mtrs. apart in each course
and all exposed quions 2 line dressed 5 cms wide on each face
including scaffolding curing with all lead & lifts for materials,
necessary hydraulic test for water tightness etc., complete (contractor
will make his own arrangements for procuring water for testing).

9. (1) Providing pointing to stone masonry in cement mortar 1:3 Sqm 72-60
including scaffolding, racking out joints 25 mm deep, smooth
finishing, curing etc., complete with all lead and lift for all materials
for grooved pointing.

-do- for Tuck pointing Sqm 80-30

10 Providing plastering 2 to 3 cms. thick in CM 1:3 proportion including Sqm 125-40


scaffolding, racking out joints smooth finishing with minimum 2% of
approved quality water proof compound including curing with all
lead and lift for all materials etc., complete

11. Labour charges for fabricating mild steel or tor steel bars of all sizes M.T. 4521-00
for reinforcement of R.C.C. works including conveying steel to
workspot with all lead including cleaning straighteing, bending,
fabricating, placing in position, tieing as per designs including cost
of binding wire hosting all lift etc., complete (excluding cost of steel)

12. For M.S. ladder, final, lightening arrestor and fixing gauge.
BWSSB 28 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

WATER SUPPLY MISCELLANEOUS ITEMS


1. Providing House connection with excavation in all types of soils without
damaging the other utilities and supplying & laying of 25mm ODMDPE pipe
(PE80) manufactured in accordance with ISO 4427 / 1996 with minimum
required strength of 8 Mpa. hydraulic design stress of 6.3 Mpa and with minimum
wall thickness of 2.3 mm by making the bore of 15mm dia size on the Board’s
supply mains of 100 mm dia. Size using drilling bits or machines only and laying
the pipe line at a depth not less than 0.45 Mts. from the road surface, including
providing 40mm dia of ‘A’ class GI pipe as casing over the MDPE pipe from bore
point and up to the entrance of the premises and removing the stone slab
covering of the drain and dismantling the size stone masonry wherever necessary
and making bore in the wall of the premises. On entering the premises
connection should be continued with 20 mm GI pipe by making ‘U’ shape for the
meter point below the ground level by making pit with sufficient space for the
easy installation and removal of the water meter and providing vertical stand
pipes on both sides of the meter. The connection should be secured firmly on
the Boards’ main pipe with SS/Brass Ferrule of size 1/2” x 3/4” and fixing the
union joint and gate valve / stop cock before the meter point and a Reflex valve
/ Non return valve should fixed on the connection after the meter point (all these
fixtures should of standard quality conforming to IS) and compression fittings for
MDPE pipes conforming to ISO 14236 and its latest versions the excavated
trench should be refilled with soft selected earth and the dismantled masonry of
the drain should be reconstructed with the available size stones in CM (1:8) and
providing coping in CC (1:3:6) wherever required and the stone slab covering
should be refixed in position with pointing in CM (1:3) and also the bored wall
of the premises should be redone to the original position and the rates are
inclusive of the cost of all the materials, cement, sand, water etc., required for
these works. The road surface should be compacted well and brought to the
original condition and the excess earth or debris should be disposed off to a
distance with an initial lead of 10 Kms. etc., complete
a) -do- For a length of Minimum 2.0 Mts Rmt. 2291-00
b) -do- For additional length (per every meter & part thereoff) Rmt. 323-40
SPECIFICATION FOR FIXING OF STRAP ON SADDLE FOR HSC
1(A) Providing and fixing of non corrosive Engineering Plastic moulded composite
strap saddle with Stainless steel 304 threaded metal inserted for tapping outlet
suiting for different sizes of clear bore confirming to IS 554 wide strap with
elestrometic insulation for proper grip around the DI pipe with SS 304 bolts and
nuts. Saddle to have rubber SBR grade 30 'O' ring around the tapping hole.
All metal parts shall be made of SS 304 and saddle seal shall be of virgin
rubber SBR Grade 30/NBR (NSF 61 approved). Fasterners shall be of
Stainless Steel 202NC rolled threaded. M12 with tightening torque
14-15 Kg-m FOR 100 MM DIA pipes.

BORE SIZE Material cost Labour cost Total cost


12mm connection Rs. 570/- Rs. 80/- Rs. 650/-
20mm connection Rs. 635/- Rs. 90/- Rs. 725/-
25mm connection Rs. 740/- Rs. 110/- Rs. 850/-
BWSSB 29 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

Supplying & Fixing of Sluice Valves

2. Supplying & fixing Sluice Valves of Board approved make confirming


to relevant ISS with latest amendments as detailed below for
following diameter and types with two Nos. MJ Collars, Two
Flanged Spigots and conveying to work site, loading, unloading,
stacking etc., with all lead and lift including aligning etc., complete.
The rate is inclusive of cost of valve, Flanged Spigots, MJ
Collars Bolts & Nuts and Rubber Insertions, excluding
earthwork.

(CI sluice valve body and seat ring bronze PN 1.0 conforming
to IS 14846:2000)

Bolts &
Rate per Flanged MJ Taxes
nuts & Labour Rate
Sl Diameter of valve spigots collars Taxes at
rubber charges inclusive of
No. valves (1 No.) (2 Nos.) (2 Nos.) 5%
insertons Rs all Rs.
Rs. Rs. Rs. (4% + 1%)
Rs.
a 100 mm dia 4,160.00 1,792.00 3,384.00 470.00 281.00 504.00 10,591.00

b 150 mm dia 6,240.00 3,034.00 4,526.00 470.00 281.00 728.00 15,279.00

c 200 mm dia 10,761.00 4,525.00 8,316.00 740.00 468.00 1,241.00 26,051.00

d 250 mm dia 16,638.00 7,052.00 13,074.00 1,025.00 468.00 1,913.00 40,170.00

e 300 mm dia 21,123.00 8,282.00 15,542.00 1,110.00 1,123.00 2,359.00 49,539.00

f 400 mm dia 40,750.00 16,314.00 24,642.00 3,080.00 1,123.00 4,295.00 90,204.00

g 450 mm dia 49,100.00 20,148.00 29,390.00 3,420.00 4,216.00 5,314.00 1,11,588.00

h 600 mm dia 93,915.00 34,730.00 47,772.00 4,360.00 4,501.00 9,264.00 1,94,542.00


BWSSB 30 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

Fixing of Sluice Valves (Labour charges only)

3. Fixing Sluice Valves of Board approved make confirming to relevant


ISS with latest amendments as detailed below for following diameter
and types with two Nos. MJ Collars, Two Flanged Spigots and
conveying to work site, loading, unloading, stacking etc., with all
lead and lift including aligning etc., complete. The rate is excluding
cost of earth work.(CI sluice valve body and seat ring bronze PN
1.0 conforming to IS 14846:2000, two Nos. MJ Collars, Two
Flanged Spigots, Bolts & Nuts and Rubber Insertions to be
supplied by the Department)
a) 100 mm dia Rs. 281.00
b) 150 mm dia Rs. 281.00
c) 200 mm dia Rs. 468.00
d) 250 mm dia Rs. 468.00
e) 300 mm dia Rs. 1,123.00
f) 400 mm dia Rs. 1,123.00
g) 450 mm dia Rs. 4,216.00
h) 600 mm dia Rs. 4,501.00

Supplying & fixing of Air Valves

4 Supplying / fixing of Double / Isolated Air valves of Board approved


make conforming to relevant ISS with latest amendments as
detailed below for following diameters with required Stub & Flange
and conveying to work site, loading, unloading, stacking with all
lead, lift and aligning etc., complete. The rate is inclusive of cost
of Air Valve, Stub, Flange & Jointing material such as Rubber
Insertion, Bolts & Nuts, etc., excluding earthwork.
CI Tamper proof Air Valves PN 1.0 - dimension confirming to
IS 14845:2000
a) 100 mm dia Rs. 15,487.00
b) 150 mm dia Rs. 28,725.00
Fixing of Air Valves (Labour charges only)
5 Fixing of Double / Isolated Air valves of Board approved make
conforming to relevant ISS with latest amendments as detailed
below for following diameters with required Stub & Flange and
conveying to work site, loading unloading, stacking etc. with all
lead, lift and aligning etc., complete excluding earthwork. (Air
Valve, Stub, Flange & Jointing material such as Rubber Insertion,
Bolts & Nuts, etc., to be supplied by the Department)
CI Tamper proof Air Valves PN 1.0-dimension confirming to IS
14845:20000
a) 100 mm dia Rs. 281.00
b) 150 mm dia Rs. 281.00
BWSSB 31 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

AMR METERS

Providing, Installing AMR Meter of Multijet Type

1 Providing installing and giving satisfactory field testing of AMR


meter of Multijet type magnetically coupled having dry dial.
hermetically sealed totalizer class B, Water meter suitable for
ambient 50 deg Celsius temperature & maximum pressure of 16
BAR with built in GSM+GPRS modem for transfer of data from
water meter to remote server located at Cauvery Bhavan as per ISO
4064 and IS 779-1994 and IS 6784-1996 and having MID marking.
The meter shall be provided with IP 68 Protection class, with
complete immersion proofing up to 3 meters of water. The meter
interface unit may be directly mounted on the meter without any
wires and shall have battery life of 5 years, should be able to detect
& transfer the backflow volume and tampering. The accuracy of the
meter should be +/– 5% at low flow rate (Q min) and +/– 2^ at High
flow rate (Qt to Q max) true fow. The meter Factory Acceptance
Test certificate & Type Test Certificate for offered model shall be
furnished. The meter shall be fixed to the domestic and non-
domestic connections, including providing meter enclosure as per
direction of Engineer-in-charge and transfer the readings to AMR
Server with installation of SIM card. The data format & protocol will
be prescribed by BWSSB. The meter shall have inbuilt data logger
for storing data for period of one year on daily basis.

The rates as follows :

Sl. Supply Erection


Diameter Unit Total
No. rate charges
1 15 mm No. 31,200/- 6,000/- 37,200/-
2 20 mm No. 37,800/- 6,000/- 43,800/-
3 25 mm No. 44,400/- 6,000/- 50,400/-
4 40 mm No. 50,400/- 6,000/- 56,400/-

Note :

1. The data rates are valid for only one year period subject to
variationn in the market rate.

2. Erection charges shall inclusive of AMR water meter protection


covers/chambers as per site conditions & stainers for
mechanical meters.
BWSSB 32 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

Providing, Installation Electromagnetic Type AMR meters

2 Providing, installation and Giving satisfactory field test of Battery


powered Electromagnetic Type AMR meters with Built in type GSM
+ GPRS modem for transfer of data communication to remote
server located at Cauvery Bhavan as per ISO 4064, Battery life -
5 years Display - LCD 8 Digit totaliser & Rate of flow, Diagnosis
message. Ambient temperature 50 degree Celsius, max pressure of
16 bar. The meter shall be provided with IP 68 Protection class, with
complete immersion proofing up to 3 meters of water. The meter
interface unit may be directly mounted on the meter without any
wire and shall have battery life of 5 years, should be able to detect
the backflow voluume and tampering. The accuracy of the meter
should be +/– 5% at flow rate (Q min) and +/– 2% at High flow rate
(Qt to Q max) true fow. The meter Factory Acceptance Test
certificate & Type Test Certificate for offered model shall be
furnished. The meter shall be fixed to the domestic and non-
domestic connections, including providing meter enclosure as per
direction of Engineer-in-charge and transfer the readings to AMR
Server with installation of SIM card. The data format & protocol will
be prescribed by BWSSB. The meter shall have inbuilt data logger
for storing data for period of one year on daily basis.

The rates as follows :

Sl. Supply Erection


Diameter Unit Total
No. rate charges
1 50 mm No. 78,000/- 6,000/- 84,000/-
2 80 mm No. 90,000/- 6,000/- 96,000/-
3 100 mm No. 1,08,000/- 6,500/- 1,14,500/-
4 150 mm No. 1,26,000/- 7,000/- 1,33,000/-
5 200 mm No. 1,47,000/- 7,500/- 1,54,500/-

Note :

1. The data rates are valid for only one year period subject to
variationn in the market rate.

2. Erection charges shall inclusive of AMR water meter protection


covers/chambers as per site conditions & stainers for
mechanical meters.
BWSSB 33 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

Providing, Installation of Ultrasonic Transit Time Type AMR


meters

3 Providing, installation and Giving satisfactory field test of Battery


powered Electromagnetic Type AMR meters with Built in type GSM
+ GPRS modem for transfer of data communication to remote
server located at Cauvery Bhavan as per ISO 4064, Battery life -
5 years Display - LCD 8 Digit totaliser & Rate of flow, Diagnosis
message. Ambient temperature 50 degree Celsius, max pressure of
16 bar. The meter shall be provided with IP 68 Protection class, with
complete immersion proofing up to 3 meters of water. The meter
interface unit may be directly mounted on the meter without any
wire and shall have battery life of 5 years, should be able to detect
the backflow voluume and tampering. The accuracy of the meter
should be +/– 5% at flow rate (Q min) and +/– 2% at High flow rate
(Qt to Q max) true fow. The meter Factory Acceptance Test
certificate & Type Test Certificate for offered model shall be
furnished. The meter shall be fixed to the domestic and non-
domestic connections, including providing meter enclosure as per
direction of Engineer-in-charge and transfer the readings to AMR
Server with installation of SIM card. The data format & protocol will
be prescribed by BWSSB. The meter shall have inbuilt data logger
for storing data for period of one year on daily basis.

The rates as follows :

Sl. Supply Erection


Diameter Unit Total
No. rate charges
1 50 mm No. 78,000/- 6,000/- 84,000/-
2 80 mm No. 90,000/- 6,000/- 96,000/-
3 100 mm No. 1,08,000/- 6,500/- 1,14,500/-
4 150 mm No. 1,26,000/- 7,000/- 1,33,000/-
5 200 mm No. 1,47,000/- 7,500/- 1,54,500/-

Note :

1. The data rates are valid for only one year period subject to
variationn in the market rate.

2. Erection charges shall inclusive of AMR water meter protection


covers/chambers as per site conditions & stainers for
mechanical meters.
BWSSB 34 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

ATTENDING LEAKS ON WATER SUPPLY LINES

For Attending Leaks with Leak Repair Clamps

1. Supplying CI/DI pipe Socket leak repair MJ Clamps for attending to


leak joints in Socket/Spigot joints of CI/DI pipes with necessary
earthwork excavation including using of pneumatic breakers and
JCB Excavator wherever required and providing DI MJ leak repair
clamp, including cost of all materials required for jointing comprising,
DI MJ clamp & its accessories such as Rubber Gaskets made of
SBR/EPDM on the socket face making the Socket/Spigot joint water
tight at the operating pressure backfilling with available earth &
consolidation and bailing out water wherever necessary etc complete
inclusive of all taxes, duties.

In all types of road surfaces : Concrete Asphalt roads.

Amount
Cost of MJ Labour Unit
in Rs.
Sl Diameter of Clamp charges
No. pipes with all Rs.
accessories

a 100 mm dia 1,525.00 751.00 Each 2,276.00


b 150 mm dia 2,682.00 833.00 Each 3,515.00
c 200 mm dia 3,257.00 874.00 Each 4,131.00
d 250 mm dia 4,480.00 954.00 Each 5,434.00
e 300 mm dia 5,500.00 1,249.00 Each 6,749.00
f 400 mm dia 7,698.00 1,405.00 Each 9,103.00
g 450 mm dia 10,501.00 1,405.00 Each 11,906.00
BWSSB 35 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

Attending Leaks on various dia water supply with Leak Repair


(Labour charges only)

2. Attending to leak joints in Socket/Spigot joints of CI/DI pipes with


necessary earthwork excavation including using of pneumatic
breakers and JCB Excavator wherever required for jointing DI MJ
& its accessories such as Rubber Gaskets made of SBR/EPDM on
the socket face making the Socket/Spigot joint water tight at the
operating pressure backfilling with available earth & consolidation
and bailing out water wherever necessary etc complete inclusive of
all taxes, duties. In all types of road surfaces : Concrete Asphalt
roads.

DI MJ clamps, Including all other materials required for attending


leaks to be supplied by Department.

Labour
Sl Diameter of
Unit charges
No. pipes
Rs.
a 100 mm dia Each 751.00
b 150 mm dia Each 833.00
c 200 mm dia Each 874.00
d 250 mm dia Each 954.00
e 300 mm dia Each 1,249.00
f 400 mm dia Each 1,405.00
g 450 mm dia Each 1,405.00
BWSSB 36 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

3. Attending to leak joints of CI/DI pipes with necessary earthwork


excavation in all types of soils including use of compressor for
breaking of asphalt, cement or concrete roads, dewatering using
dewatering pump wherever required and providing & fixing MJ
COLLAR suitable for DI K9 & K7 pipes and CI LA Class pipes with
all accessories, loading and unloading at both destinations including
freight charges, backfilling with available earth and consolidation

(For 100 mm dia)

Sl Rate AMOUNT
Item UNIT QTY
No. (Rs. Ps.) (Rs. Ps.)
Part - 1 Material Portion
1 DI MJ COLLAR with all accessories 100 mmd dia Nos. 40 1845 73800
Sub-Total 1 73800
Part-2 Labour Portion
1 FITTER CLASS-1 (PWD SR-2012-13 Nos. 10 188.74 1887
P-XXXXVIII Sl. No.46)
2 Mazdoor Light (PWD SR-2012-13 P-XXXXVII Nos. 20 184.74 3695
Sl.No.6)
3 Supervisor / Work Inspector/Maistry Nos. 10 184.74 1847
(PWD SR 2012-13 P-XXXXX 1-149)
4 Air Compressor 250cfm with pneumatic break/jack hr 24 275 6600
hammer along with accessories BWSSB
SR 2012-13 P-111 1-116 (8 hours - 3 days)
Sub-total 2 14030
Total of Sub total 1 & 2 – (A) 87830
Part 3 - Miscellaneous
1 Contractors Profit @ 10% on sub toal (2) % 10 1403
2 Dewatering pumps, barricading, danger lighting & 5 701
shoring strutting etc., on labour portion
3 Tools and plants (Crow bar, pan, pick axe, mumty, & 5 701
caulking tools, hammer etc.) on labour portion
Sub Total 3 = (A) + Part 3 90636
1 Taxes @7% (such as WCT, IT, cess) = % 5 4532
(4%+2%+1%) on Subtotal 3
Grand Total for a period of 10 days work
40 joints 95168
For one joint of 100 mm dia 2380
BWSSB 37 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

4. Attending to leak joints of CI/DI pipes with necessary earthwork


excavation in all types of soils including use of compressor for
breaking of asphalt, cement or concrete roads, dewatering using
dewatering pump wherever required and providing & fixing MJ
COLLAR suitable for DI K9 & K7 pipes and CI LA Class pipes with
all accessories, loading and unloading at both destinations including
freight charges, backfilling with available earth and consolidation

(For 100 mm dia)

Sl Rate AMOUNT
Item UNIT QTY
No. (Rs. Ps.) (Rs. Ps.)
Part - 1 Material Portion
1 DI MJ COLLAR with all accessories 150 mmd dia Nos. 40 3075 123000
Sub-Total 1 123000
Part-2 Labour Portion
1 FITTER CLASS-1 (PWD SR-2012-13 Nos. 10 188.74 1887
P-XXXXVIII Sl. No.46)
2 Mazdoor Light (PWD SR-2012-13 P-XXXXVII Nos. 20 184.74 3695
Sl.No.6)
3 Supervisor / Work Inspector/Maistry Nos. 10 184.74 1847
(PWD SR 2012-13 P-XXXXX 1-149)
4 Air Compressor 250cfm with pneumatic break/jack hr 24 275 6600
hammer along with accessories BWSSB
SR 2012-13 P-111 1-116 (8 hours - 3 days)
Sub-total 2 14030
Total of Sub total 1 & 2 – (A) 137030
Part 3 - Miscellaneous
1 Contractors Profit @ 10% on sub toal (2) % 10 1403
2 Dewatering pumps, barricading, danger lighting % 5 701
shoring strutting etc., on labour portion
3 Tools and plants (Crow bar, pan, pick axe, mumty, % 5 701
caulking tools, hammer etc.) on labour portion
Sub Total 3 = (A) + Part 3 139836
1 Taxes @7% (such as WCT, IT, cess) = % 5 6992
(4%+2%+1%) on Subtotal 3
Grand Total for a period of 10 days work
40 joints 146828
For one joint of 150 mm dia 3670
BWSSB 38 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

5. Supplying of MJ DI Specials such as branches, bends suitable for


the DI K9 & K7 pipes and CI LA Class pipes as per IS 13382 with
latest amendments with complete accessories and fixing at site
excluding earthwork including loading and unloading at both locations,
including freight charges, etc. complete.

Sl Labour Rate
Particulars 1 No. UNIT
No. Charges Inclusive of all
Rs.
(Rs. Ps.) Rs.

a 100 mm x 100 mm dia 2406 Each 103.8 2509.8

b 150 mm x 150 mm dia 4134 Each 103.8 4237.8

c 150 mm x 100 mm dia 3420 Each 103.8 3523.8

d 100 mm x 90 mm dia 2480 Each 103.8 2583.8

e 100 mm x 45 mm dia 2354 Each 103.8 2457.8

f 150 mm x 90 mm dia 4163 Each 103.8 4266.8

g 150 mm dia DI Collar 1845 Each 103.8 1948.8

h 150 mm dia DI Collar 3075 Each 103.8 3178.8

Note : In a day one fitter can fix 2 bends / 2 branches / 2 collars


excluding aligning the pipeline

FITTER COST 1 No. 188.74

Contractors profit 10% 18.87

TOTAL 207.61

For 1 No 103.81
BWSSB 39 S.R. 2013-14

SUPPLYING, LAYING OF D.I. PIPES


1. Supplying Ductile Iron pipes conforming to IS 8329:2000 with latest amendments
and conveying to worksite, rolling and lowering into trenches, laying true to line,
level and perfect linking at joints, testing and commissioning, including loading and
unloading at both destinations and cuts of pipes wherever necessary including
jointing of DI pipes and specials, (excluding cost of specials) with rubber gaskets
including cleaing the socket and spigot ends with soap solution and applying soft
soap to the spigot and socket ends before insertion of rubber gaskets, jacking and
fixing in perfect conditions including cost of soap solution, soft soap, waste etc.,
and giving necessary hydraulic test to the required pressure as per ISS with all lead
and lift including cost of jointing materials. (contractor will make his own arrangements
for procuring water for testing)

Sl. Particulars of Cost of pipe Cost of Cutting, Rate inclusive of cost of


No. Pipe per Mtr. lowering, laying C.I. pipe, Cutting, lower-
(in Rs.) Tyton jointing & ing, laying Jointing using
perfect linking gasket perfect linking per
per Mtr. (in Rs.) Mtr. (in Rs.)

DI Pipe rates are based on the Foundary grade Rig Iron (S1 2% - 2.5%) of 32.050/- per Mt.
K-7 Class
1) 100 mm dia 1061-50 33-00 1096-50
2) 150 mm dia 1556-50 49-50 1606-00
3) 200 mm dia 1965-70 63-80 2029-50
4) 250 mm dia 2592-70 77-00 2669-70
5) 300 mm dia 3286-80 100-10 3386-90
6) 350 mm dia 4077-70 122-10 4199-80
7) 400 mm dia 4901-60 157-30 5058-90
8) 450 mm dia 5809-90 191-40 5998-30
9) 500 mm dia 6751-80 215-60 6967-40
10) 600 mm dia 8919-90 312-40 9232-30

K-9 Class
1) 100 mm dia 1192-40 33-00 1225-40
2) 150 mm dia 1746-80 49-50 1796-30
3) 200 mm dia 225940 63-50 2323-20
4) 250 mm dia 3034-90 77-00 3111-70
5) 300 mm dia 3842-30 100-10 3942-40
6) 350 mm dia 4746-50 122-10 4868-60
7) 400 mm dia 5707-90 157-30 5865-20
8) 450 mm dia 6813-40 191-40 7004-80
9) 500 mm dia 7882-60 215-60 8098-20
10) 600 mm dia 10403-80 312-40 10716-20
BWSSB 40 S.R. 2013-14

M. S. PIPELINE & SPECIALS


(A) M.S. PIPES
1. Manufacturing, providing, transporting, rolling, lowering, laying & jointing, testing,
commissioning of ERW (Electric Resistance Welded) SAW (Submerged Arc Welded)
MS pipe (Fe-410 grade) conforming to IS 3589-2001 with latest amendments including
perfect linking and welding of joints to correct position including cost and conveyance
of pipes and materials with all lead and lift, cost of all labour and giving satisfactory
hydraulic test as per IS 3589-2001 with latest amendments for test pressure and
working pressure both at factory and site etc., complete as per detailed specifications
with inside C.M. 1:1.5 lining of minimum 10mm thick upto 610 mm OD & minimum
12mm thick beyond 610 mm OD and out side minimum 25 mm thick coating in CM
1:3 over 50 x 50 mm weld mesh of 13 gauge, including loading and unloading of
pipes for the following diameters and specified thickness of plate as noted below,
including bailing out of water wherever necessary. The rates are inclusive of all
taxes and duties. (Contractor will make his own arrangement for procuring water for
testing).

NOTE : No Negative tolerance in respect of thickness is permissible

Sl. Outer dia of Thickness of Cost of pipe Cost of inner lining, Total cost of
No. pipe pipe per Mtr. outer coating, lowering, per Mtr.
(in mm) (in Rs.) laying jointing, perfect (in Rs.)
linking
per Mtr. (in Rs.)

Basic cost of MS pipes is considered as Rs. 46,000.00 per MT excluding excise duty, CST
and Transportation
1 1) 219 mm dia 4-80 1708-30 1003-20 2711-50
2) 5-40 1916-20 990-00 2906-20
3) 5-60 1985-50 993-30 2978-80
4) 6-00 2124-10 980-10 3104-20
5) 6-40 2260-50 983-40 3243-90
6) 7-00 2466-20 972-40 3438-60
7) 7-90 2770-90 953-70 3724-60
8) 8-20 2872-00 955-00 3827-00
9) 8-70 3041-00 949-00 3990-00
10) 9-50 3308-00 935-00 4242-00

2. 1) 273.1 mm dia 4-80 2140-00 1103-00 3243-00


2) 5-60 2489-00 1084-00 3573-00
3) 6-00 2663-00 1076-00 3739-00
4) 6-40 2837-00 1073-00 3910-00
5) 7-20 3181-00 1056-00 4237-00
6) 7-80 3439-00 1051-00 4490-00
7) 8-70 3822-00 1029-00 4851-00
8) 9-30 4077-00 1024-00 5101-00
BWSSB 41 S.R. 2013-14

Sl. Outer dia of Thickness of Cost of pipe Cost of inner lining, Total cost of
No. pipe pipe per Mtr. outer coating, lowering, per Mtr.
(in mm) (in Rs.) laying jointing, perfect (in Rs.)
linking
per Mtr. (in Rs.)

3. 1) 323.9 mm dia 5-60 2962-00 1192-00 4155-00


2) 6-00 3170-00 1185-00 4355-00
3) 6-40 3377-00 1169-00 4546-00
4) 7-10 3738-00 1152-00 4889-00
5) 7-90 4149-00 1140-00 5289-00
6) 8-40 4404-00 1123-00 5527-00
7) 8-70 4557-00 1119-00 5676-00
8) 9-50 4964-00 1100-00 6064-00

4. 1) 355.60 mm dia 5-60 3257-00 1276-00 4533-00


2) 6-00 3486-00 1262-00 4748-00
3) 6-40 3714-00 1252-00 4966-00
4) 7-10 4112-00 1240-00 5352-00
5) 7-90 4565-00 1219-00 5784-00
6) 8-70 5016-00 1198-00 6214-00
7) 9-50 5465-00 1170-00 6635-00

5. 1) 406 mm dia 5-60 3727-00 1375-00 5102-00


2) 6-00 3989-00 1360-00 5349-00
3) 6-40 4250-00 1345-00 5596-00
4) 7-10 4707-00 1332-00 6039-00
5) 7-90 5227-00 1306-00 6533-00
6) 8-70 5744-00 1290-00 7035-00
7) 9-50 6260-00 1266-00 7526-00
8) 10-00 6581-00 1245-00 7826-00
6) 1) 457 mm dia 5-60 4201-00 1584-00 5785-00
2) 6-40 4793-00 1566-00 6359-00
3) 7-10 5309-00 1552-00 6861-00
4) 7-90 5896-00 1539-00 7435-00
5) 8-70 6482-00 1516-00 7998-00
6) 9-50 7065-00 1505-00 8570-00
7) 10-00 7429-00 1493-00 8922-00

7. 1) 508 mm dia 5-60 4676-00 1703-00 6379-00


2) 6-40 5335-00 1680-00 7015-00
3) 7-10 5910-00 1665-00 7575-00
4) 7-90 6566-00 1643-00 8209-00
5) 8-70 7219-00 1625-00 8844-00
BWSSB 42 S.R. 2013-14

Sl. Outer dia of Thickness of Cost of pipe Cost of inner lining, Total cost of
No. pipe pipe per Mtr. outer coating, lowering, per Mtr.
(in mm) (in Rs.) laying jointing, perfect (in Rs.)
linking
per Mtr. (in Rs.)

6) 9-50 7871-00 1607-00 9478-00


7) 10-00 8276-00 1597-00 9873-00

8. 1) 559 mm dia 5-60 5150-00 1865-00 7015-00


2) 6-40 5877-00 1845-00 7722-00
3) 7-10 6512-00 1829-00 8341-00
4) 7-90 7236-00 1800-00 9036-00
5) 8-70 7957-00 1828-00 9785-00
6) 9-50 8676-00 1761-00 10437-00
7) 10-00 9125-00 1754-00 10879-00

9 1) 610 mm dia 5-60 5625-00 2011-00 7636-00


2) 6-40 6421-00 1988-00 8408-00
3) 7-10 7114-00 1971-00 9085-00
4) 7-90 7906-00 1947-00 9853-00
5) 8-70 8694-00 1925-00 10619-00
6) 9-50 9581-00 1904-00 11385-00
7) 10-00 9972-00 1892-00 11864-00
8) 12-00 11926-00 1838-00 13764-00
10. 1) 660 mm dia 6-40 6952-00 2191-00 9143-00
2) 7-10 7704-00 2165-00 9869-00
3) 7-90 8562-00 2145-00 10707-00
4) 8-70 9417-00 2116-00 11534-00
5) 9-50 10271-00 2090-00 12361-00
6) 10-00 10803-00 2080-00 12883-00

11. 1) 711 mm dia 6-40 7494-00 2325-00 9819-00


2) 7-10 8306-00 2307-00 10613-00
3) 7-90 9231-00 2281-00 11513-00
4) 8-70 10155-00 2256-00 12411-00
5) 9-50 11076-00 2223-00 13299-00
6) 10-00 11651-00 2206-00 13857-00
7) 12-00 13941-00 2140-00 16081-00

12. 1) 762 mm dia 7-10 8908-00 2483-00 11391-00


2) 7-90 9901-00 2448-00 12349-00
3) 8-70 10892-00 2429-00 13321-00
4) 9-50 11881-00 2398-00 14279-00
5) 10-00 12498-00 2384-00 14882-00
BWSSB 43 S.R. 2013-14

Sl. Outer dia of Thickness of Cost of pipe Cost of inner lining, Total cost of
No. pipe pipe per Mtr. outer coating, lowering, per Mtr.
(in mm) (in Rs.) laying jointing, perfect (in Rs.)
linking
per Mtr. (in Rs.)

13. 1) 813 mm dia 7-10 9510-00 2584-00 12093-00


2) 7-90 10571-00 2553-00 13124-00
3) 8-70 11630-00 2526-00 14156-00
4) 9-50 12686-00 2489-00 15175-00
5) 10-00 13346-00 2477-00 15823-00
6) 12-00 15975-00 2401-00 18376-00

14. 1) 864 mm dia 7-90 11241-00 2751-00 13992-00


2) 8-70 12367-00 2724-00 15091-00
3) 9-50 13492-00 2695-00 16187-00
4) 10-00 14193-00 2676-00 16869-00

15. 1) 914 mm dia 7-90 11897-00 2982-00 14879-00


2) 8-70 13090-00 2941-00 16031-00
3) 9-50 14281-00 2912-00 17193-00
4) 10-00 15025-00 2886-00 17911-00

16 1) 965 mm dia 8-70 13828-00 3153-00 16981-00


2) 9-50 15087-00 3118-00 18205-00
3) 10-00 15872-00 3096-00 18968-00

17. 1) 1016 mm dia 8.70 14565-00 3346-00 17911-00


2) 9-50 15892-00 3314-00 19206-00
3) 10-00 16720-00 3295-00 20015-00
4) 12-00 20024-00 3193-00 23217-00

18. 1) 1067 mm dia 8-70 15303-00 3464-00 18767-00


2) 9-50 16697-00 3427-00 20124-00
3) 10-00 17568-00 3399-00 20967-00

19. 1) 1118 mm dia 8-70 16040-00 3594-00 19634-00


2) 9-50 17502-00 3549-00 21051-00
3) 10-00 18415-00 3526-00 21941-00

20. 1) 1168 mm dia 9-50 18292-00 3808-00 22100-00


2) 10-00 19247-00 3776-00 23023-00

21. 1219 mm dia 10-00 20094-00 3889-00 23983-00


BWSSB 44 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

2. Manufacturing, providing, transporting, rolling, lowering, laying and


jointing, testing and commissioning of MS specials of minimum 8
mm thick conforming to IS 7322:1985 with latest amendments,
perfect linking and welding of joints to correct position including cost
and conveyance of materials with all lead and lifts, cost of all labour
and giving satisfactory hydraulic test as per IS 3589:2001 with latest
amendments for test pressure and working pressure both at factory
and site etc., complete as per detailed specifications with inside
lining two coats of food grade epoxy painting of approved make with
each coat of 250 micron, thick (after dry) over one coat of food
grade epoxy primer of approved make with minimum of 50 micron
thick (after dry) and outside 25mm thick coating in CM 1:3 by
providing 50 x 50mm weld mesh including loading and unloading of
pipes for the following category to suit PSC / MS / CI / AC / DI /
PVC pipes. The rates are inclusive of all taxes and duties. The
weight of the MS shell only be considered before lining and coating
for arriving at the rate.
The thickness of plate will be specified by the engineer (contractor
will make his own arrangements for procuring water for testing)
Note : No negative tolerance in respect of thickness is permissible
1) upto & inclusive of 500 mm dia of pipe Kg 110-00

2) above 500 mm dia of pipe Kg 101-20

(B) M.S. SPECIALS


1. Providing, fabrication, supply & fixing at site of various diameter MS
specials of machined ends as per sketch to suit PSC pipe socket
& spigot joints. The rate is inclusive of all materials including rubber
'O' ring, labour, consumables, hire charges for tools & tackles,
welding equipment etc complete as per instructions of the Engineer
in charge.

1 450 mm dia Each 17530-00


2 600 mm dia Each 20400-00
3 700 mm diia Each 23925-00

2. Providing, fabrication, supply & fixing at rate of various diameter MS


MJ ends to suit CI / DI pipes as per sketch. The cost is inclusive
of all materials, rubber 'O' ring, flanges, bot & nuts, labour,
consumables, hire charges for tools & tackles, welding equipment
complete as per instructions of the Engineer in charge.
1 100 mm dia Each 1875-00
2 150 mm dia Each 2985-00
3 200 mm dia Each 3920-00
4 250 mm dia Each 5150-00
BWSSB 45 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

5 300 mm dia Each 6595-00


6 400 mm dia Each 9150-00
7 450 mm dia Each 10690-00
8 600 mm dia Each 15910-00
9 24" mm dia Each 16710-00
10 700 mm dia Each 19435-00

3. Providing, fabrication, supply & fixing at site of various diameter


M.S. Flanges as per IS standards to fix sluice valves as per sketch.
The rate is inclusive of all materials, labour, consumables, hire
charges for tools & tackles, welding equipment etc complete as per
instructions of the Engineer in charge.
1 100 mm dia x 10 mm th Each 570-00
2 150 mm dia x 16 mm th Each 1345-00
3 200 mm dia x 20 mm th Each 2250-00
4 250 mm dia x 20 mm th Each 2970-00
5 300 mm dia x 20 mm th Each 3460-00
6 400 mm dia x 25 mm th Each 5530-00
7 450 mm dia x 25 mm th Each 6405-00
8 600 mm dia x 25 mm th Each 7900-00
9 700 mm dia x 30 mm th Each 11060-00

4. Hire charges for 2 HP dewatering pump to bail out water at leaking


pits inclusive of hire charges, cost of fuel, transportation charges,
operator charges etc., compete
Rs. 1300/- per day of 8 hours shift per day.

5. Futher, while preparing the estimates, the following weights of bolt


& nuts and rubber insertion required to fix 1 No. sluice valve shall
be considered

Sl. Nominal Dia and length of No. of Weight of bolts Weight of rubber
No. dia bolts bolts Kgs insertion Kgs
1 100 5/8" dia x 2½" 16 3 2
2 150 ¾" dia x 3" 16 4 3
3 200 ¾" dia x 3" 16 4 4
4 250 ¾" dia x 3" 24 6 5
5 300 ¾" dia x 3" 24 6 6
6 400 1" dia x 4" 32 24 8
7 450 1" dia x 4" 40 30 12
8 600 1" dia x 4" 40 30 16
9 700 1" dia x 5" 48 42 18
BWSSB 46 S.R. 2013-14

H. D. P. E. - PIPES
1. Supplying HDPE pipes conforming to IS 4984:1995 with latest
amendments and conveying to work site including loading and
unloading at both destination and rolling, lowering into trenches,
laying true to line and jointing of pipes and specials (excluding cost
of specials) giving hydraulic test as per relevant ISS with all lead
and lift including encasing the pipe alround to a depth of not less
than 15cms with soft gravel or selected earth available from the
excavation, testing and commissioning. The rate is exclusive of
required specials and fittings wherever necessary like saddle Tee,
Stub ends, flanged sets, bends, reducers etc., complete (contractor
will make his own arrangements for procuring water for testing)

Sl. Outer dia of Class of pipe Cost of pipe Labour Charges for Total cost
No. pipe (in mm) per Mtr. laying & jointing per Mtr.
(in Rs.) per Mtr. (in Rs.) (in Rs.)

HDPE Grade - PE80 conforming to IS 4984 - 1995


A PE-80 Rates are based on resin rate of Rs. 1,05,907.00 pe MT
1) 90 mm dia PN 6-0 223-00 22-00 245-00
2) 110 mm dia PN 6-0 336-00 29-00 365-00
3) 125 mm dia PN 6-0 411-00 35-00 446-00
4) 140 mm dia PN 6-0 513-00 39-00 552-00
5) 160 mm dia PN 6-0 669-00 41-00 710-00
6) 180 mm dia PN 6-0 842-00 45-00 887-00
7) 200 mm dia PN 6-0 1043-00 50-00 1093-00
8) 225 mm dia PN 6-0 1313-00 50-00 1363-00
9) 250 mm dia PN 6-0 1623-00 53-00 1676-00
10) 280 mm dia PN 6-0 2028-00 55-00 2083-00
11) 315 mm dia PN 6-0 2566-00 60-00 2626-00
12) 355 mm dia PN 6-0 3253-00 66-00 3319-00
13) 400 mm dia PN 6-0 4226-00 72-00 4298-00
14) 450 mm dia PN 6-0 5337-00 75-00 5412-00
15) 500 mm dia PN 6-0 6597-00 83-00 6680-00
16) 560 mm dia PN 6-0 8246-00 85-00 8331-00
17) 630 mm dia PN 6-0 10443-00 91-00 10534-00
18) 710 mm dia PN 6-0 13571-00 96-00 13667-00

2. 1) 90 mm dia PN 8-0 285-00 22-00 307-00


2) 110 mm dia PN 8-0 426-00 30-00 456-00
3) 125 mm dia PN 8-0 525-00 35-00 560-00
4) 140 mm dia PN 8-0 653-00 40-00 693-00
5) 160 mm dia PN 8-0 754-00 41-00 795-00
6) 180 mm dia PN 8-0 1080-00 45-00 1125-00
BWSSB 47 S.R. 2013-14

Sl. Outer dia of Class of pipe Cost of pipe Labour Charges for Total cost
No. pipe (in mm) per Mtr. laying & jointing per Mtr.
(in Rs.) per Mtr. (in Rs.) (in Rs.)

7) 200 mm dia PN 8-0 1331-00 50-00 1381-00


8) 225 mm dia PN 8-0 1679-00 50-00 1729-00
9) 250 mm dia PN 8-0 2077-00 53-00 2130-00
10) 280 mm dia PN 8-0 2599-00 55-00 2654-00
11) 315 mm dia PN 8-0 3289-00 60-00 3349-00
12) 355 mm dia PN 8-0 5266-00 66-00 5332-00
13) 400 mm dia PN 8-0 5407-00 72-00 5479-00
14) 450 mm dia PN 8-0 6843-00 75-00 6918-00
15) 500 mm dia PN 8-0 8437-00 83-00 8520-00
16) 560 mm dia PN 8-0 10573-00 84-00 10657-00
17) 630 mm dia PN 8-0 13383-00 91-00 13474-00
18) 710 mm dia PN 8-0 17382-00 96-00 17478-00

3 1) 90 mm dia PN 10-0 342-00 22-00 364-00


2) 110 mm dia PN 10-0 507-00 29-00 536-00
3) 125 mm dia PN 10-0 629-00 35-00 664-00
4) 140 mm dia PN 10-0 785-00 39-00 824-00
5) 160 mm dia PN 10-0 1024-00 41-00 1065-00
6) 180 mm dia PN 10-0 1295-00 45-00 1340-00
7) 200 mm dia PN 10-0 1596-00 49-00 1645-00
8) 225 mm dia PN 10-0 2020-00 50-00 2070-00
9) 250 mm dia PN 10-0 2493-00 53-00 2546-00
10) 280 mm dia PN 10-0 3123-00 55-00 3178-00
11) 315 mm dia PN 10-0 3951-00 60-00 4011-00
12) 355 mm dia PN 10-0 5013-00 66-00 5079-00
13) 400 mm dia PN 10-0 6492-00 72-00 6564-00
14) 450 mm dia PN 10-0 8225-00 75-00 8300-00
15) 500 mm dia PN 10-0 10142-00 83-00 10225-00
16) 560 mm dia PN 10-0 12726-00 85-00 12811-00
17) 630 mm dia PN 10-0 16079-00 91-00 16170-00

4 1) 90 mm dia PN 12-5 405-00 22-00 427-00


2) 110 mm dia PN 12-5 608-00 30-00 638-00
3) 125 mm dia PN 12-5 748-00 35-00 783-00
4) 140 mm dia PN 12-5 935-00 39-00 974-00
5) 160 mm dia PN 12-5 1218-00 41-00 1259-00
6) 180 mm dia PN 12-5 1561-00 45-00 1606-00
7) 200 mm dia PN 12-5 1906-00 49-00 1955-00
BWSSB 48 S.R. 2013-14

Sl. Outer dia of Class of pipe Cost of pipe Labour Charges for Total cost
No. pipe (in mm) per Mtr. laying & jointing per Mtr.
(in Rs.) per Mtr. (in Rs.) (in Rs.)

8) 225 mm dia PN 12-5 2438-00 50-00 2488-00


9) 250 mm dia PN 12-5 2966-00 53-00 3019-00
10) 280 mm dia PN 12-5 3730-00 55-00 3785-00
11) 315 mm dia PN 12-5 4703-00 60-00 4763-00
12) 355 mm dia PN 12-5 5979-00 66-00 6045-00
13) 400 mm dia PN 12-5 7741-00 72-00 7813-00

5 1) 90 mm dia PN 16-0 488-00 22-00 510-00


2) 110 mm dia PN 16-0 727-00 30-00 757-00
3) 125 mm dia PN 16-0 887-00 35-00 922-00
4) 140 mm dia PN 16-0 1124-00 39-00 1163-00
5) 160 mm dia PN 16-0 1464-00 41-00 1505-00
6) 180 mm dia PN 16-0 1851-00 45-00 1896-00
7) 200 mm dia PN 16-0 2281-00 49-00 2330-00
8) 225 mm dia PN 16-0 2892-00 50-00 2942-00
9) 250 mm dia PN 16-0 3563-00 53-00 3616-00
10) 280 mm dia PN 16-0 3394-00 55-00 3449-00
11) 315 mm dia PN 16-0 5656-00 60-00 5716-00
12) 355 mm dia PN 16-0 7175-00 66-00 7241-00
13) 400 mm dia PN 16-0 9284-00 72-00 9356-00
B PE-100 Rates are based on resin rate of Rs. 1,07,051.00 pe MT

1) 90 mm dia PN 6-0 190-00 22-00 212-00


2) 110 mm dia PN 6-0 281-00 30-00 311-00
3) 125 mm dia PN 6-0 340-00 35-00 375-00
4) 140 mm dia PN 6-0 427-00 39-00 466-00
5) 160 mm dia PN 6-0 556-00 40-00 596-00
6) 180 mm dia PN 6-0 702-00 45-00 747-00
7) 200 mm dia PN 6-0 865-00 49-00 914-00
8) 225 mm dia PN 6-0 1098-00 50-00 1148-00
9) 250 mm dia PN 6-0 1348-00 53-00 1401-00
10) 280 mm dia PN 6-0 1691-00 55-00 1746-00
11) 315 mm dia PN 6-0 2141-00 60-00 2201-00
12) 355 mm dia PN 6-0 2713-00 66-00 2779-00
13) 400 mm dia PN 6-0 3507-00 72-00 3579-00
14) 450 mm dia PN 6-0 4443-00 75-00 4518-00
15) 500 mm dia PN 6-0 5486-00 83-00 5569-00
16) 560 mm dia PN 6-0 6997-00 85-00 7082-00
BWSSB 49 S.R. 2013-14

Sl. Outer dia of Class of pipe Cost of pipe Labour Charges for Total cost
No. pipe (in mm) per Mtr. laying & jointing per Mtr.
(in Rs.) per Mtr. (in Rs.) (in Rs.)

17) 630 mm dia PN 6-0 8858-00 91-00 8949-00


18) 710 mm dia PN 6-0 11224-00 96-00 11320-00

2. 1) 90 mm dia PN 8-0 242-00 22-00 264-00


2) 110 mm dia PN 8-0 360-00 30-00 390-00
3) 125 mm dia PN 8-0 438-00 35-00 473-00
4) 140 mm dia PN 8-0 549-00 39-00 588-00
5) 160 mm dia PN 8-0 715-00 41-00 756-00
6) 180 mm dia PN 8-0 904-00 45-00 949-00
7) 200 mm dia PN 8-0 1113-00 49-00 1162-00
8) 225 mm dia PN 8-0 1411-00 50-00 1461-00
9) 250 mm dia PN 8-0 1738-00 53-00 1791-00
10) 280 mm dia PN 8-0 2179-00 55-00 2234-00
11) 315 mm dia PN 8-0 2756-00 60-00 2816-00
12) 355 mm dia PN 8-0 3488-00 66-00 3554-00
13) 400 mm dia PN 8-0 4520-00 72-00 4592-00
14) 450 mm dia PN 8-0 5726-00 75-00 5801-00
15) 500 mm dia PN 8-0 7062-00 83-00 7145-00
16) 560 mm dia PN 8-0 9034-00 85-00 9119-00
17) 630 mm dia PN 8-0 11429-00 91-00 11520-00
18) 710 mm dia PN 8-0 14482-00 96-00 14578-00

3. 1) 90 mm dia PN 10-0 292-00 22-00 314-00


2) 110 mm dia PN 10-0 431-00 30-00 461-00
3) 125 mm dia PN 10-0 529-00 35-00 564-00
4) 140 mm dia PN 10-0 662-00 39-00 701-00
5) 160 mm dia PN 10-0 864-00 41-00 905-00
6) 180 mm dia PN 10-0 1096-00 45-00 1141-00
7) 200 mm dia PN 10-0 1351-00 49-00 1400-00
8) 225 mm dia PN 10-0 1705-00 50-00 1755-00
9) 250 mm dia PN 10-0 2100-00 53-00 2153-00
10) 280 mm dia PN 10-0 2630-00 55-00 2685-00
11) 315 mm dia PN 10-0 3333-00 60-00 3393-00
12) 355 mm dia PN 10-0 4238-00 66-00 4304-00
13) 400 mm dia PN 10-0 5490-00 72-00 5562-00
14) 450 mm dia PN 10-0 6926-00 75-00 7001-00
15) 500 mm dia PN 10-0 8556-00 83-00 8639-00
16) 560 mm dia PN 10-0 10922-00 85-00 11007-00
BWSSB 50 S.R. 2013-14

Sl. Outer dia of Class of pipe Cost of pipe Labour Charges for Total cost
No. pipe (in mm) per Mtr. laying & jointing per Mtr.
(in Rs.) per Mtr. (in Rs.) (in Rs.)

17) 630 mm dia PN 10-0 13836-00 91-00 13927-00


18) 710 mm dia PN 10-0 17573-00 96-00 17669-00

4. 1) 90 mm dia PN 12-5 348-00 22-00 370-00


2) 110 mm dia PN 12-5 516-00 22-00 546-00
3) 125 mm dia PN 12-5 635-00 35-00 670-00
4) 140 mm dia PN 12-5 798-00 39-00 837-00
5) 160 mm dia PN 12-5 1040-00 41-00 1081-00
6) 180 mm dia PN 12-5 1315-00 45-00 1360-00
7) 200 mm dia PN 12-5 1621-00 49-00 1670-00
8) 225 mm dia PN 12-5 2054-00 50-00 2104-00
9) 250 mm dia PN 12-5 2526-00 53-00 2579-00
10) 280 mm dia PN 12-5 3167-00 55-00 3222-00
11) 315 mm dia PN 12-5 4010-00 60-00 4070-00
12) 355 mm dia PN 12-5 5090-00 66-00 5156-00
13) 400 mm dia PN 12-5 6600-00 72-00 6672-00

5. 1) 90 mm dia PN 16 431-00 22-00 453-00


2) 110 mm dia PN 16 639-00 30-00 669-00
3) 125 mm dia PN 16 771-00 35-00 806-00
4) 140 mm dia PN 16 965-00 39-00 1004-00
5) 160 mm dia PN 16 1263-00 41-00 1304-00
6) 180 mm dia PN 16 1593-00 45-00 1638-00
7) 200 mm dia PN 16 1968-00 49-00 2017-00
8) 225 mm dia PN 16 2488-00 50-00 2538-00
9) 250 mm dia PN 16 3069-00 53-00 3122-00
10) 280 mm dia PN 16 3848-00 55-00 3093-00
11) 315 mm dia PN 16 4862-00 60-00 4922-00
12) 355 mm dia PN 16 6169-00 66-00 6235-00
13) 400 mm dia PN 16 7997-00 72-00 8069-00
14) 450 mm dia PN 16 10134-00 75-00 10209-00
15) 500 mm dia PN 16 12496-00 83-00 12579-00
BWSSB 51 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

PRESTRESSED PIPES (PSL)


1. (1) Manufacturing of the prestressed concrete pipes as per I.S.S.
784-2001 and I.S.S. 1343-1980 using all the required materials
such as cement, seived sand, trap or basalt jelly with all lead and
lift including cost and conveyance of all materials for manufacture
of pipes and supply, carefully rolling, lowering into trenches laying
true to line and correct position, linking, perfect jointing using rubber
ring etc., suitable for confined joints including testing and
commissioning with all lead and lifts for conveyance of pipes etc.,
complete giving satisfactory hydraulic test on line, to the required
pressure as per relavent ISS including bailing out water wherever
necessary etc., complete as per IS : 784, Pipes are to be as per
the design. The rates are inclusive of all taxes and duties. (Contractor
will make his own arrangement for procuring water for testing).
Relevant IS specification are to be referred for the aggregate size.
1) P.S.C Pipes suitable for a test pressure of 12 Kg/cm2
1) 375 mm dia (inner) Mtr. 2253-00

2) 400 mm dia (inner) Mtr. 2351-00

3) 450 mm dia (inner) Mtr. 2468-40

4) 500 mm dia (inner) Mtr. 2865-50

5) 600 mm dia (inner) Mtr. 3223-00

6) 700 mm dia (inner) Mtr 3934-70

7) 750 mm dia (inner) Mtr. 4233-90

8) 800 mm dia (inner) Mtr. 4440-00

9) 900 mm dia (inner) Mtr. 5019-00

10) 1000 mm dia (inner) Mtr. 5980-00

11) 1100 mm dia (inner) Mtr. 6652-00

12) 1200 mm dia (inner) Mtr. 7433-00

2) P.S.C. Pipes suitable for a test pressure of 18 Kg/Cm2


1) 375 mm dia (inner) Mtr. 2282-50

2) 400 mm dia (inner) Mtr. 2371-60

3) 450 mm dia (inner) Mtr. 2526-70

4) 500 mm dia (inner) Mtr. 2903-00

5) 600 mm dia (inner) Mtr. 3313-00


BWSSB 52 S.R. 2013-14
Sl. RATE
PARTICULARS UNIT
No. in Rs.

6) 700 mm dia (inner) Mtr 4089-00.

7) 750 mm dia (inner) Mtr. 4419-00

8) 800 mm dia (inner) Mtr. 4635-00

9) 900 mm dia (inner) Mtr. 5195-00

10) 1000 mm dia (inner) Mtr. 6273-00

11) 1100 mm dia (inner) Mtr. 7054-00

12) 1200 mm dia (inner) Mtr. 7864-00


2 Carfully rolling conveying with all lead & lift P.S.C. pipesof all
classes lowering into trenches, laying true to line and correct
position, linking, perfect jointing using rubber ring etc., suitable for
all types of joints, including testing and commissioning etc., complete
giving satisfactory hydraulic test on the line to the required pressure
as per relevant ISS including bailing out water wherever necessary
etc., complete, Rubber ring will be issued free of cost, at Divisional
or Sub-Divisional Stores (Contractor will make his own arrangement
for procuring water for testing).

1) 375 mm dia (inner) Mtr. 180-40

2) 400 mm dia (inner) Mtr. 185-90

3) 450 mm dia (inner) Mtr. 195-80

4) 500 mm dia (inner) Mtr. 206-80

5) 600 mm dia (inner) Mtr. 261-80

6) 700 mm dia (inner) Mtr 282-70

7) 750 mm dia (inner) Mtr. 306-90

8) 800 mm dia (inner) Mtr. 317-90

9) 900 mm dia (inner) Mtr. 381-70

10) 1000 mm dia (inner) Mtr. 460-90

11) 1100 mm dia (inner) Mtr. 507-10

12) 1200 mm dia (inner) Mtr. 555-50


BWSSB 53 S.R. 2013-14

P. V. C. PIPES

1. Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest


amendments and conveying to worksite, rolling and lowering into
trenches, laying true to line and level and perfect linking at joints,
testing and commissioning, including loading and unloading at both
destinations and cuts of pipes wherever necessary including jointing
of PVC pipes and specials (excluding cost of specials) with jointing
of approved type, with all labour with all lead & lift including
encasing the pipe alround to a depth of not less than 15cms with
soft gravel or selected earth available from the excavation etc.,
complete and giving necessary hydraulic test to the required
pressure as per ISS (contractor will make his own arrangements for
procuring water for testing).
PVC pipes rates are based on the resin rate of Rs. 78,296.00
per MT

Sl. Outer dia of Pipes Cost of pipe Cost of Cutting, Rate inclusive of cost of
No. in mm & working per Mtr. lowering, laying PVC pipe, jointing
pressure (in Rs.) jointing & perfect materials and labour
linking charges for laying &
per Mtr. (in Rs.) jointing per Mtr. (in Rs.)

1) 25-10 Kg/cm2 (Class5) 25-00 6-00 31-00

2) 32-10 Kg/cm2 (Class5) 40-00 8-00 48-00

3) 50-6 Kg/cm2 (Class 3) 63-00 10-00 73-00

4) 63-6 Kg/cm2 (Class5) 68-00 13-00 81-00

5) 75-6 Kg/cm2 (Class 3) 97-00 17-00 114-00

6) 90-6 Kg/cm2 (Class 3) 139-00 18-00 157-00

7) 110-6 Kg/cm2 (Class 3) 202-00 25-00 227-00

8) 140-6 Kg/cm2 (Class 3) 336-00 27-00 363-00

9) 160-6 Kg/cm2 (Class 3) 424-00 28-00 452-00

10) 200-6 Kg/cm2 (Class 3) 660-00 33-00 693-00

11) 250-6 Kg/cm2 (Class 3) 1064-00 36-00 1100-00

12) 315-6 Kg/cm2 (Class 3) 2468-00 44-00 2512-00