Appendix - 6.

INVENTORY AND CONDITION SURVEY FOR CULVERTS

Road Name : NH - 109 EXTN. Road No NH - 87

Section : KHAIRNA TO KAKRIGHAT Date of Survey : 3-Jun-16


Sl. Type of Span Arrangement Width of culvert Height above Condition Assessment
Condition Assessment*
Structures Bed Level
No.
Location (chainage) Length (m) Recommendation on Whether waterway adequate (Yes/No) Remarks
Parapet/
(Pipe, Slab, Number of Spans Width of Span (m) Total (m) Carriageway (m) U/S Side D/S Side widening/reconstruction
Box,Slab, Wing Handrail
Head wall Return wall etc
Box, Arch) (m) (m) pipe,arch wall

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 16.250 Culvert 1.50 1 0.700 5.28

Page 127 of 6
Appendix - 6.3

INVENTORY AND CONDITION SURVEY FOR CULVERTS

Road Name : NH - 109 EXTN. Road No NH - 87

Section : KHAIRNA TO KAKRIGHAT Date of Survey : 3-Jun-16

Page 128 of 6
Appendix - 6.3

INVENTORY AND CONDITION SURVEY FOR CULVERTS

Road Name : NH - 109 EXTN. Road No NH - 87

Section : KHAIRNA TO KAKRIGHAT Date of Survey : 3-Jun-16

Page 129 of 6
Appendix - 6.3

INVENTORY AND CONDITION SURVEY FOR CULVERTS

Road Name : NH - 109 EXTN. Road No NH - 87

Section : KHAIRNA TO KAKRIGHAT Date of Survey : 3-Jun-16

*Distressed requiring reconstruction

*Not distressed, only widening required

*No widening or reconstruction required

Remarks:Indicate presence of protection works,scour etc.

Page 130 of 6
Sr. No. Description Chainage Side Unit Nos. Length Width

1 Abutment A1 16.250 1
Abutment A2 16.250 1
Culvert
(slab)
16.250 1 1.500 5.280

2 Abutment A1 19.000 1
Abutment A2 19.000 1
Culvert
(slab)
19.000 1 1.250 4.000

3 Abutment A1 20.250 1
Abutment A2 20.250 1
Culvert
(slab)
20.250 1

2
3
1 7.840 0.600
Qty
Depth
(Cum)

0.700

0.900

0.600 2.822

Total 2.822