Wapda H. E Dated 16.05.

2018
Power Gen: 53.08 GWh
Peak Share System data not provided by NPCC
1 - Tarbela
Inflow: 41,200 Cfs
Outflow: 34,200 Cfs
Level: 1,394.38 Ft
Storage: 0.087 MAF
Units: 10x175 & 4x432
Qd (Discharge/Unit): 10x 6700 & 4x15000 cfs
Installed Cap: 3478 MW
Outage: Nil
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: 1042~2030MW (Min~Max)
Energy: 4.612 GWh
Average Load: 1537 MW
Units under operation 14
Off peak Hours 21 hrs
Generation: 340~1795 MW (Min~Max)
Energy: 15.052 GWh
Units under operation 13 (1 standby)
Average Load: 819 MW
Electricity: 19.664 million units
2 - Ghazi Barotha
Units: 5x290
Qd (Discharge/Unit): 5x15238 cfs
Installed Cap: 1450 MW
Outage: Nil
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: 0~1450 MW (Min~Max)
Energy: 3.183 GWh
Average Load: 1061 MW
Units under operation 5
Off peak Hours 21 hrs
Generation: 0~1450 MW (Min~Max)
Energy: 9.084 GWh
Units under operation 5
Average Load: 511 MW
Electricity: 12.267 million units

3 - Mangla
Inflow: 37,527 Cfs
Outflow: 35,035 Cfs
Level: 1093.30 Ft
Storage: 0.256 MAF
Units: 10x100
Qd (Discharge/Unit): 10x4550 cfs
Installed Cap: 1000 MW
Unit # 5 & 6 refurbishment
Outage:
since 12.11.2017
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: 577 MW (Min~Max)
Energy: 1.587 GWh
Average Load: 529 MW
Units under operation 8
Off peak Hours 21 hrs
Generation: 30 MW (Min~Max)
Energy: 8.778 GWh
Units under operation 8
Average Load: 432 MW
Electricity: 10.366 million units
4 - Warsak
Units: 4x40 & 2x 41.48
Qd (Discharge/Unit): : 4x3640 & 3 x 3800 cfs
Installed Cap: 243 MW
Outage: Nil
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: 173~210 MW (Min~Max)
Energy: 0.415 GWh
Average Load: 138 MW
Units under operation 6
Off peak Hours 21 hrs
Generation: 20~210 MW (Min~Max)
Energy: 2.838 GWh
Units under operation 6
Average Load: 136 MW
Electricity: 3.252 million units
5 - Chashma
Inflow: 63,906 Cfs
Outflow: 69,000 Cfs
Level: 642.4 Ft
Storage: 0.066 MAF
Units: 8x23
Qd (Discharge/Unit): :8x8829 cfs
Installed Cap: 184 MW
Unit # 2 under repair since 24.07.2017
Outage:
Unit # 8 under repair since 27.05.2016
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: 117 MW (Min~Max)
Energy: 0.304 GWh
Average Load: 101 MW
Units under operation 6
Off peak Hours 21 hrs
Generation: 92~117 MW (Min~Max)
Energy: 1.6 GWh
Units under operation 6
Average Load: 79 MW
Electricity: 1.904 million units

6 - Duber Khwar
Units: 2x65
Qd (Discharge/Unit): : 2x512 cfs
Installed Cap: 130 MW
Outage: Nil
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: 130 MW (Min~Max)
Energy: 0.354 GWh
Average Load: 118 MW
Units under operation 2
Off peak Hours 21 hrs
Generation: 130 MW (Min~Max)
Energy: 1.507 GWh
Units under operation 2
Average Load: 78 MW
Electricity: 1.861 million units
7 - Allai Khwar
Units: 2x60.5
Qd (Discharge/Unit): : 2x371 cfs
Installed Cap: 121 MW
Outage: Nil
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: 0~121 MW (Min~Max)
Energy: 0.334 GWh
Average Load: 111 MW
Units under operation 2
Off peak Hours 21 hrs
Generation: 0~121 MW (Min~Max)
Energy: 0.944 GWh
Units under operation 2
Average Load: 53 MW
Electricity: 1.278 million units

8 - Neelum Jhelum
Units: 4x242.5
Qd (Discharge/Unit): : 4x 2470 cfs
Installed Cap: 969 MW
Outage: Unit # 3 & 4 Checking/ Inspection
9 - T4
Units: 3x470
Qd (Discharge/Unit): : 3x 9372 cfs
Installed Cap: 1410 MW
Outage: Nil
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: Nil MW (Min~Max)
Energy: Nil GWh
Average Load: Nil MW
Units under operation Nil
Off peak Hours 21 hrs
Generation: Nil MW (Min~Max)
Energy: Nil GWh
Units under operation Nil
Average Load: Nil MW
Electricity: Nil million units
10 - Golen Gol
Units: 3x36
Qd (Discharge/Unit): : 3x341 cfs
Installed Cap: 108 MW
Outage: 1x36
Peak Hours 3 hrs (18 30 – 21 30)
Peak Share: 2~6 MW (Min~Max)
Energy: 0.013 GWh
Average Load: 4.33 MW
Units under operation 1
Off peak Hours 21 hrs
Generation: 1.25~7.75 MW (Min~Max)
Energy: 0.091 GWh
Units under operation 1
Average Load: 4.5 MW
Electricity: 0.104 million units

11 - Small Hydel (having Cap less than 100 MW)


● Total Max Load 193.45 / 296 MW
● Gomal Zam Power House (17.4 MW) is under repair at the
risk & cost of the Contractor
● 4 Units of Jinnah (1x12) are under repair
o Unit # 1 since 24.11.2015
o Unit # 2 since 03.08.2017
o Unit # 4 since 14.09.2014
o Unit # 8 since 15.02.2018
● Satpara (Total Capacity: 17.4 MW of 4 Power Houses)
o Max Load: 6.75 MW
o Energy : 0.091 GWh
o Unit 1 of P/H-2 is under repair
o P/H-4 is not operational