The detailed terms and conditions can be had from the office of NIIFT, Mohali on any
working day between 10.00 A.M. to 3.00 P.M. and can also be seen on the website
www.niiftindia.com. Interested Architects/Project Consultant who fulfill all the prescribed
criteria may give their bids latest by 30-6-2009 at 3.00 P.M. at the office of NIIFT, Mohali.
All the bids have to be personally submitted at the office and no postal bids shall be
accepted.
Director General
Northern India Institute of
Fashion Technology, Mohali
Detailed terms and conditions for selecting Architect-cum-Project Consultant for
the construction of building of Northern India Institute of Fashion Technology
located at Maharaja Ranjit Singh Avenue, Jalandhar.
1 Total area of land 2.72 (approx) acres located at Maharaja Ranjit Singh Avenue
Jalandhar (Site can be seen)
5. Preferred Qualification:
Two bids systems shall be followed – financial bid and technical bid. After evaluation of
technical bids, the financial bids of the technically conforming firms only will be opened.
Financial bid shall be given separately in an envelope and no other document etc. shall
be included in that envelope. The financial bid shall categorically indicate:-
a). The proposed charges for overall preparation of plans for the entire area.
b). The proposed charges for detailed preparation of plans as per DNIT for area of
50,000 sq. ft. which is to be immediately constructed.
c). Project management cost.
All other items shall form the part of technical bid which shall be placed separately
in another envelope or packet. The envelope containing financial bid shall be clearly
indicating and written as ‘financial bid’. The financial and technical bids shall clearly
mention the name and details of the participant and earnest money Rs. 5,000/-
(refundable in case of unsatisfactory bidder) shall be essential by way of bank draft
payable in the name of “Director, Northern India Institute of Fashion Technology, Mohali”,
and payable at ‘Mohali’. The earnest money shall be the part of technical bid.
8.Completion period:
From the date of assigning the job, the Architect-cum-Project Consultant shall have to
complete the work within 60 days. In case of failure to do that a deduction of 0.5% of the
total amount payable shall be made for every day of delay. However, in extraneous
circumstances it may be considered for relaxation at the sole discretion of Executive
Director.
Annexure-‘A’
Space Requirement for Northern India Institute of Fashion Technology, Jalandhar
Area Guidelines
Sr. No. Name Function Carpet Area (in Nos Total Area(in sq.ft)
sq.ft)
1. Administration Block
a Reception cum waiting 1150 1 1150
b Director/Registrar 575 1 575
c With Personal Staff 300 1 300
d Officer Rooms 250 2 500
e Administrative Staff 1000 1000
f Mini Conference Hall 500 1 500
4025
2. Academic Block
A Fashion Design Dept.
Class Rooms 500 2 1000
Laboratory size-36’x39’ 1400 2 2800
Pattern Making & Draping
Laboratory size-36’-39’ 1400 1 1400
Construction
Staff Room with cabins, kit, toilet 575 1 575
Girls & Boys Toilet 575 1 575
B. Fashion Design in Leather Apparels & Accessories
Class Rooms 500 2 1000
Laboratory size-36’x39’ 1400 2 2800
Pattern Making & Draping/Studio
Laboratory size-36’-39’ Construction 1400 1 1400
Staff Room with cabins, kit, toilet 575 1 575
12125
3. Facility
A Library cum Resource Centre 1500 1 1500
B Computer Lab 575 2 1150
C Canteen & Kitchen 1150 1 1150
4 Services
Generator Room 300 1 300
Electrical room/LT Panel Room 300 1 300
Water pump Rom 300 1 300
Store 575 1 575
Tuck shop/ Security Room 150 4 600
5875
Total Carpet Area 22025
Total Area under Circulation , walls , columns etc = 50% 11015
Total Covered Area 33040
Annexure-‘C’
Future Space Requirement for Northern India Institute of Fashion Technology, Jalandhar
Area Guidelines
Sr. No. Name of Function Carpet area(In Sq.Ft) Nos Total Area (In Sq.Ft)
1. Academic Block
A Design
Class Rooms 500 2 1000
Laboratory size-36’x39’ Pttern Making & Textile Testing Lab 1400 2 2800
Laboratory size-36’-39’ Construction 1400 1 1400
Staff Room with cabins, kit, toilet 575 1 575
Girls & Boys Toilet 575 1 575
B Technology
Class Rooms 500 2 1000
Laboratory size-36’x39’ Pattern Making & Draping 1400 2 2800
Laboratory size-36’-39’ Construction 1400 1 1400
Staff Room with cabins, kit, toilet 575 1 575
3 Facility
Presentation/Auditorium/Seminar Hall 4000 1 4000
Green Rooms Ladies and Gents 300 2 600
4600
Total Carpet Area 16725
Annexure-‘B’
Sr. No. Name Function Carpet area (in Sq.Ft) Nos Total Area (in Sq.Ft)
1 Rooms for Students 300 25 7500
2 Toilets Blocks 575 05 2875
3 Mess Cum Kitchen 1000 01 1000
4 Common Room 600 01 600
5 Warden Residence cum office 1000 01 1000
6 Guest Rooms with Attached Toilets 300 02 600
7 Security Room 150 01 150
8 Residence for Centre Head 2200 01 2200
Total 15925