THE
BLUE
BOOK
A/E Design Manual
for Architect/Engineer Firms
Performing Service for UNHCR
THE BLUE BOOK

UNHCR/AI/2015/3 - Annex B
April 2015
COVER BACKSIDE 

Page | 2 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
Foreword
 
This  A/E  Design  Manual  outlines  the  requirements  for  Architecture/Engineering  (A/E) 
companies when taking up work with UNHCR. It describes the scope of work and the specific 
requirements of UNHCRUNHCR for the design of its facilities and the Terms of Reference for  Page | 3
the provision of A/E Services. These requirements are for the direction of A/E Consultants in 
the preparation of project specific documentation, fit for purpose. 
The A/E Design Manual must be attached to any contract and can be used  to estimate the 
effort required for single design work orders/ purchase order. One of the main purposes of 
setting‐up  design  standards  for  the  whole  organization  is  to  minimize  (though  not  to 
eliminate) the requirement for specific training of staff members in the field, who will know 
what to expect when requiring a "concept design" or a "construction schedule" or any other 
type of technical document. 
 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 4 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
Index

Foreword  2  Page | 5
Index  5 
01.  General Requirements and Principles  9 
01.01  List of required services  9 
01.01.01  Design Services  9 
01.01.02  Post Construction Award Services (PCAS)  10 
01.01.03  Facility and Leasing Management   10 
01.01.04  Other Services  10 
01.02  Applicable regulations and standards  10 
01.03  Design general principles and objectives  10 
01.04  Environmental and Functional Needs  11 
01.05  Safety  11 
01.06  Economy  12 
01.07  Sustainability  12 
01.08  Design Quality Control and Review Process  12 
01.08.01  Progress Reports  13 
01.08.02  Formal Reviews of Design Documents  13 
02.  Design Submittals  15 
02.01  General  15 
02.02  Project start‐up  16 
02.03  Concept Design Submittal  16 
02.04  Concept Design Presentation and Review meeting  17 
02.05  Charrette Meeting  17 
02.06  Interim Design Submittal  17 
02.06.01  Purpose  17 
02.06.02  Deliverables  18 
02.07  Pre‐Final Design Submittal  19 
02.07.01  Purpose  19 
02.07.02  Deliverables  20 
02.08  Final Design Submittal  21 
02.08.01  Purpose  21 
02.08.02  Elements  21 
02.09  Other reviews and meetings  22 
02.10  Meeting Minutes  22 
02.11  “Over‐the‐shoulder” review meetings  22 
02.12  Presentation requirements and meetings  22 
02.12.01  Renderings  22 
02.12.02  Material Boards and Samples  22 
02.12.03  Model Requirements  22 
03.  Design Drawings  23
03.01  General  23 
03.02  Arrangement and Presentation of Drawings  24 
03.03  Size of Drawings and Sketches  25 
03.04  UNHCR Standard Drafting Media  25 
03.05  Detail designation  25 
03.06  UNHCR Standard title/drawing sheet and title block  25 
04.  Specifications  27 
04.01  General Conditions and Administrative Requirements  27 
04.02  Technical Specifications  27 
04.02.01  Performance Specifications  27 
04.02.02  Design Specifications  27 
04.02.03  Proprietary Requirements  29 
04.02.04  Submittal requirements  29 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
05.  Basis of Design (BoD)  31 
05.01  General  31 
05.02  Civil  31 
05.02.01  Site Plan  31 
05.02.02  Asbestos and Toxic Materials  31 
05.02.03  Water Supply  31 
05.02.04  Sewers and Sewage Disposal System  31 
05.02.05  Roads, Parking and Walks  31 
Page | 6 
05.02.06  Fencing  31 
05.03  Architectural  32 
05.04  Structural  32 
05.05  Mechanical  33 
05.05.01  General  33 
05.05.02  Heating, Ventilation and Cooling (HVAC)  33 
05.06  Plumbing  34 
05.07  Fire Protection  34 
05.08  Electrical  35 
05.08.01  Interior Distribution Systems  35 
05.08.02  Exterior Distribution Systems  35 
05.09  Special Systems  36 
06.  Construction Cost Estimate (CCE) and Bill of Quantities (BoQ)  37 
06.01  Cost Estimate  37 
06.02  Bill of Quantities  37 
07.  Construction Schedule  39 
08.  Submittals and Submittal Register (SR)  41 
08.01  Submittals  41 
08.02  Submittal List  41 
08.03  Submittal Register  41 
08.04  Type of Construction Submittals  41 
08.04.01  Pre‐Construction submittals: Pre‐Construction submittals are   
required prior to signing the construction contract.  41 
08.04.02  Construction Submittals  41 
09.  Technical Reports and Calculations  45 
10.  Health and Safety (H&S) Coordination  47 
11.  Administrative Permits Applications  49 
11.01  Construction Permit  49 
11.02  Fire Prevention Permit  49 
11.03  Sanitary Permit  49 
12.  Support to the UNHCR Technical Evaluation Committee (TEC)  51 
12.01  General  51 
12.02  Pre‐Proposal / Bid Conference  51 
12.03  Clarifications  51 
12.04  Submittal and Evaluation of Tender Proposals  51 
13.  Post Construction‐Award Services (PCAS)  53 
13.01  General  53 
13.02  Non‐Reimbursable Consultation  53 
13.03  Reimbursable Consultation  53 
13.04  Basis of Payment for Reimbursable Consultation  54 
13.05  Request for Consultation  54 
13.06  Consultation Reports  54 
13.07  Evaluation of contractor‐proposed acceptance/variations of the contract  55 
document 
13.08  Evaluation of construction contractor’s value engineering change proposals  55 
(VECPs) 
13.09  Design Field Support  55 
13.10  Shop Drawings/Submittal Review  57 
13.10.01  Proposed Variations/Deviations from the contract requirements  57 
 
13.10.02  Approval/Disapproval by UNHCR of contractor submittals  57 
13.10.03  Miscellaneous aspects of Submittal review  58 
13.11  Record (“as‐built”) Drawings  58 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
13.12  Construction Supervision and Quality Control Services  58 
14.  Interior Design (ID)  59 
13.01  General  59 
13.02  Scope of Work  59 
15.  Operations and Maintenance Support Information (OMSI)  61 
15.01  General  61 
15.02  Operations and Maintenance Manual  61 
15.03  Operating Manual  61 
Page | 7
15.04  User Manual  61 
     
 
Attachments 
Att. A  List of Acronyms & Abbreviations  63 
Att. B  Standard Form IMU‐014 (Standard Cover Sheet and Title Block)*  65 
Att. C  Standard Form IMU‐005 (Fee Proposal Form)*  67 
Att. D  Standard Form IMU‐007 (Application and Certificate for Progress Payment)*  69 
Att. E  Standard Form IMU‐006 (Design Comment Sheet)*  71 
*: These attachments are available on the attached CD‐ROM. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 8 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
01.  General Requirements and Principles 
 
 
01.01 List of required services 
Page | 9
The  Contractor  shall  provide  Architectural/Engineering  Services  at  single  and/or 
various  locations,  worldwide  or  in  a  specific  country  or  region,  as  required  by  the 
RFP.  
The UNHCR Infrastructure Management Unit (IMU) will issue a detailed Statement of 
Work (SoW) for each individual Purchase Order (PO) required from the Contractor. 
Required services include, but may not be limited to: 
01.01.01 Design Services 
 Civil Engineering Design   Security Engineering Design 
 Architectural Design   Fire Protection and Safety 
 Structural Engineering Design  Design 
 Mechanical/Plumbing   Special Systems Engineering 
Engineering Design  Design 
 Electrical Engineering Design   Geotechnical Engineering 
 Interior Design 
For the preparation of construction tender packages, including: 
 Plans   Construction Schedules 
 Specifications   Submittal Registers 
 Cost Estimates   Calculations 
 Cost/Benefit Analyses   Feasibility Studies 
 Site Investigations (i.e.   Courier and Telephone 
topographic surveys,   Preparation of construction 
architectural survey and utility  permit application packages 
system investigations)   Renderings and colour boards 
 Review of construction 
contractor‐prepared design 
submittals 
Supporting the acquisition of: 
 New constructions   Repairs 
 Changes of use   Demolitions 
 Alterations   Improvements 
 Additions   Extraordinary maintenance 
Acquisition Strategies may include: 
 Design/bid/build 
 Design/build 
 Lease agreements 
 Memorandums of Understanding to obtain the Right of Use (RoU) of 
facilities provided by third‐parties (e.g. local governments or other 
entitiesorganizations) 
 Lease‐related constructions 
 
     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
01.01.02 Post Construction‐Award Services (PCAS) 
 Construction Supervision and   Office Consultation during 
Quality Control  construction 
 Record Drawing Preparation   Field Consultation during 
and review  construction 
 Review of construction   Quality Control during 
Page | 10 
contractor‐provided Shop  construction 
Drawings   Technical review of design 
deliverables provided by 
contractors 
01.01.03 Facility and Leasing Management (support to) 
 Preparation, negotiation and 
 Maintenance of facilities 
management of utility contracts 
(ordinary, preventive and 
breakage, including building   Maintenance of Special Systems 
systems)  (Security, Audio/Video, etc.) 
 Lease acquisitions   Lease‐related construction 
contracts 
 Preparation of Lease 
agreements 
01.01.04 Other Services 
Other services may include, but not be limited to: 
 Attendance to meetings, including, but not be limited to: 
o The IMU main office in Budapest or in any other location, 
depending on the project 
o Preliminary Site Inspections 
o Pre‐design meetings 
o Concept Design presentation and review meetings 
o Presentation of Construction Permit application packages 
o Charrette meetings 
o Interim, pre‐final and final design review meetings 
 Travel 
 Copy services 
 Other services, as required 
01.02 Applicable regulations and standards 
All  services  shall  be  performed  in  accordance  with  any  applicable  UNHCR  and  host 
nation  building  and  fire  norms,  standards,  and  building  codes  and/or  International 
standards.  The  UNHCR  Project  Manager  (PM)  will  provide  specific  guidance  in  the 
case of contradictory requirements.  
Whenever Services are provided in relation to any phase of the implementation of a 
construction contract (Chapter 13 ‐ Post Construction‐Award Services), the A/E shall 
be bound by the obligations set out in the construction services contract and related 
UNHCR General Conditions for Civil Works as applicable. 
01.03 Design general principles and objectives 
The  A/E  shall  provide  complete  design  services  including  all  major  and  minor 
disciplines.  The  end  result  of  any  contract  with  the  A/E  must  be  documents  that 
provide  a  complete  and  fully  functional  facility.  UNHCR  buildings  and  facilities  shall 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
be designed and constructed to best meet the functional, safety, and environmental 
needs of the programmes they house.  
01.04  Environmental and Functional Needs  
UNHCR facilities shall provide an environment in which occupants can do their work 
with  maximum  efficiency  at  the  optimum  level  of  comfort,  taking  the  following 
factors into consideration:  Page | 11
a. Arrangement of Space: space relationships within buildings shall be planned to 
optimize the functions being performed by the occupant.   
b. Reasonable  accommodation  for  persons  with  disabilities:  buildings  shall  meet 
the  needs  of  persons  with  disabilities  including  access,  sufficient  space  and 
sanitary facilities.  
c. Lighting: Natural and artificial lighting shall be sufficient to meet requirements of 
the tasks performed by the occupants.  
d. Hygrothermal  Comfort:    the  hygrothermal  environment  shall  provide  safe  and 
healthy working conditions for the occupants and proper climatic conditions for 
the work being performed.   
e. Provision  of  flexibility  and  suitable  control  is  necessary.  Individual  control  shall 
be considered where appropriate.  
f. Acoustical  Environment:  new  buildings  and  alterations  shall  be  planned  and 
designed  to  minimize  noise  that  disturbs  occupants  unduly  or  interferes  with 
their ability to do their work.   
g. An  adequate  level  of  privacy  shall  be  provided  so  that  occupants  can  perform 
their tasks effectively with minimum outside disturbance.   
h. Maintenance  and  Operation:  designs  shall  be  based  on  user  needs  and 
maintenance  capabilities  and  shall  satisfy  the  functional  requirements  for 
efficient operation of the facility.   
i. Materials  and  projects  shall  be  durable,  easily  maintained,  and  appropriate  for 
the intended use.  
j. Harmony with local environment. 
 
01.05 Safety 
UNHCR  facilities  shall  provide  an  environment  that  is  safe  for  occupants,  and  that 
offers maximum protection during emergencies or disasters. 
 Prior  to  signing  any  agreement  for  the  acquisition  of  premises,  a  certificate  of 
compliance  to  all  minimum  safety  standards  complying  with  the  local  safety  laws, 
norms and standards must be obtained. In its absence, an equivalent statement shall 
be required from the landlord, signed by a professional A/E consultant, or obtained 
by UNHCR consultant A/E, with regard to: 
a. Hygienic Adequacy: facilities must be certified for compliance to any applicable 
local  norms,  codes  and  regulations  (or,  in  their  absence,  to  international 
standards). 
b. Structural  Adequacy:    structures  shall  be  adequate  for  the  functions  to  be 
performed  and  the  loads  imposed  by  building  equipment,  occupants,  their 
activities and weather conditions.   
Soil  and  other  geotechnical  conditions  shall  be  carefully  analyzed  and  resolved 
during the design process.  
Structural  certifications  must  be  required  for  both  new  constructions  and 
alterations  to  existing  ones.  When  leasing  new  premises,  a  structural 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
certification must be required from the landlord or an engineering consultancy 
contract must be awarded in order to obtain it. 
Both  existing  and  new  facilities  must  be  designed/assessed  for  the  risk  of 
earthquakes by engineering specialists. 
c. Fire Prevention: facilities must be certified for compliance to any applicable local 
norms, codes and regulations (or, in their absence, to international standards), 
Page | 12  and to the UN Security Management System Fire safety policy and guidelines. 
d. Natural  Disasters:  appropriate  design  criteria  shall  be  determined  for  each 
project,  based  on  a  facility‐specific  risk  assessment  (SRA)  and  an  analysis  of  all 
available information on security considerations, constraints, and tenant needs. 
e. Occupational  health  and  safety  design:  Design  shall  be  the  result  of  safety 
analyses  and  shall  address  unsafe  conditions  that  cause  injury,  illness,  or 
property damage. 
 
01.06 Economy  
a. UNHCR  facilities  shall  be  designed  at  the  most  reasonable  cost  in  terms  of 
combined  initial  and  long‐term  expenditures,  based  on  best  life  cycle  costs, 
without  compromising  other  project  requirements,  considering  the  following 
factors: Energy Conservation. 
b. Maintenance, Operation, Repair, and Replacement Costs. 
c. Foster Maximum Competition in Bidding. 
 
01.07 Sustainability  
UNHCR  is  committed  to  actively  support  the  reduction  of  carbon  emissions  and  a 
sustainable future. 
The following objectives relate to buildings: 
a.  Reduction in energy consumption and Green‐House Gas (GHG) emissions. 
b.  Reduction in water consumption. 
c.  Reduction in waste production. 
d.  Monitoring  and  reporting  energy  and  electricity  consumption,  and  related 
greenhouse gas emissions, for all UNHCR facilities (owned, leased or in right of 
use). 
e.  Improved indoor environmental quality for occupants. 
f.  Achieve LEED® minimum Gold certification at the best value. 
Without  limiting  design  flexibility,  the  recommended  approach  to  achieving  GHG 
neutral  construction  (on  new  construction  projects)  requires  optimization  of  the 
building’s energy performance. To eliminate GHG emissions from direct combustion, 
it is recommended that all building systems be optimized to minimize demand. Once 
energy  consumption  is  minimized,  a  GHG  neutral  project  may  be  achieved  by 
considering low GHG emission energy sources, including low GHG emission electricity 
and on‐site renewable energy. 
 
01.08 Design Quality Control and Review Process 
UNHCR  requires  a  high  degree  of  design  and  quality  control  during  the  design 
process.  Non‐coordinated,  low  quality  drawings  and  specifications  are  not 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
acceptable.  In  this  section  all  required  deliverables  that  relate  to  design  quality 
control are described.  
A/E  must  be  clear  about  these  requirements  and  if  there  are  any  questions  these 
must  be  forwarded  to  the  UNHCR  Project  Manager  before  the  start  of  the  design 
phase. 
A  primary  responsibility  of  the  A/E  is  to  take  charge  of  the  overall  project  Page | 13
interdisciplinary  coordination,  including  schedules,  costs,  sub‐consultants,  permit 
submittal, and all aspects of project management; and final contract documents must 
give clear evidence that such has been the case. 
01.08.01 Progress reports 
Throughout  the  design  process  the  A/E  is  required  to  monitor  the 
progress of the project and to provide bi‐weekly (or as differently stated 
in the project schedule included in the SoW) progress report to the PM.  
01.08.02 Formal Reviews of Design Documents 
At  the  end  of  each  design  phase  the  A/E  shall  submit  the  design 
documents  to  the  UNHCR  review  team  (on  the  delivery  dates  set  out  in 
the SoW) who will review the submittals.  
Depending on the value and the complexity of the works, UNHCR will set 
up  a  team  of  professionals  who  will  provide  a  set  of  comments  for 
revision/correction  of  the  documents.  The  UNHCR  Project  Manager  will 
lead and coordinate the review team. 
The  project  schedule  shall  allocate  a  minimum  of  ten  working  days  for 
each UNHCR review, after which the PM will forward a consolidated set of 
comments to the A/E. 
The  A/E  is  responsible  for  the  distribution  of  comments  to  the  design 
team  and  shall  provide  rebuttals  in  writing  to  each  comment.  If  a 
comment  is  rejected  (and  therefore  not  incorporated  in  the  design)  the 
A/E shall provide a rationale for not incorporating the comment.  
A/E  responses  will  be  discussed  during  the  review  meeting  to  be  held 
after the time agreed for review. Attendance by all parties involved in the 
project (including final users/project owners) is required.  
If the meeting is cancelled or not included in the specific SoW, responses 
must  be  provided  to  the  PM  within  one  week  after  comments  were 
forwarded. Once comments are discussed, either at meetings or via email, 
the A/E shall resolve issues and incorporate requested comments into the 
documents.  
The  review  process  is  not  intended  to  relieve  the  A/E  from  its 
responsibility  to  produce  complete  and  coordinated  documents. 
Incomplete  or  poorly  coordinated  packages  will  be  returned  to  the  A/E 
until they are deemed ready for review by UNHCR.  

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 14 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
02.  Design Submittals 
 
02.01 General 
All submittals shall be provided in the English language, unless differently required in 
the  specific  SoW.  Upon  specific  SoW  instruction,  translation  into  the  host  country’s  Page | 15
language may be required. 
Drawing  sheets  shall  be  European  size  A1  sheets  with  title  block  as  required  by 
UNHCR  IMU.    Note  that  the  “A0”  size  sheet  shall  not  be  used  unless  specifically 
allowed by the PM. 
All drawing prints shall be half‐size, unless differently specified. 
Any  document  shall  have  pages  clearly  numbered  and  include  tabs  or  coloured 
sheets to clearly indicate the sections.   
Any document shall contain a table of contents when there is more than one section 
contained therein.   
Incorporation of review comments: review comments will be discussed during design 
review  meetings  and,  once  agreed,  incorporated  in  the  following  design  submittal. 
Rebuttals to comments shall be provided in writing within five days after the review 
meeting. 
Final documents are required to be submitted in electronic format, in addition to the 
paper submittals outlined elsewhere in this document.  Files shall be on recordable 
CD‐ROMs  and  shall  not  be  stored  using  file  compression  software,  i.e.  WinZip, 
WinRar, etc.  Final submittals shall be in the following formats: 
 Drawings:  Autodesk  AutoCAD  “DWG”  format,  Release  2008  (see 
Chapter 3) 
 Specifications: MS Word “docx” format, Release 2010 (see Chapter 4) 
 Basis of Design (see Chapter 5) 
 Cost  Estimates  /  Bills  of  Quantities:  MS  Excel  “xlsx”  format,  release 
2010 (see Chapter 6) 
 Schedules: MS Project “MPP” format, Release 2010 (see Chapter 7) 
 Construction Submittal Register: MS Excel “xlsx” format, release 2010 
(see Chapter 8) 
 Technical Reports and Calculations: MS Word “docx” format, Release 
2010 or Acrobat “pdf” 
 Safety Plan: Acrobat “pdf” 
Disks shall be labelled with project name, location, date, A&E firm name, and initials 
of  the  person  performing  the  virus  scan.  Four  complete  sets  shall  be  provided,  as 
follows: 
 CD‐ROM no. 1 (UNHCR Originals) 
Shall  include  all  documents  as  operable  files  (with  the  exception  of 
design calculations and reports that can be submitted as pdf files). 
 CD‐ROM no. 2 (UNHCR PDFs) 
Shall include all documents as pdf files. 
 CD‐ROM no. 3 (Tender documents) 
Shall  include  all  documents  as  pdf  files,  with  the  exception  of  form 
files  to  be  filled  by  bidders  and  excluding  the  Construction  Cost 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
Estimate. 
 CD‐ROM no. 4 (Tender documents) 
Shall  include  all  documents  as  operable  files  (with  the  exception  of 
design  calculations  and  reports  that  can  be  submitted  as  pdf  files, 
and excluding the Construction Cost Estimate). 
The  required  number  of  hard  copies  of  all  documents  will  be  set‐up  in  the  specific 
Page | 16  SoW.  
All  deliverables  shall  be  submitted  directly  by  courier  service.  Submittal  dates 
specified in the SoW shall be considered as delivery dates. 
All  submittal  shall  be  available  to  UNHCR  reviewers  by  the  dates  indicated  in  the 
Design SoW. With the exception of the Concept Design Submittal, a minimum of ten 
working  days  is  required  for  UNHCR  review  and  comments  consolidation,  unless 
differently required by the SoW.  
At the end of the review period, a review meeting shall be held with the participation 
of all the UNHCR parties involved as final users/reviewers in the project. The A/E shall 
keep  minutes  of  the  meeting  and  submit  them  within  five  working  days  from  the 
meeting. 
At  UNHCR  Project  Manager’s  judgement,  the  review  meetings  may  be  suppressed 
and/or  replaced  and/or  integrated  by  “over‐the‐shoulder”  review  meetings,  to  be 
held  at  the  A/E’s  office,  in  order  to  expedite  the  review  process.  The  SoW  shall 
address this requirement in detail. 
At  UNHCR’s  discretion,  design  can  be  partially  or  totally  suspended  and/or 
interrupted at any stage of its development. In this case, the AE will be reimbursed 
on the basis of the work performed, as amicably settled between the parties on the 
basis  of  the  agreed  fee  as  indicated  in  the  PO.  Relevant  deliverables  shall  be 
submitted to UNHCR at their current completion stage. 
 
02.02 Project start‐up 
As soon as the SoW is signed and the related PO issued, the UNHCR Project Manager 
will  schedule  a  project  start‐up  meeting.  Attendance  by  all  parties  involved  in  the 
project is required. 
The  scope  of  the  meeting  is  to  achieve  the  maximum  level  of  coordination  and 
cooperation among all of the project players.   
Subject  to  specific  requirements  included  in  the  specific  SoW,  attendance  of  the 
entire design team is required.   
The meeting outcome shall be:   
 Review of the Project requirements and A/E SoW 
 Review of the project schedule 
 Review of the project budget and definition of cost control procedures 
 Set‐up of progress meetings and relevant attendance 
 Review of requirements for deliverables 
 
 
 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
02.03 Concept Design Submittal 
Unless  differently  specified  in  the  SoW,  required  deliverables  include  but  are  not 
limited to: 
 Existing condition plans 
 Proposed Layout Plans 
 List and samples of materials  Page | 17
 Colour board (with samples of proposed materials) 
 Parametric cost estimate 
 Draft construction schedule (GANNT chart) 
 Construction  Permit  application  package  (as  required  by  the  host  country’s 
codes and where applicable) 
 
02.04 Concept Design Presentation and Review meeting 
Based on the start‐up meeting outcome, the A/E shall prepare a concept design to be 
presented to the project owners and to the PM before starting the development of 
technical  drawings  and  documents.  The  scope  of  the  meeting  is  to  achieve  the 
maximum level of coordination and cooperation among all of the project players.   
Deliverables to be included in the presentation will be defined in the specific SoW. 
The  meeting  outcome  shall  be  the  formalization  of  the  requirements  identified 
during the start‐up meeting, through layouts, colour boards and any other document 
to  ensure  that  designers  comply  with  UNHCR  requirements  and  are  on  the  right 
track. 
A  copy  of  the  Concept  Design  submittal  shall  be  provided  by  the  A/E  to  all  of  the 
UNHCR reviewers. 
After the presentation, the A/E shall collect all of the comments verbally expressed 
by UNHCR reviewers and submit the minutes of the meeting after five working days 
from the meeting itself. 

02.05 Charrette Meeting 
The Concept Design submittal can be replaced by a Charrette meeting during which 
the  A/E,  with  its  own  tools  (laptop  computers,  printers,  etc.),  meets  all  the  parties 
involved  in  the  project  and  prepares  a  Concept  layout  of  the  facility,  in  order  to 
proceed straight to the Interim Design submittal. 
The  Charrette  is  held  typically  within  UNHCR  premises  in  order  to  facilitate  the 
attendance of all the parties involved in the project as final users and/or reviewers. 

02.06 Interim Design Submittal 
02.06.01 Purpose 
The  purpose  of  the  interim  design  submittal  is  to  allow  a  review  of  the 
design  at  a  sufficient  stage  of  technical  development  and  to  collect  the 
final comments from UNHCR representatives.  
Unless  unforeseen  events  occur  (e.g.  a  change  in  operational 
requirements),  after  the  approval  of  the  interim  design,  only  technical 
comments by technical reviewers shall be considered in the development 
of the 100% (pre‐final and final) design. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
Each Concept Design review comments sent to the A/E shall be returned 
with each comment addressed. If the comment was incorporated into the 
design, a response shall so indicate. If the comment was not incorporated, 
an explanation shall be provided for not doing so. 
02.06.02 Deliverables 

Page | 18 
Unless differently specified in the SoW, required deliverables include but 
are not limited to: 
CIVIL 
 Site Plan 
 Utility Plan 
 Drainage Plan 
 Sewage Plan 
ARCHITECTURAL 
 Demolition plans and sections 
 Floor plans 
 Furniture footprint plans 
 Finish schedule 
 Roof Plan 
 Elevations 
 Typical sections 
 Typical wall sections 
 Legend 
STRUCTURAL 
 Foundation Plan 
 Floor framing plans 
 Roof framing plan 
MECHANICAL 
 Site Plan 
 HVAC  floor  plans,  showing  equipment  locations,  one  or  two 
line duct layout, preliminary piping runs1 
 Mechanical equipment / room plans 
 List and features of major equipment 
 Legend. 
PLUMBING. 
 Floor Plans, showing fixtures and equipment locations 1 
 Legend 
ELECTRICAL 
 Site Plan 
 Lighting floor plans1 
 Lighting fixture schedule 
 Power floor plans 

1   Mechanical, Electrical, Special Systems and Fire Protection floor plans should indicate proposed number and location of 
fixtures, outlets, devices, etc., but should not indicate any conduit or cable runs. Plans should also indicate proposed 
location and space required for electrical equipment such as transformers, switchboards, panel boards, 
telecommunication equipment, etc. 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
 One‐Line diagrams and/or Power Riser diagrams 
 Legend 
SPECIAL SYSTEMS (Communications, Security, CCTV, etc.) 
 Site Plan 
 Floor Plans1 
 One‐Line diagrams and/or Riser diagrams 
Page | 19
 Legend 
FIRE PROTECTION SYSTEMS 
 Schematic diagrams 
 Floor plans1 
 FP equipment / room plans 
 List and features of major equipment 
 Evacuation plans 
 Legend 
SPECIFICATIONS 
 See Chapter 4 
BASIS OF DESIGN 
 See Chapter 5 
CONSTRUCTION COST ESTIMATE 
 See Chapter 6 
CONSTRUCTION SCHEDULE 
 See Chapter 7 
CONSTRUCTION SUBMITTAL REGISTER 
 See Chapter 8 
TECHNICAL REPORTS AND CALCULATIONS 
 See Chapter 9 
HEALTH AND SAFETY COORDINATION 
 See Chapter 10 
ADMINISTRATIVE PERMITS APPLICATIONS 
 See Chapter 11 
02.07 Pre‐Final Design Submittal 
02.07.01 Purpose 
The  scope  of  the  100%  design  review  is  to  thoroughly  review  the 
construction package provided by the A/E, in order to ascertain that it is 
adequate  to  form  the  essential  part  of  the  construction  contract  to  be 
awarded by UNHCR on the basis of the outcome of the relevant tender 
procedure.  
This  review  stage  is  usually  limited  to  technical  players  and  final  users 
are not involved in it, unless major changes are required, on the basis of 
large  changes  of  operational  requirement.  In  that  case,  the  design 
should  go  back  for  another  interim  review,  against  the  new 
requirements and an additional fee must be negotiated with the A/E, to 
cover  the  additional  required  effort.  The  SoW  shall  be  amended 
accordingly. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
An  A/E  internal  technical  review  is  required  to  ensure  compliance  with 
project requirements, constructability adequacy, and a functional check.  
The  A/E  shall  submit  plans  and  specifications  in  final  form  from  its 
viewpoint, thus preventing time‐consuming reviews of incomplete plans 
and specifications. 

Page | 20 
Each Interim Design review comments sent to the A/E shall be returned 
with  each  comment  addressed.  If  the  comment  was  incorporated  into 
the  design,  a  response  shall  so  indicate.  If  the  comment  was  not 
incorporated, an explanation shall be provided for not doing so. 
02.07.02 Deliverables 
Unless differently specified in the SoW, required deliverables include but 
are not limited to: 
a. Plans  –  coordinated,  checked  and  complete  from  the  A/E 
viewpoint. 
b. Mechanical drawings – Area for tube, coil, and filter etc. removal 
shall  be  shown  dotted  and  labelled.  Piping  and  equipment 
isometrics  should  be  included  for  all  but  the  simplest  systems.  If 
space is limited, show dots in major equipment from other trades; 
domestic hot water heater, electrical panels, etc. Consider use of 
3D  isometric  layout  for  spaces  that  are  crowded.  Prior  to  final 
submittal  an  overlay  should  be  made  of  plumbing,  mechanical, 
electrical  and  communication  equipment  in  the  space  to  verify 
required clearances and access space. The sequence of operation 
for  the  automatic  temperature  control  system  should  be  shown 
on the drawings. 
c. Colour Design:  
i. Finish  schedule  with  colour  code  and  columns  completed 
with the appropriate colour codes. 
ii. Where other than usual painting or wall covering schemes or 
ceramic  wall  tile,  graphics,  built‐in  equipment  or  window 
treatments  are  used,  labelled  floor  plans,  elevations  and 
sketches  using  the  colour  codes  as  necessary  should  be 
drawn. 
iii. A  colour  legend  along  with  colour  notes  should  be 
completed referencing and specifying all finishes used in the 
finish schedule. 
iv. A  colour  board  should  be  furnished  identifying  all  finish 
colours  listed  in  the  finish  schedule,  labelled  with 
appropriate colour codes. The board should be a reasonable, 
transferable size (max A1 size). 
d. Collateral  Equipment:  the  A/E  shall  check  with  the  Project 
Manager  that  the  footprint  of  all  of  the  equipment  to  be 
purchased  or  provided  by  UNHCR  is  included  in  the  plans,  and 
labelled  either  as  “UNHCRp/Ki”  (UNHCR  provided  /  Contractor 
installed),  or  “UNHCRp/UNHCRi”  (UNHCR  provided  /  UNHCR 
installed). 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
e. Administrative  Specifications:  General  requirements  of  the 
construction  contract  are  included  in  Design  Specification 
Divisions  00  and  01  (to  be  provided  by  UNHCR  Project  Manager 
and  edited  by  the  A/E  as  directed  by  the  PM  in  accordance  with 
Chapter 4 of the present document). 
f. Technical Specifications. 
Page | 21
g. Calculations:  Engineering  calculations  shall  be  neat,  legible, 
logically ordered, bound and indexed. Design data shall be clearly 
stated.  Formulas  and  reference  sources  shall  be  cited.  Designers 
and checkers shall initial and date each computation sheet.  
h. A  Manufacturer’s  catalogue  should  be  furnished  of  major 
equipment which was used as a basis of design. Data shall include 
dimensions,  weights,  and  specified  ratings.  Examples  of  major 
equipment requiring catalogue data are: 
i. Switchgear / substations 
ii. Power Generators 
iii. UPSs 
iv. Filters 
v. HVAC 
vi. Pumps 
vii. Domestic hot water heaters 
viii. Other special equipment 
02.08 Final Design Submittal 
02.08.01 Purpose 
The purpose of Final Design  Submittal  is to finalise design phase and 
prepare documents for construction contract advertisement. 
Each Pre‐Final Design review comments sent to the A/E shall be 
returned with each comment addressed. If the comment was 
incorporated into the design, a response shall so indicate. If the 
comment was not incorporated, an explanation shall be provided for 
not doing so. 
02.08.02 Elements. 
a. Signatures – Originals of design documents shall be signed as 
required by the host country’s applicable code. 
b. Ownership of design documents – In accordance with Article 11 of 
the General Conditions of Contract for the Provision of Services 
(Annex A to the A/E Contract) or UNHCR Consultancy Contract where 
applicable, design documents, masters and any other data developed 
by the A/E shall become property of UNHCR unless stated otherwise 
in the Sow 
c. Design items – All design items shall be provided in electronic format, 
in operable and pdf files, on different CD‐ROMs. The required 
number of disk copies shall be indicated in the Scope of Work, as well 
as the number of hard copies. 
d. Quality Control Data – The A/E is expected to perform an internal 
Quality Control review of all documents submitted to UNHCR.  

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
This review will evaluate both the technical accuracy and discipline 
coordination. A statement of performed Quality Control review shall 
be provided with the final submittal and signed by the appointed A/E 
professional. 
e. Code Compliance – A statement of compliance with all host country 
applicable laws, codes, norms and regulations shall be provided to 
Page | 22  the UNHCR Project Manager with the Final Design submittal, and 
signed by the A/E Project Manager.  
02.09 Other reviews and meetings 
Subject to specific SoW requirements, additional review sessions and/or meetings 
may be required or some of the above ones may be suppressed. 
02.10 Meeting Minutes 
A/E shall provide meetings minutes within 5 working days after each meeting. 
02.11 “Over‐the‐shoulder” review meetings 
At the UNHCR Project Manager’s judgement, review meetings may be suppressed 
and/or replaced and/or integrated by “over‐the‐shoulder” review meetings, to be 
held at the A/E’s office, in order to expedite the review process. The Design Scope of 
Work shall address this requirement in detail. 
02.12 Presentation requirements and meetings 
If required by the SoW, the A/E shall prepare a presentation of the design to 
technical and non‐technical stakeholders.  Any presentation submittal will be 
provided in hard copy and electronic format (pdf, ppt, jpg) on CD‐ROM. 
02.12.01 Renderings  
Renderings may be required to illustrate and delineate the design in the 
best possible manner. Number of renderings will be specified in the SoW. 
All renderings shall comply with following requirements: 
 to be photorealistic, showing materials and shadows with both natural 
and artificial light; 
 to have definition to allow a 300dpi colour printing at least on A3 
format. 
02.12.02 Material Boards and Samples  
A/E shall present all material selected for review and approval by UNHCR 
in a format that is portable and presentable to others such as material 
boards and binders.  
All interior finishes shall be presented on a board tagged with where it is 
used and primary specifications.  
Furniture selections must be presented in a binder and include pictures of 
the furniture, finish samples, and specifications. 
02.12.03 Model Requirements  
A/E may be required to provide a model of the project, with the following 
requirements: 
 The model shall be provided with a protective clear case or cover in a 
scale that is moveable; 
 materials shall be durable and withstand time and movement;  
 the model shall be photographed by the A/E and a set of prints as well 
as digital files in JPG format  delivered to the UNHCR PM.  
 
     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
03. Design Drawings 
 
03.01 General 
Design Drawings usually consist of six main elements: 
Page | 23
 Plans, which show horizontal relationships 
 Elevations, which show the main features of the structure 
 Sections  and  details  which  show  either  horizontal  or  vertical  relationships, 
generally to a larger scale for greater clarity and more complex content than can 
be illustrated on plans and elevations 
 Finish Schedules 
 Equipment Schedules 
 Diagrams 
Drawings shall show: 
 Location of each material assembly, component or accessory 
 Sizes  (thickness  and  all  other  significant  dimensions)  of  all  field‐assembled 
components 
 Identification (consistent with specification nomenclature) of all prefabricated or 
pre‐assembled components or equipment described in the specifications 
 Diagrams of specially fabricated connections 
All drawings issued must be annotated with the author, checker and approver of the 
drawings  together  with  relevant  signatures  (electronic  or  print).  Drawings  must 
contain the A/E seal and signatures and shall be deemed to be the contractual copy 
of the relevant drawings at each project phase. 
Drawings shall be drawn full size within the drawing model space with scaling of the 
drawing  to  the  required  format  on  the  drawing  layout.    The  drawings  legend  shall 
contain  details  of  the  units  to  which  the  drawing  is  dimensioned.  The  issuer  shall 
ensure  consistency  of  the  dimensions  through  all  drawings  prepared  as  part  of  the 
project. 
Each drawing shall contain a detailed legend, a scale bar and a north sign and where 
required, a key plan of the relevant project site. 
All  drawings  shall  be  prepared  at  standard  scales  (e.g.  1:100,  1:200,  1:50)  unless 
agreed  otherwise.  Should  layouts  contain  a  number  of  drawings  of  differing  scales, 
the  title  block  shall  state  “as  shown”  and  the  relevant  scales  shall  be  contained 
beneath the different drawings contained on the drawing sheet. 
Drawings shall contain all information required to complete the works and /or refer 
to  other  sources  of  information  if  required.    All  information  shall  be  clear  and 
unambiguous and shall be consistent with all other drawings for the same location. 
Drawing  text  type  shall  be  the  “Arial”  type  as  contained  within  the  AutoCAD  text 
library;  this  shall  also  be  the  requirement  for  dimensional  text.    The  issuer  shall 
ensure  that  all  information  contained  on  each  drawing  is  legible  at  A3  size,  the 
minimum text height on printed copies of drawings shall be 2.5 mm for general text 
and 5.0 mm for headline text on the printed paper. 
Dimensional references shall utilise closed filled arrows and shall be sized such that 
they are legible at A3 size. “Architectural ticks” are not permitted. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
The  proovision  of  coloured 
c draawings  (UNHHCR  title  bllock  excludeed)  shall  on
nly  be 
permittted upon spe ecific approvval. The issue
er shall endeeavour to disstinguish bettween 
similar  elements on n drawings t hrough the  use of varyin ng line typess, line thicknnesses 
and nottation. 
All draw
wing sectionss shall be cleearly annotatted on plan d
drawings inccluding the se
ection 
ref (see the figure b
below) and thhe direction of the sectio
on. 
Page | 24 
 

 
ELEVATIO
ON, SECTION
N OR DETAIL SYMBOL 
No
ote: Symbol sshould alwayys appear as part of the title, placed uunder the vie
ew. 
 
Notwith hstanding the contained above, in re elation to the
e use of textt, dimensions, line 
types, hhatching etc,, it.  it  shall   be  ensured  that  the  output  at   A3  drawingg  size  
shall  bee readable and understa ndable. 
 
03.002 Arrange Presentation  of Drawingss 
ement and P
The  gen
neral  numbe ering  schemees  required  is  called  the
e  Uniform  D
Drawing  Syste
em  or 
UDS. Cuurrently, it is a worldwidee industry standard practtice. 
Drawinggs must be n numbered ussing an alphanumeric system. The fi rst digit is a letter 
that rep
presents the e discipline aassociated with that draw
wing sheet. TThe sheets wwithin 
each  discipline  are
e  then  nummbered  consecutively  an nd  shall  be  arranged  in  the 
followin
ng order: 
 Sheets CS‐01
1   to  T‐999  Title Sheet(s) and Index 
 Sheets D‐001   to  D‐999  Demolitions
D
 Sheets C‐001   to  C‐999  Civil (Utility a
C nd Infrastruccture) 
 Sheets A‐001   to  A‐999  Architectural
A
 Sheets S‐001
1   to  S‐999  Sttructural 
 Sheets M‐0001   to  M‐999  Mechanical (H
M HVAC) 
 Sheets P‐001   to  P‐999  Plumbing 
 Sheets FP‐00
01  to FP‐999  Fire Protectio on and Safetyy Systems 
 Sheets E‐001
1   to  E‐999  Electrical 
 Sheets SS‐00
01  to SS‐999  Special System ms 
   
UNHCR/AI/2015/3 – A
Annex B  IMU AA/E Manual – April 2015 
 
 Sheets ID‐001  to  ID‐999  Interior Design 
In addition to the discipline‐numbering scheme, there is also a total sheet count for 
the entire project. However, in most cases, the number used to refer to a drawing is 
the discipline sheet number. 
Drawings  shall  be  submitted  in  Half‐Size  copies  (A3),  bound  (not  full‐size,  folded), 
unless differently required by the SoW or by UNHCR Project Manager.  Page | 25

03.03 Size of Drawings and Sketches 
UNHCR uses the following size drawings: 
ISO A4  mm 21.0 x 29.7:  Used  for  sketches,  reports,  and  any  suitable 
documents, usually bound. 
ISO A3  mm 42.0 x 42.0:  Used for half‐size copies of drawing sheets and/or in 
bound reports, folded to fit the A4 binding, in a way 
that allows reading the page number and the subject 
of the sheet. 
ISO A1  mm 84.0 x 59.4:  Used for drawing sheets. 
03.04 UNHCR Standard Drafting Media 
UNHCR  requires  all  drawing  files  to  be  prepared  in  Autodesk  AutoCAD  “DWG” 
format, Release 2008, unless differently required by the Scope of Work or by UNHCR 
Project Manager.  
03.05 Detail designation 
Standard symbols for details may be specified under the SoW for any specific PO.  
03.06 UNHCR Standard title/drawing sheet and title block 
A template is provided as Attachment B to this document. 
 
 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 26 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
04. Specifications 
  
Included  under  design  are  the  Specifications  or  "specs".  This  is  a  broad  term  encompassing 
the  written  documents  that  are  part  of  the  construction  contract,  and  apply  to  both  the 
general requirements and the technical aspects of the construction contract.  Page | 27

 
04.01 General Conditions and Administrative Requirements. 
The  A/E  shall  include  UNHCR  General  Conditions  for  Civil  Works  in  the  design 
package as Specification Section 00 (in their latest approved version, as provided by 
the UNHCR Project Manager).  
 
04.02 Technical Specifications 
Technical  Specifications  may  be  classified  according  to  the  way  in  which  they 
describe a requirement.  
Regardless  of  the  type  of  specification  used,  specifications  shall  clearly  describe  to 
the bidders what is desired either in terms of functions, performance characteristics, 
detailed design parameters, or any combination of these, depending on the selected 
acquisition strategy. 
04.02.01 Performance Specifications 
In  Design/  Build  (DB)  contracts  “Performance  Specifications”  are 
commonly  used,  while  in  more  traditional  Design/Bid/Build  (DBB) 
contracts,  “Design  Specifications”  are  the  standard.  However,  it  is 
important  to  note  that  these  categories  are  not  necessarily  rigid  or 
exclusive,  since  the  Project  Manual  for  a  D/B  contract  may  include  a 
more  detailed  design  for  a  portion  of  the  facility  in  which  UNHCR 
requirements  are  more  stringent  and  less  open  to  innovation  and/or 
contractor’s  Construction  Contractor  (KTR)’s  interpretation.  On  the 
other  hand,  the  Project  Manual  for  a  Design/Bid/  Build  (DBB)  contract 
normally  includes  some  sections  in  which  the  detailed  design  shall  be 
prepared by the contractor, e.g. the steel reinforcement.  
Performance Specifications shall describe "performance required" as the 
end product or results to achieve, rather than the method to be used in 
achieving  those  results.  Even  though  a  "performance  specification" 
places significant risk on prospective contractors to meet a requirement, 
it  gives  a  great  deal  of  flexibility  in  selecting  the  most  suitable  "means 
and  methods".  Performance  Specifications  generally  provide  for  a 
significant  amount  of  competition  and  innovation.  Disadvantages 
include  some  difficulty  in  establishing  or  describing  the  level  of 
performance required and in a difficult in evaluation of proposals.  
04.02.02 Design Specifications. 
Design  Specifications  are  commonly  used  in  DBB  contracts.  They  shall 
describe  in  great  detail  the  exact  physical  materials,  relationships, 
locations  etc.  that  UNHCR  desires.  They  are  generally  taken  to  be  the 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
most restrictive in terms of competition and are easier to enforce. Their 
advantage consists of: 
 a maximum control over the end product; 
 the construction contract may be easily awarded since each bidder 
is working off of the same information; 
 they allow for a great deal of flexibility in the amount and  type  of 
Page | 28 
quality  assurance  since  specific  criteria  are  available  to  be 
measured during all aspects of the project.  
Disadvantages  include  lack  of  flexibility  in  alternative  methods  and 
UNHCR assumption of increased liability for the design, and generally a 
longer total project schedule. 
There are several groups of "standard specifications" that are routinely 
used  in  the  construction  industry.  Reference  Specifications  are  widely 
used  published  specifications,  incorporated  in  the  project  specification 
by reference. Examples include European Union and U.S. standards, such 
as DIN, ISO ASTM, ASHRAE, etc. 
Architect‐Engineer  (A/E)  firms  contracted  by  UNHCR  to  perform  design 
for  UNHCR  are  generally  required  to  use  the  U.S.  Construction 
Specification Institute (CSI) format, which has 16 standard divisions. The 
CSI format is an industry standard, used worldwide in the private sector 
for  construction  contracts.  The  use  of  CSI  Format  requires  that  the 
construction contract be broken down into disciplines. It also separates 
technical requirements from administrative requirements.  
Specification sections shall be organised as follows: 
 Division 00:  General Conditions 
 Division 01:  Administrative requirements 
 Division 02:  Site Work 
 Division 03:  Concrete 
 Division 04:  Masonry 
 Division 05:  Metals 
 Division 06:  Wood and Plastics 
 Division 07:  Thermal and Moisture 
 Division 08:  Doors and Windows 
 Division 09:  Finishes 
 Division 10:  Specialties 
 Division 11:  Equipment 
 Division 12:  Furnishing 
 Division 13:  Special Construction 
 Division 14:  Conveying Systems 
 Division 15:  Mechanical 
 Division 16:  Electrical 
With  the  exception  of  Specification  Sections  00  (General  Terms  and 
Conditions) and 01 (Administrative Requirements) the technical aspects 
are  described  in  Specification  Divisions  02  through  16,  which  shall 
contain  the  qualitative  requirements  for  materials  and  workmanship, 
including  precise  and  detailed  definitions  to  ensure  use  of  correct 
materials and methods of assembly.  
     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
Each division contains sections, which must tailor to the specific project 
by: 
Part 1 (General) 
 Definitions 
 Quality Assurance 
 Submittals 
Page | 29
 Product delivery, storage and handling 
 Job conditions 
 Alternatives and allowances 
 Guarantee 
Part 2 (Products) 
 Materials 
 Mixes 
 Fabrication and manufacture 
Part 3 (Execution) 
 Inspection 
 Preparation 
 Installation 
 Application 
 Performance 
 Erection 
 Field quality control 
 Adjustment  &  cleaning  (incl.  environmental  protection,  where 
appl.) 
 Schedules 
04.02.03 Proprietary Requirements 
Proprietary  requirements  describe  the  use  of  a  specific  manufacturer's 
product, or limit the number of available sources to one. This practice is  
inconsistent  with  UNHCR’s  policy  of  promoting  full  and  open 
competition.  
All  proprietary  specifications  require  approval  by  the  UNHCR  
Procurement  Officer,  in  accordance  with  the  estimated  value  of  the 
work or item.  
It  is  however  possible  to  reference  specific  products,  by  listing  at  least 
three  suitable  manufacturers  to  be  indicated  in  the  spec,  “or  equal 
approved”.  "Or  equal"  requirements  are  a  shortcut  method  of  using  a 
make and model to describe the requirement, without actually requiring 
that specific make and model. 
04.02.04 Submittal Requirements 
Concept Design Submittal: Submittal of Specifications is not required at 
the  Concept  Design  stage.  However,  a  brief  description  of  the  project 
features  is  required  in  order  to  explain  the  facility  performance  to  the 
final users. 
Interim Design Submittal: As a minimum requirement, a complete list of 
specification  sections  to  be  included  in  the  final  design  is  required  as 
part of the Interim Design submittal. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
In addition to the list, the A/E shall submit the Specification package at 
its actual development stage.  
Pre‐Final  Design  Submittal:  A  complete  set  of  specifications  is  required 
as part of the Pre‐Final Design submittal, amended and integrated as per 
the comments agreed during the Interim Design review. 

Page | 30 
Final  Design  Submittal:  A  complete  set  of  specifications  is  required  as 
part  of  the  Pre‐Final  Design  submittal,  amended  and  integrated  as  per 
the comments agreed during the Pre‐Final Design review. 
 
 
 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
05. Basis of Design (BoD) 
 
05.01 General 
The  Basis  of  Design  shall  include  all  technical,  administrative  and  regulatory 
references and criteria to be followed during design.   Page | 31

05.02 Civil 
05.02.01 Site Plan 
a. Describe  and  quantify  the  dredging  requirement,  proposed  disposal 
plan, and status of the dredging permit.  
b. Identify dredge depth and quality control procedure requirements. 
05.02.02 Asbestos and Toxic Materials 
Investigate  for  the  presence  of  asbestos  and/or  toxic  waste  materials  in 
existing buildings. Provide indication for cleanup system, with reference to 
applicable host country norms. 
05.02.03 Water Supply 
a. Describe the existing water supply system, indicating particularly the 
type,  capacity,  condition,  present  water  use,  and  unsatisfactory 
elements. 
b. State type of construction proposed, materials for water mains, type 
of well, etc. 
c. For  exterior  distribution  systems,  state  design  parameters  including 
domestic and fire flow, residual pressure, elevation differentials, etc. 
Include designer’s initial estimate of pipe sizes.  
d. State  tentative  sizes,  elevations,  capacity,  etc.,  as  can  readily  be 
determined  without  long  computations  or  design  consideration  for 
reservoirs, treatment units, pumping stations, well pumps, and such 
units. 
e. Dead‐end pipes are not allowed in new water distribution systems. 
05.02.04 Sewers and Sewage Disposal Systems 
a. Describe  the  existing  disposal  systems  indicating  particularly  the 
type, capacity, condition, present flow, and unsatisfactory elements. 
Address the adequacy of the down storm sewers for capacity and of 
the  pumping  station  to  prevent  overflows  including  alarms,  power, 
and assumed response time by the relevant local authorities. 
b. State materials to be used for sewer systems. 
c. Identify standards governing the design. 
05.02.05 Roads, Parking Areas and Walks 
a. State  general  soil  conditions,  with  a  brief  outline  of  soil  exploration 
and testing performed. 
b. Describe the type and volume of traffic. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
05.02.06 Fencing. 
State type, height and reasons for fencing. 
05.03 Architectural 
Provide  statement  of  the  type  of  construction  adopted  with  reference  to  the 
occupancy,  anticipated  tenure  of  usage,  degree  of  fire  resistance,  and  maximum 
Page | 32  allowable floor areas, and building code restrictions.  
Provide statement of the type of the type of thermal insulation to be provided and 
the insulation factor. Also provide description of all architectural energy conservation 
/ sustainability features to be incorporated, including any passive solar systems. 
Provide  a  one  page  narrative  description  of  the  proposed  colour  design  concept, 
addressing  architectural  finishes  and  colours.  The  description  of  finishes  (colours, 
textures, and patterns) shall be accomplished by the use of a finish schedule, colour 
legend,  notes.  The  finish  schedule  shall  identify  interior  building  material  finishes 
(A/E may choose room‐by‐room name or number format). For the completed project 
all reference to building colours shall be on the drawings in the colour legend that is 
referenced  to  the  finish  schedule.  Provide  a  generic  colour  board  referencing  the 
narrative, integrated by material samples, where possible. 
Provide a description and number of items not considered to be a permanent part of 
the structure, such as work benches, shelving, bins and removable partitions. 
List areas of high noise and vibration and acoustic principles applied. 
Describe accessibility features of the building with reference to code requirements. 
Provide  computation  of  gross  and  net  floor  areas.  Net  areas  shall  be  provided  per 
single  room  and  per  room  type  (workstations,  connectivity,  restrooms,  technical 
rooms, etc.) 
Determine  occupancy  classifications,  calculated  occupant  load,  number  and  size  of 
exits  and  other  requirements  per  the  applicable  local  codes.  Describe  unusual  or 
critical code requirements and indicate how such requirements willwill be met. 
Describe  special  construction  features  incorporated  into  the  facility  such  as  barred 
windows,  special  wall/roof  construction,  raised  computer  flooring,  anti‐blast  films, 
special anti‐blast window frames, etc. 
05.04 Structural 
Provide description of foundation conditions, type of foundation to be used, method 
by  which  the  allowable  bearing  values  are  determined,  and  maximum  allowable 
bearing capacity for the foundations. Geotechnical information, including field boring 
notes and report of recommendations shall be submitted. 
Provide  statement  of  the  type  of  construction  adopted,  and  reason  therefore,  with 
capacity, dimensions, or other size criteria, and list of material selected with design 
strengths. 
Special  features  to  be  included  in  the  structure  which  are  not  evident  from  the 
drawings. 
Description  of  the  structural  floor  and  roof  system  proposed,  with  length,  spacing 
and size of principal members (for beam and girder, etc.). 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
Provide  description  of  the  lateral  force  resisting  system  proposed  with  appropriate 
materials and dimensions. 
Provide  statement  of  any  special  considerations  that  affect  the  design  (e.g. 
“superflat” floors, special corrosion resistance requirements, etc.). 
Describe requirement for the use of cranes during construction. 
The  usual  accepted  means  of  structural  system  selection  is  economy.  Demonstrate  Page | 33
this with parametric  computations of various appropriate framing systems and cost 
comparisons of each, including: 
“Typical Bay” member sizing and cost comparison of alternate structural systems. 
Horizontal force resisting system for wind and earthquake. 
Consideration of unusual geometry (long span, high bay, deep cuts, etc.). 
Consideration of heavy equipment supports. 
05.05 Mechanical 
05.05.01 General 
As  an  objective,  mechanical  systems  should  be  simple  and  reliable  while 
providing  a  comfortable  environment  for  building  occupants,  with 
minimum consumption of energy. 
Mechanical systems should be self‐sufficient, as in many locations UNHCR 
does not have building operators. 
Maintenance  costs  should  reflect  the  complexity  of  the  system.  If  the 
present values of alternative systems are close, select the simpler system. 
Adequate space shall be allocated for proper access and maintenance of 
equipment.  
Mechanical room plan and sections shall be large enough to show access 
areas and resolution of interferences. 
05.05.02 Heating, Ventilation and Cooling (HVAC) 
a. Use  of  professionally  recognised,  nationally  used  computerized  load 
calculations is required. 
b. Copies of input/output data are required. 
c. The  sequence  of  operations  for  the  automatic  temperature  control 
system shall be shown on the drawings. 
d. Comfort  Heating  –  The  heating  inside  design  temperature  for 
personnel comfort should be 20°C for administrative and living areas, 
13°C for working areas, and 5°C for storage areas, for the prevention 
of freezing. 
e. Describe  the  source  of  thermal  energy  which  will  be  used.  Also 
explain  why  this  source  was  selected  in  lieu  of  other  available 
sources. Provide an explanation of why this system is preferred over 
others.  The choice among different available sources shall be driven 
by energy conservation considerations. 
f. Indicate location of major components of the system. 
g. Provide  a  brief  description  of  the  type  of  ventilation  system 
proposed. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
h. Indicate the number of outside air changes per hour in various areas, 
the  type  of  filtration,  with  reference  to  the  host  country  applicable 
codes. 
i. Describe requirement for smoke removal system, if any. 
j. Describe the operation of the system in summer and winter modes. 
k. Comfort  Cooling:  The  air‐conditioned  inside  temperature  should  be 
Page | 34  10°C  less  than  the  2‐1/2  outside  dry  bulb  weather  condition,  but 
should  not  exceed  26°C  dry  bulb  or  be  less  than  24°  dry  bulb.  The 
design  relative  humidity  should  be  50%  minimum  or  the  design 
temperature equal to the outside air dew point design temperature, 
whichever is less. 
l. Provide a complete description and schematics of the cooling system 
proposed  including  an  explanation  of  why  this  system  is  preferred 
over  others.  Also  indicate  locations  of  major  components  of  the 
system.  
m. Identify  special  humidification  or  dehumidification  requirements,  as 
well as special filtration requirements. 
n. Briefly describe the HVAC control system type and functions. The use 
of remote control systems (smart‐building type) is encouraged. 
05.05.03 Plumbing 
a. Provide  determination  of  each  type  of  fixture  based  upon  the 
number of persons to be served. 
b. Provide estimated number of fixture units and water demand in LPM 
(litres per minute) for all plumbing fixtures. 
c. Provide  estimated  maximum  and  minimum  water  pressure  at  each 
building  and  indicate  if  booster  pumping  will  be  required.  Refer  to 
host country’s applicable code to check if the use of booster pumping 
is allowed. 
d. Indicate type, size and design temperature of domestic water heater 
and  distribution  system.  Also,  provide  a  statement  as  to  whether 
heat recovery is contemplated for domestic water heating. The use of 
passive systems, environmental friendly, such as solar panels is highly 
encouraged. 
e. Indicate  design  temperature  of  domestic  hot  water  distribution 
system and extent of recirculation system within building. 
05.06 Fire Protection 
Refer to all applicable host country codes. 
Automatic  sprinkler  and  gaseous  extinguishing  systems  piping  layouts  shall  not  be 
designed: i.e., a piping plan will generally not be provided to show new work. Such a 
plan may be necessary to indicate existing piping sizes and locations or to show pipe 
routing  where  interference  problems  exist.  In  instances  where  architectural  and 
interior design features are critical (e.g. lobbies, official meeting rooms, etc.), it may 
be necessary to show sprinkler head or piping locations. A schematic riser diagram is 
required and points of connection must be identified. 
Describe  fire  detection  and  alarm  systems  including  location  of  detectors,  manual 
stations,  audible  devices,  control  panel,  etc.  Number  of  conductors  shall  not  be 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
indicated  unless  required  to  ensure  proper  interface  with  existing  systems  or  for 
unusual complex systems. 
Indicate location of water supply main entrance to the building and detail of sprinkler 
valves. Also indicate location and details of gaseous extinguishing system equipment 
and  supplies;  show  piping  to  the  extent  required  by  space  limitations,  where 
potential interference problems may occur. 
Page | 35
Provide the following information about sprinkler systems: 
a. Relevant authority 
b. Hazard classification of occupancy 
c. Identify  type(s)  of  automatic  sprinkler  system(s)  involved,  i.e.  wet‐
pipe,  dry‐pipe,  etc.  Indicate  areas  to  be  protected  and  each  type  of 
system proposed 
Provide fire pump data, if applicable. 
05.07 Electrical 
05.07.01 Interior Distribution Systems 
a. Refer to all applicable host country codes. 
b. Provide  electrical  characteristics  (phase,  voltage,  and  number  of 
conductors). 
c. Provide  breakdown,  by  category,  of  the  estimated  connected  loads, 
demand  factors  and  demand  loads  for  each  category,  total  demand 
load,  diversity  factor,  and  total  diversified  demand  load.  Load 
categories shall include the following: 
c.1 Lighting load. 
c.2 Convenience outlet load. 
c.3 Mechanical  equipment  load,  such  as  heating,  air  conditioning, 
etc. 
c.4 Special  operating  equipment  loads,  such  as  compressors, 
generators,  pumps  and  power  receptacles  being  provided  to 
serve special equipment. 
c.5 User equipment loads. 
c.6 Miscellaneous/other loads. 
d. Describe  type  of  wiring  system,  such  as  rigid  conduit,  electric, 
sheathed cable, etc., and where proposed to use.  
e. Describe  type  of  conductor  and  insulation  material,  and  where 
proposed to use. 
f. Provide  a  description  of  proposed  standards  for  design,  such  as 
voltage  drop,  lighting  intensities,  type  of  light  sources,  and  a 
statement  regarding  the  use  of  selective  switching  and  any  other 
energy conservation features. 
g. Provide short circuit calculations. 
h. Describe supporting facilities (outlets raceways, and backboard) to be 
provided for telecommunication systems. 
i. Provide lighting calculations keyed to lighting floor plans, and lighting 
fixture schedule. 
05.07.02 Exterior Distribution Systems 
a. Contact the UNHCR Project Manager for location and characteristics 
of  nearest  electrical  power  source  capable  of  supplying  project 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
requirements. Do not contact local utility companies unless required 
by the Project Manager. 
b. Provide  a  statement  relative  to  the  adequacy  of  the  primary  power 
source at the point of pick‐up. If primary source is inadequate, state 
measures proposed to correct the deficiency. 

Page | 36 
c. Provide  electrical  characteristics  of  the  power  source,  including 
circuit interrupting requirements. 
d. Provide  an  estimate  of  total  connected  load  and  resulting  kW 
demand  load  by  applying  proper  demand  and  diversity  factors,  if  a 
group of loads is involved. 
e. Describe  the  basis  for  selection  of  primary  and/or  secondary 
distribution voltage. 
f. Do not use aluminium as conductor material.  
g. Describe type of insulation for cable systems. 
h. Provide a statement describing pertinent standards of design, such as 
voltage  drop,  physical  characteristics  of  overhead  or  underground 
circuits,  type  of  lighting  units  and  lighting  intensities.  Provide 
manhole design calculations as applicable. 
05.08 Special Systems 
a. Provide  a  description  (including  riser  diagrams)  of  Cable  Television  Systems 
(CATV),  Closed  Circuit  Television  Systems  (CCTV),  intercoms,  sound,  signal  and 
fire alarm systems. 
b. Provide  a  statement  relative  to  supporting  facilities  (outlets,  raceways,  and 
backboard)  to  be  provided  for  telecommunication  systems.  Number  and 
location  of  telecommunication  outlets  (i.e.  telephone,  LAN,  etc.)  should  be 
obtained by the Project Manager.  
c. Identify  space  required  for  telecommunication  equipment,  point  of  connection 
to  any  existing  telephone  system  /  LAN,  size  of  incoming  duct/conduit,  size  of 
patch‐panels. 
d. Provide manhole design calculation as applicable. 
e. Describe type and adequacy of public address and fire alarm systems, including a 
statement as to spare capacity on fire alarm circuit. 
f. Refer to all host country applicable codes. 
 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
06. Construction Cost Estimate (CCE) 
and Bill of Quantities (BoQ) 
 
06.01 Cost Estimate  Page | 37

A cost estimate is required with each design submittal, as follows: 
 Concept Design:  Parametric cost estimate. 
 Interim Design:  Detailed Cost Estimate. 
 Pre‐Final and Final Design:  Detailed Cost Estimate, final issue. 
All  estimates  must  be  prepared  in  Microsoft  Excel  and  be  marked  with 
“CONFIDENTIAL”. 
The  estimate  detail  for  each  submittal  shall  be  consistent  with  the  level  of  design 
required  for  that  submittal.  The  A/E  is  responsible  for  accurate  quantity  take‐off, 
and accurate unit prices for the project’s geographic location. 
The  A/E  is  required  to  develop  a  final  estimate  that  will  be  within  10%  of  the 
lowest,  technically  acceptable  bid.  When  this  objective  is  not  met,  the  A/E  shall 
support  the  tender  evaluation  by  preparing  a  comparison  of  cost  between  the 
lowest,  technically  acceptable  bid,  and  the  final  A/E  estimate.  Reasons  for  major 
differences,  sorted  by  specification  division,  must  be  stated  within  a 
recommendation to award or reject. This bid analysis must be received by UNHCR 
Project  Manager  within  one  week  after  notification  that  is  required,  and  is  to  be 
provided at no additional cost to UNHCR. 
The final Cost Estimate shall be included in the Final Design Submittal. 
 
06.02 Bill of Quantities 
A copy of the Cost Estimate, purged by the unit prices, shall be provided with the 
Pre‐Final and the Final Design submittals, to be included in the tender package. 
The  final  Bill  of  Quantities  shall  be  included  in  the  Final  Design  Submittal,  as 
required by Paragraph 2 of this Manual. 
Separate  bills  of  quantities  shall  be  provided  for  works  under  the  facility  of  the 
landlord’s responsibility, where applicable, if identified by UNHCR Project Manager 
at any stage of design development. 
 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 38 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
07. Construction Schedule (CS) 
 
The  A/E  shall  prepare  an  indicative  construction  schedule  as  part  of  the  design,  to  be 
included  in  the  RFP  package,  to  be  verified  with  the  selected  contractor  after  the  contract 
award.  Page | 39
The  schedule  shall  be  prepared  with  MS  Project  and  submitted  at  its  current  stage  of 
development with all design submittals. 
A construction schedule as detailed as possible is required with the pre‐final and final design 
submittals, including, as a minimum, the following phases (when applicable): 
a. Pre‐Construction submittals (submittal, UNHCR review and approval) 
b. Revised  Submittal  Register,  including  time  for  UNHCR  review  and  approval,  as 
directed by the tender documents or by UNHCR Project Manager 
c. Delivery and installation dates of major equipment,  as described  by the project 
Scope of Work 
d. Mobilization 
e. Exterior roads and paving 
f. Landscaping 
g. Utility connections 
h. Foundations 
i. Vertical Structure 
j. Perimeter walls 
k. Roof 
l. Interior walls 
m. Interior flooring 
n. Interior power distribution and lighting system 
o. Interior mechanical system 
p. Fire protection system 
q. Special systems 
r. Installation of exterior doors and glazing 
s. Interior finishes 
t. Installation of interior doors 
u. Furnishing 
v. Testing and commissioning 
w. Any other (as directed by UNHCR Project Manager) 
Each phase shall include as many sub‐phases as required by the single project.  
The  schedule’s  level  of  detail  shall  be  clarified  by  UNHCR  Project  Manager  during  the 
negotiation of the A/E fee. 
 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 40 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
08. Submittals and Submittal Register (SR) 
 
08.01 Submittals 
The  term  “submittal”  defines  any  administrative  documentation,  material  samples 
and/or  catalogue  cuts,  design  item  (shop  drawings,  red‐line  drawings,  as‐built  Page | 41

drawings,  calculation  reports),  testing  certification,  etc.,  required  by  construction 


contract  from  the  contractor  (KTR),  in  general  prior  to  the  execution  of  a  specific 
construction phase. 
08.02 Submittal List 
The  A/E  shall  develop  a  complete  list  of  submittals  as  Design  deliverable  items, 
identifying  required  submittals  in  the  specifications,  and  using  such  list  to  prepare 
the Submittal Register.   
08.03 Submittal Register 
The Submittal Register shall be submitted as part of the A/E’s Pre‐Final and the Final 
Design submittals 
08.04 Type of construction submittals 
08.04.01 Pre‐Construction  submittals:  Pre‐Construction  submittals  are  required 
prior to signing the construction contract. They include, but may not be 
limited to: 
Certificates of insurance 
a. Performance and Material, Payments and Liens bonds 
b. List of proposed subcontractors 
c. List of proposed products 
d. Construction Progress Schedule 
e. Submittal register 
f. Schedule of values (to be used for payments evaluation) 
g. Detailed Construction Schedule 
h. Partial / Full Design 
i. Construction Safety Plan 
08.04.02 Construction submittals 
Construction  submittals  are  required  during  construction,  and  UNHCR 
approval is required prior to any installation/construction work.  
They include, but may not be limited to: 
x. Shop  Drawings:  Drawings,  diagrams  and  schedules  specifically 
prepared to illustrate any portion of the work. 
y. Diagrams and instructions from a manufacturer or fabricator for use 
in  producing  the  product  and  as  aids  to  the  KTR  for  integrating  the 
product or system into the project. 
z. Drawings prepared by or for the KTR to show how multiple systems 
and interdisciplinary work will be coordinated. 
aa. Product  Data:  Catalogue  cuts,  illustrations,  schedules,  diagrams, 
performance  charts,  instructions  and  brochures  illustrating  size, 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
physical  appearance  and  other  characteristics  of  materials  or 
equipment for some portion of the work. 
bb. Samples of warranty language when the contract requires extended 
product warranties. 
cc. Samples: Physical examples of materials, equipment or workmanship 
Page | 42 
that illustrate functional and aesthetic characteristics of a material or 
product and establish standards by which the work can be judged. 
  Colour  samples  from  the  manufacturer's  standard  line  (or  custom 
colour  samples  if  specified)  to  be  used  in  selecting  or  approving 
colours  for  the  project.  Field  samples  and  mock‐ups  constructed  on 
the  project  site  establish  standards  by  which  the  ensuring  work  can 
be judged. Include assemblies or portions of assemblies which are to 
be incorporated into the project and those which will be removed at 
conclusion of the work. 
dd. Design  Data:  Calculations,  mix  designs,  analyses  or  other  data 
pertaining to a part of work. 
ee. Test  Reports:  Report  signed  by  authorized  official  from  the  testing 
laboratory  that  a  material,  product  or  system  identical  to  the 
material,  product  or  system  to  be  provided  has  been  tested  in 
accordance  with  specified  requirements.  Testing  must  have  been 
within three years of the date of contract award for the project. 
ff. Report which includes findings of a test required to be performed by 
the  Contractor  on  an  actual  portion  of  the  work  or  prototype 
prepared  for  the  project  before  shipment  to  job  site.  Report  which 
includes  finding  of  a  test  made  at  the  job  site  or  on  sample  taken 
from the job site, on portion of work during or after installation. 
gg. Certificates:  Statements  signed  by  responsible  officials  of 
manufacturers  of  products,  systems  or  materials  attesting  that 
products, systems or materials meet specification requirements. This 
must be dated after the award of project contract and clearly named 
the project. 
hh. Documents  required  from  contractors,  suppliers,  installers  or 
subcontractors  (through  the  Contractor),  the  purpose  of  which  is  to 
monitor the orderly progression of a specific trade or group of trades,  
by  documenting  procedures,  acceptability  of  methods  or  personnel 
qualifications. 
ii. Manufacturer's  Instructions:  Pre‐printed  material  describing 
installation of a product, system or material, including special notices 
and Material Safety Data sheets concerning impedances, hazards and 
safety precautions. 
jj. Manufacturer's Field Reports. 
kk. Documentation  of  the  testing  and  verification  actions  taken  by 
manufacturer's  representative  to  confirm  compliance  with 
manufacturer's standards or instructions. 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
ll. Operation  and  Maintenance  Data:  Data  that  is  furnished  by  the 
manufacturer,  or  the  system  provider,  to  the  equipment  operating 
and  maintenance  personnel.  This  data  is  needed  by  operating  and 
maintenance  personnel  for  the  safe  and  efficient  operation, 
maintenance and repair of the item. 
 
  Page | 43

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK
 
 
 
 
 
Page | 44 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
09. Technical Reports & Calculations 
 
 
Technical  Reports  and  Calculations  shall  be  prepared  by  the  A/E,  for  each  design  discipline 
(Structural, Electrical, Mechanical, Fire  Protection, Communication and Security Systems), if  Page | 45
applicable.  
Reports  and  Calculations  shall  be  submitted  as  part  of  the  A/E’s  Pre/Final  and  Final  Design 
submittals. 
In the case of DBB contracts, Reports and Calculations must be forwarded to the bidders for 
their acknowledgement during the bidding phase. During and after construction, the reports 
and the calculation will be included in the list of documents to be updated and integrated by 
the KTR (as well as the record and/or red‐line design documents and the KTR‐produced shop 
drawings), and submitted to the UNHCR Technical Consultants for Post Construction‐Award 
Services  (see  Chapter  13)  for  review  (when  applicable)  and  to  the  UNHCR  Project  Manager 
for approval. 
 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 46 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
10. Health and Safety (H&S) Coordination 
 
 
Where required, UNHCR  will appoint  an A/E representative as  Health & Safety Coordinator 
for the design and/or the construction phases, in compliance to the host country H&S laws.  Page | 47

In  the  absence  of  specific  national  norms,  the  PM  will  provide  direction  on  the  reference 
norms to be used. 
The  cost  of  Health  &  Safety  Coordination  shall  be  negotiated  as  an  additional  engineering 
service, on the base of the same contract rates used for other items of the A/E’s performance 
as  specified  in  Annex    E  to  the  A/E  Contract  or  in  UNHCR  consultancy  contract  where 
applicable. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 48 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
11. Administrative Permits Applications 
 
 
11.01 Construction Permit 
Page | 49
The A/E may be required to prepare a feasibility study describing requirements and 
procedures to obtain permits for construction from relevant authorities. That study 
must be prepared as part of the Concept Design phase.  
A dedicated design package may be required for applying for a construction permit; 
the level of detail of such package is determined by the local regulations and shall be 
described in the Concept Design feasibility study.  
The  Construction  Permit  Application  package  shall  be  prepared  either  between  the 
submittal of Concept Design and the Interim Design, or at any other time, depending 
on  the  requirement  included  in  Scope  of  Work  or  on  the  direction  provided  by 
UNHCR Project Manager.  
The  cost  of  the  Construction  Permit  Application  package  shall  be  negotiated  as  an 
additional engineering service, on the base of the same contract rates used for other 
items  of  the  A/E’s  performance,  as  specified  in  Annex    E  to  the  A/E  Contract  or  in 
UNHCR consultancy contract where applicable. 
 
11.02 Fire Prevention Permit 
The A/E may be required to prepare a Fire Prevention Application Package to obtain 
a  permit  or  authorization  from  the  local  Fire  Authority,  including  drawings, 
calculations,  reports  and  forms,  to  comply  with  any  local  relevant  regulations  and 
procedures. 
The  SoW  will  specify  a  list  of  services  and  deliverables  to  be  provided  in  order  to 
obtain the required permits. 
The cost of the Fire Prevention Permit Application package shall be negotiated as an 
additional engineering service, on the base of the same contract rates used for other 
items  of  the  A/E’s  performance  as  specified  in  Annex    E  to  the  A/E  Contract  or  in 
UNHCR consultancy contract where applicable. 
 
11.03 Sanitary Permit 
The A/E may be required to prepare a Sanitary Permit Application Package to obtain 
any  permits  or  authorizations  that  may  be  required  by  the  local  Sanitary  Authority, 
including drawings, calculations, reports and forms, to comply with any local relevant 
regulations and procedures. 
The  SoW  will  specify  a  list  of  services  and  deliverables  to  be  provided  in  order  to 
obtain the required permits. 
The  cost  of  the  Sanitary  Permit  Application  package  shall  be  negotiated  as  an 
additional engineering service, on the basis of the same contract rates used for other 
items of the A/E’s performance as specified in Annex  E to the A/E Contract and or in 
UNHCR consultancy contract where applicable. 
 
     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

 
 
 
 
Page | 50 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
12. Support to the UNHCR Technical Evaluation 
Committee (TEC) 
 
 
Page | 51
12.01 General 
During  the  tender  phase,  the  A/E  may  be  required  to  assist  the  UNHCR  Technical 
Evaluation Committee (TEC). 
While  performing  the  above  services,  the  A/E  is  required  to  exercise  maximum 
confidentiality.  The  signature  of  a  non‐disclosure  statement  may  be  required  at 
discretion of the UNHCR Procurement Officer. 
Those services shall be negotiated on the basis of hourly contract rates, as a closed 
package of hours. 
12.02 Pre‐Proposal / Bid Conference 
Prior  to  the  submission  of  tender  proposals,  all  invited  firms  participate  in  a  pre‐
proposal / bid conference. 
A  Pre‐Proposal  /  Bid  conference  may  be  used  when  UNHCR’s  requirement  is  of  a 
complex nature. The purpose shall be to inform all potential bidders of the complex 
nature  and  to  explain  the  scope  of  work  or  technical  specifications  in  detail.  The 
timing  of  the  conference  shall  be  as  soon  as  possible  after  the  release  of  the 
solicitation  document  to  give  all  bidders  the  opportunity  to  obtain  sufficient 
information to enable them to prepare Proposals and Bids. 
Objective  of  the  meeting  is  to  get  to  a  common  and  better  understanding  of  the 
project’s  requirements  and  complexity,  thus  ensuring  the  most  competitive  price 
proposals.  
The  visit  and  the  meeting  generally  take  place  at  the  same  time  for  all  the  firms 
participating in the tender.  
The  A/E  may  be  required,  as  an  additional  engineering  service,  to  attend  the 
conference,  in  order  to  support  the  UNHCR  Project  Manager  throughout  the 
discussion with potential bidders. 
12.03 Clarifications 
Any  prospective  bidder  desiring  an  explanation  or  interpretation  of  the  RFP,  may 
request  this  in  writing  (e‐mail  is  accepted)  to  the  UNHCR  Procurement  Officer,  in 
time to allow a reply to reach all prospective bidders before the submission of their 
bids.  Technical  responses  are  provided  to  the  Procurement  Officer  by  the  Project 
Manager. 
The  A/E  may  be  therefore  required  to  support  the  Project  Manager  during  the 
tender, in order to provide the required clarifications to bidders. 
12.04 Submittal and Evaluation of Tender Proposals 
UNHCR  policy  requires  that  construction  works  of any  type  are  to  be  awarded  as a 
fixed‐cost contract, following a competitive process based on the “Best Value” (BV) 
evaluation concept. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
In  the  Best  Value  procedure  for  the  award  of  construction  contracts,  the  technical 
criterion for award is normally between 60% and 70% of the overall proposal. Price is 
therefore rated between 40% and 30%.  
The A/E may be required to support the Project Manager during the UNHCR TEB in 
the evaluation of tender proposals. 

Page | 52 
Such support may include: 
a. Analysis  of  the  proposed  construction  schedule  to  ascertain  completeness, 
feasibility and consistency. 
b. Analysis  of  proposed  materials/equipment  for  compliance  to  the  tender 
technical  and/or  performance  specifications,  including  comparison  among 
proposals. 
c. Any other technical evaluation criteria included in the RFP. 
d. Analysis  of  the  financial  proposals  to  ascertain  adherence  to  market  prices 
and economic reliability of the proposal. 
 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
13. Post Construction‐Award Services (PCAS) 
 
 
Page | 53
13.01 General 
After  the  award  of  the  construction  contract,  the  A/E  may  be  required  to  provide 
additional  services  to  support  the  UNHCR  PM  during  the  construction  and  the 
testing/commissioning phases. Such consultation may or may not be reimbursable as 
follows: 
 
13.02 Non‐Reimbursable Consultation 
The  A/E  shall  promptly  provide  consultation  services  without  additional 
compensation.  Such  consultation  typically  occurs  in  the  form  of  a  Request  for 
Information (RFI) from the UNHCR Project Manager. 
Typically, RFIs include clarification on the intent of the drawings and specifications in 
response to questions. Requests for clarification routinely arise during the course of 
construction.  They  may  result  in  preparation  of  amplified  drawings,  specifications, 
amendments,  change  orders  and  cost  estimates  (to  correct  errors,  omissions, 
inconsistencies  between  drawings  and  specifications,  conflict  in  dimensions,  lack  of 
detail or poor design quality) in the drawings and specifications. Amplifying drawings, 
specifications,  amendments,  change  orders  and  cost  estimates  shall  be  prepared  in 
accordance with the provisions and standards set forth in this Design Manual. In such 
cases, the A/E shall assure through discussions with the UNHCR Project Manager the 
timing  required  for  preparation  of  such  documents  to  minimise  delay  to  the 
construction.  It  is  expected  that  the  A/E  will  provide  a  response  to  an  RFI  not  later 
than  three  working  days  after  notification.  Where  the  response  to  an  RFI  requires 
additional time, the A/E shall notify the Project Manager as to the expected date of 
response. 
 
13.03 Reimbursable Consultation 
In  addition  to  non‐reimbursable  consultation,  reimbursable  A/E  services  may  be 
required  for  specialized  consultation  with  the  Project  Manager  either  at  the  site  of 
construction or in the A/E’s office regarding matters of a nature not included within 
the fee agreed under the Sow Such consultations may include, but not be limited to: 
a. Consultation regarding unforeseen problems or questions during construction. 
b. Consultation on critical items during construction, including, but not limited to: 
b.1 Assisting the Project Manager in final field checkout of basic mechanical 
and electrical systems. 
b.2 Witnessing final acceptance tests for HVAC and /or special systems. 
b.3 Witnessing and certifying construction contractor’s compliance with field 
test  procedures  for  specialised  mechanical,  electrical  and  electronic 
systems  designed  for  the  project.  Such  services  shall  be  performed  by 
registered  professional  engineers  and  include  the  A/E  certification  of 
compliance  by  the  construction  contractor  with  all  specified  or  norm‐

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
required test procedures, a critique of the data obtained and the stated 
results of the tests performed. 
b.4 The  preparation  of  all  changes  or  additions  to  the  drawings  or 
specifications, amendments, change orders and cost estimates resulting 
from  a  change  in  scope,  unforeseen  conditions,  or  other  modifications. 
Such  drawings,  specifications,  amendments,  change  orders  and  cost 
Page | 54  estimates  shall  be  prepared  in  accordance  with  the  provisions  and 
standards  set  forth  in  this  Design  Manual.  In  such  cases,  the  A/E  shall 
assure through discussions with the Project Manager the timing required 
for  preparation  of  such  documents  to  minimise  delay  to  the 
construction. 
b.5 Evaluation of construction KTR proposed exceptions or variations to the 
contract requirements. 
b.6 Evaluation of construction KTR’s value engineering change proposals. 
13.04 Basis of Payment for Reimbursable Consultation 
Payment  for  reimbursable  consultation  services,  whether  performed  in  the  A/E’s 
office  or  at  the  construction  site,  will  be  made  on  a  cost  per  man‐day  basis.  The 
number and cost of reimbursable consultation man‐days required both at the A/E’s 
office and at the site will be discussed during fee negotiations. The SoW will stipulate 
a  lump  sum  price  for  consultation  man‐days.  This  lump  sum  price  is  based  on  the 
daily rates specified under the A/E Contract or in UNHCR consultancy contract where 
the  A/E’s  office  is  located.  For  projects  located  outside  of  the  country  where  the 
A/E’s office is located, a specific rate shall be agreed upon. It should be  noted that 
although the agreed lump sum price for consultation reflects the anticipated amount 
of  consultation  required,  no  minimum  amount  is  guaranteed.  Payment  for 
consultation services will be made on an “as requested” basis. 
To establish the A/E’s cost per man‐day for office and site consultation services, the 
A/E shall submit with its fee proposal the following unit prices for negotiation: 
a. Labour  cost  per  person  (average  cost  per  professional,  including  overhead  and 
profit, for 8 hours per day). 
b. Labour  cost  per  person  associated  with  travel  time  (round  trip)  from  the  A/E’s 
office to the site. 
c. Travel cost per day (e.g. car operating cost or car rental) 
d. Travel  cost  per  trip  in  addition  to  the  above  (e.g.  airfare)  to  the  site,  based  on 
UNHCR’s policy for travel. 
e. Lodging and meal costs per day per person at the site, based on UNHCR’s official 
Daily Subsistence Allowance (DSA) for the project location.  
13.05 Requests for Consultation 
Requests  for  A/E  consultation  during  construction  will  be  sent  directly  from  the 
Project Manager. In most cases, the A/E will receive such requests by telephone and 
a follow‐up e‐mail.  
13.06 Consultation Reports 
Within  2  working  days  after  each  site  consultation  visit  and/or  completion  of  each 
office  consultation  request  the  A/E  shall  e‐mail  to  the  Project  Manager  a  report  of 
the services rendered.  
Each report shall include as a minimum: 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
a. A  cover  letter  indicating  the  A/E  and  construction  contract  involved,  the 
telephone conversation or e‐mail requesting the site or office consultation, the 
order  number  of  the  consultation  and  the  A/E  representatives  who  performed 
the services with their titles. 
b. A description of the services rendered. 
c. Persons  contacted  and  in  attendance  during  the  consultation  as  well  as  their 
telephone numbers and E‐mail address.  Page | 55
d. Problems encountered. 
e. Recommended solutions and/or proposed milestones for resolution. 
13.07 Evaluation of contractor‐proposed acceptance/variations of the contract document 
In  addition  to  the  general  requirements,  consultation  reports  on  A/E  evaluation  of 
KTR’s proposed exceptions or variations to the contract documents shall address: 
a. Whether the proposed substitution is of equal, better or lesser quality than the 
design requirement. 
b. If of lesser quality, the difference in value. 
c. If  of  equal  or  better  quality,  the  advantages  to  UNHCR  in  accepting  the 
substitution at no change in contract price. 
13.08 Evaluation of construction contractor’s value engineering change proposals (VECPs) 
The purpose of a VECP is to achieve savings in cost by adjusting the design so as to 
permit  more  economical  methods  and  materials  of  construction  and  still  maintain 
the operational, functional and aesthetic quality of the facility.  
Note  that  a  construction  contractor  VECP  differs  from  a  construction  contractor 
proposed  variation  or  exception  to  the  contract  documents  in  that  a  VECP  must 
maintain at least the same level of quality as in the original design while a proposed 
variation or exception could lower the quality of construction. 
In the case of the acceptance of a VECP the construction contract may provide for a 
contractor  and  UNHCR  share  in  the  savings  resulting  from  the  proposal  while  a  full 
credit (deduct) in the construction contract price is taken for approved variations or 
exceptions which are of lesser quality than the original design. 
In  addition  to  the  general  requirements,  consultation  reports  on  A/E  evaluation  on 
VECPs shall include: 
a. The advantages and disadvantages of the VECP 
b. Economic  analysis  and  justification  for  recommending  approval  or  rejection  of 
the VECP 
In order to avoid tacit delays to construction, UNHCR processing time for VECPs is 15 
working days from the date the Project Manager receives the VECP package from the 
contractor. Accordingly, the A/E shall complete and forward consultation reports to 
the Project Manager within 5 working days from the time of receipt. When the VECP 
response requires additional time, the A/E shall notify the Project Manager as to the 
expected date of responses. 
13.09 Design Field Support 
Unless  supervision  and  Quality  Control  services  (see  paragraph  13.12  below)  are 
negotiated  and  contracted,  the  A/E  has  no  field  construction  responsibilities.  The 
Project  Manager  is  responsible  for  field  administration  and  quality  assurance.  The 
A/E shall, however at the UNHCR’s request, provide Design Field Support to assist the 
Project Manager. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
Design Field Support consists of periodic (either scheduled or random) site visits by 
teams  of  the  A/E  personnel  to  observe  and  report  on  particular  phases  of 
construction or problems, to ascertain the progress of construction and to assist the 
Project Manager in quality assurance measures. The purpose of the team visits is to 
ascertain whether work‐in‐place satisfactorily meets the design and to keep the A/E 
aware  of  the  status  and  quality  of  the  construction.  As  a  general  rule,  Design  Field 
Page | 56  Support is required for critical design elements or phases of the construction work. 
The number of visits and A/E composition is based on the size and complexity of the 
project. The request for a site visit and the preferred A/E team composition will be 
determined  by  the  Project  Manager.  Only  the  design  disciplines  directly  involved 
with  that  particular  critical  design  element  should  make  site  visits.  Visits  will  be 
coordinated  and  scheduled  the  Project  Manager  to  allow  UNHCR  to  get  maximum 
benefit from each trip. 
a. Number of site visits: The number of site visits and stage of construction, as well 
as  the  required  personnel  team  members  will  be  determined  by  the  Project 
Manager  and  the  A/E  during  the  fee  negotiation  in  accordance  with  the  rates 
specified  in  Annex  E  to  the  A/E  Contract  or  in  UNHCR  consultancy  contract 
where applicable, on the basis of the project type, complexity and scale of the 
construction. 
b. A/E  tasks  and  responsibilities  for  Design  Field  Support:  A/E  participants  in  the 
site visits shall be alert and document the presence of perceived deficiencies in 
the construction work, and shall note potential coordination problems.  
Unless  differently  directed  by  the  Project  Manager,  the  A/E  shall  not  conduct 
tests of equipment or systems during site visits. Moreover, they shall not disturb 
the work performed by the KTR in any manner that might cause the KTR to have 
to  perform  additional  work.  The  A/E  shall  provide  construction  contract 
drawings and specifications for team participants to use during site visits. 
At  the  conclusion  of  each  visit,  the  A/E  shall  informally  advise  the  Project 
Manager of any observed deficiencies in construction or coordination problems. 
Within 2 working days from the conclusion of the site visit, the A/E shall email a 
report  of  all  observed  deficiencies  in  construction  or  coordination  problems.  
The  report  shall  list  the  construction  contract,  the  A/E  firm  and  UNHCR 
participants  in  the  meetings  and  inspections  and  their  specific  disciplines  and 
roles.  
Each  observed  construction  deficiency  shall  be  addressed  separately  in  the 
report  by  citing  the  specific  construction  contract  requirement  (specification 
paragraph and/or drawing detail) which pertains to the observed deficiency and 
stating specifically how the observed construction differs from that required in 
the construction contract documents or from that intended by the designer. 
The  A/E  should  also  comment  on  the  advisability  of  corrective  measures  to  be 
taken  in  such  instances,  and  comment  on  observed  coordination  problems.  In 
addition, although the A/E is not responsible for construction safety, serious life 
safety hazards observed shall be included in the report. 
13.10 Shop Drawings/Submittal Review 
The  A/E  specification  writer  shall  provide  the  list  of  systems,  equipment  and 
materials deemed sufficiently critical or complex or aesthetically significant to merit 
approval by UNHCR.  
     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
At  the  UNHCR’s  option,  checking  of  shop  drawings/submittals  and  other  data 
submitted by the KTR for contract compliance and/or technical adequacy is an A/E’s 
responsibility.  
The  KTR  will  be  instructed  to  forward  to  the  A/E’s  office  for  review  and  technical 
endorsement  all  shop  drawings,  manufacturer’s  data,  certifications  and  samples, 
except those designated for exclusive UNHCR’s review and approval. 
Page | 57
If the submittal requires compliance with the construction contract requirements the 
A/E shall forward it to the Project Manager stamped as “contract compliant”. 
If the submittal does not comply with the contract requirements and cannot be made 
to comply by minor revisions and the contractor has not proposed and supported a 
variation,  the  A/E  shall  forward  it  to  the  Project  Manger  stamped  as  “non  contract 
compliant” with a report explaining reasons for recommending disapproval. 
13.10.01 Proposed Variations/Deviations from the contract requirements 
If  the  contractor  proposed  a  variation/deviation  from  the  contract 
requirements, it must be supported by the following information: 
a. Reason for the proposed substitution/deviation. 
b. If  material  or  equipment  is  unavailable,  document  efforts  made  to 
procure. 
c. Complete  technical  data  on  the  proposed  substitution,  sufficient  to 
determine acceptability. 
d. Acknowledgement  that  all  changes  caused  by  the  proposed 
substitution  will  be  the  responsibility  of  the  contractor  and  at  no 
additional cost to UNHCR. 
e. Proposed change, if any, in the contract price and/or time. 
These  submittals  should  be  reviewed  but  not  stamped.  A/E 
comments/recommendations  shall  be  noted  and  forwarded  to  the 
Project Manager. 
If the variation is approved by UNHCR the Project Manager will notify 
the contractor and the A/E. 
13.10.02 Approval/Disapproval by UNHCR of contractor submittals 
The  A/E  shall  forward  all  submittals,  technically  endorsed  for 
approval/disapproval,  to  the  Project  Manager  no  later  than  10  working 
days from receipt. 
The  Project  Manager  will  forward  notification  of  approval/disapproval  to 
the contractor and to the A/E within 5 working days from receipt. 
If the submittal is not approved by UNHCR: 
a. as non‐compliant with contract requirements or for any other reasons, 
and 
b. cannot be made to comply with minor revisions, and 
c. the  contractor  has  not  proposed  and  supported  a  deviation  from  the 
contract requirements, 
the  submittal  shall  be  transmitted  to  the  KTR  and  to  the  A/E  stamped  as 
“DISAPPROVED”. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
13.10.03 Miscellaneous aspects of Submittal review 
When  a  submittal  must  be  reviewed  by  the  A/E  because  UNHCR 
requirements  have  changed  or  the  design  needs  to  be  corrected  due  to 
deficiency,  it  must  be  forwarded  to  the  Project  Manager  with  an 
explanation  for  the  new  requirements  and  the  estimated  change  in 
contract  price/time  for  the  contractor  to  comply  with  the  new 
Page | 58  requirements. 
13.11 Record (“as‐built”) Drawings 
Typically, the KTR is responsible for the preparation of as‐built drawings. At UNHCR’s 
option, the A/E may be responsible for the review of drawings.  
When this option is exercised, the A/E will be provided with an electronic copy of the 
revised design drawings, indicating all changes occurred during construction.  
As  an  alternative,  the  A/E  may  be  responsible  for  the  preparation  of  as‐built 
drawings.  
When this option is exercised, the A/E will be provided with marked hard copies of 
design drawings.  
Subsequently, the A/E shall check the marked copies to make sure that they reflect 
the actual construction and transfer them into electronic format.  
13.12 Construction Supervision and Quality Control Services 
The  A/E  may  be  required  to  provide  Supervision  and  Quality  Control  Services, 
including  field  construction  responsibilities  (field  administration  and  quality 
assurance)  that  are  typically  carried  over  by  the  UNHCR  Project  Manager. 
Subsequently,  should  these  services  be  required,  the  A/E  shall  perform  all  duties 
typically carried over by the UNHCR Project Manager, with the exception of: 
a. Approval of changes and variations from the contract requirements. 
b. Supervision of progress payments. 
c. Coordination with final users. 
d. Final approval of the facility, after the testing and commissioning phase. 
Construction Supervision and Quality Control Services will be negotiated on the basis 
of the required time effort, based on the expected duration of the construction work. 
 
 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
14. Interior Design (ID) 
 
 
14.01 General 
Page | 59
Interior  Design  services  deal  with  the  design,  selection,  arrangement  and  colour 
coordination of furniture and interior finishes.  
14.02 Scope of Work 
The scope of work for interior design includes: 
a. Selection of furniture, furnishing and accessories including, but not limited to 
sofas, chairs, tables, screens, planters, art work, carpets, draperies, etc. Most 
items should be purchased from vendors that have a Frame Agreement (FA) 
with  UNHCR  when  the  items  are  available  when  so  directed  by  the  Project 
Manager.  
b. For  items  not  available  through  Frame  Agreements,  or  for  which  there  is  a 
different  requirement,  the  A/E  shall  prepare  adequate  specifications  and 
other data, necessary for procurement actions. 
c. The A/E shall select and coordinate all colours, fabrics, etc., and verify actual 
contractor  applied  finishes  through  site  verification  and  coordination  with 
the Project Manager. 
d. The A/E shall prepare and deliver a presentation to the Project Manager, A1 
minimum  size,  including  furniture  placement  plan,  catalog  cut‐outs  of 
furniture  and  accessories,  colour  samples,  material  swatches  of  draperies, 
carpets and fabrics. The PM will coordinate for internal UNHCR approval and 
notify the A/E. The A/E may be required to attend a presentation meeting to 
UNHCR management for the approval of colour boards and layouts. 
e. Upon  approval  of  the  layouts  and  colour  boards,  the  A/E  shall  also  prepare 
an A4 size binder including, but not limited to: 
i. Floor  plans  indicating  location  of  furniture,  furnishings  and 
accessories. These items shall be identified with an item number that 
keys to the presentation board and the furniture procurement list. 
ii. A  procurement  list,  identifying  all  items  to  be  purchased  by  FA 
number, quantity, price and delivery times. Care shall be taken in the 
selection  of  all  items  to  ensure  that  delivery  times  are  reasonably 
within  the  construction  completion  time  of  the  project,  and  FA 
contracts will not expire at the time of purchase.  
iii. Purchase specifications, drawings and other supporting data for open 
purchase  for  items  not  to  be  supplied  via  FAs,  including  suppliers’ 
data,  i.e.  name,  location,  points  of  contact,  estimated  price  and 
delivery times. 
iv. Photographic  colour  reproductions  or  colour  copies  of  the 
presentation boards, to be reduced in A3 size, folded and bound with 
other documents. 
v. Advisory service as required to make changes resulting from changes 
in  requirements,  non‐availability  of  items  or  materials  previously 
selected, etc. 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
vi. Room  placement  sheets  should  be  provided  for  each  room/area, 
listing  each  item  of  furniture  or  equipment  that  will  be  installed  in 
the area. 
f. One original and four copies of the binder shall be provided as per the agreed 
schedule. 
 
Page | 60 
 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
15. Operations and Maintenance Support Information 
(OMSI) 
 
 
Page | 61
15.01 General 
At UNHCR’s option, the preparation of OMSI manuals is an A/E responsibility. 
OMSI  manuals  may  be  developed  during  construction  or  for  existing  facilities  to 
provide  UNHCR  with  clear,  comprehensive  data  needed  to  safely  and  efficiently 
operate and maintain the actual products and systems built/installed in a facility. 
The principal OMSI elements which to be included in the manuals are: 
 
15.02 Operation and Maintenance Manual 
a. Overall system configuration and operation 
b. System flow diagrams 
c. Start‐up, normal operations and shut‐down procedures 
d. Normal operating temperatures, pressures, flow rates, etc. 
e. Emergency operating and safety instructions 
f. Preventive maintenance plan and schedule 
g. Troubleshooting guide and diagnostic techniques 
h. Repair  and  maintenance  procedures,  including  spare  parts  list,  special  tools 
and test equipment 
i. Environmental considerations 
j. Training plan, staffing requirements and personnel qualifications 
k. Removal and replacement instructions 
 
15.03 Operating Manual 
a. System design analysis and discussion 
b. Procedures  for  normal  start‐up,  operation  and  shutdown  in  manual  and 
automatic modes 
c. Floor plans and schematic diagrams for flow, piping and instrumentation. 
d. Control set points and calibration requirements 
e. Procedures for abnormal/alternate operational modes 
 
15.04 User Manual 
a. As‐built  record  of  product  and  Operations  and  Maintenance  (O&M)  data, 
indexed by specification and location. 
b. Basic descriptive data on facility; basis of design 
c. Single line floor plans 
d. Utility connections and cut‐off points 
e. Special warranty data 
f. Expanded  operation,  maintenance  and  repair  information  on  HVAC,  fire 
protection, electrical and special systems 
 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 62 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
Attachment A 
 
List of acronyms & Abbreviations 
 
Page | 63
A/E  Architect/Engineer Company 
ASHRAE  American Society of Heating, Refrigerating and Air Conditioning Engineers 
ASTM  American Society for Testing and Materials 
BoD  Basis of Design 
BoQ  Bill of Quantities 
BREEM  United Kingdom’s Building Research Establishment Environmental 
Assessment Method 
BV  Best Value 
CATV  Cable Television 
CCE  Construction Cost Estimate 
CCTV  Closed Circuit Television 
CD‐Rom  Compact Disc ‐ Read‐Only Memory 
CSI  United States Construction Specification Institute 
D/B  Design/Build 
D/B/B  Design/Bid/Build 
DESS  Division of Emergency, Security & Supply 
DIN  Deutsches Institut für Normung 
DM  Design Manager 
DOCX  Extension of Microsoft Word files 

DSA  United Nations Daily Subsistence Allowance  
DWG  Extension of Autodesk AutoCAD files 
FA  Frame Agreement 
GANNT  Type of bar chart illustrating a project schedule 
GHG  Green‐House Gas 
H&S  Health & Safety 
HC  Hard Copy 
HVAC  Heating, Ventilation & Air Conditioning 
ID  Interior Design 
IMU  Infrastructure Management Unit 
ISO  International Organization for Standardization 
JPG  Extension of image files 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
KTR  Construction Contractor 
LAN  Local Area Network  
LEED®  Leadership in Energy & Environmental Design 
MOSS  Minimum Operating Security Standards 
Page | 64  MPP  Extension of MS Power Point files 
O&M  Operations & Maintenance 
OMSI  Operations & Maintenance Support Information 
PCAS  Post Construction‐Award Services 
PDF  Extension of Adobe Acrobat files 
PM  Project manager 
PO  Purchase Order 
PR  Purchase Requisition 
RFI  Request for Information 
RFP  Request for Proposals 
SMLS  Supply Management Logistics Services 
SR  Submittal Register 
SRA  Specific Risk Assessment 
SoW  Statement of Work 
TEB  Technical Evaluation Board 
UN  United Nations 
UNHCR  United Nations High Commissioner for Refugees 
UNCHRp/ UNHCR provided / Contractor installed 
Ki 
UNHCRp/ UNHCR provided / UNHCR installed 
UNHCRi 
VE  Value Engineering 
VECP  Value Engineering Change Proposal 
XLSX  Extension of MS Excel files 
 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
Attachment B 
Standard Form IMU‐014 
 
Standard Cover Sheet and Title Block 
Page | 65

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 66 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
 
Attachment D 
Standard Form IMU‐007 
 
Application and Certificate for Progress Payment  Page | 69

(Technical Consultancy) 
 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 70 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
IMU Fee Proposal Form
User hints

Introduction
This form consists of a number of worksheets, all linked to each other, in order to avoid repetitions in the
input of data and provide a consistant tool to both our end users (procurement officers) and our
consultants.

User Manual

General Instruction
In all the worksheets, the cells highlighted in light pink shall be filled by the users. Cells not highlighted
include formulas, and are protected from writing.
Users are required to fill the form as it is provided by the Procurement Officer, without modifications.
Each section (with the exclusion of Section A) include a space for any necessary addition to the
Government provided form.
Should the Design Manager identify flaws or errors in the form, please notify the person in charge.

Rates Worksheet
This is the basic worksheet, in which you provide the information used by all the other worksheets.
The first part shall include professionals and sub-professionals rates and some of the relevant estimated
effort (no. of drawing sheets, cost estimate sheets, specification sheets, and construction submittals), per
discipline. The estimated number of construction submittals (including shop drawings) has been used as
a basis to calculate the A/E effort for shop drawing review.

The second part includes:


PCAS (Post Construction-Award Services), including Office and Field Consultation during Construction:
The calculation of the office and field consultation, based on packages of hours. It is required to input the
number of option packages, including the basic option, if any. PCAS also include review of contractor-
produced shop drawings and either preparation or review (if prepared by the contractor) of as built
documents.

List of Drawings Worksheet


This list is usually prepared by the UNHCR Project Manager. It is forwarded to the A/E for review and
discussion. Once agreed, this will be considered as the official list of minimum deliverables. It is the basis
for the fee calculation, with the unit rates sheet.

Summary Worksheet
Please fill in the projects basic information (title, location, contract number, A&E name, name of the
person that prepared the estimate, date of preparation, ECC (Estimated Construction Cost, in €, or change
symbol if in any other currencies).
All other data will be loaded automatically from the backup worksheets.
Once calculated and negotiated, this summary sheet will be attached to the PO as well as all the backup
sheets and paid as a Lump-Sum fee.

Backup Worksheets (Sections A through G)


Fill pink cells, where applicable.

Rates shall include profit, overhead and all administrative expenses.


No profit will be paid by the UNHCR for travel expenses which will be reimbursed on the basis
of UNHCR travel regulation for staff.
Fee proposal form shall be signed by a principal of the firm, preferably the chief executive
officer.
 
PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Rates Reference Sheet
Disciplines Personnel Rates

Section A - Design
Design Management Design Manager
No. of Design drawing sheets 0
No. of Construction Submittals 0
No. of Specification sheets 0
Admin Assistant
Civil Engineering Professional
CAD Operator
No. of Design drawing sheets 0
No. of specification sheets
No. of Construction Submittals
Landscaping Professional
CAD Operator
No. of Design drawing sheets 0
No. of specification sheets
No. of Construction Submittals
Architecture Professional
CAD Operator
No. of Design drawing sheets 0
No. of specification sheets
No. of Construction Submittals
Structural Engineering Professional
CAD Operator
No. of Design drawing sheets 0
No. of specification sheets
No. of Construction Submittals
Mechanical & Plumbing Engineering Professional
CAD Operator
No. of Design drawing sheets 0
No. of specification sheets
No. of Construction Submittals
Electrical Engineering Professional
CAD Operator
No. of Design drawing sheets 0
No. of specification sheets
No. of Construction Submittals
Fire Protection & Safety Engineering Professional
CAD Operator
No. of Design drawing sheets 0
No. of specification sheets
No. of Construction Submittals
Special Systems Engineer (Security, Telecom) Professional
CAD Operator
No. of Design drawing sheets 0
No. of specification sheets
No. of Construction Submittals
Professional as required Professional
CAD Operator
No. of Design drawing sheets
No. of specification sheets
No. of Construction Submittals

RATES REFERENCE SHEET Page 2


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Rates Reference Sheet
Disciplines Personnel Rates

Specifications Professional
Subprofessional
No. of sheets 0
Cost Estimating Professional
Subprofessional
No. of sheets 0
Interior Design Professional
CAD Operator
No. of ID drawing sheets 0
No. of specification sheets
No. of Construction Submittals

Sections G/H - PCAS - Consultation during construction


Consultation during construction Office Field
No. of option packages (incl. basic option)

Section E - Engineering Services


Topographic Surveyors Chief Surveyor
Surveyor
Geotechnical Engineering Geotechnical engineer (S)
Geotechnical Subprofessional
Translations Drawing Sheet A1 Size
A4 sheets
Reproductions Drawing Sheet A1 Size, B&W
Drawing Sheet, Half size, B&W
A4 sheets, B&W
Drawing Sheet A1 Size, Color
Drawing Sheet, Half size, Color
A4 sheets, Color
Bindings
CD recording

Section F - Travel

Taxi (Round trips)


Airfare (Round trips)
Rental car
Gas
Subsistence (persons)

No profit shall be applied on travel expenses.

RATES REFERENCE SHEET Page 3


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Estimated Drawing Sheets
Sheets Scale No. Sub-Totals

Cover Sheet
T
N/A
Abbreviations & Symbols N/A 0

Civil Engineering Drawings Scale

Landscaping Drawings Scale

L 0

Architectural Drawings Scale

A
0

Structural Engineering Drawings Scale

S 0

Mechanical Engineering Drawings Scale

M
0

SF IMU-005 Revised January 2013 PAGE 4


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Estimated Drawing Sheets
Sheets Scale No. Sub-Totals

Electrical Engineering Drawings Scale

E
0

Fire Protection & Safety Engineering Drawings Scale

FP 0

Special Systems Engineering Drawings Scale

SS
0

Interior Design Drawings Scale

ID
0
0

SF IMU-005 Revised January 2013 PAGE 5


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Summary Sheet
PROJECT TITLE A&E
Type here the name of your Company

PROJECT LOCATION PREPARED BY


Type here the name of the Company representative who prepared this
fee proposal
CONTRACT # PREPARED ON ECC (U.S.$)
Type here the contract number Type here the date fee was prepared

Section A: Design Sub-Totals Total


A1. Professionals $ -
A2. CAD Operators $ -
A3. Other Personnel $ -
Profit #REF!
TOTAL DESIGN $ -
% SECTION A ON ECC #DIV/0!
Sections B-C-D-E-F: PCAS Sub-Totals Total
SECTION B: Shop Drawings / Construction submittals review $ -
SECTION C: Record Drawings Prep. $ -
SECTION D: Office consultation during construction Single package $ -
No. of packages 0 $ -
SECTION E: Field consultation during construction Single package $ -
No. of packages 0 $ -
F1. Construction Supervision $ -
TOTAL SECTIONS B-C-D (PCAS) $ -

Section G: Services Sub-Totals Total


G1 - Pre-design site work
G1.1 - Field Investigations $ -
G1.2 - Topographic Survey $ -
G1.3 - Geotechnical Report $ -
Sub-Total $ -
G2 - Meetings
G2.1 - Pre-Design $ -
G2.2 - Concept Design Presentation $ -
G2.3 - 35% Design Review $ -
G2.4 - 100% Design Review $ -
Sub-Total $ -
G3 - Construction Inspection Rept.
Sub-Total $ -
G4. Host Nation Code Compliance Rept.
Sub-Total $ -
G5. Submittal Register
Sub-Total $ -
G6 - Translations
Sub-Total € 0.00
G7 - Reproductions
G7.1 - Pre-Design $ -
G7.2 - 35% Design Submittal $ -
G7.3 - 100% Design Submittal $ -
Sub-Total $ -
G8 - Courier & Telephone
Sub-Total $ -
G9 - Renderings
Sub-Total $ -
G11 - Quality Control of submittals from other A/E
Sub-Total $ -
G12 - Other Services (This space is for additional services not included in this standard form) $ -
TOTAL SECTION E: ENGINEERING SERVICES $ -

Section H: Travel Sub-Totals Total


H.1 - Field Investigations $ -
H.2 - Topographic Survey $ -
H.3 - Geotechnical survey $ -
H.4 - Concept Design Presentation $ -
H.5 - Pre-Design $ -
H.6 - 35% Design Review Mtg. $ -
H.7 - 100% Design Review Mtg. $ -
H.8 Other Services (This section is for eventual additions to the standard form) $ -
SUB-TOTAL SECTION F: TRAVEL $ -

GRAND TOTAL $ -
TOTAL % ON THE ECC #DIV/0!

SF IMU-005 Revised January 2013 SUMMARY SHEET - 6


 
PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Section A: Design
No. of Hrs per Effort Est.
A1. Professionals Rates Total
Sheets Sheet (Hrs) Cost
Design Manager 0 0 $ - $ -
Civil Engineer 0 0 $ - $ -
Landscape Architect 0 0 $ - $ -
Architect 0 0 $ - $ -
Structural Engineer 0 0 $ - $ -
Mechanical Engineer 0 0 $ - $ -
Electrical Engineer 0 0 $ - $ -
Fire Protection & Safety Engineer 0 0 $ - $ -
Special Systems Engineer (Security & Telecom) 0 0 $ - $ -
Interior Designer 0 0 $ - $ -
Other Professional as required 0 0 $ - $ -
Sub Total Professionals $ -

No. of Hrs per Effort Est.


A2. CAD Operators Rates Total
Sheets Sheet (Hrs) Cost
Title sheets 0 0 $ - $ -
Civil Engineering 0 0 $ - $ -
Landscaping 0 0 $ - $ -
Architecture 0 0 $ - $ -
Structural Engineering 0 0 $ - $ -
Mechanical & Plumbing Engineering 0 0 $ - $ -
Electrical Engineering 0 0 $ - $ -
Fire Protection & Safety Engineering 0 0 $ - $ -
Special Systems Engineer (Security, Telecomm) 0 0 $ - $ -
Interior Design 0 0 $ - $ -
CAD Operator 0 0 $ - $ -
Sub Total CAD Operators $ -

TOTAL SHEETS 0

No. of Hrs per Effort Est.


A3. Other Personnel Rates Total
Sheets Sheet (Hrs) Cost
Specification Professional 0 0 $ - $ -
Specification Sub-professional 0 0 $ - $ -
Cost Estimating Professional 0 0 $ - $ -
Cost Sub-professional 0 0 $ - $ -
Admin Assistant 0 0 $ - $ -
Sub Total Others $ -

TOTAL SECTION A: DESIGN HRS 0 $ -

% SECTION A ON ECC #DIV/0!


ESTIMATED COST PER SHEET #DIV/0!

SF IMU-005 Revised January 2013 PAGE 7


 
PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Sections B-C-D-E-F: PCAS
SECTION B: Shop Drawings / Construction submittals review Total
Estimated Effort per
Estimated Est.
B1. Professionals no. of submittal Rates Sub-Totals
Effort (hrs) Cost
submittals (hrs)
Design Manager 0 0 $ - $ -
Civil Engineer 0 0 $ - $ -
Landscape Architect 0 0 $ - $ -
Architect 0 0 $ - $ -
Structural Engineer 0 0 $ - $ -
Mechanical Engineer 0 0 $ - $ -
Electrical Engineer 0 0 $ - $ -
Fire Protection & Safety Engineer 0 0 $ - $ -
Special Systems Engineer (Security, Telecom) 0 0 $ - $ -
Interior Design 0 0 $ - $ -
Professional as required 0 0 $ - $ -
$ -
B2. Telephone / Fax (LS)
TOTAL SECTION B: SHOP DRAWINGS REVIEW
$ -

SECTION C: Record Drawings Prep. Total


No. of
Effort per Estimated Est.
C1. Professionals Design Rates Sub-Totals
sheet (hrs) Effort (hrs) Cost
Sheets
Design Manager 0 0 $ - $ -
Civil Engineer 0 0 $ - $ -
Landscape Architect 0 0 $ - $ -
Architect 0 0 $ - $ -
Structural Engineer 0 0 $ - $ -
Mechanical Engineer 0 0 $ - $ -
Electrical Engineer 0 0 $ - $ -
Fire Protection & Safety Engineer 0 0 $ - $ -
Special Systems Engineer (Security, Telecom) 0 0 $ - $ -
Interior Design 0 0 $ - $ -
Professional as required 0 0 $ - $ -
Sub Total Professionals $ -
No. of
Effort per Estimated Est.
C2. CAD Operators Design Rates
sheet (hrs) Effort (hrs) Cost
Sheets
Title sheets 0 0 $ - $ -
Civil Engineering 0 0 $ - $ -
Architecture 0 0 $ - $ -
Landscaping 0 0 $ - $ -
Structural Engineering 0 0 $ - $ -
Mechanical & Plumbing Engineering 0 0 $ - $ -
Electrical Engineering 0 0 $ - $ -
Fire Protection & Safety Engineering 0 0 $ - $ -
Special Systems Engineer (Security, Telecom) 0 0 $ - $ -
Interior Design 0 0 $ - $ -
Professional as required 0 0 $ - $ -
Sub Total CAD Operators $ -
C3. Telephone / Fax (LS)
TOTAL SECTION C: RECORD DRAWINGS PREPARATION
$ -

SECTION D: Office consultation during construction Total


Option
Est.
D1. Personnel package Rates Sub-Totals
Cost
hours
Design Manager $ - $ -
Professional as required $ - $ -
Sub Total Professionals $ -
D2. Telephone / Fax (LS)
TOTAL SECTION D: OFFICE CONSULTATION DURING CONSTRUCTION $ -
For total number of negotiated packages please see "RATES".
For total cost of negotiated packages, please see "SUMMARY".

SF IMU-005 Revised January 2013 PAGE 8


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Sections B-C-D-E-F: PCAS
SECTION E: Field consultation during construction Total

Office time Travel time Site time Est.


E1. Professionals Rates Sub-Totals
(hours) (hours) (hours) Cost
Design Manager $ - $ -
Professional as required $ - $ -
Sub Total $ -
Times / Est.
E2. Travel No. Rates
Days Cost
Taxi (Round trips) $ - $ -
Airfare (Round trips) $ - $ -
Rental car $ - $ -
Gas $ - $ -
Subsistence (DSA) $ - $ -
Sub Total $ -
E3. Telephone / Fax (LS)
TOTAL SECTION H: FIELD CONSULTATION DURING CONSTRUCTION $ -
For total number of negotiated packages please see "RATES".
For total cost of negotiated packages, please see "SUMMARY".

F1. Construction Supervision Total


Effort Est.
Description Rates Sub-Totals
(months) Cost
Chief Quality Control Engineer US$/Month $ -
Quantity control technician US$/Month $ -
Rates comprehensive of perdiem and home leave

Sub Total Professionals $ -


TOTAL OTHER PCAS $ -

TOTAL SECTIONS B, C, D, E, F: POST CONSTRUCTION AWARD SERVICES (PCAS) $ -

SF IMU-005 Revised January 2013 PAGE 9


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Section G: Services
G1 - Pre-design site work Sub-Totals Total
Est.
G1.1 - Field Investigations Office Hrs. Travel Hrs. Hrs at Site Rates Sub-Totals
Cost
Design Manager $ - $ -
Professional as required $ - $ -
Sub-Total $ -
Sub-Total G1.1 - Field Investigations $ -
Est.
G1.2 - Topographic Survey Office Hrs. Travel Hrs. Hrs at Site Rates Sub-Totals
Cost
Chief Surveyor $ - $ -
Surveyors (3) $ - $ -
Sub-contracted (LS: must be =0 if the above two lines were used) LS
Sub-Total $ -
Total Sub-Section G.1.2 - Topographic Survey $ -
Est.
G1.3 - Geotechnical Report Office Hrs. Travel Hrs. Hrs at Site Rates Sub-Totals
Cost
Geotechnical engineer $ - $ -
Geotechnical Subprofessional $ - $ -
Est.
No. Unit cost
Cost
Mobilization (LS)
Borings $ -
Crew
Sub-Total $ -
Sub-Total G1.3 - Geotechnical Report $ -

Total Sub-Section G.1 - Pre-design site work $ -

G2 - Meetings Sub-Totals Total


Mtg prep. Est.
G2.1 - Pre-Design Travel time Mtg time Rates Sub-Totals
Time Cost
Design Manager $ - $ -
Civil Engineer $ - $ -
Architect (2) $ - $ -
Structural Engineer $ - $ -
Mechanical Engineer $ - $ -
Electrical Engineer $ - $ -
Fire Protection & Safety Engineer $ - $ -
Interior Design $ - $ -
Special Systems Engineer (Security, Telecom) $ - $ -
$ -
Sub-Total G2.1 - Pre-Design $ -
Mtg prep. Est.
G2.2 - Concept Design Presentation Travel time Mtg time Rates Sub-Totals
Time Cost
Design Manager $ - $ -
Civil Engineer $ - $ -
Architect (2) $ - $ -
Structural Engineer $ - $ -
Mechanical Engineer $ - $ -
Electrical Engineer $ - $ -
Fire Protection & Safety Engineer $ - $ -
Interior Design $ - $ -
Special Systems Engineer (Security, Telecom) $ - $ -
$ -
Sub-Total G2.2 - Concept Design Presentation $ -
Mtg prep. Est.
G2.3 - 35% Design Review Travel time Mtg time Rates Sub-Totals
Time Cost
Design Manager $ - $ -
Civil Engineer $ - $ -
Architect (2) $ - $ -
Structural Engineer $ - $ -
Mechanical Engineer $ - $ -
Electrical Engineer $ - $ -
Fire Protection & Safety Engineer $ - $ -
Interior Design $ - $ -
Special Systems Engineer (Security, Telecom) $ - $ -
Sub-Total $ -
Sub-Total G2.2 - 35% Design Review $ -

SF IMU-005 Revised January 2013 PAGE 10


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Section G: Services
Mtg prep. Est.
G2.4 - 100% Design Review Travel time Mtg time Rates Sub-Totals
Time Cost
Design Manager $ - $ -
Civil Engineer $ - $ -
Architect $ - $ -
Structural Engineer $ - $ -
Mechanical Engineer $ - $ -
Electrical Engineer $ - $ -
Fire Protection & Safety Engineer $ - $ -
Interior Design $ - $ -
Special Systems Engineer (Security, Telecom) $ - $ -
Sub-Total $ -
Sub-Total G2.3 - 100% Design Review $ -

Total Sub-Section G.2 - Meetings € 0.00

G3 - Construction Inspection Rept. Sub-Totals Total


Est.
Staff Hrs Rates
Cost
Design Manager $ - $ -
Civil Engineer $ - $ -
Architect $ - $ -
Structural Engineer $ - $ -
Mechanical Engineer $ - $ -
Electrical Engineer $ - $ -
Fire Protection & Safety Engineer $ - $ -
Special Systems Engineer (Security, Telecom) $ - $ -
Sub-Total $ -

Total Sub-Section G3 - Construction Inspection Rept. $ -

G4. Host Nation Code Compliance Rept. Sub-Totals Total


Est.
Staff Hrs Rates
Cost
Design Manager $ - $ -
Civil Engineer $ - $ -
Architect $ - $ -
Structural Engineer $ - $ -
Mechanical Engineer $ - $ -
Electrical Engineer $ - $ -
Fire Protection & Safety Engineer $ - $ -
Special Systems Engineer (Security, Telecom) $ - $ -
Sub-Total $ -

Total Sub-Section G4 - Host Nation Code Compliance Rept. $ -

G5. Submittal Register Sub-Totals Total


Est.
Staff Hrs Rates
Cost
Design Manager $ - $ -
Civil Engineer $ - $ -
Architect $ - $ -
Structural Engineer $ - $ -
Mechanical Engineer $ - $ -
Electrical Engineer $ - $ -
Fire Protection & Safety Engineer $ - $ -
Special Systems Engineer (Security, Telecom) $ - $ -
Sub-Total $ -

Total Sub-Section G5 - Submittal Register $ -

G6 - Translations Sub-Totals Total


Est.
Est. Sheets Rates
Cost
Specifications (OPTION - see Scope of Work) $ - $ -
Any other document, letter or A4 size (OPTION - see App. A) $ - $ -
Drawing Sheets $ - $ -
Sub-Total $ -

Total Sub-Section G6 - Translations $ -

SF IMU-005 Revised January 2013 PAGE 11


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Section G: Services
G7 - Reproductions Sub-Totals Total
No. of
G7.1 - Pre-Design No.of Items Unit Cost Est. Cost Sub-Totals
Copies
Half size drawings - B&W $ - $ -
Half size drawings - Color $ - $ -
Concept Design Rept. - B&W sheets $ - $ -
Concept Design Rept. - Color sheets $ - $ -
Bindings $ - $ -
CD Recording $ - $ -
Sub-Total € 0.00
Sub-Total G7.1 - Pre-Design € 0.00
No. of
G7.2 - 35% Design Submittal No.of Items Unit Cost Est. Cost Sub-Totals
Copies
Full size drawings $ - $ -
Half size drawings $ - $ -
Basis of Design $ - $ -
Host Nation Code Compliance Analysis $ - $ -
Outline Specifications $ - $ -
Cost Estimate $ - $ -
Bindings $ - $ -
CD Recording $ - $ -
Sub-Total $ -
Sub-Total G7.2 - 35% Design $ -
No. of
G7.3 - 100% Design Submittal No.of Items Unit Cost Est. Cost Sub-Totals
Copies
Full size drawings 0 $ - $ -
Half size drawings 0 $ - $ -
Design Analysis and Calculations $ - $ -
Specifications 0 $ - $ -
Translated Specifications 0 $ - $ -
Cost Estimate $ - $ -
Construction Inspection Rept. $ - $ -
Submittal Register $ - $ -
Bindings $ - $ -
CD Recording $ - $ -
Sub-Total $ -
Sub-Total G7.3 - 100% Design $ -

Total Sub-Section G.7 - Reproduction € 0.00

G8 - Courier & Telephone Sub-Totals Total


Est.
Deliv.s Unit cost Est. Cost
(Kg)
Courier $ -
Telephone (LS) LS $ -

Total Sub-Section G8 - Courier & Telephone $0.00

G9 - Renderings Sub-Totals Total

Orig. Unit cost Est. Cost


Renderings
$ -
Sub-Total $ -
No. of
Orig. Unit cost Est. Cost
copies
Copies 0 $ - $ -
Framed copies 0 $ -
Sub-Total $ -

Total Sub-Section G9 - Renderings $0.00

G10 - Construction Permit Application Package Sub-Totals Total


Est.
TO BE PERFORMED BY LOCAL CONSULTANT SUB-CONTRACTORS. Hrs Rates
Cost
Design Manager $ - $ -
Special Systems Engineer (Security, Telecom) $ - $ -
CAD Operator $ - $ -
Sub-Total $ -

Total Sub-Section G10 - Construction Permit Application Package $ -

G11 - Quality Control of submittals from other A/E Sub-Totals Total

No of Sub-tot. Est.
No of staff Hrs/subm. Rates
submittals Hours Cost

Contract Manager 0 $ - $ -
Professional as required 0 $ - $ -
Admin Assistant 0 $ - $ -
Sub-Total $ -

Total Sub-Section G11 - Quality Control of submittals from other A/E $ -

SF IMU-005 Revised January 2013 PAGE 12


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Section G: Services
G12 - Other Services (This space is for additional services not included in this standard form) Sub-Totals Total
Est.
Description Rates
Cost

Sub Total $ -

Total Sub-Section G12 - Other Services $ -

TOTAL SECTION G - SERVICES $ -

SF IMU-005 Revised January 2013 PAGE 13


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Section H: Travel
H.1 - Field Investigations Total
Times / Est.
No. Rates
Days Cost
Taxi (Round trips) $ - $ -
Airfare (Round trips) $ - $ -
Rental car $ - $ -
Gas $ - $ -
Subsistence (persons) $ - $ -

Sub-Total H.1 - Travel for Field Investigations $ -

H.2 - Topographic Survey Total


Times / Est.
No. Rates
Days Cost
Taxi (Round trips) $ - $ -
Airfare (Round trips) $ - $ -
Rental car $ - $ -
Gas $ - $ -
Subsistence (persons) $ - $ -

Sub-Total H.2 - Travel for Topographic Survey $ -

H.3 - Geotechnical survey Total


Times / Est.
No. Rates
Days Cost
Taxi (Round trips) $ - $ -
Airfare (Round trips) $ - $ -
Rental car $ - $ -
Gas $ - $ -
Subsistence (persons) $ - $ -

Sub-Total H.3 - Travel for Geotechnical Survey $ -

H.4 - Concept Design Presentation Total


Times / Est.
No. Rates
Days Cost
Taxi (Round trips) $ - $ -
Airfare (Round trips) $ - $ -
Rental car $ - $ -
Gas $ - $ -
Subsistence (persons) $ - $ -

Sub-Total H.4 - Travel for Pre-Design $ -

H.5 - Pre-Design Total


Times / Est.
No. Rates
Days Cost
Taxi (Round trips) $ - $ -
Airfare (Round trips) $ - $ -
Rental car $ - $ -
Gas $ - $ -
Subsistence (persons) $ - $ -

Sub-Total H.5 - Travel for Pre-Design $ -

SF IMU-005 Revised January 2013 PAGE 14


PROCUREMENT SENSITIVE

IMU Fee Proposal Form


Section H: Travel
H.6 - 35% Design Review Mtg. Total
Times / Est.
No. Rates
Days Cost
Taxi (Round trips) $ - $ -
Airfare (Round trips) $ - $ -
Rental car $ - $ -
Gas $ - $ -
Subsistence (persons) $ - $ -

Sub-Total H.6 - Travel for 35% Design Review Mtg. $ -

H.7 - 100% Design Review Mtg. Total


Times / Est.
No. Rates
Days Cost
Taxi (Round trips) $ - $ -
Airfare (Round trips) $ - $ -
Rental car $ - $ -
Gas $ - $ -
Subsistence (persons) $ - $ -

Sub-Total H.7 - Travel for 100% Design Review Mtg. $ -

H.8 Other Services (This section is for eventual additions to the standard form) Total
Est.
Description Rates Sub-Totals
Cost

Sub Total $ -

Sub-Total H.8 Travel for Other Services $ -

TOTAL SECTION F - TRAVEL $ -

SF IMU-005 Revised January 2013 PAGE 15


Attachment D 
Standard Form IMU‐007 
 
Application and Certificate for Progress Payment  Page | 69

(Technical Consultancy) 
 

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 70 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
IMU
                         Application and Certificate
                   Infrastructure Management Unit for Progress Payment 001
Project No.:  Project Title: Location:

Contract #: A/E: PO #:

UNHCR Project Manager:

Contract Completion Date: Extension for approved COs (solar days): New Completion Date:

Application Date: Period to:
15/01/2013 31/12/2012

1. CONTRACT VALUE

2. NET CHANGE BY CHANGE ORDERS

3. CONTRACT SUM TO DATE (Line 1+2) $                                      ‐

4. TOTAL COMPLETED TO DATE
(Column f on backup sheet + column l on Change Orders  Log)

5. CONTRACT RETAINAGE: 10% $                                      ‐

6. TOTAL EARNED LESS RETAINAGE ( Line 4 less Line 5 Total) $                                      ‐

7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) $                                      ‐

8. CURRENT PAYMENT DUE $                              ‐

9. BALANCE TO FINISH INCLUDING RETAINAGE (Line 3 less Line 6) $                                      ‐

Application is made for payment in connection with the Contract.  Backup sheet is attached. The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and 
belief the work covered by this application for payment has been completed in accordance with the Contract documents, that all amounts have been paid by the Contractor for work for which 
previous Certificate for Payment were issued and payments received from the WFP Procurement, and that current payment shown herein is now due.

Title: Name: Signature: Date:

Certificate for Payment
In accordance with the Contract Documents, based on on‐site observations and the data comprising  this applications, the Project Manager certifies to the UNHCR Procurement that to the best of 
the her/his knowledge, information and belief the work has progressed as indicated, the quantity of the work is in accordance with the Contract Documents, and the Contractor is entitled to 
payment of the AMOUNT CERTIFIED.

AMOUNT CERTIFIED $                              ‐

The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any right of UNHCR or Contractor under this 
contract.

Title: Name: Signature: Date:

Title: Name: Signature: Date:

SF IMU-007 Page 1
 
Attachment E 
Standard Form IMU‐006 
 
Design Comment Sheet  Page | 71

     
IMU A/E Manual ‐ April 2015    UNHCR/AI/2015/3 – Annex B 
THIS PAGE WAS INTENTIONALLY LEFT BLANK

Page | 72 

     
UNHCR/AI/2015/3 – Annex B    IMU A/E Manual – April 2015 
 
           IMU – Infrastructure Management Unit    SF IMU‐006
 
Project Title: 
 
Location: 
  Submittal:   
Comments by:    Phone:    Date of Rvw:   
Title:    Discipline:   
E‐Mail:    Code/In.:   
 

ACTION CODES   
EP   Explanation provided on separate sheet WP  Will provide at next submittal C  Concur 
R  Rejected (provide explanation in writing) WCK Will check DPM  Deleted by the PM
TBD  To be discussed  WC Will correct  
 

DWG. NO.  DETAIL NO.  ACTION 


#  COMMENTS 
OR SECT.  NO.  OR PAR NO.  CODES 

1.      
2.       a.
3.      
4.      
5.      
6.      
7.      
8.      
9.      
10.      
11.      
12.      
13.      
14.      
15.      
16.      
17.      
18.      
19.      
20.      
21.      
22.      
23.      
24.      
25.      
26.      
27.      
28.      
29.      
30.      
31.      
32.      
33.      
34.      
35.      
36.      
37.      
1 | P a g e  
           IMU – Infrastructure Management Unit    SF IMU‐006
 
Project Title: 
 
Location: 
  Submittal:   
Comments by:    Phone:    Date of Rvw:   
Title:    Discipline:   
E‐Mail:    Code/In.:   
 

ACTION CODES   
EP   Explanation provided on separate sheet WP  Will provide at next submittal C  Concur 
R  Rejected (provide explanation in writing) WCK Will check DPM  Deleted by the PM
TBD  To be discussed  WC Will correct  
 

DWG. NO.  DETAIL NO.  ACTION 


#  COMMENTS 
OR SECT.  NO.  OR PAR NO.  CODES 

38.      
39.      
40.      
41.      
42.      
43.      
44.      
45.      
46.      
47.      
48.      
49.      
50.      
51.      
52.      
53.      
54.      
55.      