4.09 PROJECT DESIGN DOCUMENTS, CALCULATIONS AND DRAWINGS


CHK’D

A. The CONTRACTOR shall submit all design documents, calculations, studies and
drawings at various stages of the PROJECT as per Table 4.01, as a minimum.
DESCRIPTION

Table 4.01
Bid Base Detail As-Built
# INDEX TITLE Stage Design Design & Stage
Stage Construct.
Stage
1. A Equipment/Materials
2. HV GIS + Exit Bus and associated devices X X X, IV X
3. HV/MV Power Transformers
NO.

4. 108 kV & 18 kV Surge arresters X


REVISIONS
5. HV Power Cables
6. Power Cable Termination and Splice Kits
7. MV Switchgear and associated devices
DEPT.: E&DD
8. MV Power Cables
9. Station Service Transformers
10. Sheath Voltage Limiter (SVL)
PREP. BY: RNF / SG
11. Link Box along with its accessories
DATE: 13 / 06 / 2016 12. MV Capacitor Banks with Reactors
13. LV Distribution Panels
14. Battery and Battery Chargers
15. LV Power, Control and Instrumentation Cables
16. Cable Tray System X, IV X
17. Bay Control Panels, Bay Protection Panels, X X, IV X
TFR Panels, as applicable
18. Interface Panel (for alarms generated X X, IV X
APPROVED
equipment other than IEDs ) and Annunciator
BY: MAG / MA Panel
19. Protective Relays, Relay Manuals & Catalogues X X
DATE: 13 / 06 / 2016
20. Fiber Optic Terminal Equipment
21. Relay Application/Installation/Commissioning X X, IV X
Manuals
22. Various Control and Metering Instrument and X, IV X
Devices and Recording/Indicating Instruments, if
applicable
CERTIFIED
23. Grounding System Material, Joints, etc. X, IV X
24. Shielding System Material
BY: AHM 25. Indoor/Outdoor lighting fixtures including
DATE: 13 / 06 / 2016
emergency / exit lights, receptacles
26. Fire Alarm System , Fire Suppression System &
Fire Fighting Equipment
27. EOT Crane
28. HVAC Equipment
29. Site Layout/Plot Plan
30. Substation Layout Plan X X, I X
31. Design Calculations, Test & Procedure
THIS DOCUMENT IS
NOT TO BE USED FOR 32. 125 V DC Battery and Charger Sizing
CONSTRUCTION OR
FOR ORDERING Calculations
MATERIALS UNTIL
CERTIFIED AND DATED
33. MV CB Back-to Back Capacitor Current
Switching Capability Calculation
34. Capacitor Bank Sizing Calculation including

DRAWING CONTROL SHEET PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
SOW/TS FOR P O W E R S U P P L Y T O K I N G ABDULAZIZ
ET-918532 CITY FOR SCIENCE AND TECHNOLOGY P V P L AN T I N
JOB ORDER NO.
K H AF J I AR E A ( S U B S T AT I O N P O R T I O N ) 47
NG0777 A PTS-16EN1013 OF 0
KHAFJI SAUDI ARABIA 70
CERT.
NATIONAL GRID SA ‫الشركة الوطنية لنقل الكهرباء‬
APP’D

Bid Base Detail As-Built


CHK’D

# INDEX TITLE Stage Design Design & Stage


Stage Construct.
Stage
EMTP studies, Jumper & neutral conductor
sizing, etc.
35. Study & Design Calculations for Very Fast X X, IV X
DESCRIPTION

Transient Over Voltage


36. 108 and 18kV Surge Arrester Sizing X X, IV X
Calculations
37. Detailed HV Cable Ampacity Calculations
38. Calculations for Cable Metallic Sheath Sizing
and Fault current withstand capability
39. Calculations for sheath standing voltage,
NO.

sheath voltage rise and the Selection of Sheath


3

REVISIONS Voltage Limiters (SVL).


40. Cable pulling tension and sidewall pressure
calculations.
41. Calculations for verification of Grounding X X, II X
DEPT.: E&DD System Design
42. CT Calculations to support Burden Rating and X X, IV X
Knee Point Voltage/Characteristics
PREP. BY: RNF / SG 43. Lightning and Shielding system Design
44. VT Calculations to support Burden Rating X X, IV X
45. Lighting System Design
DATE: 13 / 06 / 2016

46. MV Cable Sizing and Ampacity Calculations


47. Relay Application and Relay Setting Calculations X X, IV X
48. Civil Design philosophy, standards, codes,
design basis and design data
49. Structural Design Calculations of Substation
Building (to include, but not limited to, GIS,
Switchgear, Control, Battery, External Telecom,
APPROVED FK-5-1-12, Communication Rooms, cable
raceway, toilet, hallways and stairways).
BY: MAG / MA
50. Foundation design calculation of Substation
Building
DATE: 13 / 06 / 2016
51. Structural design calculations of cable
entry/basement retaining walls
52. Foundation design calculations for Power
Transformer and Fire walls
53. Structural design calculations of Cable Trench
and Precast concrete cover.
54. Design calculation of reinforced concrete
CERTIFIED Underground Water Tank, Sewer Manhole,
Condensate Drain Pit and Chemical Dry Pit
55. Sizing Calculation for Oil Catch Basin for
BY: AHM
Power Transformer
DATE: 13 / 06 / 2016
56. Structural Design of Station Service Transformer
foundation.
57. Design calculation for electrical manholes and
hand holes
58. Design calculations for precast boundary wall
panels, columns and footings
59. Structural calculation for duct banks in traffic
areas and road crossings
THIS DOCUMENT IS
60. Structural Design Calculations of Foundations
NOT TO BE USED FOR for capacitor banks, CTs, VTs, lighting and
CONSTRUCTION OR lightning poles and associated outdoor
FOR ORDERING
MATERIALS UNTIL equipment (if any)
CERTIFIED AND DATED 61. Structural Design Calculations of foundation for X, II X
Project Signboard with Electronic Counter
62. HVAC System Design Calculations

DRAWING CONTROL SHEET PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
SOW/TS FOR P O W E R S U P P L Y T O K I N G ABDULAZIZ
ET-918532 CITY FOR SCIENCE AND TECHNOLOGY P V P L AN T I N
JOB ORDER NO.
K H AF J I AR E A ( S U B S T AT I O N P O R T I O N ) 48
NG0777 A PTS-16EN1013 OF 0
KHAFJI SAUDI ARABIA 70
CERT.
NATIONAL GRID SA ‫الشركة الوطنية لنقل الكهرباء‬
APP’D

Bid Base Detail As-Built


CHK’D

# INDEX TITLE Stage Design Design & Stage


Stage Construct.
Stage
63. Plumbing System Design Calculations
64. Water Supply and Sewerage System Design
Calculations
DESCRIPTION

65. Fire Suppression System Design Calculations


66. PROJECT PERT/CPM Schedule for Monitoring X
and Control of Activities X
67. CONTRACTOR’s Loss Prevention Program X
68. Site Security Plan X
69. QA/QC Plan X
70. Inspection and Test Plan X
71. Factory Test Procedure X
72. Site Test Procedure X
NO.

73. A schedule showing the outages requirements for


REVISIONS X X
the PROJECT on the existing facilities
74. Electrical Interference Study in case the power
cable parallels the communication circuits.
75. Calculation of Power Cables Sequence
DEPT.: E&DD
Impedance.
76. P Design Drawings
77. Abbreviations, Symbols and Legend X X, IV X
PREP. BY: RNF / SG 78. Switching One-Line Diagram X X, IV X
79. Relaying and Metering One-Line Diagram X X, IV X
DATE: 13 / 06 / 2016
80. AC Auxiliary System One-Line Diagram X X, VI X
81. DC Auxiliary System One-Line Diagram X X, VI X
82. AC Composite Three Line Diagram X, VI X
83. DC Composite Schematic for Protection X. VI X
84. DC Composite Schematic for Control X, VI X
85. Logic Flow Diagram for Interlocking Scheme X X, VI X
86. Panel Wiring Diagrams for BCP, BPP, SCADA X, VI X
Interface, Fault Recorder and RTCC , as
APPROVED
applicable
BY: MAG / MA
87. Substation Equipment Layout X X, II X
88. Substation Equipment Sections X X, II X
DATE: 13 / 06 / 2016 89. Substation Equipment Details X X, IV X
90. Interconnection Diagrams X, VI X
91. Substation Grounding Layout X X, II X
92. Substation Grounding Details X X, II X
93. Substation Raceway and Cabling Plan X, IV X
94. Substation Raceway and Cabling Details X, IV X
95. Duct bank Layout and details X X, IV X
CERTIFIED 96. Control Building Equipment Layout - Plan & X X, II X
Sections
97. Substation Outdoor Equipment Arrangement
BY: AHM
Plan & Sections
DATE: 13 / 06 / 2016 98. Substation Outdoor Lighting/Power Layout and
Details
99. Building Power/Lighting Plan and Details
100. Cable and Conduit Schedule X, IV X
101. Interlock Scheme X X, VI X
102. AC and DC Panel Wiring Diagram and
Schematics including LV AC Automatic Transfer
Scheme for AC System
THIS DOCUMENT IS 103. AC/DC Panel board Schedule X, IV X
NOT TO BE USED FOR
CONSTRUCTION OR
104. SCADA Drawing Standard Symbols X X. VI X
FOR ORDERING 105. SCADA Function Diagram X X, VI X
MATERIALS UNTIL
CERTIFIED AND DATED 106. SCADA Handover Book Sheets X, VI X
107. SCADA Single Line Diagram X X, VI X
108. SCADA Interconnecting Diagram Status X, VI X

DRAWING CONTROL SHEET PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
SOW/TS FOR P O W E R S U P P L Y T O K I N G ABDULAZIZ
ET-918532 CITY FOR SCIENCE AND TECHNOLOGY P V P L AN T I N
JOB ORDER NO.
K H AF J I AR E A ( S U B S T AT I O N P O R T I O N ) 49
NG0777 A PTS-16EN1013 OF 0
KHAFJI SAUDI ARABIA 70
CERT.
NATIONAL GRID SA ‫الشركة الوطنية لنقل الكهرباء‬
APP’D

Bid Base Detail As-Built


CHK’D

# INDEX TITLE Stage Design Design & Stage


Stage Construct.
Stage
109. SCADA Interconnecting Diagram Control X, VI X
110. SCADA Interconnecting Diagram Analog X, VI X
111. Annunciator System Equipment Layout. X X, IV X
DESCRIPTION

Interconnection Diagram & Mounting Details, as


applicable
112. SOE Points List, as applicable X X, IV X
113. Fire Alarm and Detection System Equipment
Layout, Interconnection Riser diagrams
114. Fire Alarm Equipment mounting Details
115. Fire Fighting Equipment Layout
116. Vendor Drawings X X, IV X
117. Revision of Existing System Drawings X X, IV X
NO.

118. K HVAC Plan and Sections


REVISIONS
119. HVAC Details
120. L Plumbing Layout and Details
121. Q General Civil/Structural Notes (Specifications of
Concrete, Steel Reinforcements, Formwork,
DEPT.: E&DD Earthworks etc.)
122. Plan, section and details of Power Transformer
Foundation (including Oil Catch basin, Gratings
PREP. BY: RNF / SG etc.)
123. Details of Trenches & Duct banks X X, IV X
DATE: 13 / 06 / 2016
124. Fire wall and Foundation – Plan, Sections and
Details
125. Plan, Sections and Details of Duck banks for MV
outgoing feeders
126. Plan, Sections and Details of Duck banks for HV X X, IV X
incoming feeders
127. Foundations for capacitor banks, CTs, VTs,
lighting and lightning poles and associated
APPROVED
outdoor equipment (if any)
128. Layout, Sections and Details of Wing Walls
BY: MAG / MA 129. Building Foundation Plan, Sections & Details
130. Ground Floor Framing Plan, Grade Beam
DATE: 13 / 06 / 2016
Schedule, Details and Sections
131. First Floor Framing Plan, Beam Schedule, Details
and Sections (if any)
132. Ground floor slab plan, sections and details
133. First floor slab plan, sections and details (if any)
134. Roof framing Plan, Roof Beam Schedule, Details
and Sections
CERTIFIED 135. Roof slab Plan, Sections and Details
136. Foundation/column Plan, schedule, sections and
BY: AHM
details
137. Parapet wall Plan, Sections and details
DATE: 13 / 06 / 2016 138. Staircase Plan, sections and details
139. Precast Boundary Wall, Columns & Foundation –
Layout, Sections and Details
140. Layout and details of Removable Precast
Boundary Wall, Columns and Foundations (if
any)
141. Details of Precast Boundary Wall Retaining Wall
and Foundations
THIS DOCUMENT IS 142. EOT Crane Support details in HV GIS room
NOT TO BE USED FOR
CONSTRUCTION OR
143. Steel Reinforcements, Typical Bending Details
FOR ORDERING and Schedule
MATERIALS UNTIL
CERTIFIED AND DATED
144. Plan and Details of Sump pit in Cable
entry/basement (including steel gratings)
145. Manhole/Handhole Plan, Sections and Details

DRAWING CONTROL SHEET PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
SOW/TS FOR P O W E R S U P P L Y T O K I N G ABDULAZIZ
ET-918532 CITY FOR SCIENCE AND TECHNOLOGY P V P L AN T I N
JOB ORDER NO.
K H AF J I AR E A ( S U B S T AT I O N P O R T I O N ) 50
NG0777 A PTS-16EN1013 OF 0
KHAFJI SAUDI ARABIA 70
CERT.
NATIONAL GRID SA ‫الشركة الوطنية لنقل الكهرباء‬
APP’D

Bid Base Detail As-Built


CHK’D

# INDEX TITLE Stage Design Design & Stage


Stage Construct.
Stage
146. Duct banks, Sections and Details
147. Ramp Plan, Section and Details
148. Jib Crane Structural Support Plan, Section and
DESCRIPTION

Details (if any).


149. Plan, Section and Details of Crash barrier, chain
link and foundation
150. Project Signboard with Electronic Counter
Foundation Plan, Section and Details.
151. R 3D Perspective Views of Substation
152. Basement Floor Plan
153. Ground Floor Plan
154. First Floor Plan (if any)
NO.

155. Roof Plan and Details


REVISIONS 156. Building Sections and Elevations
157. Wall Sections and Details
158. Building Finish Schedule
159. Door and Hardware Schedule
DEPT.: E&DD 160. Ceiling Plan, Section and Details
161. Raised Floor Plan Section and Details at
Communication Room
PREP. BY: RNF / SG 162. Raised Floor Plan Section and Details at Control
Room (if any)
DATE: 13 / 06 / 2016
163. Toilet Plan, Sections, Details & Fitting Schedule
164. Battery Room Plan, Sections, Elevations &
Details
165. Communication Room Plan, Sections,
Elevations & Details
166. External Telecom Room Plan, Section and
Details
167. M Structural Steel details for support structures
APPROVED and Capacitor Banks
168. Drive Gate & Personnel Gate Plan, Section and
BY: MAG / MA
connection details.
DATE: 13 / 06 / 2016
169. Fence for Capacitor Bank, Sections and Details
170. Steel Caged Ladder Plan, Section and Details
171. Plan, Section and Details of Jib Crane Steel
Structure (if any)
172. Project Signboard with Electronic Counter Plan,
Section and Details .
173. Signboard on Substation Building
174. Lighting & Lightening Poles, Sections and
CERTIFIED Details
175. Plan, Section & Details of Crane Runway Girder
BY: AHM
in GIS Room
176. T System Interconnection Diagram (For X X, VI X
DATE: 13 / 06 / 2016 interconnection of Communication Equipment
with SCADA/SAS and Protective Relays)
177. Telephone outlet layout
178. Additional Drawings as specified in Appendix VI X X, VI X
179. S Site Grading and Paving Plan
180. Site Grading Sections and Details
181. Signs and Road Markings Plan, Section and
Details
THIS DOCUMENT IS 182. L/S Fire Suppression System Equipment & Piping
NOT TO BE USED FOR
CONSTRUCTION OR Layout
FOR ORDERING 183. Fire Suppression System Sections & Details
MATERIALS UNTIL
CERTIFIED AND DATED 184. Drainage Layout, Sections and Details
185. Topographic Layout with Existing Grade Levels
(including the Key/Location Plan)

DRAWING CONTROL SHEET PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
SOW/TS FOR P O W E R S U P P L Y T O K I N G ABDULAZIZ
ET-918532 CITY FOR SCIENCE AND TECHNOLOGY P V P L AN T I N
JOB ORDER NO.
K H AF J I AR E A ( S U B S T AT I O N P O R T I O N ) 51
NG0777 A PTS-16EN1013 OF 0
KHAFJI SAUDI ARABIA 70