Mobile Business Planning Model

Year 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

TANAH
Luas (m2) 4,000
Harga per m2 17,000 17,563 18,126 18,690 19,253 19,815 20,378 20,940 21,503 22,067
Total harga
perolehan tanah 68,000,000 70,250,800 72,505,851 74,760,783 77,011,082 79,259,806 81,510,784 83,760,482 86,013,639 88,267,196

GEDUNG
Luas (m2) 3,453
Harga per m2 4,000,000 4,132,400 4,265,050 4,397,693 4,530,064 4,662,342 4,794,752 4,927,087 5,059,626 5,192,188

Total harga
perolehan
pembangunan gedung 13,812,000,000 14,269,177,200 14,727,217,788 15,185,234,261 15,642,309,813 16,099,065,259 16,556,278,712 17,013,232,005 17,470,887,946 17,928,625,210

MESIN-MESIN PRODUKSI
Nama Mesin 1 Dewalt 2300W 14” Metal Cut Off Machine D28720
Jumlah 1
Harga beli per unit 2,369,000 2,447,414 2,525,976 2,604,534 2,682,930 2,761,272 2,839,692 2,918,067 2,996,563 3,075,073
Total harga perolehan
mesin 1 2,369,000 2,447,414 2,525,976 2,604,534 2,682,930 2,761,272 2,839,692 2,918,067 2,996,563 3,075,073

Nama Mesin 2 CNC LATHE FTC-350-L WITH FANUC 0I-TF


Jumlah 1
Harga beli per unit 1,185,580,000 1,224,822,698 1,264,139,507 1,303,454,245 1,342,688,218 1,381,894,714 1,421,140,524 1,460,364,002 1,499,647,794 1,538,938,566
Total harga perolehan
mesin 2 1,185,580,000 1,224,822,698 1,264,139,507 1,303,454,245 1,342,688,218 1,381,894,714 1,421,140,524 1,460,364,002 1,499,647,794 1,538,938,566

Nama Mesin 3 Swlaser-WF200 Welding Machine


Jumlah 1
Harga beli per unit 68,880,000 71,159,928 73,444,162 75,728,275 78,007,696 80,285,521 82,565,630 84,844,441 87,126,757 89,409,478
Total harga perolehan
mesin 3 68,880,000 71,159,928 73,444,162 75,728,275 78,007,696 80,285,521 82,565,630 84,844,441 87,126,757 89,409,478

Nama Mesin 4 Shenghao SH-35T Blow Molding


Jumlah 1
Harga beli per unit 551,040,000 569,279,424 587,553,294 605,826,201 624,061,570 642,284,167 660,525,038 678,755,529 697,014,053 715,275,821
Total harga perolehan
mesin 4 551,040,000 569,279,424 587,553,294 605,826,201 624,061,570 642,284,167 660,525,038 678,755,529 697,014,053 715,275,821

Nama Mesin 5 PROSPRAY PS.3.34 SPRAYPACK


Jumlah 1
Harga beli per unit 72,425,100 74,822,371 77,224,169 79,625,841 82,022,578 84,417,638 86,815,099 89,211,195 91,610,976 94,011,184
Total harga perolehan
mesin 5 72,425,100 74,822,371 77,224,169 79,625,841 82,022,578 84,417,638 86,815,099 89,211,195 91,610,976 94,011,184

Nama Mesin 6 WMT XH7132 CNC Milling Machine


Jumlah 1
Harga beli per unit 206,640,000 213,479,784 220,332,485 227,184,825 234,023,089 240,856,563 247,696,889 254,533,323 261,380,270 268,228,433
Total harga perolehan
mesin 6 206,640,000 213,479,784 220,332,485 227,184,825 234,023,089 240,856,563 247,696,889 254,533,323 261,380,270 268,228,433

Nama Mesin 7 LH-140T Aluminium Die Casting Machine


Jumlah 1
Harga beli per unit 185,976,000 192,131,806 198,299,237 204,466,343 210,620,780 216,770,907 222,927,200 229,079,991 235,242,243 241,405,589
Total harga perolehan
mesin 7 185,976,000 192,131,806 198,299,237 204,466,343 210,620,780 216,770,907 222,927,200 229,079,991 235,242,243 241,405,589

Nama Mesin 8 Ellsen square tube bending machine multi function manual hydraulic pipe bending machine
Jumlah 1
Harga beli per unit 13,638,240 14,089,666 14,541,944 14,994,198 15,445,524 15,896,533 16,347,995 16,799,199 17,251,098 17,703,077
Total harga perolehan
mesin 8 13,638,240 14,089,666 14,541,944 14,994,198 15,445,524 15,896,533 16,347,995 16,799,199 17,251,098 17,703,077

Nama Mesin 9 Bor Obeng Elektrik FISCH TS601200


Jumlah 1
Harga beli per unit 155,000 160,131 165,271 170,411 175,540 180,666 185,797 190,925 196,061 201,197
Total harga perolehan
mesin 9 155,000 160,131 165,271 170,411 175,540 180,666 185,797 190,925 196,061 201,197

KENDARAAN
Nama Kendaraan 1 Forklift Truck
Jumlah 2
Harga beli per unit 178,828,885

Total harga perolehan


kendaraan 1 357,657,770 - - - - - - - - -

Nama Kendaraan 2 Forklift Truck


Jumlah 1
Harga beli per unit 123,804,614

Total harga perolehan


kendaraan 2 123,804,614 - - - - - - - - -

Nama Kendaraan 3 Crane


Jumlah 1
Harga beli per unit 123,567,899

Total harga perolehan


kendaraan 3 123,567,899 - - - - - - - - -

Nama Kendaraan 4 Belt Conveyor


Jumlah 8
Harga beli per unit 1,500,000

Total harga perolehan


kendaraan 4 12,000,000 - - - - - - - - -

PERLENGKAPAN KANTOR

Nama Perlengkapan
Kantor 1 Meja Kerja Direktur
Jumlah 1 - - - - 1 - - - -
Harga beli per unit 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000

Total harga perolehan


perlengkapan kantor
1 3,000,000 - - - - 3,000,000 - - - -

Nama Perlengkapan
Kantor 2 Kursi Kerja Direktur
Jumlah 1 1
Harga beli per unit 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000

Total harga perolehan


perlengkapan kantor
2 2,000,000 - - - - 2,000,000 - - - -

Nama Perlengkapan
Kantor 3 Kursi Tamu Direktur
Jumlah 1 1
Harga beli per unit 1,500,000 1,500,000

Total harga perolehan


perlengkapan kantor
3 1,500,000 - - - - 1,500,000 - - - -

Nama Perlengkapan
Kantor 4 Sofa Panjang
Jumlah 1 1
Harga beli per unit 5,000,000 5,000,000

Total harga perolehan


perlengkapan kantor
4 5,000,000 - - - - 5,000,000 - - - -

Nama Perlengkapan
Kantor 5 Rak Buku dan Berkas
Jumlah 6 10
Harga beli per unit 2,300,000 2,300,000

Total harga perolehan


perlengkapan kantor
5 13,800,000 - - - - 23,000,000 - - - -

Nama Perlengkapan
Kantor 6 Meja Kerja
Jumlah 3 24
Harga beli per unit 5,500,000 5,500,000

Total harga perolehan


perlengkapan kantor
6 16,500,000 - - - - 132,000,000 - - - -

Nama Perlengkapan
Kantor 7 Kursi Kerja
Jumlah 3 24
Harga beli per unit 1,400,000 1,400,000

Total harga perolehan


perlengkapan kantor
7 4,200,000 - - - - 33,600,000 - - - -

Nama Perlengkapan
Kantor 8 Lunar Meja Rapat Besar LMK 240
Jumlah 1 1
Harga beli per unit 3,000,000 3,000,000

Total harga perolehan


perlengkapan kantor
8 3,000,000 - - - - 3,000,000 - - - -

Nama Perlengkapan
Kantor 9 AC Split Sharp 1 PK
Jumlah
Harga beli per unit 15,000,000

Total harga perolehan


perlengkapan kantor
9 15,000,000 - - - - - - - - -

Nama Perlengkapan
Kantor 10 Mesin Fotocopy
Jumlah
Harga beli per unit 9,500,000

Total harga perolehan


perlengkapan kantor
10 9,500,000 - - - - - - - - -

Nama Perlengkapan
Kantor 11 Printer Canon Pixma E410
Jumlah
Harga beli per unit 2,500,000

Total harga perolehan


perlengkapan kantor
11 2,500,000 - - - - - - - - -

Nama Perlengkapan
Kantor 12 Kulkas Samsung 2 Pintu 322 L
Jumlah
Harga beli per unit 5,000,000

Total harga perolehan


perlengkapan kantor
12 5,000,000 - - - - - - - - -

Nama Perlengkapan
Kantor 13 Komputer ASUS Core i3
Jumlah
Harga beli per unit 45,000,000

Total harga perolehan


perlengkapan kantor
13 45,000,000 - - - - - - - - -

Nama Perlengkapan
Kantor 14 Projector inFocus XGA IN233
Jumlah
Harga beli per unit 10,000,000

Total harga perolehan


perlengkapan kantor
14 10,000,000 - - - - - - - - -

Nama Perlengkapan
Kantor 15 Spash Fire Extinguisher
Jumlah
Harga beli per unit 4,000,000

Total harga perolehan


perlengkapan kantor
15 4,000,000 - - - - - - - - -

Nama Perlengkapan
Kantor 16 Karpet Masjid
Jumlah
Harga beli per unit 800,000

Total harga perolehan


perlengkapan kantor
16 800,000 - - - - - - - - -

Nama Perlengkapan
Kantor 17 Flow Through Rack
Jumlah
Harga beli per unit 3,500,000

Total harga perolehan


perlengkapan kantor
17 3,500,000 - - - - - - - - -

Nama Perlengkapan
Kantor 18 Pallet Rack
Jumlah
Harga beli per unit 12,000,000

Total harga perolehan


perlengkapan kantor
18 12,000,000 - - - - - - - - -

Nama Perlengkapan
Kantor 19 Pallet Kayu
Jumlah
Harga beli per unit 15,000,000

Total harga perolehan


perlengkapan kantor
19 15,000,000 - - - - - - - - -

PENGELUARAN
TOTAL INVESTASI
TANGIBLE ASSETS 16,955,033,623 16,701,821,221 17,237,949,682 17,774,049,917 18,309,048,819 19,046,773,045 19,378,833,359 19,913,689,160 20,449,367,398 20,985,140,824