You are on page 1of 25

SITE ACCEPTANCE TEST

INDEX

1. 11 kV SWITCHGEAR

1.1 METHOD STATEMENTS


1.2 TEST REPORT FOR METAL CLAD SWITCHGEAR
1.3 TEST REPORT FOR 11kV BUSBAR
1.4 TEST REPORT FOR CIRCUIT BREAKER
1.5 TEST REPORT FOR CURRENT TRANSFORMER
1.6 TEST REPORT FOR VOLTAGE TRANSFORMER
1.7 OUTPUT SIGNALS - FUNCTION

Page: 1 / 25
SITE ACCEPTANCE TEST

1.1 METHOD STATEMENTS

1. Metal Clad Switchgear

 Check for Completeness of installation as per check list


 Prior testing Erection Check Format /Erection Control Form) must be checked
and filled
 Check Insulation Resistance values for all aux circuits
 Check Operation of Breakers
 Check Function of control and selector switches
 Check Function of meters and relays
 Check over all function of current and voltage transformers
 Check Function of aux. CT / aux. PT if any
 Check Function of control circuits and fuses
 Check Function of heater and heater switch
 Check Function of cubicle illumination lamp

NOTE: Relevant drawings, this SAT procedure, FAT report and test forms must be
available on site during testing.

2. HVAC Test

(i) IR Value Measurement

Measure insulation resistance at 5000 V DC


 Between phases
 Between phase to earth

(ii) HVAC Test :

This test is to be carried out on each of the phases with respect to earth. AC
voltage equal to 2.5 times of line voltage (27.5kV) for 1 minute is applied to the
conductor with respect to ground. The leakage current is recorded and noted
down.

Page: 2 / 25
SITE ACCEPTANCE TEST

3. Circuit Breaker

(i) IR Value
 Across the Pole when breaker is open
 Between the pole when breaker is closed
 Pole to earth when breaker is closed

(ii) Contact Resistance Test


As per IEC publication 694 the measurement of contact resistance shall be
made by voltage drop method by passing a direct current of not less than
100 Amps through the circuit breaker (in closed position) and measuring the
voltage drop across the breaker terminals
(Incoming – outgoing), it is achieved by using micro ohmmeter.

(iii) Timing Test


The measurement may be made at normal control voltage and the values
obtained shall be not more than the ones given below
(a) Closing times around 100 milli seconds.
(b) Tripping time around 40 milli seconds.

(iv) Operational and functional check


(a) Operational Check
 Local and Remote Closing and tripping
 Protection Tripping
 Anti Pumping if any

(b) Functional Check


 Emergency Trip
 ON - OFF Indication
 Spring Charge Limit Switch
 C.B Auxiliary Contacts

Page: 3 / 25
SITE ACCEPTANCE TEST

 Auto Trip Indication


 Trip Circuit Healthy

4. Current Transformer

(I) IR Value Measurement


 Measure insulation resistance Primary to earth and between primary to
secondary by using 5000V megger.
 Measure insulation resistance between secondary cores and secondary
core to earth by using 500V megger.

(ii) Continuity Test


Measure the continuity of the winding by using multimeter.

(iii) Winding resistance measurement


Measure the winding resistance of the CT by using low range micro ohm
meter.

(iv) Polarity Test


This test is to be carried out by applying small DC voltage on one side of the CT
and the direction of momentary deflection of a milli ammeter on the opposite side of
the CT is noted and compared with polarity marks.

(v) Ratio Test


This test is to be carried out by applying current in primary and record the
Current value in secondary. To get the ratio of the CT by dividing the Primary
current by that of the secondary current and comparing with it rated value.

(vi) Magnetising Curve Test (Excitation Test)


Excitation tests are made to assure the CT is capable of developing its published
secondary terminal voltage without excessive excitation current. An excitation curve
is plotted by applying various values of an AC voltage below saturation level to the
secondary with the primary open circuited. While measuring secondary current and
voltage substantial deviations from published curves should be investigated (or from
the curves obtained during commissioning) and may indicate a turn to turn short

Page: 4 / 25
SITE ACCEPTANCE TEST

circuit or a completed magnetic path around the CT core.

(vii) Burden Measurement


This test is to be carried out by applying the rated current to the secondary circuit of
the CT and measure the voltage across secondary. The burden is usually
expressed in volt – ampere absorbed at a specified power factor and at rated
secondary current.

5. Voltage Transformer

(i) IR Value Measurement


 Measure insulation resistance Primary to earth and between primary to
secondary by using 5000V megger.
 Measure insulation resistance between secondary cores and secondary
core to earth by using 500V megger.

(ii) Winding resistance measurement


Measure the winding resistance of the VT by using low range micro ohm
meter.

(iii) Polarity Test


This test is to be carried out by applying small DC voltage on one side of
the VT and the direction of momentary deflection of a milli ammeter on
the opposite side of the VT is noted and compared with polarity marks.

(iv) Ratio Test


This test is to be carried out by applying voltage in primary and measure the
voltage value in secondary. To get the ratio of the VT by dividing the Primary
voltage by that of the secondary voltage and comparing with it rated value.

(v) Burden Measurement


This test is to be carried out by applying the rated voltage to the secondary circuit of
the VT and measure the current drawn by the secondary circuit. The burden is
usually expressed in volt – ampere absorbed at a specified power factor and at
rated secondary voltage.

Page: 5 / 25
SITE ACCEPTANCE TEST

1.2 TEST REPORT FOR METAL CLAD SWITCHGEAR

1. Location :
2. Name Plate Details :
Make :
Type :
3. Check for Completeness of installation as per check (erection control form) list
4. Insulation Resistance values for all aux circuits
5. Operation of Breakers
6. Function of control and selector switches
7. Function of meters and relays
8. Function of current and voltage transformers
9. Function of aux CT / aux PT if any
10. Function of control circuits and fuses
11. Function of heater and heater switch
12. Function of cubicle illumination lamp

Page: 6 / 25
SITE ACCEPTANCE TEST

1.3 TEST REPORT FOR HVAC TEST

1. Location :
2. Name plate :

3. Insulation Resistance Test : Using 5kV Megger

Date : Temp :

Circuit Ref Before HV Test After HV Test


R – Phase to Earth
Y – Phase to Earth
B – Phase to Earth
R-Phase to Y-Phase
Y-Phase to B-Phase
B-Phase to R-Phase

4. HVAC Test :
Applied Voltage : 27.5 kV AC
Duration : 1 min
All Circuit Breakers in Service Position

Circuit Ref Leakage Current ( mA )


R phase - Earth
Y phase - Earth
B phase - Earth
Page: 7 / 25
SITE ACCEPTANCE TEST

5. INSTRUMENTS USED FOR TESTING

Description Serial No Calibration Validity

6. Remarks :

Page: 8 / 25
SITE ACCEPTANCE TEST

1.4 TEST REPORT FOR CIRCUIT BREAKER


in acc to IEC 62271 - 100
1.Location :
Designation :

2.Name Plate Details :


Make : ABB Sl.No. :
Type : VD4 Rated Voltage : 12kV
Breaking
: 25kA Rated Current :
Capacity
Making Operating
: 63kA : O - 0.3S – CO - 3Min - CO
Capacity Sequence

3.General Inspection and Pre commissioning checks as per check list :

4. Insulation Resistance Measurement Date :

Megger Used : 5000 V

CIRCUIT REF PHASE

R-Phase Y-Phase B-Phase

Across Poles / Contacts


( When C.B Open )
Pole - Earth
( When C.B Closed )
Pole - Pole R-Y Y-B B-R
( When C.B Closed )

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date
Page: 9 / 25
SITE ACCEPTANCE TEST

5. Contact Resistance ( In Micro Ohms ) : Temp :

R - PHASE Y - PHASE B - PHASE

6. Timing Test
A. At Rated Voltage : in millisecs (ms)

Operation R- Phase Y- Phase B - Phase


Close
Open
Close - Open

B. At 85% Voltage : in millisecs (ms)

Operation R- Phase Y- Phase B - Phase


Close
Open
Close - Open

8. Operational Checks :

a) FUNCTION MANUAL ELECTRICAL


LOCAL REMOTE
CLOSE
OPEN

b) Protection Trip :

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 10 / 25
SITE ACCEPTANCE TEST

9. Functional Checks :

Sl. No Description Status


a. Emergency Trip :
b. ON - OFF Indication (Mechanical) :
C. ON - OFF Indication (Electrical) :
d. Spring Charge limit switch :
e. C.B Auxiliary Contacts :
f. Auto Trip Indication :
g. Test/Service limit switch:
h. Test-Service position indication (Mechanical):
i. Test-Service position indication (Electrical):

10. Interlock checks:

Sl. No Description Status


When the Circuit Breaker in Service position,
1
Check the operation of Earth Switch.
When the Earth Switch is closed, check the
2
rack-in operation of Circuit Breaker.
When the Circuit Breaker in Service position,
3
Check the operation of Busbar Earth Switch.
When the Busbar Earth Switch is closed, check
4
the rack-in operation of Circuit breaker.
Check the operation of Circuit Breaker
5
in between Test & Service position.
6 When the Circuit Breaker in Service position,
open the access door.

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 11 / 25
SITE ACCEPTANCE TEST

Sl. No Description Status


7 When the Earth Switch is open, open the VT
access door.
8 When the VT access door is open, open the
Earth Switch.
9 When the Circuit Breaker in Service position &
closed, check the rack-out operation of Breaker.

11. INSTRUMENTS USED FOR TESTING

Description Serial No Calibration Validity

12. Remarks :

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date
Page: 12 / 25
SITE ACCEPTANCE TEST

1.5 TEST REPORT FOR CURRENT TRANSFORMER

1.Location :
Designation :

2.Name Plate Details :

Make : Ratio :
Sl.No. : R Class :
Y Burden :
B Kpv :
Resistance :

3.General Inspection and Pre commissioning checks as per check list :

4. (i) Insulation Resistance Measurement Date :

Megger Used : 5000 V

CORE PHASE

R-Phase Y-Phase B-Phase


Primary - Secondary Core I
Primary - Secondary Core II
Primary - Secondary Core III
Primary - Earth

5. Print out from CT Analyzer is attached .

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 13 / 25
SITE ACCEPTANCE TEST

ii) Insulation Resistance Measurement Date :

Megger Used : 500 V

BETWEEN CORES PHASE

R-Phase Y-Phase B-Phase


Secondary Core I - Earth
Secondary Core II - Earth
Secondary Core III - Earth
Secondary Core I - Core II
Secondary Core I - Core III
Secondary Core II - Core III

6.Continuity Test :

Continuity Check Between Terminals :

CORES BETWWEN PHASE


TERMINALS
R-Phase Y-Phase B-Phase
CORE I 1S1 - 1S2
1S1 - 1S3
CORE II 2S1 - 2S2
2S1 - 2S3
CORE III 3S1 - 3S2
3S1 - 3S3

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date
Page: 14 / 25
SITE ACCEPTANCE TEST

7. Secondary Winding Resistance ( In Ohms ) : Temp :

CORES TERMINAL PHASE

R-Phase Y-Phase B-Phase


CORE I 1S1 - 1S2
1S1 - 1S3
CORE II 2S1 - 2S2
2S1 - 2S3
CORE III 3S1 - 3S2
3S1 - 3S3

8. Polarity Test : With 1.5 V D.C Supply


Connect +VE AT P1 and -VE AT P2

CORES CONNECT NULL PHASE


DEFLECTION METER
R-Phase Y-Phase B-Phase
BETWEEN
1S1 (+VE), 1S2 (-VE)
CORE I
1S1 (+VE), 1S3 (-VE)
2S1 (+VE) , 2S2 (-VE)
CORE II
2S1 (+VE), 2S3 (-VE)
3S1 (+VE), 3S2 (-VE)
CORE III
3S1 (+VE), 3S3 (-VE)

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date
Page: 15 / 25
SITE ACCEPTANCE TEST

9. RATIO TEST
(a) Selected Ratio :
PHASE PRI. CURRENT SEC. CURRENT THEORITICAL ACTUAL RATIO
REF % ACTUAL Core-1 Core-2 RATIO Core-1 Core-2
(1S1-1S2) (1S1-1S2)

(b) Selected Ratio :


PHASE PRIMARY SECONDARY THEORITICAL ACTUAL RATIO
REF CURRENT CURRENT RATIO
% ACTUAL Core-1 Core-2 Core-1 Core-2
(1S1-1S3) (1S1-1S3)

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 16 / 25
SITE ACCEPTANCE TEST

10. Magnetizing Curve Performance :


Ratio :

R-Phase Y - Phase B - Phase


Core - 1 Core - 1 Core - 1
1S1 – 1S2 1S1 – 1S3 1S1 – 1S2 1S1 – 1S3 1S1 – 1S2 1S1 – 1S3
I I I I I I
V V V V V V
(mA) (mA) (mA) (mA) (mA) (mA)

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature
Name
Date
Page: 17 / 25
SITE ACCEPTANCE TEST

10. Magnetizing Curve Performance :


Ratio :

R-Phase Y - Phase B - Phase


Core - 2 Core - 2 Core - 2
2S1 – 2S2 2S1 – 2S3 2S1 – 2S2 2S1 – 2S3 2S1 – 2S2 2S1 – 2S3
I I I I I I
V V V V V V
(mA) (mA) (mA) (mA) (mA) (mA)

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature
Name
Date

Page: 18 / 25
SITE ACCEPTANCE TEST

10. Magnetizing Curve Performance :

R-Phase Y - Phase B - Phase


Core -1 Core -2 Core -3 Core -1 Core -2 Core -3 Core -1 Core -2 Core -3
1S1-1S2 2S1-2S2 3S1-3S2 1S1-1S2 2S1-2S2 3S1-3S2 1S1-1S2 2S1-2S2 3S1-3S2
V I V I V I V I V I V I V I V I V I

(mA) (mA) (mA) (mA) (mA) (mA) (mA) (mA) (mA)

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 19 / 25
SITE ACCEPTANCE TEST

11. Burden Measurement :

Phase Ref Core Ref Applied Current Measured Voltage


in Amps in Volts
Core - 1
R Phase Core - 2
Core - 3
Core - 1
Y - Phase Core - 2
Core - 3
B - Phase Core - 1
Core - 2
Core - 3

11.1 CT Model used

12. INSTRUMENTS USED FOR TESTING

Description Serial No Calibration Validity

13. Remarks :

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 20 / 25
SITE ACCEPTANCE TEST

1.6 TEST REPORT FOR VOLTAGE TRANSFORMER

1.Location :
Designation :

2.Name Plate Details :


Make : Ratio :
Sl.No. : R Burden :
Y
B

3.General Inspection and Pre commissioning checks as per check list :

4 i) Insulation Resistance Measurement Date :

Megger Used : 5000V

CORE PHASE

R-Phase Y-Phase B-Phase


Primary - Secondary Core I
Primary - Secondary Core II
Primary - Secondary Core III
Primary - Earth

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 21 / 25
SITE ACCEPTANCE TEST

ii) Insulation Resistance Measurement Date :


Megger Used : 500 V

BETWEEN CORES PHASE

R-Phase Y-Phase B-Phase


Secondary Core I - Earth
Secondary Core II - Earth
Secondary Core I - Core II

5. Secondary Winding Resistance ( In Ohms ) : Temp :


CORE TERMINAL PHASES
R -PHASE Y - PHASE B - PHASE

CORE - 1

CORE - 2

6. Primary Winding Resistance ( in Ohms ) : Temp :


CORE TERMINAL PHASES
R -PHASE Y - PHASE B - PHASE

CORE - 1

CORE - 2

7. Polarity Test : With V D.C Supply


Connect Battery at Secondary Terminals and note the deflection in Primary Terminals.

R - PHASE Y - PHASE B - PHASE


Core-1 Core-2 Core-1 Core-2 Core-1 Core-2

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature
Name
Date
Page: 22 / 25
SITE ACCEPTANCE TEST

8. Ratio Test :

PHASE PRIMARY SECONDARY THEORITIC ACTUAL


VOLTAGE VOLTAGE AL RATIO RATIO
BETWEEN VALUE
a-n
R - PH da – dn
a-n
da – dn
a-n
Y - PH da – dn
a-n
da – dn
a-n
B - PH da – dn
a-n
da – dn

9. Burden Measurement :

Phase Ref Core Ref Applied Voltage Measured Current


in Volts in mA
Core - 1
R Phase
Core - 2
Core - 1
Y - Phase
Core - 2
Core - 1
B - Phase
Core - 2

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 23 / 25
SITE ACCEPTANCE TEST

10. No Load Test :


Duration : 30 mins

Phase Ref Core Ref Applied Voltage Measured Current


at Secondary in Volts in Amps
Core - 1
R Phase
Core - 2
Core - 1
Y - Phase
Core - 2
Core - 1
B - Phase
Core - 2

11. VT model used

12. Remarks :

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date
Page: 24 / 25
SITE ACCEPTANCE TEST

1.8 OUTPUT – SIGNALS – FUNCTION

Location:
Designation

1.
Designation Local Signal
Indication Status
CB TRUCK IN TEST POSITION
CB TRUCK IN SERVICE POSITION
E/S OPEN
E/S CLOSED
CB MOTOR SPRING CHARGE FAILURE
HEATERS ON
LOAD SHEDDING TRIP

2. Remarks :

Tested by Witnessed by Witnessed by


ABB Contractor Consultant
Signature

Name
Date

Page: 25 / 25

You might also like