1-ACCESS ISSUES

Location Observation consiquences


1, Fire exit The hand rail height is less that
staircase 1100 mm there is no grip People
may fall
Control measures:
Fall hazard
The height of the rail should
raised up to 1200 mm additional
welding required
Cost approx:10,000-100,000
2, access staircase Access stair case smooth no grip
this leads to fall
Control measures
Trip slip hazard
Provide andi slip resistant sticker
in floor
Cost approx :10,000-35,000
3 access staircase Sub standard stair case design
for water tank this leads to person slip/fall
roof top injury.
Control measures
Fall hazards
Remove substandard access
provide proper stair case

Cost approx :10,000-25,000

2-ELECTRICAL ISSUES
Location Observation consiquences
Security cabin Battery box not covered
properly contact with person
Control measures
Provide cover for battery box Dust,explosion
immediately
No cost: ensure proper
maintenance
Generator room Electrical panel boards are
open no locking Syaten
Control measures
Close the electrical box
immediately & lock key should Arc flash
be keep with electrical person
No cost: ensure proper
maintenance
Sub standard wooden box are
using this leads to fire hazard

Generator room Fire hazard


Control measures

Remove the wooden box provide


new one
Cost approx: 1000-10000

Cable turnkey don’t have


cover workman may contact
Panel boards are not closed
Tower 2 electrical Control measures
Provide proper cover for Arc, fire ,flash
panel room
turnkey /panel boards should
closed

Cost approx: 1000-10000


Generator room No rubber mats are provided
in generator are chance of
static electricity is high no
house keeping
Control measures
Electrocution
Maintain housekeeping Provide
33kv insulated rubber mats asap

Cost approx-
1000 -20,000
Electrical Eletrical cables are keep in trip slip/eletrocution
connection unsafe condiattions
desktop work Control measures
stations
immediate seal the cable by
electrical team the cables
required sleeving/tied with cable
cost
approx -00

lone working near exposed live


electricity conductors;
chancess of accidents is high
control measures

Transformer
room/battery room eletctrocution / psycolagical hazard
required immidate training never
Transformer allow any person with out proper
room/battery room supervison eletctrocution / psycolagical hazard

cost appox -00

there is no Maintenance
room for maintence
activity in tower 2
persons are taking
maintence in eletrical
Transformer room short circuit /eletrocution
room/battery room Control measures
provide
one room for maintanence

cost appox -00

3-EARGNOMICAL ISSUES
Location Observation consiquences
TOWER 2 ALL Improper eargnaomical chair
FLOOR are using in office risk is DSE
dislplay screen equipment this
will leads to ill health isssues
(Work related upper limb
disorders eye strain,backpain
fatigue and stress)

physical hazard (eargonomical)


control measures
provide SAFETY DSE trainning
for employees,provide
eargonomical chairs with head
rest to avoid back pain and foot
rest approx cost :
7000-350,000

4-CHEMICAL HANDLINGS
chemical handling and storing
in unsafe condtion no msds,
over exposure to chemical

control measures
TOWER 2
Chemical chemical should store in isolated
place room should be lock , chemical hazards
handling &
storing retrain cleaning womens/mens on
the dangers of
Chemical chemical should store in isolated
place room should be lock , chemical hazards
handling &
storing retrain cleaning womens/mens on
the dangers of
leaving,handling,storing of
chemical
approx cost-00

5-MATERIAL STACKING
Location Observation consiquences
Different type type of
combustable materials
(new,scrap) are stored in car
parking area this leads to
fires,toxic smokes material
damages & there is no fire line
system

control measures
remove all the materials from
carparking area stacked in
container waste material remove
immidatly or segrigate in
external area maintain house
keeping

CAR PARKING provide wet sprinkler system in


fire & explosion
AREA car parking area .
car parking area is only design
for parking not for stacking
materials

approx cost -70,000-2.50,000

6-FIRE FIGHTING EQUIPMENTS


Location Observation consiquences
TOWER -2 ALL no inspection tag for fire
FLOOR fire extinguisher ,some of the co2
extinguishers extinguisher hose pipe is brittle
control
measures
fire risk assessment should be
conducted all the fire frosbite will happen hand injury
extinguisher should inspect
monthely reomve damage
equipments approx
cost - 1000-20,000

the fire plan is not updated


(emergency no) & not displyed
in properlocation control
measures update the
contact no & displyed in visible
TOWER -2 area fire exit direction maring
should displayed miss communication in the event
ALL FLOOR
fire fighting trainging of fire
fire plan
required each employee
approx cost=00

fire door push handle bar is


install upward direction
control measures fix
the door handle in downward
direction must conduct
fire risk assessment drill et c
TOWER -2 approx cost=00 event of fire emergency the cant
ALL FLOOR
open from in side
3 foor

most of the fire hydrant hose


reel hose are keep inside the
room it & maintaing it
properly & there is no signages
TOWER -2 in the event of fire empolyees
for fire hydrant
ALL FLOOR fire fighting persons cant
control measures
3 foor identify the fire hydrant
most of the fire hydrant hose
reel hose are keep inside the
room it & maintaing it
properly & there is no signages
TOWER -2 in the event of fire empolyees
for fire hydrant
ALL FLOOR fire fighting persons cant
control measures
3 foor identify the fire hydrant
All the fire hydrant system
should be rerouted it should be
visible no obstruction
approx cost 1,0000 -350,000

inadequate fire fighting lines in


car parking area,no
smoke/heat detector (hevay
staking of Material )incase of
TOWER -2 fire there is chance of
basemant car fire &explosion
parking property,structural damage
Control
Measures provide wet
sprinklers system for car parking
area approx cost -70,000-
2.50,000