BFC 31602 – CONTRACT & ESTIMATION

Lecturer: Dr. Azeanita Suratkon

GROUP PROJECT (15%)

PROJECT INSTRUCTION:

Your company is participating in an open tender for construction of 1 unit of Type A Shop Office Block for client
(THP Enstek Development Sdn. Bhd.). The following items must be provided for submitting the tender (your
company’s proposal) to the client:

(i) Company’s profile;


(ii) Project cost estimation using preliminary estimating techniques (floor area and volume methods);
(iii) Quantity measurement (taking off) for all items under work below lowest floor finish (WBLFF);
(iv) Build-up rate calculation of 1 m3 soil excavation (manually using hand);
(v) Build-up rate calculation for 1 m3 of selected concrete grade using concrete mixer;
(vi) Schedule of rate;
(vii) Bill of Quantity (BQ) for WBLFF;
(viii) Amount of proposed project price (contract price or contract sum);
(ix) Calculation of performance bond;
(x) Calculation of maximum advanced payment that your company intent to claim;
(xi) Calculation of liquidated ascertained damages (LAD) in case of the project delay;
(xii) FILA (Facts, Idea, Learning Issue, Action) table (example as attached);
(xiii) All references and resources used, and assumption made for item (i)-(xi).
th
The tender must be submitted (in hardcopy and softcopy) before Thursday, 24 May 2018, BEFORE 12.00 Noon.
EXAMPLE OF FILA TABLE

Facts Ideas Learning Issues Action/Resources Needed

1. A person disposes 2. All solid wastes and 3. What are the elements or 1. Find information through
waste daily liquid waste mingle strategies that need to be books and websites.
together without done to enhance waste 2. Interview solid waste
separation separation? operator and DOE executive
to gain more knowledge on
waste management and Akta
XX.
3. Comparison of waste
generation data within
countries or cities.
2. YY 2. YYY 3. YYY 1. YYY