Professional Documents
Culture Documents
2 Pengolahan Data
a. PerhitunganSpesimen
1. Berat Produk (W0) = 2,4 . 10-2 Kg
2. Density Alumunium (ρ) = 2,7 gr/cm3
3. Yield ratio (y) = 70%
4. Pouring weight (W)
W0
W= x 100%
y
2,4 . 10-2
W== x 100% = 0,34 Kg
70%
340
As = = 1,22 cm2
(2,7) (0,8388) (0,3351) √2 (9,8) (10)
1,2 x √9,9581
Diameter atas sprue = = 1,972 cm
2
1,22
r = √3,14 = 0,62
Ab = 2r
Ab = 2 (0,62) = 1,2 cm
Well area = 5 x As
Well area = 5 x 1,22
= 6,2 cm
Lwell = π r2
Lwell = 3,14 (0,62)2 = 1,228 cm
Lwell
r=√ π
1,228
r = √ 3,14 = 0,625
Diameter (D) = 2r
= 2 (0,625)
= 1,25 cm
Well depth = 2 x 2 tinggi runner
= 2 x 2 (1,5)
= 6 cm
20. Calculate ingate area Ag
As x gating ratioingate
Ag = jumlah ingate
1,2 x 0,8
Ag = = 0,98 cm
1
Q
Vg = Ag
151,37
Vg = = 154,07 cm/sec
0,98
jumlah Ingate 1
Luas Area Ingate 0.982440082
Kedalaman Ingate (cm) 0.75
Lebar Ingate l (cm) 1.309920109
Flowing Volume (cm^3/sec) 151.3729446
jumlah ingate = n 1
Q 151.3729446
21 Velocity (cm/sec)
At Sprue 123.2628411
At Runner 136.9587124
At Ingate 154.0785514
22 Reynold Number (cm^2/kg)
Sprue 377.1232018
Runner 419.0257797
Ingate 471.4040022