You are on page 1of 8

Y

2.40 1.20 2.40

X X'
40CM X 40 CM FLOOR TILES
2.10

VERTICAL GRABRAIL
HORIZONTAL GRABRAIL

Y'

1 FLOOR PLAN
A-1 SCALE : 1 : 30 METERS

CONSTRUCTION OF
PWD COMFORT ROOMS
0.50 0.50

0.80 0.80

1.80 0.60

0.80 0.80 0.80


0.60

1 CROSS SECTION THRU Y-Y'


A-2 SCALE : 1 : 30 METERS

CONSTRUCTION OF
PWD COMFORT ROOMS
1 CROSS SECTION THRU X-X'
A-3 SCALE : 1 : 30 METERS

CONSTRUCTION OF
PWD COMFORT ROOMS
2.15 1.45 2.15
F1-C1 F1-C1 F1-C1 F1-C1

2.10
F1-C1 F1-C1 F1-C1 F1-C1

Ø10mm. TEMPERATURE BARS


@ 0.50M. BOTHWAYS

1 FOUNDATION PLAN
S-1 SCALE : 1 : 30 METERS

CONSTRUCTION OF
PWD COMFORT ROOMS
2.15 1.45 2.15
Ø12mm. BARS
@ 10" O.C.

1.85 2.10

1 ROOF FRAMING PLAN


S-2 SCALE : 1 : 30 METERS

CONSTRUCTION OF
PWD COMFORT ROOMS
10Ømm TIES
@ 0.20M O.C.

0.80m

6-12Ømm VERT. BARS


0.25m

5-12Ømm BARS
10Ømm TIES @ 0.20M O.C. FINISH FLOOR LINE
0.25m FINISH GROUND LINE
0.80m

EARTH FILL

@ 0.10M O.C.
10Ømm TIES
5-12Ømm BARS
0.70m

1 PLAN OF F1-C1
S-3 SCALE : 1 : 25 METERS

5-12Ømm BARS BOTHWAYS 0.30m

2 SECTION OF F1-C1
S-3 SCALE : 1 : 25 METERS

4-Ø16mm BARS 2-Ø16mm BARS 4-Ø16mm BARS

4-Ø16mm BARS

3 DETAILS OF ROOF BEAM


S-3 SCALE VERIFY

0.15m
2-Ø12mm TOP BARS

0.30m
2-Ø12mm TOP BARS

TYPICAL SECTION

CONSTRUCTION OF
PWD COMFORT ROOMS
Ø10mm BARS EVERY 6" CONCRETE HOLLOW BLOCKS
3 C.H.B. BOTHWAYS W/ Ø10MM BARS @ 3 C.H.B.
CEMENT BOTHWAYS
PLASTER
6" CONCRETE FINISH
HOLLOW BLOCKS CERAMIC TILES FLOOR FINISH

Ø10mm TEMP BARS


Ø10mm TRANSVERSE @0.50M O.C. BOTHWAYS
FOOTING BARS
@0.30M 0.C.
FINISH FLOOR LINE
CLASS A CONTINUOUS 4" CONCRETE SLAB
CONCRETE FOOTING 4" GRAVEL
0.40m
EARTH FILL
3-Ø12mm CONTINUOUS FINISH GROUND LINE
FOOTING BARS
3-Ø12mm
CONTINUOUS BARS 0.30m
0.50m
Ø10mm TRANSVERSE
BARS @ 0.30M O.C.

CLASS A CONTINUOUS 0.45m 0.20m


0.45m CONCRETE FOOTING

1 PLAN OF C.H.B. WALL 2 SECTION OF C.H.B. WALL


SCALE : 1 : 25 METERS
S-4 SCALE : 1 : 25 METERS S-4

CONSTRUCTION OF
PWD COMFORT ROOMS
1. ALL HORIZONTAL PIPINGS IN PERFECT ALIGNMENT
AND A UNIFORM GRADE OF NOT LESS THAN 2%.

2.39 2. CHANGE IN DIRECT SHALL BE DONE BY


APPROPRIATE USE OF 45% WYE LONG SWEEP
QUARTER BENT 86 OR 10
6
BENDS WHEN CHANGE OF
FLOW IS FROM HORIZONTAL TO VERTICAL A SINGLE
1
8 BEND COMBINATION MAY BE USED IN WASTE
LINES. TEE AND CROSSES MAY BE USED IN VENT
LEACHING WELL
PIPES.
DIGESTIVE CHAMBER
1.90
3. NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE
LEACHING WELL
USED ON HORIZONTAL SOIL OR WASTE LINES. THE
DRILLING & TAPPING OF HOUSE WASTE OR VENT
PIPES AND USED OF SADDLE HUBS AND BEND ARE
HOSE HOLE HOSE HOLE
PROHIBITED.

4. CLEANOUTS ARE REQUIRED UNDER THE


FOLLOWING CONDITIONS:

a. EVERY CHANGE IN HORIZONTAL DIRECTION


EXCEEDING 22.5 DEGREES.
b. 1.5M. INSIDE PROPERTY LINE BEFORE THE HOUSE
Ø10MM BARS BOTHWAYS DRAINAGE.
2.39 c. EVERY 15 MTS. IN HORIZONTAL RUN OF PIPE.
d. AT ANY END OF ANY HORIZONTAL PIPE LINE.
0.10M
0.30M
5. THE DIGESTIVE CHAMBER OF ANY SEPTIC VAULT
FLOW LINE
MUST BE WATER PROOFED.
OUTLET
SLUDGE
4" DIA. PVC WASTE PIPE 6. NOT LESS THAN 30 MTS. OF AIR SPACE MUST BE
LEACHING 1.70M
LEFT BETWEEN THE TOP OF THE SEWAGE AND
CHAMBER
BOTTOM OF THE SEPTIC VAULT COVER.
DIGESTIVE CHAMBER
4" THK. CHB WALL WITH PLASTER
7. ALL PLUMBING WORKS SHOULD BE DONE IN
1" COMPACTED GRAVEL ACCORDANCE WITH THE PROVISION OF THE
SLUDGE NATIONAL PLUMBING CODE. THE REQUIREMENTS OF
THE LOCAL PLUMBING INSPECTION OFFICE.
3-12MM. DIA. CONTINUES BARS PERTINENT PROVISIONS OF THE EXISTING LOCAL
BUILDING CODE.

SECTION 8. ALL PLUMBING WORKS SHALL BE DONE BY A


LICENSED MASTER PLUMBER OR SANITARY
1 SEPTIC VAULT DETAILS ENGINEER AND LICENSED PLUMBING CONTRACTOR.
P-1 SCALE: 1 : 40 METERS

CONSTRUCTION OF
PWD COMFORT ROOMS