PROJECT
JANUARY, 2012
Tender Enquiry No. PROC‐FD/CB/PROJ/0366/2012
TABLE OF CONTENTS
I – INVITATION TO BID
Section-II (Instructions to Bidders)
Sheet 1 of 17
II – INSTRUCTIONS TO BIDDERS
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 2 of 17
TABLE OF CONTENTS
6.1 OGDCL’s Right to Accept any Bid and to Reject any or all Bids.................................................................. 17
6.2 OGDCL’s Right to Vary the Scope of Contract ......................................................................................17
6.3 Notification of Intent to Award .......................................................................................................17
6.4 Signing of Contract......................................................................................................................17
6.5 Performance Bond.......................................................................................................................17
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 3 of 17
LIST OF ANNEXURES
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 4 of 17
1.0 GENERAL
OGDCL intends to develop Jhal Magsi Gas Field by installing surface facilities, flow lines, commingling
system and gas purification plant. The gas purification plant unit will be capable of processing on an
average 15 MMSCFD (excluding 10% design margin) raw gas stream. For implementation of the project
Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System) is
required for Jhal Magsi Gas Field Development Project.
In this connection, sealed Bids are hereby invited for Design, Fabrication, Supply and Commissioning
of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
for Jhal Magsi Gas Field Development Project by OGDCL.
These instructions to bidders (ITB) define the basis of Bid for Design, Fabrication, Supply &
Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min
Water System) for Jhal Magsi Development Project. The Bidders will prepare and submit their Bids, as
per instructions given in this document.
OGDCL has appointed ENAR Petrotech Services (Private) Limited (ENAR) as Engineering Consultant for
providing engineering, project management, procurement assistance and site supervision consultancy
services to ensure timely completion of the project complying with technical specifications.
a) The equipment to be supplied under the Contract must be produced in and supplied from a
country maintaining bilateral trade relation with the Islamic Republic of Pakistan.
b) The Bidder and its engineering staff should meet all the requirements of Pakistan Engineering
Council (PEC) Act 1976, its by-laws and amendments and provide documents to OGDCL to this
effect.
c) The Bidder Company/ firm must have Designed, Fabricated, Supplied and Commissioned atleast
one (01) Amine Unit during last seven (7) years of similar size which require equivalent or more
engineering design & fabrication works as needed for amine unit. Bidder must submit details of
such projects with completion certificates. Projects without completion certificates will not be
considered.
d) The Offshore companies registered at places e.g. Virgin Cayman, Nausa, Jersy and Bohaman
Islands and Israel shall not be eligible nor entertained and bids if submitted shall be rejected.
a) Sub-contracting arrangement for submission of bid is not allowed for any portion of work
including design, manufacturing, supply, commissioning etc.
b) JV arrangement (if proposed by the bidder) shall only be acceptable for design engineering
relevant works whereas partner incharge (lead partner) is responsible for supplying of whole
equipment, packages material, etc. and provision of matching /compatibles
drawings/documents to have a consistent and reliable design. Accordingly, performance bond is
acceptable only from Partner Incharge.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 5 of 17
Bids submitted by a joint venture/consortium of two or more firms as partners shall comply with the
following requirements:
i) The bid, and in case of a successful bid the Form and Conditions of Contract, shall be signed so as
to be legally binding on all partners.
ii) Partner shall be nominated as being incharge (lead partner) subject to fulfillment of requirement
mentioned earlier in section 1.4 b) and this authorization shall be evidenced by submitting a
power of attorney signed by legally authorized signatories of all the partners and certified by
Notary Public.
iii) The partner incharge shall be authorized to incur liabilities and receive instructions for and on
behalf of any and all partners of the joint venture/consortium and the entire execution of the
Contract including payment shall be done exclusively with the partner incharge.
iv) All partners of the joint venture/consortium shall be liable jointly and severally for the execution
of the Contract in accordance with the Contract terms, and a relevant statement to this effect
shall be included in the authorization mentioned under Clause (b) above as well as in the Form of
Bid and the Form and Conditions of Contract (in case of a successful bid); and
v) A copy of the Memorandum of Understanding (MOU) entered into by the consortium/joint venture
Partners broadly, outlining the relationship and responsibilities with respect to Amine Sweetening
Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System) shall be
submitted with the Bid.
vi) Within fifteen (15) days of issuance of notification of intent to award from OGDCL the successful
Bidder shall furnish a copy of Contract entered into by consortium/joint venture partners shall be
submitted.
a) The Bidder shall bear all costs associated with the preparation and submission of its bid, and
OGDCL will in no case be responsible or liable for those costs, regardless of the conduct or
outcome of the bidding process.
b) The Bidder shall bear all costs of obtaining and submitting Bid Bond, Performance Guarantee
and all other documents required as per instructions in the Tender Document.
1.6 Assurance
The successful Bidder will be required to give satisfactory assurance of its ability and intention to
complete the Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete
Amine unit with Acid Gas Flare System and D-min Water System) pursuant to the contract within the
time set-forth therein.
1.7 Agents/Representatives
The Agents/Representatives can collect the tender document and submit the Bid (Including the Bid
Bond) on behalf of their principals. However, they shall be required to submit Agency/Representation
letter (On Principal’s Letterhead) duly signed and stamped with authorization for the subject tender.
Further the Agent/Representative can represent only one principal.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 6 of 17
2.1.1 The Tender Document comprises the following together with any Addenda that may be issued from
time to time.
• Volume – I
• Volume – II
− P&IDs and Datasheets, Plot Plan, Mechanical and Electrical & Instruments Specifications
2.1.2 The prospective Bidder shall carefully study and examine the Tender Document and Instructions and
comply with all requirements of preparation of the Bid. Failure to furnish all information required by
the Tender Document or submission of a Bid not substantially responsive to the Tender Document in
every aspect will be at the Bidder's risk and may result in the rejection of the Bid.
2.1.3 Appropriate portions of the Technical Bid and Commercial Bid and Addenda or selected sections of
the above Tender Document as appropriate will be incorporated in the contract that will be executed
with the successful bidder.
2.1.4 Bidders may also make any additional enquiries or investigations necessary to become fully informed
of all conditions which may affect the scope of work of Supplier. Failure on the part of the Bidder to
diligently investigate any condition which may affect Contractor’s scope shall not relieve the Bidder
of the responsibility of executing the Contract.
Project Manager
(Jhal Magsi Development Project)
ENAR Petrotech Services (Private) Limited
7-B, Korangi Industrial Area
Adjacent NRL, Korangi
Karachi, Pakistan
Telephone: (92-21) 3507 3259
Fax No.: (92-21) 3506 7522
Email: m.zeeshan@enar.com.pk, cbd@enar.com.pk
c.c.
Project Coordinator
(Jhal Magsi Development Project)
Oil & Gas Development Company Limited
OGDCL House, 9th Floor, Tower C,
Jinnah Avenue, Blue Area
Islamabad, Pakistan
Telephone: (92-51) 8352948
Fax No: (92-51) 2623070
Email: iftikhar_abbasi@ogdcl.com
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 7 of 17
OGDCL/Engineering Consultant will respond in writing to any request for clarifications of the Tender
Document, which it receives not later than one (1) week prior to the deadline for the submission of
bids prescribed in the Tender Document. Written copies of Engineering Consultant’s response
(including an explanation of the query but without identifying the sources of inquiry) will be sent to
all participating Bidders.
2.3.1 At any time prior to the deadline for submission of Bids, OGDCL may, for any reason, whether at its
own initiative or in response to a clarification requested by a prospective Bidder, modify the Tender
Document by amendment.
2.3.2 The amendment shall form part of the Tender Document, and shall be notified in writing by fax or e-
mail to all prospective Bidders who have received the Tender Document, and will be binding on them.
The Bidders are required to acknowledge receipt of any such amendment in the Tender Document.
2.3.3 In order to provide prospective Bidders reasonable time in which to take the amendment into account
in preparing their Bids, OGDCL may, at its discretion, extend the deadline for the submission of Bids.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 8 of 17
3.2.1.1 General
The following information shall be submitted, separately, with the Technical Bid:
(i) Corporate & Financial information of Bidder and its consortium/joint venture partners as per
format given in Annexure – I.
(ii) A list and details as per (Annexure – II) of related projects being executed by Applicant’s
organization alongwith project schedule.
(iii) Provide a comprehensive list and details as per (Annexure – III) of related projects executed
by the applicant organization during the last ten (10) years which require equivalent or more
engineering design & fabrication works as needed for amine unit. Certificates of satisfactory
completion by the respective client/ owner should be attached with duly filled Annexure-III.
Only those projects whose completion certificates (in the name of applicant or as lead
partner in case of JV) are attached would be considered in experience & track record of the
bidder/company
(iv) QA/QC, HSE systems/procedures of your organization as per Annexure–IV.
(v) Details of technical support services as per format given in (Annexure – V).
(vi) Original Bid bond for an amount of US$ 40,000 or equivalent in Pak Rs. on the format as
given in Annexure – VI.
(vii) Confirmation of Period of validity of the Bid i.e. 120 days
(viii) Form of Tender or Bidding Form Annexure – VII.
(ix) Letter of Authorization in favour of Officer signing the Bid.
(x) A power of Attorney certified by Notary Public (Applicable for Joint Venture/ consortium
Bids).
(xi) Duly initialed and stamped copy of Complete Tender Document (Invitation to Bid,
Instructions to Bidders, Scope & Specifications, Form and Conditions of Contract, Data Sheets
& P&IDs) along with declarations as given in Annexure-VIII.
(xii) A statement of total compliance with the requirement of Tender Document.
(xiii) Data Summary Sheet as per format given Annexure – IX.
(xiv) Un-priced Bid Price Schedule as per Annexure – X.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 9 of 17
ix) Detail list of equipment/packages clearly mentioning skid mount equipment and ship loose
equipment/packages
xi) Comments or deviations/exceptions as per Instruction 3.4. to the scope and specifications
and other relevant codes and standards.
xii) Delivery period/schedule: Bidder shall mention firm delivery period and submit schedule
with target delivery date(s) with work/delivery schedule starting from the date of
establishment of L/C.
xiii) Statement regarding on time arrangements of expatriate by the bidder required for
installation, supervision, pre-commissioning, start-up & training activities.
xvi) List of spares (all categories) for start-up and commissioning. All spares for commissioning &
start-up shall be covered. OGDCL shall not be responsible for any payment over and above
the price indicated.
xvii) List of recommended spare parts for two (2) years of continuous operation for the equipment
being supplied.
xviii) List of recommended personnel safety equipment to protect maintenance personnel and
tools.
All the above mentioned documents are necessarily required along with the technical bid. Any
missing information may lead rejection of technical bid and may not be considered for technical
evaluation.
The technical proposal shall also contain following information/details and documents:
i) Documentary evidence established in accordance with Instructions 3.3 that the equipment
and material to be supplied by the Bidder is eligible equipment and material and conform to
the Tender Document.
iii) Detailed procedure of how physical progress and percent completion will be measured
tracked and reported for each component of the scope of the Supplier.
v) The Bidder should confirm that during design period he will make plan to integrate the
offered units with other units of plant and review of the operations.
vii) Availability of spare parts of the equipment being supplied with country of origin alongwith
lead time period and maintenance center(s) addresses, focus, e-mail to provide backup
support.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 10 of 17
ix) The Supplier shall provide following with the Bid: Preliminary knockout pressure vessel test
procedure,
xi) Where drawings and data are called for in the tender Document, Bidder is to include the cost
in his quoted price. Bidder must also state the time needed for submission of drawings, data,
etc., this time schedule to be based from the date of signing of the Contract.
xii) Bid should conform in all respects to the applicable specifications, drawings and instructions
forming part of the Tender Document.
xiii) Bidders must state any deviation from material or other standards specified, separate list of
proposed standards shall then be attached to the Bid indicating the appropriate standards
proposed by the Bidder, stating in each case the comparable standards specified.
xiv) Detailed list of material and equipment (separate of each category) with following
information:
− Sources/country of origin.
− Name & complete address with telephone, fax and e-mail of each original manufacturer
(including name of contact person)
− Name and address of major sub-suppliers (including name of contact persons) and details
of their capability & relevant creditentials.
xv) Specific Quality Assurance and Quality Control procedures, which the Bidder intends to
adopt/follow for equipment and fabrication/manufacturing etc.
xvii) Undertaking from the manufacturers for compliance of the warrantee liabilities (back-up
guarantee) and other after sale service obligations.
xviii) In case the equipment model becomes obsolete or OEM cease to manufacture the particular
model, the supplier/bidder has to apprise well in advance and ensure to supply the spares
sufficient for at least ten (10) years.
xix) Likewise any up gradation in the software(s), the same shall be provided free of cost.
Any other information as deemed necessary by the Bidder for the intended & scope of package. All
those items for which information requirements are specifically mentioned in the Scope &
Specifications.
iii) Item-wise break-up of all major items of the package as well as optional items (where
possible).
iv) Item-wise price list of spares for start-up and commissioning. All spares for commissioning &
start-up shall be covered. OGDCL shall not be responsible for any payment over and above
the price indicated.
v) Item-wise price list of recommended spare parts for two (2) years operation and the
equipment being supplied, as an optional item.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 11 of 17
vi) The Expenses on design review, HAZOP meetings and shop witness testing for control system
FAT by OGDCL/ Engineering Consultant at Supplier’s offices/manufacturers works located
outside Pakistan will be quoted on the following basis:
The Contractor shall provide the following facilities for these visits;
Local supplier shall consider only air tickets, Hotel accommodation and boarding & lodging
arrangements within the country.
vii) The pre-commissioning, commissioning, start-up & performance testing of package shall be
Supplier’s responsibility accordingly, lumpsum charges are to be quoted on this account
considering 30 days time for pre-commissioning, commissioning, start-up and testing
activities with involvement of various discipline engineers.
The supplier shall provide the detailed breakup for the man-days involved, personnel and
their respective experience in man-hour rates format for the above services.
viii) The Supplier shall provide the on-site training services for operation and maintenance for all
required disciplines to OGDCL personnel for the period of two (02) working weeks. The
supplier shall submit the price in commercial proposal on lump sum basis with indication of
estimated days for the training and other details.
ix) The Third Party Inspection charges (by well reputed inspector) shall also be included in the
quoted prices. The scope of the pre-shipment inspection by a third party Inspector shall
generally cover the following;
• Review the detailed listing of the material & equipment being shipped by the supplier
and other relevant documents.
• Match the details given in the supplier’s list with other relevant documents.
• Physical inspection of material & equipment being shipped to verify its condition and
conformity with the supplier’s list & other relevant documents.
• Witness the loading and seal the container.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 12 of 17
The minimum requirement of third party inspection is presented as Annexure-XI, which will
be reviewed and approved after shop performance test.
Note: The pre-shipment inspection shall be carried out from the following approved 3rd party
inspectors viz.
a) M/S Lloyd’s,
b) M/S SGS,
c) M/S Velosi and
d) Moody International
x) Supplier shall also be responsible for completeness of supplies by inspecting the material
arrived at site before the installation of package at site by sending OEM’s representative(s)
and also participating inspection performed by OGDCL.
– The Bidder shall furnish, as part of the Bid, documents establishing the eligibility and conformity
to the Tender Documents of the equipment, which the Bidder proposes to supply under the
Contract including a clause-by-clause commentary on the Technical Specifications demonstrating
the equipment substantial responsiveness to those specifications.
– The documentary evidence of the equipment eligibility shall consist of a statement in the
technical proposal about the country of origin of the equipment offered, which shall be
confirmed by a certificate of origin issued at the time of shipment.
The prices shall be for complete scope and obligations detailed in this Tender Document. The quoted
prices shall be firm and fixed for the Contract performance period and shall not be subject to
escalation on any account.
The prices shall be quoted by the Bidder shall be in US Dollars (applicable for foreign bidder) or Pak
Rupees (applicable for local bidder).
The prices shall include all duties/taxes and levies payable on equipment, machinery and other
items/services being supplied under the Contract in country of origin or exporting country and Supplier
will assume full and exclusive liability on this account.
3.6.1 The bid shall remain valid for one hundred and twenty (120) calendar days after the date of bid
opening prescribed by OGDCL. A bid valid for a shorter period may be rejected by OGDCL as non-
responsive.
3.6.2 In exceptional circumstances, OGDCL may solicit the bidder's consent to an extension of the period of
validity. The request and the response there to shall be made in writing (by telefax or email). The bid
bond provided under Instruction 3.7 shall also be suitably extended. A bidder may refuse the request
without forfeiting its bid security. A bidder granting the request will not be required nor permitted to
modify its bid.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 13 of 17
3.7.1 The Bidder shall furnish, as part of its Bid, a Bid Bond of an amount of US$ 40,000 or equivalent in
Pak Rupees.
3.7.2 The Bid Bond is required to protect OGDCL against the risk of Bidder’s conduct which would warrant
the Bid Bond encashment pursuant to Instructions given in following paragraphs.
3.7.3 The Bid Bond shall be denominated in US$ or equivalent in Pak Rupees, and shall be in form of a bank
guarantee issued by a Scheduled Bank in Pakistan or any international bank operating in Pakistan
acceptable to OGDCL, in the form provided in the Tender Document and valid for 150 days counting
from day of bid opening.
3.7.4 Any Bid not accompanied with the Bid Bond of required amount shall be rejected by OGDCL as non-
responsive.
3.7.5 Unsuccessful Bidder’s Bid Bond will be discharged/returned as promptly as possible, but not later
than 30 days after the expiry of the validity period of Bid Bond.
3.7.6 The successful Bidder's Bid Bond will be discharged upon the Bidder's executing the Contract, and
furnishing the Performance Bond, pursuant to Instruction 6.5.
3.7.8 The Bidders must particularly note that in case of submission of forged Bid Bond they will be liable to
severe punitive action by OGDCL leading to Black Listing in addition to any other legal action, which
shall be initiated against such Bidder.
3.8.1 The Bid comprising Technical and Commercial Proposals with accompanying documents and clearly
marked ‘Original Bid’, plus two (02) copies must be received by OGDCL at the date, time and place as
specified. In the event of any discrepancy between the original and the copy, the original shall
govern.
3.8.2 The original and copies of the Bid shall be typed or written in indelible ink and shall be signed and
stamped by a person or persons duly authorized to sign on behalf of the Bidder. All pages of the Bid
shall be initialed by the authorized person or persons. Proof of authorization shall be furnished in the
form of authorization letter on original letterhead of the Bidder signed by President, Chief
Executive/Chief Operating Officer and Managing Director of Company/Corporation.
3.8.3 The Bid shall contain no interlineations, erasures or over-writing except as necessary to correct errors
made by the Bidder, in which case such corrections shall be initialed by the person or persons signing
the Bid.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 14 of 17
4.1.2 The Original Technical (alongwith soft copy CD) and Commercial Bids (soft copy not required) shall be
separately packed in an inner envelope marked as Technical (Original) or Commercial (Original) Bids
as the case may be; each inner envelope shall be sealed in an outer envelope, which shall also be
marked. Copies of the Technical and Commercial Bids shall be sealed and marked in separate inner
and outer envelopes.
BID FOR DESIGN, FABRICATION, SUPPLY AND COMMISSIONING OF AMINE SWEETENING UNIT
COMPLETE UNIT WITH ACID GAS FLARE SYSTEM AND D-MIN WATER SYSTEM FOR JHAL MAGSI
DEVELOPMENT PROJECT
4.1.4 The sealed envelope shall indicate the name and address of the Bidder to enable the bid to be
returned unopened in case it is declared LATE.
4.1.5 OGDCL will not be held responsible for the premature opening or misplacement of any Bid not clearly
marked and addressed in accordance with Instruction 4.1.3.
4.2.2 OGDCL may, at its discretion, extend this date for the submission of Bids by amending the Tender
Document in accordance with Instruction 2.3 in which case all rights and obligations of
OGDCL/Engineering Consultant and Bidders will extend likewise.
4.4.2 The Bidder's modifications or withdrawal notice shall be prepared, sealed, marked and dispatched in
accordance with the provisions of Instruction 4.1. A withdrawal notice may also be sent by fax or e-
mail but followed by a signed confirmation copy, postmarked not later than the deadline for
submission of the Bids.
4.4.3 No Bid shall be modified subsequent to the deadline for submission of the Bids.
4.4.4 No Bid shall be withdrawn in the interval between the date for submission of Bids and the expiry of
the period of Bid validity specified by the Bidder on the Bid Form. Withdrawal of a Bid during this
interval may result in encashment of Bid Bond under Instruction 3.7.7.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 15 of 17
The Bidder’s representatives who are present shall sign a register evidencing their attendance.
The Commercial Bids of technically responsive bids will be opened on above location in presence of
Bidder’s representatives who choose to attend. The date and timings of opening of commercial bids
will be intimated to relevant Bidders.
5.2.2 If as a result of any clarification sought by OGDCL/Engineering Consultant some changes are made in
Scope of Work or technical specifications and/or bidder(s) willing to meet the tender requirement are
allowed to submit their revised Technical Proposal and supplementary Commercial Proposal,
according to the technical requirement, as per instructions given in Section 4.1 of Instructions to
Bidders;
5.2.3 If bidder(s) not willing to conform their technical bid/proposal to the revised/tender technical
requirement shall be allowed to withdraw their respective bid(s) without forfeiture of their bid bond;
5.2.4 The additions/deletions will be opened alongwith the base commercial proposal and summation of it
will be made the total bid price for commercial evaluation purpose. However, OGDCL will reserve the
right during contract negotiation to restrict the lowest evaluated bidder to restrict to its original
prices in part/parts or in totality.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 16 of 17
Only those bids which will clear the preliminary technical examination will undergo detailed
technical evaluation.
In case the technically responsive and financially lowest bidder has also quoted the optional items,
the optional items will only be included subject to their price rationality and comparability.
a) Where there is a discrepancy between amounts in figures and in words, the amount in
words shall govern and
b) Where there is a discrepancy between the unit rate and the total amount derived from the
multiplication of the unit rate and the quantity, the unit rate as quoted shall govern.
• Calculation of financial effect of:
− Completion period beyond the stipulated seven (07) months.
− Deviation in payment terms
− Any other exception/deviation which has financial implications.
The Bids whose delivery period is beyond seven (07) months an amount equivalent to one (1)
percent of total quoted price shall be added to respective Bidders price for each excess week.
• The effect of payment terms asked by the bidder other than those spelled out in ITB or In case
the information asked for is not provided by the Bidder as per requirement of ITB. OGDCL
reserves the right to use its own judgment in assessing the amount for loading/unloading the
respective head of the Bid.
With the addition of above effects to each Bidder’s total quoted price, the evaluated price shall
be arrived.
• The award will be recommended in favor of the Bidder whose price is lowest.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-II (Instructions to Bidders)
Sheet 17 of 17
5.4.1 Subject to Instruction 5.2 no Bidder or his agent shall contact OGDCL or Engineering Consultant on any
matter relating to its Bid, from the time of the Bid opening to the time the Contract is awarded.
5.4.2 Any effort by Bidder to influence OGDCL or Engineering Consultant in its Bid evaluation, Bid
comparison or Contract award decisions may result in the rejection of the Bidder's Bid.
6.1 OGDCL’s Right to Accept any Bid and to Reject any or all Bids
OGDCL reserves the right to accept or reject any bid or part of a bid and to annul the bidding process
and reject all bids at any time prior to award of Contract, without thereby incurring any liability to
the affected bidder or bidders or any obligation to inform the affected bidder or bidders of the
grounds for OGDCL’s action.
6.3.1 Prior to the expiration of the period of bid validity, OGDCL will notify the successful Bidder in writing
by fax or courier service its intent to award the contract. The Contract will be executed subject to
satisfactory negotiation of the terms and conditions of the Contract.
6.3.2 Upon the successful bidder’s furnishing of Performance Bond pursuant to Instruction 6.5, OGDCL will
promptly notify each unsuccessful bidder and will discharge its Bid Bond pursuant to Instruction 3.7.5.
6.4.1 At the same time as OGDCL notifies the successful Bidder of its intent to award the Contract, OGDCL
will send the Bidder the Form and Conditions of Contract (Section – IV & V) provided in the Tender
Document, incorporating all agreements between the parties.
6.4.2 Within fifteen (15) days of receipt of the Form and Conditions of Contract the successful bidder will
be required to sign the Contract and return it to OGDCL.
6.5.1 Within ten (10) days of the receipt of notification of intent to award the Contract from OGDCL, the
successful Bidder shall furnish a Performance Bond in the Form of Bank Guarantee (Annexure – XIII)
for an amount of US$ (for foreign bidders) or Pak Rupees (for local bidder) ten (10%) percent of the
Contract Price as a guarantee for the due and faithful performance of the Contract. The said
Performance Bond shall be valid upto twelve (12) months from the date of completion of performance
test of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water
System) or Twenty Four (24) months from the date of shipment, whichever occurs first. The
performance Bond shall be issued by a Pakistani Scheduled Bank or an International Bank operating in
Pakistan and acceptable to OGDCL.
6.5.2 Failure of the successful Bidder to comply with the requirements of Instruction 6.4 or 6.5 shall
constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Bond, in which
event OGDCL may make the award to the next lowest evaluated Bidder or call for new Bids.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
LIST OF ANNEXURES
ANNEXURE – III : RELATED PROJECTS EXECUTED DURING LAST SEVEN (07) YEARS
ANNEXURE-I
PART – I
GENERAL INFORMATION
• Postal Address :
• Telephone:
• Facsimile:
• e-mail:
• Website Address:
1.1 Has the Company operated under any other name? If yes please give name, date of
change and reason for change.
2. Type of Entity/Firm:
• Corporation/Stock Company
• Public Limited
• Private Limited
• Partnership
• Proprietorship
4. Place of Incorporation/Registration:
5. Year of Incorporation/Registration:
(Please provide copies of Incorporation/Registration Certificates and Memorandum &
Articles of Association)
7. Company’s Core Business Areas and their annual sales revenue/earnings during last five (5)
years.
9. Registration with Pakistan Engineering Council (PEC) as Contractor. Please provide copy of
membership certificate issued by PEC.
Instructions to Bidders
Sheet 2 of 2
PART – II
FINANCIAL STRENGTH
1. Provide details with regard to the financial standing of the applicant including copies of last
three (3) years Audited profit & loss account and balance sheet. Also, please fill the
financial summary as per below table;
Years
S. No. Description
2008 2009 2010
1 Sales Revenue
2 Paid Up Capital
5 Current Assets
6 T. Asset
7 Owner Equity
9 Current Liability
10 Total Liabilities
3. Detail record with regard to litigation/arbitration proceedings or any other dispute related
to project undertaken/being undertaken by the Bidder their Sub-Contractors and Suppliers
(Specially with OGDCL it Joint Venture Partners or other public and private organizations
working in the Oil & Gas sector of Pakistan) during past five (05) years.
The undersigned on behalf of ___________ hereby declare that the statements made and the
information provided official herewith is complete, true and correct in every detail
_____________________
Signature Official Seal of the Company
Instructions to Bidders
Sheet 1 of 1
ANNEXURE – II
Sr. Name, Name & Country & Project Contract Value* Detailed Details of Equipment Details of Name of JV and Whether the
No. Description & Address of Year Comp- Description of Supplied (Including Qualification of their Project is on
Capacity of the Client letion Work, Scope & nature/type of Man-power Responsibilities Schedule? If
Project Period Foreign Local Total Respons- equipment, its value* Employed not, specify
ibilities** and origin/source) reasons for
Currency Currency delay and give
expediting
plans
ANNEXURE – III
Sr. Name, Name & Country Project Completion Contract Value* Detailed Details of Equipment Details of Name of JV Reason for
No. Description & Address of & Period Description of Supplied (Including Qualification and their Delay in
Capacity of the Client Year Work, Scope nature/type of of Manpower responsibiliti Project
Project Planned Actual Foreign Local Total & Responsib- equipment, its value* Employed es Comple-
Currency Currency ibilities** and origin/source) tion, if
applicable
ANNEXURE - IV
HSE DETAILS
Weekly _________
Fortnightly _________
Monthly _________
8- How are accidents investigated and reports circulated to management? Give a copy of any report
if available.
Instructions to Bidders
Sheet 1 of 3
ANNEXURE – V
Please indicate only the type(s) of work your company is involved and is capable of undertaking
• Motors YES NO
• Bus Bar YES NO
• Control Modules YES NO
• Generator Control Panel YES NO
Instructions to Bidders
Sheet 3 of 3
• Alternator YES NO
• Gas Engines YES NO
• Power Cables YES NO
7.0 Testing Shop Facilities as per API 616 & ASME PTC 22 YES NO
Note: In case any service/facility is not available in-house but the company has standing arrangement to
outsource such service / facility please indicate with sufficient details.
Instructions to Bidders
Sheet 1 of 1
ANNEXURE – VI
BID BOND
Dear Sir,
1. To make unconditional, immediate and forthwith payment of the sum of US$ 40,000 (United States
Dollars Forty Thousand Only) or Equivalent in PKR__________ (Pak Rupees……………………..only) upon
your FIRST and SIMPLE written demand without further recourse, question, query, deferment,
contestation or reference to the bidder, account party or any other person in the event of the
withdrawal of the aforesaid bid by the BIDDER before the end of the period specified in the Bid after
the opening of the same for the validity thereof or if no such period be specified, within 150 days
after the said opening or if the Bidder, having been notified of the acceptance of his bid by the
Company during the period of bid validity:
a) Fails, refuses or delays to execute the Contract in accordance with the instruction to
Bidders, or
b) Fails, refuses or delays to furnish Performance Bond in accordance with the instruction to
Bidders.
2. To accept written intimation(s) from you as conclusive, sufficient and final evidence of the existence
of a default of non-compliance, breach or default as aforesaid on the part of the BIDDER and to make
payment immediately and forthwith upon receipt of your FIRST and SIMPLE written intimation.
3. No grant of time or other indulgence to, or composition or arrangement with the BIDDER in respect of
the aforesaid Bid with or without notice to us shall affect this Guarantee and our liabilities and
commitments hereunder.
4. This is an independent and direct obligations guarantee and shall be binding on us and our successor
in-interest and shall be irrevocable.
5. The Guarantor Bank warrants and represents that it is fully authorized, empowered and competent to
issue this guarantee.
Yours faithfully,
(B A N K E R S)
Instructions to Bidders
Sheet 1 of 1
ANNEXURE – VII
Dated: _____________
To
Gentlemen,
1. Having examined the Conditions of Contract and specifications, the receipt of which is hereby
acknowledge, we, the undersigned, offer to Design, Fabrication, Supply & Commissioning of Amine
Gas Sweetening Package with Acid Gas Flare System and D-min Water System for Jhal Magsi
Development Project.
2. If our Bid is accepted we shall undertake – Design, Fabrication, Supply & Commissioning of Amine Gas
Sweetening Package with Acid Gas Flare System and D-min Water System for Jhal Magsi Development
Project within 07 months from the date of establishment of letter of credit by OGDCL.
3. If our Bid is accepted we shall obtain the Guarantee from a Scheduled Bank to jointly and severally
bind us equivalent to ten percent (10%) of estimated Contract price for due performance of the
Contract under the Terms of Performance Bond (Guarantees) as approved by you.
4. We agree to abide by this Tender for the period of one hundred and twenty (120) days from the date
fixed for opening the same and it shall remain binding upon us and may be accepted at any time
before the expiration of that period.
5. Until a formal Contract is prepared and executed, this Bid, together with your written acceptance
thereof, shall constitute a Binding Contract between us.
6. We understand that you are not bound to accept the lowest or any bid you may receive.
7. Our bid proposal do not contain any deviation or exceptions from the terms & conditions enunciated
in the tender documents.
behalf of:
Complete Address:
Telephone No.
Telex/Fax No.
Signature:
Witness:
Instructions to Bidders
Sheet 1 of 1
ANNEXURE – VIII
DECLARATIONS
ii. The Contractors/Seller/Supplier hereby further declares and affirms that no association of the
Contractor/Seller/Supplier, Agent directors, officers exists with any party abroad and any agent in
Pakistan, who may have a direct or indirect conflict of interest with the purchaser, and fully
understands that the contract will become null and void and un enforceable in the event it is discovered
that such; a relationship was in existence at the time of entering into contract. The
Contractor/Seller/Supplier further under takes to immediately inform the purchaser if such a
relationship is established after signing of the contract and it will be up to the purchaser to terminate
the contract if so desired without any recourse or compensation or continue with it.
iii. Any such disclosure contrary to the above declaration and affirmations shall be material breach
resulting in termination of the contract forth with and the Contractor/Seller/Supplier Agent shall be
fully liable under, the governing laws of Pakistan, and shall also be responsible to make good any loss or
damage caused to the purchaser by such breach.
ANNEXURE – IX
CONFIRMATION THAT QUOTED PRICED IS FIRMED/FIXED AND NOT BASED ON ANY PRICE ADJUSTABLE
CHECK LIST:
B. Design, Fabrication & Supply of Acid Gas Flare System & D-min Water System
C. Supply of Start-up and Commissioning Spares (Please provide separate item-wise priced list)
D. Supply of two years recommended spare parts (Please provide separate item-wise priced list)
• HAZOP Meeting
Eight (08) engineers for a duration of five (05) working days
J. Lumpsum charges of Installation supervision, pre-commissioning, commissioning, start-up & Performance testing
(Please provide detailed breakup for the mandays involved, personnel and their respective experience in man-hour rates format for the
above services.)
K. Training of Operational Personnel at Plant (As per details stipulated in Section-II (ITB) section 3.2.2.1 bullet viii ).
GRAND TOTAL
Note:
1- The Vendor shall consider 45 man-days time for installation supervision at site.
2- The Vendor shall consider 30 days time for pre-commissioning, commissioning, start-up and performance testing activities with involvement of various discipline engineers (one commissioning, one mechanical, one
Instrument Engineer)
3- The commercial evaluation will be based on the total of the price of the item listed above as A, B,C, E, F, G, H, I, J & K.
ANNEXURE - X
BID PRICE SCHEDULE - DESIGN, FABRICATION, SUPPLY & COMMISSIONING OF AMINE SWEETENING UNIT
(Complete Amine unit including Acid Gas Flare System and D-min Water System)
JHAL MAGSI DEVELOPMENT PROJECT
Tender Enquiry No. PROC-FD/CB/PROJ/0366/2012
(Applicable for Local Bidder)
Unit Price Total Price Unit Price Total Price Taxes Total Price (Inclusive of Taxes)
(Ex-Works basis) (Ex-Works basis) (At Site basis) (At Site basis) (Please Indicate break-up (At Site basis)
BID ITEM Qty. PKR PKR PKR PKR of all the applicable taxes PKR
i.e. GST, FED etc.)
B. Design, Fabrication & Supply of Acid Gas Flare System & D-min Water System
C. Supply of Start-up and Commissioning Spares (Please provide separate item-wise priced list)
D. Supply of two years recommended spare parts (Please provide separate item-wise priced list)
• HAZOP Meeting
Eight (08) engineers for a duration of five (05) working days
I. Pre-shipment Inspection (Third Party Inspection) lumpsum charges (As per details stipulated in Section-II (ITB) section
3.2.2.1 bullet ix).
J. Lumpsum charges of Installation Supervision, pre-commissioning, commissioning, start-up & Performance testing
(Please provide detailed breakup for the mandays involved, personnel and their respective experience in man-hour rates format for the
above services. )
K. Training of Operational Personnel at Plant (As per details stipulated in Section-II (ITB) section 3.2.2.1bullet viii).
GRAND TOTAL
Note:
1- The Vendor shall consider 45 man-days time for installation supervision at site.
2- The Vendor shall consider 30 days time for pre-commissioning, commissioning, start-up and performance testing activities with involvement of various discipline engineers (one commissioning, one mechanical, one Instrument Engineer)
3- The commercial evaluation will be based on the total of the price of the item listed above as A, B,C, E, F, G, H, I, J & K.
Instructions to Bidders
Sheet 1 of 2
ANNEXURE – XI
TERMS OF REFERENCE
The scope for Open Box Pre-shipment inspection of one train of Amine Sweetening unit
Package to be carried out by third party inspector is outlined below:
- Coordinate with OEM/Amine unit packager for finalizing the Date and Place of
inspection.
- Review the detailed listing (will be provided by OEM/Amine unit Packager) of the
equipment, materials, tools, accessories, spare parts, and all other relevant parts
being shipped, Material Test Certificates, Purchase Order and other relevant
documents.
- Each equipment of Amine unit package shall contain following information with
unwashable paint.
a) Oil & Gas Development Company Ltd, Jhal Magsi Development Project.
b) Oil & Gas Development Company Ltd, Islamabad Pakistan.
c) Contract No.__________
d) L/C No.___________
e) Equipment No._____________
f) Case No.____________
g) Storing and handling instructions for fragile and perishable items.
h) Gross Weight (in metric tons)
i) Dimensions (length*width*height in metric system)
j) Place of Origin
- Verify the completeness of whole Amine unit package based on the final Packing
List provided by OEM/Amine unit Packager.
- Physical check for any damages of whole Amine sweetening unit package.
- Instructions necessary for the storage of Amine sweetening package to maintain its
integrity at site and before startup.
- Integrity of exterior paint must be checked and ensured. Make sure that paint does
not contain Lead or chromates.
- All exterior surfaces except for corrosion resistant material shall be coated with
rust preventive material.
Instructions to Bidders
Sheet 2 of 2
- All interior surfaces shall be physically checked to ensure that no dust, oily
particles, welding spatters and other damaging particles reside there and those
surfaces shall be coated for rust prevention.
- All the threaded openings must be secured with steel plugs and openings beveled
for welding shall be secured to prevent entrance of any moisture contents or dust.
- Centre of Gravity and lifting points must be marked clearly on all the
equipments/skids of Amine unit package.
- All the components being shipped separately shall be tagged with item and serial
number of the equipment for which it is intended.
- All the equipment and components of Amine unit package to be shipped shall
comply with Occupational Health and Safety Standards.
- Any connections dismantled for shipment purpose shall be match marked for ease
of assembly.
- Copy of installation manual must be shipped along with the equipments of Amine
unit package.
- The inspection shall be carried out through the following inspectors only:
1. M/s Lloyds
2. SGS
3. Velosi
4. Moody International
The above scope covers the minimum requirement, any other check whether visual or
any other inspection procedure required to rd confirm the completeness of the Amine unit
Package will be the responsibility of the 3 party inspector.
Instructions to Bidders
Sheet 1 of 1
ANNEXURE – XII
DEVIATION FORM
List of Deviations:
Tender
Sr.
Title/Description of Deviation Document Proposed Change Remarks
No.
Reference
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
ANNEXURE – XIII
Dear Sir,
1. To make unconditional payment to you as called upon of (10%) ten percent of the Contract value of the contract price mentioned in
the said contract, on your written FIRST and SIMPLE demand without further recourse, question or reference to CONTRACTOR or
any other person in the event of default, non-performance or non-fulfillment by CONTRACTOR of his obligations, liabilities,
responsibilities under the said contract of which you shall be the sole judge.
2. The accept written intimation from you as conclusive and sufficient evidence of the existence of the default or breach as aforesaid
on the part of CONTRACTOR and to make payment immediately and forthwith upon receipt of your FIRST and SIMPLE written
demand.
3. This Performance Bond shall remain valid and in full force and effect upto ________ or issue of statement of discharge by your
authorized representative or return of original guarantee whichever is earlier.
If clean documents are not negotiated within Negotiation Period allowed in Letter of Credit or documents are with held by Bank on
account of any discrepancy:
• If the Demurrage, if any incurred due to late negotiation of the Clean Documents and paid by OGDCL will be realized from the
beneficiary of L/C, by encashing this Performance Bond to the extent of demurrage amount. In case demurrage amount
exceeds the total value of this Performance Bond the balance amount will be payable by the beneficiary.
5. That no grant of time or other indulgence to, amendment in the terms of the Contract by Agreement between the parties, or
imposition or Agreement with CONTRACTOR in respect of the performance of his obligations under the said Agreement, with or
without notice to us, shall in any manner discharge or otherwise affect this Guarantee and our liabilities and commitments there
under.
6. This is an independent and direct obligation guarantee and shall be binding on us and our successors interest and shall be
Irrevocable.
7. This guarantee shall not be affected by any change in the constitution of the Guarantor Bank or the constitution of the Contractor.
8. The Guarantor Bank Warrants and represents that it is fully authorized, empowered and competent to issue this guarantee.
(B A N K E RS)
III – SCOPE & SPECIFICATIONS
OIL & GAS DEVELOPMENT COMPANY LIMITED
Job No.: 14-0102
Spec. No.: 0102-GA-8600
Sheets: 52
SCOPE OF WORK
FOR
AMINE UNIT PACKAGE
0 Issued for Bidding Jan, 23, 12 ATF SRA AHB MHQ MZW
A Issued for Review Jan, 16, 12 ATF SRA AHB MHQ MZW
TABLE OF CONTENTS
1.0 INTRODUCTION............................................................................................................................4
1.1 Definitions............................................................................................................................................... 4
1.2 Package Overview .................................................................................................................................. 4
1.2.1 General .................................................................................................................................................... 4
1.2.2 Scope........................................................................................................................................................ 5
1.3 Company’s Intention.............................................................................................................................. 7
2.0 CODES AND STANDARDS.....................................................................................................11
2.1 Codes and Specifications...................................................................................................................... 11
2.2 Order of Precedence............................................................................................................................. 11
3.1 Package Description ............................................................................................................................. 12
3.2 Equipment Layout, Operability and Maintainability ....................................................................... 12
4.0 ENVIRONMENTAL DESIGN CRITERIA ................................................................................14
4.1 General .................................................................................................................................................. 14
4.2 Area Classification ............................................................................................................................... 14
4.3 Site, Environmental & Utility Design Data ........................................................................................ 14
5.0 SUPPLIER’S SPECIFIC RESPONSIBILITIES ........................................................................15
5.1 Commissioning and Startup spares .................................................................................................... 16
5.2 Startup and Commissioning Services ................................................................................................. 16
5.3 Two Years Operational and Maintenance Spares............................................................................. 17
5.4 On-Site Training of OGDCL Operating Personnel........................................................................... 17
5.5 Standby Philosophy.............................................................................................................................. 17
6.0 PACKAGE REQUIREMENTS....................................................................................................18
6.1 Vessels, Columns & Exchangers ......................................................................................................... 18
6.2 Piping & Valves .................................................................................................................................... 18
6.3 Instrumentation.................................................................................................................................... 21
6.4 Electrical ............................................................................................................................................... 24
6.5 Safety and Relief Valves....................................................................................................................... 24
6.6 Blow down ............................................................................................................................................ 27
6.7 Structure & Lifting .............................................................................................................................. 27
6.8 Painting & Corrosion Protection ........................................................................................................ 28
6.9 Insulation for Equipment & Piping .................................................................................................... 29
6.10 Equipment Tagging, Labeling & Nameplates.................................................................................... 29
6.11 Packing, Preservation and Transportation of Material & Equipment............................................ 29
6.12 Civil Design ........................................................................................................................................... 30
6.13 Installation/Erection Works ................................................................................................................ 31
6.15 DESIGN REVIEW MEETINGS AND HAZOP Study..................................................................... 31
1.0 INTRODUCTION
Oil & Gas Development Company Limited (OGDCL) is developing its Jhal Magsi Gas
Field City Jhal Magsi, District Jhal Magsi near Dera Murad Jamali, Balochistan
Province of Pakistan. OGDCL has engaged ENAR Petrotech Services (Pvt.) Limited
(ENAR) to carry out the Basic & detailed engineering for the Jhal Magsi Gas Field
Development Project as well as to provide the procurement assistance and the overall
project management consultancy of the project.
This document covers the basis of process design for the Detailed Engineering of the
“Amine Unit Package” at Jhal Magsi Gas Field Development Project.
1.1 Definitions
Terms used in this specification have the following meanings:
“Supplier” means Entity with whom the Company will execute a Contract for supply of
equipment/material as per this document
“Amine Unit Package” means “Complete Amine Unit including Acid Gas Flare System
and De-min Water System”
1.2.1 General
This requisition defines the requirements of modular based skid mounted “Amine unit
Package” complete with all instruments, piping and associated facilities, to be installed at
Jhal Magsi Gas Field Development Plant. The package skids, which support the equip-
ment, shall also support all other accessories, piping, instruments, control panel,
maintenance/access platforms, etc and shall be supplied in complete assembled condition.
However, columns shall be supplied in unassembled form but the interconnecting piping
between skid and off skid equipment/columns shall be supplied by supplier considering
prefabricated spools with flanged connections. Minimum numbers of field weld joints are
required wherever necessary.
1.2.2 Scope
This specification define the requirements for “Amine Unit Package” and the
interconnecting piping complete with all necessary equipments, associated piping,
instrument and control system.
Following equipments are envisaged as minimum to be part of the Amine unit Package.
An indicative P&IDs of the whole package attached with this scope of work; the supplier
shall provide all the equipments and instrumentation, shown on the attached P&IDs, as a
minimum. Any equipment or item, besides the following equipments, required for the
safe and continuous operation of the unit shall also be in the scope of the Supplier and
supplier to incorporate if any additional equipment in the P&ID’s. The list of minimum
equipments required is mentioned below:
Heat Exchangers
400-EA1 Sour Gas Evaporative Cooler
400-EA2 Sweet Gas Evaporative Cooler
400-EA3 Lean Amine Evaporative Cooler
400-EA4 Amine Regenerator Condenser
400-E1A/B Lean/Rich Amine Exchanger
400-E2 Amine Regenerator Reboiler
Filter/Strainer
400-S1A/B Rich Amine Strainers
400-S2A/B Lean Amine Strainers
400-F1A/B Lean Amine Pre-Filters
400-F2 Carbon Bed Filter
400-F3A/B Lean Amine Post Filter
400-S3 Lean Amine Strainer
Pumps
Sour Gas Evaporative Cooler
400-P101A/B
Showering Pumps
400-P102A/B Sweet Gas Evaporative Cooler
Showering Pumps
400-P103A/B Lean Amine Booster Pumps
Lean Amine Evaporative Cooler
400-P104A/B
Showering Pumps
400-P105A/B Lean Amine Circulation Pumps
400-P106A/B Amine Regenerator Reflux Pumps
400-P107 Amine Charge Pump
400-P108A/B Amine Transfer Pumps
400-P109 Amine Sump Pump
400-P110A/B Flare Knockout Pumps
400-P111A/B De-min Water Supply Pumps
Tank
400-TK1 Amine Storage Tank
400-TK2 De-min Water Tank
Vessels/Columns
400-V1 Filter Coalescer Vessel
400-C1 Amine Absorber
400-V2 Sweet Gas K.O. Drum
400-V3 Rich Amine Flash Drum
400-V4 Lean Amine Surge Vessel
400-C2 Amine Regenerator
400-V5 Amine Regenerator Reflux Drum
400-V6 Amine Sump Vessel
400-V7 Flare Knockout Drum
Stack
400-ST1 Flare Stack
The whole unit shall be supplied skid mounted complete with all installed piping,
electrical and instrumentation items/cables; but the columns i.e. amine regenerator (400-
C2), Absorber (400-C1), regenerator condenser (400-EA4), & Lean amine cooler (EA-
117) can be supplied as field erected items. Inter skid piping and interconnecting piping
within the Amine Unit Package and flare & utility piping from the amine unit to the flare
tip shall be included in the supplier’s scope.
The “Amine unit Package” design shall be optimum in terms of minimizing: overall
Power Consumption, Regenerator Reboiler duty, loss of Amine from the process,
consumption of fuel gas and capital cost. Besides, the unit should operate trouble free
without foaming.
The Supplier shall supply all necessary Process Flow Diagrams (PFDs), Process &
Instrumentation Diagrams (P&ID's) and complete Heat and Material Balance (HMB) of
the entire unit on one recommended solvent (MDEA generic) of Complete “Amine Unit
Package”. The initial supply of amine solvent and two years operational makeup quantity,
required to make up the commissioning and startup losses, from supplier, is also included
under the scope of supply of the supplier. All commissioning spares and two years
operational recommended spares also part of the supplier scope. The Supplier shall also
supply startup, shutdown and operating philosophy of the Absorber and Regeneration
System, Acid Gas Flare System and De-min Water System. Following documents shall
also be supplied as minimum:
The gas sweetening unit shall be designed and supply with flexibility to operate
recommended solvent MDEA (Generic) provided by Amine Suppliers, as mentioned in
the Datasheet of Amine Sweetening Unit 14-0102-DS-1701, without reduction in Plant
design capacity
Supplier shall supply the anti-foaming system for safe and continuous operation of Amine
Sweetening Unit. Type of anti-foaming system shall be selected by the supplier.
Amine drain, storage and make up (charging) system shall also be included in the supply.
The system shall include an Amine Sump tank, Storage tank, Charge pump, circulation
system, with instrumentation.
De-min Water System containing Demin water treatment package, demin water tank , de-
min water supply pumps, instrumentation, interconnecting piping and all other
requirements for the safe & continuous operation shall also be provided as mentioned in
the Datasheet of De-min Water Treatment System 14-0102-DS-1702.
Moreover, Acid Gas Flare System containing flare stack, flare knock out drum, flare
knock out pumps, instrumentation, interconnecting piping and all other requirements for
the safe & continuous operation shall also be provided, as mentioned in the Datasheet of
Acid Gas Flare System 14-0102-DS-1703
The supplier shall also provide complete calculations for the corrosion inhibition
requirement of the package and shall also provide provisions for the corrosion inhibitor
injection; if necessary.
The supplier shall provide the complete filtration philosophy of the amine solvents and
incorporated in design. Supplier shall furnish all materials and equipment (including
initial charges of any lubricants and solvents, and chemicals if required), tools, and
consumable supplies required for the unit and shall make the complete engineering
fabrication and testing of the unit and accessories covered in this Scope of Work.
Heat stable salt removal facility shall be included in the design and supplied by Supplier;
if necessary.
Supplier shall be responsible for supplying first fill of selected Amine Solvent, and other
lubricants to be used in various equipments as identified during detailed engineering.
In case of Fire / ESD -1 on the whole plant, shutdown of amine plant shall be followed by
blow down of whole gas circuit as per API RP 520 & 521. Supplier to provide necessary
blow down valves and orifice as shown in the P&IDs provided with this document.
Supplier shall carry out and submit the relief and blow down study of Amine Unit
Package.
The Supplier shall arrange package, pipe work including pipe rack and supports and
related instrumentation according to good industry and well-recognized practices, which
facilitates continuous operation and maintenance.
The area available for the installation of the package is shown in attached plot plan
(0102-PC-2201). The Supplier shall submit equipment general arrangement drawings in
2D and 3D models format for individual skid for Company/Engineering Consultant
review and approval prior to finalization of design.
The specifications given in the ITB are for individual Equipment / package. Supplier shall
check/verify and provides the integrated specifications for the complete Unit.
All instruments, control system, control valves, instrument cables connecting piping with
valves, electric components and structural platform/ladders shall be included in the
Supplier’s scope of supply as required. All inlet and outlet piping shall terminate at the
edge of common rack as shown in the plot plan with appropriately rated flanges.
All the rotary equipment should be installed on ground or easily accessible points so that
maintenance can be done easily.
All the Mechanical equipments should be of well known brands, so that spares can be
made easily available.
The Supplier shall ensure that all the components of the package are ‘BRAND NEW’.
API – 537, Flare Details for General Refinery & Petrochemical Service.
The package P&ID (0102-PB-2101 to 0102-PB-2118) and the process data sheet are
attached with this specification. The P&IDs provided are intended to describe general
requirement of the package and to indicate supplier’s scope of supply, however, the
supplier shall be responsible to work out all details necessary for the safe and efficient
operation of the package to meet the desired objective.
The Supplier shall provide all information on space requirements for equipment layout,
handling and removal of components, to a point on or beyond the confines of the
package, where these can easily be lifted and handled by external and permanent lifting
equipment. The supplier shall also provide all information on any special handling proce-
dures or lay down area, which may be required and provide all special tools, support,
cradles and lifting frames for package maintenance purposes. Where such handling and
lifting arrangements is required, the supplier shall be responsible for the supply of fully
tested equipment and shall guarantee the performance and conformance with all
applicable codes and standards.
It shall be the responsibility of the supplier to prepare overall equipment layout and
submit the same for Company review prior to finalization of drawings for fabrications.
This shall be done in a manner so that overall schedule of delivery cannot be affected. A
preliminary equipment layout shall also be required to be submitted by the Supplier at the
time of bid submission. Supplier shall ensure in his design the reliability of equipment
and ease of maintenance in order to establish operational availability for the design life.
The package unit shall be capable of meeting the performance requirements given in the
Process Data Sheet/Specifications.
Constructability will be a major consideration. All equipment designs shall take into
account shipping size limitations, the need for ease of site erection and minimum con-
struction duration.
4.1 General
Unless otherwise stated on the data sheets the package will be located in an open exposed
area.
The Supplier's scope of work for the equipment package shall also include the following
as a minimum:
- Provision of all necessary documentation including detailed P&IDs showing all
necessary equipments, instrumentation and control system. Also supplier should
provide a comprehensive energy, heat and material balance for the system
tabulated on process flow diagrams of the unit considering MDEA (Generic)
solvent also mentioned in Datasheet of Amine sweetening unit, De-min Water
treatment unit and Acid Gas Flare System; 14-0102-DS-1701, 14-0102-DS-1702
and 14-0102-DS-1703 respectively. Bidder to also mention separately the time
based degradation/expiry of solvents.
- Provision of spares for two years of normal operation.
- Indication of all technical deviation/exception to this requisition and notifying
Company such deviation/exceptions.
- Equipment supply including design covering process & mechanical requirements
as indicated in this requisition.
- Preparation of equipment packaging and consideration of shipping arrangement
for ease of delivery in view of local transportation limitations.
- Provision of overall package guarantee, warranties and all required material
certification.
- Testing (hydraulic, pneumatic etc.) of equipment and piping. All Instruments shall
be calibrated. All electrical/instrument systems shall be checked for functional
operation.
- Testing (hydraulic, pneumatic etc.) of equipment and piping. All Instruments shall
be calibrated. All electrical/instrument systems shall be checked for functional op-
eration. Control system shall be completely configured for required operation.
- Protective coating/painting including preparation for shipment.
- Package HAZOP study
Any other activity not specified above, but essential to make the Amine Unit Package
safe and operational shall be undertaken by the Supplier.
• Performance Test
The supplier shall provide the detailed breakup for the man days involved, personnel
and their respective experience in man-hour rates format for the above services.
All spare parts furnished by Supplier shall be wrapped and packaged so that they will be
preserved in original as-new conditions of storage to be anticipated and shall be properly
tagged and coded so that later identification as intended equipment usage would be
facilitated. They shall be packaged separately, clearly marked as "Spare Parts", and
shipped at the same time as the equipment. Packing lists shall be furnished so that the
parts can be handled without uncrating if desired.
Shell and Tube Heat Exchangers shall be designed and fabricated to TEMA ‘R’ Code
with the pressure envelope being considered as a pressure vessel and complying with the
above. The design shall also be in accordance with Specification for Shell and Tube Heat
Exchanger Doc. No. 0102-EA-5500.
Vessel and column internals such as mesh pad, packing or trays if supplied loose then
supplier is responsible for providing detail drawings of installation with 10% spare
quantity of installation material.
Air Cooled Heat Exchanger shall be designed as per API 661. All Air cooler tubes shall
be Seamless tubes coupled with fins in accordance with Specification for Air Cooled Heat
Exchanger Doc. No. 0102-AEA-5900.
All the pipe work shall be designed, tested and fabricated according to the ASME Code
B31.3. The design should facilitate ease of operation and maintenance. Suitable break
flanges and/or couplings should be provided for easy removal/re-installation of pipe work
for maintenance purposes. The Supplier shall ensure that all the pipe work (on-skid and
interconnecting) is free from any stress by carrying out Piping Flexibility Analysis using
renowned computation software (e.g. CAESAR II etc.). Supplier shall use his own piping
specifications for detailed engineering with full justification and those specifications shall
be approved by Company prior to use.
Piping shall be well supported on skid and on the rack for interconnecting piping. The
pipe supports shall be designed considering dead loads, live loads, dynamic loads due to
flow induced vibration and or pulsation, wind, shipping, etc. Pipe supports shall be so
designed to accommodate pipe movement due to thermal and pressure stresses and be
positioned such that piping structure (pipe rack, etc.) have a mechanical natural frequency
above 30Hz. Piping and equipment shall be sufficiently supported to prevent differential
settlement and undue forces and stresses in the piping or connected equipment.
All piping connections required to be interconnected with plant. Process and utility piping
shall be provided at the edge of the common Pipe Rack as shown in the plot plan. All
drain and flare connection shall be piped to common headers which further require to be
connected with the plant header.
Design and supply of the piping supports, outside of the skids and within the battery limit
shall be supplier’s responsibility. Location and specifications of these supports shall be
indicated on the general arrangement drawings and isometrics. These supports can be
supplied loose for field installation by others.
The NDT and Inspection plan shall be submitted by Supplier and agreed upon by
Company prior to its finalization. Following are the minimum requirement for NDT for
pipe work anticipated by the Supplier:
- 100% radiography of total butt-welds joints of each line/specification for all Piping.
- UT/PT/RT/MPI for all other type of joints as per Suppliers standards.
Supplier shall furnish the catalogues of valves and all piping special items, such as spring
supports, expansion bellows, restriction orifices, safety relief valves etc. after LOI.
All process piping and utility piping shall be radiographed. PWHT shall be performed for
all process and utility pipes having thickness above 19mm. PWHT will also require for
all piping weld joints wherever NACE MR 0175/ISO 15156 is applicable to achieve the
NACE hardness requirements of weld material and HAZ area.
All the closed drain and Oily water underground/above ground piping (if any) within the
Amine Unit Package shall be in Supplier’s scope. Supplier shall terminate these piping
works at the Amine Unit Package battery limit. Company shall identify the locations of
tie-ins of these pipe works during detailed engineering stage.
Piping of Demin water treatment package shall be of Galvanized carbon steel. However,
Material of construction for vessels and tanks for the Demin water treatment package will
be selected by Supplier which shall be approved by the Company prior to fabrication.
6.3 Instrumentation
The scope shall cover the supply of all Field Instrumentation, Junction Boxes, Instrument
Cables, Communication Cable and Cable Glands suitable for Class 1 Div 2, Group C & D
as mentioned in General Instrumentation Specification for Package Instrumentation
(0102-ISP-6026).
All field instruments shall be installed as per the latest codes & standards and best
engineering practices.
All the instrumentation cables and cable glands between field instruments and Junction
Boxes/Control Panel and all shall be supplied by Package Supplier. Cable Glands shall be
compatible with the type of cables.
The cable shall be direct buried type, twisted pair, shield armored. They can also be laid
on cable trays. In case of cable tray layout, cable tray fittings and supports shall also be
provided by the Supplier.
All cables provided by package Supplier shall be in accordance with EN-50288-7 and
shall be flame retardant.
All the Junction Boxes shall be increased safety (Ex ’e) type suitable for Class 1 Div 2,
Group C & D and shall have weather protection of IP 65.
All the electronic instruments shall be 4-20 mA, 24VDC Smart HART type, Flame Proof
(Ex ‘d’ type), suitable for Class 1 Div 2, Group C & D and shall have weather protection
of IP 65 as mentioned in General Instrumentation Specification for Package
Instrumentation, document no. 0102-ISP-6026-0, Section 3.0
The control panel should be Hazardous Area classified suitable for use in Class 1 Div 2
environment. Control Panel shall be NEMA 4X certified.
NOTE: The purge or pressurized (Ex ‘p’) type panel shall not be acceptable.
The Fire & Gas Detectors for Amine Package shall be provided as per specification
mentioned in General Instrumentation Specification for Package Instrumentation,
document no. 0102-ISP-6026-0, Section 3.9.11.
Supplier shall supply below mention Fire and Gas Detectors as minimum:
The Fire and Gas detectors shall be suitable for Class 1 Div 2, Group C & D environment
and shall have weather protection of IP 65. Supplier shall interface Fire and Gas detectors
with Amine Control System in field.
Supplier shall provide separate I/O modules for field instruments and F&G detectors.
Configuration of F&G Detectors and other field instruments on same I/O module shall
not be acceptable.
The Amine Package along with Demin Water System and Acid Gas Flare System, shall
be controlled by redundant PLC based Amine control system which shall be self-
sufficient, requiring no additional equipment for control / monitoring purpose of these
units. Complete instrumentation, controls, alarms and shutdowns for above mentioned
Package which shall be controlled by redundant PLC based control system. This shall be
interfaced with MMI, operator workstation in control room.
Control System as described in the Specification for package Control System (0102-ISP-
6031) shall be as minimum requirement for package skid and also refer to Schematic
Diagram for Amine Sweetening Unit Control System (0102-ICD-6304)
i) Modbus RS 485 Serial and Ethernet ports for interfacing with Plant Control System.
Amine Unit Control system shall be used for controlling of amine sweetening unit
instrumentation as well as controlling and monitoring of Demin Water System and Acid
Gas Flare System. The Supplier shall be responsible for interfacing of Amine control
system with Acid Gas Flare System, Demin Water System via Modbus RS 485 and
through Hardwired for complete monitoring and controlling of these packages.
Dual 220V AC supply shall be provided to the panel from UPS. The supplier shall
provide conversion to any other voltage levels as per its requirements.
Supplier shall supply all special tools, any hardware or software and test equipment
required for installation and startup.
Complete documentation for amine package including Acid Gas Flare System, Demin
Water System shall be provided by the supplier as mentioned in General Specifications
for Package Instrumentation and Specification for Amine Package Control System.
6.4 Electrical
Below mentioned are the minimum design requirements for the electrical system of the
Amine sweetening package. The Supplier / Vendor may enhance these minimum
requirements for safe and reliable operation of the supplied package. The Supplier /
Vendor shall provide the list (including details) of all electrical equipment to be supplied
with the package.
6.4.1 The electrical equipment supplied by the Supplier shall be suitable for following
available power supply
a) Power Generation
400V, 3‐Phase, 50Hz, 4‐Wire
b) Low voltage Distribution
400V, 3‐Phase, 50Hz, 4‐Wire
c) Lighting/Sub‐distribution
230V, 1‐Phase, 50Hz, 3‐Wire
d) Instrumentation and controls (from UPS)
230 Vac, 50 Hz, single‐phase
For voltage levels other then those mentioned above the Supplier shall be responsible to
provide the voltage transformation system in its package.
6.4.2 Maximum supply voltage and frequency variations shall be as follows:
a) Steady state voltage variation +5% (AC Supplies)
‐10% +15% (DC Supplies)
b) Frequency variation +2%
Supplier scope of work will include but not limited to the selection of electrical
equipment suitable for environmental & hazardous area requirement and as required
for the entire package including switchgear / MCC, electric motors, electric heaters,
junction boxes, distribution boxes, skid lighting & earthing material etc. i.e all the
distribution & utilization equipment, interconnecting power, control, lighting, earthing
cables, Complete in all respects shall be in the scope of supplier supply.
The switchgear / MCC shall be installed in MCC room, the estimated length from MCC
room to Amine system is 200meters. The incomer for Switchgear/MCC shall be supplied
by the client.
The Supplier shall provide Schematic wiring diagram, data sheets, performance curves
and all other information / details regarding package electrical equipment.
The supplier shall select suitable starting method Direct Online DOL / Star Delta /
Variable Speed Drives (VSD) or Soft starter for higher rating motors as given bellow.
Supplier to provide complete information for interface with PLC control system, Signal
communication like Run/ Stop, command from plant control system ON/ Off/ fault status
with volt free contact, running feedback, current monitoring, any analog signal
communication with plant control system like speed variation etc. interconnecting control
cables Complete in all respects shall be in the scope of supplier supply.
Supplier package electrical equipment shall be fully pre wired however, Power and
control cables outside package battery limits shall be procured by OGDCL, List of all
such electrical cables to be provided by Supplier.
All electrical equipment shall have a finish resistant against sea water vapors and
“Chemical and Hydrocarbon plant corrosion.”
The Supplier shall provide adequate lighting fixtures to illuminate all the skid equipment
in accordance with area classification (Class 1, Group C & D and Division-1/ Division-2
locations). The lighting shall be fluorescent lighting fixture with suitable protection in the
form of cage, etc. and operate at 230 VAC, Single-Phase, 50 Hz. Supplier to provide
lighting material like lighting fixtures, JBs and cables with installation accordingly. All
details in this regard to be provided by the Supplier.
The Supplier shall provide adequate two No of industrial power socket of the following
ratings each on skid.
Three Phase, 400V, 50 Hz, 5 Pin 63 Amp: 01 No.
The Supplier shall provide adequate two No of spares of the following ratings each.
63 Amps four pole MCCB 400V, 50Hz
32 Amps two pole MCB 230V, 50Hz
The package electrical equipment supplied by the Supplier /
Vendor shall be suitable for direct cable connection to the equipment junction/terminal
box. All the electrical equipment shall be internally pre wired by the Supplier / Vendor
Terminal boxes shall provide ample space for connecting the cables. In view of the
maximum acceptable voltage drop, the prescribed cable size can be larger than considered
normal by the Supplier. A larger connecting box than the Suppliers standard may be
required.
The Vendor / Supplier shall provide two M-12 earthing bosses on the package skid, or on
independently mounted items, complete with studs, nuts and washers for external earth
cable termination by the Purchaser. All on skid package electrical/ instrument equipment
shall be provided earthing by Supplier.
The following design documents and drawings shall be prepared and issued by the
Supplier / Vendor for all supplied electrical equipment.
Electrical equipment specifications and data sheets
Electrical equipment technical details and performance curves (Electric motors
Torque/Speed, Time/Current, Terminal Withstand Curves etc)
Test Certificates, Certification Documents and Certified Drawings of motor, connection
details etc, showing the outline arrangement and dimensions shall be provided.
MCC and control system interface diagram and schematic diagrams.
Electrical equipment installation details
Ladder/Addresses documents
Input and output list and its drawings
Supplier shall calculate the relief rate requirement under different scenarios and size PSVs
on the basis of the maximum relief load expected in different scenarios. Supplier shall
provide 2 numbers PSVs (1 standby for maintenance) for each requirement.
The PSVs shall be in accordance with ASME Boiler’s and Pressure Vessels Code. ASME
& API formulae shall be used to calculate sizes of the valves. The vessel, etc. and each
PSV will have a full area stop valve in between for inspection and repair purposes only.
The stop valve shall be so arranged that it can be locked or sealed ensuring that both relief
valves are not closed simultaneously.
Prefabricated steel structure sections plat forms, etc. shall be designed by the supplier
with field bolting to avoid welding on site. All structures may be supplied loose
disassembled to the suitably sized prefabricated sections. The Company shall perform
assembly of the structure in the field. The Supplier shall submit with his bid, details of the
structural materials that are proposed. The material to be used shall comply with ASTM
standards.
Full penetration welds on lifting attachments shall be subjected to 100% UT and 100%
MPI/DPI as appropriate. All welds directly associated with lifting equipment shall be
subject to 100% MPI/DPI after load test. The package should be suitable for handling
with mobile crane using a single point lift at the construction site, where it is necessary to
use special lifting beams, slings, shackles, etc. these shall be provided by Supplier.
Detail designing of holding down bolts shall be the responsibility of Supplier. It will be
necessary to accurately locate their positions. The entire supply and design requirement
shall be in accordance with specification for steel structure Doc. No. 0102-STA-4000.
All the steel structures required for the Amine Unit Package including all type of
supports, pipe rack, T-posts for acid gas line up to flare header in the scope of supply of
supplier. Supplier to provide the complete design calculation (structural analysis, joint
calculation, bolt sizing, anchor bolt sizing etc) for the selection of steel structures
mentioned above for approval. The steel structure shall be in the form of shop fabricated
with bolted connections. The supplier shall provide the foundation loading for civil
design of all steel structures. The supplier shall use the European or Equivalent standard
for all steel sections. Detailed fabrication and installation drawings shall be required for
all steel structures.
Note
Walkways, grating, ladders, etc., must be foreseen if accessibility of the skid items
require as such. Drain pans will be provided where oil leakage or oil spill can be
expected.
Painting, protective coatings and the procedures used for the preparation of surfaces shall
be as specified in the Project Specification for Painting Doc. No 0102-GS-9523.
Color coding for equipments and piping etc. shall be finalized after approval by
Company/Engineering Consultant.
All inter-skid carbon steel piping and equipments shall be supplied with final painting and
finishing. However, interconnecting carbon steel piping between skid & equipments can
be supplied with Primer painted and Supplier shall provide the paint for final painting for
supplied Primer painted piping.
Supplier shall provide touch-up paint to repair any paint damage in shipment, handling,
welding and cutting or by any other means.
All interskid piping (where insulation required) shall be supplied with insulation by
Supplier. However, insulation (where required) for all interconnecting piping between
field erected equipments shall be estimated and supplied by Supplier with all accessories
up to battery limit of package as loose item.
All tagged items shall have corrosion resistant nameplates or labels permanently attached
which shall include Supplier’s standard identification and together with the Company’s
tag number. All other control and indication devices that operators will need to
access/maintain shall have corrosion resistant identification/duty labels permanently
attached.
Packing and Preservation shall be suitable for transportation of material and equipment
during their handling, inland transportation, shipment through sea or by air and storage at
site for up to 6 months in an uncovered and unheated location. Packing shall account for
the fragility and physico-chemical/ mechanical damages of items. Detailed requirements
for Packing & Protection of Material and Equipment are indicated in specification no.
0102-GS-9524.
Company has considered seaworthy packing of all the equipment and packages.
Following criteria can be considered as a minimum:
Loose piping material, valves, instruments, etc. shall be properly tagged to allow easy
identification/site assembling.
Nozzle openings shall be protected with steel cover with rubber gaskets. Nitrogen
blanketing will not be required.
Packing and rust prevention shall be suitable for transport and 6 months outdoor storage
in a very hot and humid climate.
Designs of equipment foundation, etc. are excluded from supplier’s scope. However, the
Supplier shall be responsible for the provision of necessary foundation design data
including but not limited to size and location of all anchor bolts, static and dynamic
loading conditions for foundation design. Supplier shall also indicate on his drawings
required elevation of equipment foundations from ground level.
The supplier shall prepare Hazard and operability (HAZOP) study for the package within
their scope of supply in accordance with a recognized formal procedure (Selection of 3rd
party HAZOP chairman with consultation of Company, finalization of HAZOP meeting
date and location for the Company/ Engineering Consultant personnel). The study shall
comprise of the systematic critical examination of the process and engineering intention
of the package to asses hazard potential of mis-operation or malfunction of individual
items of the equipment and consequential effect upon the package as a whole. The study
facilitator will be independent from design team. The supplier shall submit detailed
resume of the participants and shall notify Company with in advance the schedule of the
The supplier shall submit the Design Review Meeting and HAZOP costs as indicated in
ITB document.
• Supplier shall submit the whole tender document (Both Technical and Commercial
portion) with duly signed and stamped with the bid. Supplier shall also submit Signed &
Stamped Copy of his Bid document. The supplier bid document should be numbered with
appropriate format and indication of total number of pages. Supplier shall also provide
his minor exception & deviation list with the tender document.
• Supplier shall submit a standard plot plan for Amine Unit Package showing the inter
distances of Skids and field erected equipments, Sleeper (if required), Pipe racks, cross
overs and other structure details in his Technical Bid.
• Supplier shall arrange his submitted Plot plan such that all the equipments of Amine Unit
Package shall be arranged in the given plot area mentioned in the attached Plot plan Doc.
No. 0102-PC-2201.
• Supplier shall terminate all piping connections upto the edge of the battery limit of Amine
Unit Package at the desired location, from which these shall be connected with the plant
piping, as marked in the attached Plot plan Doc. No. 0102-PC-2201.
• Supplier shall provide all the equipments and piping of the Amine sweetening unit on
Skids except amine contactor, amine regenerator, & air coolers which can be supplied as
field erected items. All such self standing equipment shall be supplied with necessary
platforms, supporting structure/columns etc.
• For foundations of equipments, packages, pipe racks, pipe supports, etc. OGDCL will
provide civil foundations upto 300mm elevation from ground level. Equipment,
Packages, pipes which require elevations above 300mm, Supplier will consider steel
structure based design and all such structure will be supplied in pre-fabricated form.
• Supplier shall submit a 3D-Model in such file formats that can be compatible with
AutoCAD 2007 or above or CADWORX 2007 (Neutral, DXF, DWG) of Amine
sweetening unit showing all equipments, skids and piping within Ten (10) weeks time
after award of contract for review and approval. Moreover, Supplier shall provide the
general arrangement, cross sectional/dimensional drawings and foundation drawings of
all the equipments within Eight (08) weeks time after award of contract for approval.
• Supplier shall provide maximum piping of Amine Unit Package as overhead piping on
the Pipe racks. However, Sleeper piping will be allowed only if there is an essential
requirement.
• Supplier shall provide all the Pre-fabricated piping spools for interconnecting piping with
minimum field joints. Moreover, Pipe supports for Pre-fabricated piping spools shall also
be provided by Supplier and all the piping spools shall be hydrotested.
• Supplier shall in his technical bid that the undertakings from the OEMs to the supply of
spare parts and other after sales services shall be provided at LOI.
• Amine Unit Package shall have a minimum design life of 15 years and must be suitable
for installation and operation outdoors in extremely hot and humid environment. Supplier
shall confirm that his proposed Amine sweetening unit's metallurgy & design will fulfill
the design life and maintenance requirement.
• The proposed design shall permit continuous operation without shut down or major
overhaul for maintenance and repair for a minimum of 3 years.
• The noise level from each skid shall comply with the requirements of API 615 but shall
not exceed 85 dBA at 1m unless stated otherwise on the data sheets, or separately
approved by the Company. OEM supplied items shall also comply the above mentioned
requirement.
• Supplier shall provide free access to his works and that of sub-Suppliers for the
authorized representative of the Company and the certifying authority for Third party
inspection.
• Supplier shall provide all the proposed test procedures and erection detail descriptions of
the site activities related to the package installation and erection/installation of all the
loose items at the time of Bid.
• Supplier shall provide the material certification for all pressure containing and load
bearing components of Amine sweetening package at the detailed engineering stage.
• Supplier shall perform the Piping Flexibility Analysis to insure that all process & utility
piping is free from any stress and will also submit the Stress & Flexibility Analysis
report. Furthermore, Supplier shall also submit the Nozzle loading data.
• All Process & Utility piping (Interskid & interconnected between equipments) and
prefabricated piping spools shall be hydrotested by Supplier.
• All leaks testing of piping shall be performed by nitrogen. Leak testing of all interskid
piping shall be in the supplier’s scope and shall be performed at Supplier workshop at
operating pressure to verify integrity of all joints.
6.17 Materials
Materials of construction for Amine Unit Package shall conform to ASME Section II,
Part A. Latest Edition. Non pressure parts may be in accordance with ASTM
Specifications. ASME Specification numbers are prefixed by SA and the corresponding
ASTM Specification numbers are prefixed by A.
All materials and parts included in the construction of the Amine Unit Package shall be
new, unused and of the highest grade being free from all defects or imperfections likely to
affect their performance.
Supplier to confirm and verify the minimum required materials for the different
equipments as mentioned in the duty specification. If the supplier found the listed
materials not suitable for the save and reliable operation of Amine Unit Package; than
supplier will suggest the material that shall be equivalent or superior material. In this
case, Supplier will submit the selection basis and criteria with supporting documents for
the material selection.
7.1 General
Inspection and testing shall generally comply with the requirements as detailed in this
requisition documentation and in the other referenced specifications. Following is to be
considered as a minimum.
7.2 Inspection
The Supplier shall provide free access to his works and that of sub-Suppliers for the
authorized representative of the Company and the certifying authority (if required). All
necessary certification on materials, shop test data etc., shall be made available to verify
that the requirements of the purchase order are being met. No equipment surface shall be
painted until all inspection is completed.
- Start of fabrication.
- Scheduled time of hydrostatic testing.
a) Company reserves the right to approve the radiographic method and requirement for
stress relieving employed.
Process piping or tubing shall be tested with water after shop fabrication into sub
assemblies.
The normal test pressure for piping shall be 1.5 times the adjusted cold pressure rating of
the valves, fitting, expansion joints or other limiting elements in the line. Pressure testing
shall be maintained long enough to permit complete inspection but shall not be less than
60 minutes.
A shop hydrostatic test for vessels shall be applied as per Paragraph UG-99C, ASME
Code, Section VIII, Division I.
The complete pipe work assembled on the skid shall be subject to operating pressure leak
test at Supplier works to verify integrity of all joints. All prefabricated spools shall also be
hydro tested and leak test at shop.
7.7.1 Pre-Commissioning
Supplier shall provide suitable experienced and qualified personnel for pre-
commissioning as per approved plans, schedules and procedures.
The conformity checks referred to above shall be carried out in accordance with
specifications and shall be reported on pre-commissioning check lists.
Pre-commissioning check lists shall define the scope of work that must be systematically
performed on each selected item of equipment and shall also be used as a log to record
the checks made.
One pre-commissioning check list shall be prepared for each Subsystem and type of
equipment or package.
The static, de-energized tests referred to above shall be carried out in accordance with the
specifications and reported on pre-commissioning test sheets.
One pre-commissioning test sheet shall be prepared for each test performed.
All other pre-commissioning activities such as piping and vessel flushing and cleaning,
shall be supported by specific reports and drawings.
The pre-commissioning status index shall be an exhaustive list, arranged per Subsystem,
discipline and type of equipment, of all equipment and materials subject to pre-
commissioning operations.
The pre-commissioning status index shall summarize, for each Subsystem, the
corresponding pre-commissioning checks and tests to be performed for each item of
equipment or materials (e.g. pressure gauges, electrical cables, pumps and the like). Each
pre-commissioning task shall be recorded on the pre-commissioning status index.
Supplier shall clear all of punch list prior to enter into the Commissioning phase.
Supplier shall provide suitable experienced and qualified personnel for commissioning as
per approved plans, schedules and procedures.
b) Preliminary Checks
This shall include a thorough review of the pre-commissioning dossier and a physical
check of the Subsystem subject to commissioning.
The preliminary checks shall be carried out by discipline and formalized on a specific
report form.
The major outcome of such preliminary checks is identification of a number of new items
to be added to the punch lists.
d) Functional Tests
Functional tests are the live tests to be carried out on each instrumentation,
telecommunication or electrical part of a Subsystem that performs a given function as
defined in Supplier’s methodology.
Functional Tests are to be carried out on each and every loop (random checks shall not be
allowed) following guidelines and minimum requirements of the methodology and
specifications.
e) Operational Tests
• Once all functional tests on a Subsystem are completed, the Subsystem is subject
to an OT, wherever applicable. It consists in bringing the system into operation
under conditions as close as possible to normal
• Preparation of the OT’s will be done during the preparation phase. The list of
Subsystems subject to an OT, as well as the nature of the OT and the
corresponding procedures shall be submitted for approval
• Shut down sequence checks shall be performed on each Subsystem prior to OT’s
together with tests of the SDV’s/ESDV’s/BDV’s closing and opening times, that
will be adjusted if necessary
• Mechanical preparation of each piece of equipment prior to start-up shall be
included in the OT Procedures
7.7.3 Start-Up
• Provision of assistance to OGDCL for the start-up of the facilities, upon written
request of and to the extent required by OGDCL.
• Provision of Supplier’s start-up specialists
• Assistance for mobilization of Sub Contractor and supplier specialists
• Preparing, providing, operating and maintaining services and facilities at site
specifically related to start-up activities throughout the duration of the start-up
work, in addition to those related to the other parts of the Works.
The complete assembly shall be given a full functional test including instrumentation and
electrical equipment at Site. During the test all alarms, shutdown and remote signals shall
be checked. The Supplier shall be required to submit a full Performance testing procedure
before the shipment of package covering the full extent of testing on the completed
assembly at site.
The testing procedure shall be approved by the Company prior to the commencement of
testing and shall be complete with all equipment procedures and check lists.
In case of operation interruption the test shall be continued at the actual date. If this
interruption is attributable to the supplier, the continuous test shall be started from the
beginning again.
If the Performance Test is interrupted for reasons attributable to the supplier, The
Supplier shall, at promptly reengineer and/or carry out such modifications as are required
to rectify the causes of the interruption. Company will thereafter give notice in writing to
the Supplier specifying the date on which Performance Test may be recommenced.
If the Amine Unit Package fail to meet the Performance Guarantee herein specified for
reasons attributable to the Supplier; Test of the Amine Unit Package or the said portion
shall be repeated within a reasonable time upon the same terms and conditions.
• The unit shall be test at site to meet the Performance guarantee as mentioned in the
Data Sheet No. Amine sweetening unit, De-min Water treatment unit and Acid Gas
Flare System; 14-0102-DS-1701, 14-0102-DS-1702 and 14-0102-DS-1703
respectively.
• Elaboration of test procedure is included in Supplier Scope of Supply.
• Evaluation of the Site Performance test and preparation of the test report is included
in Supplier Scope of Supply.
• Job site instrumentation and piping shall be used for the Site Performance Test.
• Site Performance Test will be conducted by supplier’s commissioning engineer after
commissioning. The price for supplier on site preparation for the Site Performance
Test will be included in the commissioning services being offered on lump sum basis.
The Supplier, as part of their own Quality Management System, will also responsible to
demonstrate the QA competence of OEMs of major package component i.e., evaporative
coolers, Shell and tube heat exchangers and pumps. The OEMs of evaporative coolers,
Shell and tube heat exchangers and Pumps shall have verified Quality management
system and packager shall provide current details of registration of OEMs along with its
bid. The Company reserves the right to require the Supplier to implement addition
controls, where a satisfactory level of competence cannot be demonstrated in this regard,
and/or exercise additional controls not detailed in this requisition.
The Company reserves that right to visit the premises of the Supplier and any Sub-
supplier for the purpose of undertaking Quality Audits relating to the equipment and
services covered by this requisition, the extent of which will be discussed with the
Supplier before, award of contract. Prior notice of five working days will be given to the
Supplier of any such Audits. A copy of the Audit report will be forwarded to the Supplier
on completion. Any findings resulting from such Audits shall necessitate the
implementation of appropriate corrective actions based on a time scale to be agreed with
the Company.
Regular inspection visits by the Company for the purposes of surveillance and
documentation review will not be carried out as a matter of course. However, should it
become apparent that the Supplier’s or Sub-suppliers’ agreed Manufacturing Quality
Control Plan is either inadequate or not being implemented, the Company reserves the
right to increase the level or frequency of his Quality Control activities or request the
supplier to revise his working practices, as necessary.
- QC Plan review/markup
- Surveillance of main Supplier
- Surveillance of major Sub-suppliers
- Certification and manufacturing data review
Successful bidder will have to submit Q.C plan with surveillance/hold points for
inspection during fabrication & FAT and hydro test. Company’s review and approval for
QC plan is necessary before start of fabrication.
The Supplier shall advise their proposed material traceability system by which material
are assured to be fit-for-purpose and identified throughout the manufacturing process, as
part of the bid submission. Supplier shall provide all material certification for all pressure
containing and load bearing components.
9.0 DOCUMENTATION
The Supplier must provide the following documents as minimum at different stages of
Project as mentioned in the Table below. For equipment/package foundations, piping
support, pipe racks foundation, etc. supplier must submit all loads (static/dynamic) and
other necessary drawings / documents required for the design of civil foundations (by
others) within eight (08) weeks time after issuance of LOI.
After LOI
Instrument Index (with Make & Model and loose shipped items
47 √ √ √
list)
48 I/O function list √ √ √
49 Instrument Trip Set point list - √ √
50 Control narrative/interlock description √ √ √
51 Instrument Loop diagrams - √ √
52 Instrument Wiring/Termination diagrams - √ √
53 Instrument Hook-up diagrams - √ √
54 Typical Instrument Installation Drawings - √ √
55 Instrument location layout - √ √
56 Cable tray & tubing routing layout - √ √
57 Control System Specification/ Architectural drawing/ Panel Layout √ √ √
58 PLC Wiring Diagram √ √ √
59 Communication Signal List (Mod-bus List) √ √ √
60 Ladder Logic Diagram - √ √
61 Junction box details / GA Drawing - √ √
62 Instrument Schedule including Winterization list - √ √
63 Cable Schedule & tagging list - √ √
64 BOQ & MTO - √ √
65 Calibration Curves & Test Report - √ √
66 PLC Factory Acceptance Test Procedure √ √ √
Electrical Drawings:
68 Load list √ √ √
69 Single line diagram / Schematic Wiring Diagram √ √ √
SOFT/VFD Datasheet, GA Drawing, In/Out details & Operation
70 - √ √
Manual
71 Power system design & details (Data Sheets, layouts, hook-ups) - √ √
Miscellaneous Documents
75 Scope of Supply List √ √ √
76 Vendor's Document and Drawing List - √ √
77 Sub-Vendors' List √ √ -
78 Anchor Bolt/Erection Bolt List - √ √
79 Compliance, Deviation & Exception Form √ √ -
80 Manufacturing Schedule √ √ -
81 Material Order Specifications - √ √
82 Material Test Certificates - √ -
83 Inspection and Test Plan (ITP) √ √ √
84 Inspection & Test Procedure - √ √
85 Fabrication Procedure - √ √
86 NDE / PMI Procedure - √ -
87 Alloy Verification Procedure - √ -
88 PWHT Procedure - √ -
89 Hydrostatic Test Procedure - √ -
90 Installation procedure for activated carbon - √ -
91 Painting Procedure - √ √
92 MRB Index - √ √
93 Manufacturing Record Book (MRB) - √ √
94 Inspection Record Book (IRB) - √ √
95 WPS/PQR - √ √
96 Weld Maps - √ √
97 Welders Qualification List - √ -
98 Installation, Assembly Instruction - √ √
99 Operation and Maintenance Instruction - √ -
Labels shall be affixed to all A3 (and larger) documents in the bottom right hand corner,
as close to the title block as practicable. For A4 documents, the A4 front sheet shall be
attached to the document itself. The Supplier shall complete all label details on initial and
subsequent issues, as required.
9.4 Transmittals
All documents submitted to the Company shall be accompanied by a transmittal
completed by the Supplier. A format will be supplied to the Company at the PO/Contract
award stage. All transmittals will be sequentially numbered.
All drawings shall be prepared in AutoCAD 2004 format. All documentation shall be
prepared in MS Office 2003.
9.10 Manuals
Manuals shall be submitted in clearly labeled 4 ring white hard cover binders. All
documents smaller than A4 shall be inserted into A4 pre-punched, top-opening plastic
wallets (if original certification, etc.) or attached to A4 sheets. Documents larger than A4
shall be folded to A4 size and inserted into A4 pre-punched, top-opening plastic wallets
with the project document number/title block clearly visible to the front.
10.0 ATTACHMENTS
10.1 Specifications
• All specifications of Mechanical, Electrical and Instrumentations attached with
Volume II (Process).
THIS Contract is made this _______ day of _________, ______ between Oil & Gas Development Company
Limited having its Head Office situated at OGDCL House, Jinnah Avenue, Blue Area, Islamabad
(hereinafter referred to as “OGDCL”, which expression where the context admits shall include and mean
its successors in interest and assigns) of the FIRST PART and
_____________________________________________ having its offices at
________________________________________________________ (hereinafter referred to as “Supplier”,
which expression wherever the context admits shall include and mean its successors in interest and
assigns) of SECOND PART.
WHEREAS OGDCL intends to procure Design, Fabrication, Supply & Commissioning of Amine Sweetening
Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System) for Jhal Magsi
Development Project
WHEREAS the Supplier after reviewing and understanding the complete description of required Design,
Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas
Flare System and D-min Water System) for Jhal Magsi Development Project has submitted the Bid for
Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid
Gas Flare System and D-min Water System).
WHEREAS OGDCL has accepted the Supplier’s Bid and agreed to purchase the Design, Fabrication, Supply
and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min
Water System) for the Project from the Supplier.
1.0 CONTRACT
In this Contract words and expressions shall have the same meanings as are respectively assigned
to them in the Conditions of Contract.
The following contract documents including this Contract their Attachments, Annexures,
Appendices and Addendums shall be deemed to form and be read and construed as part of this
Contract:
• To the extent of any conflict between this Contract and the contract documents including
Annexures, Appendices and Addendums, the Contract shall prevail.
• To the extent of any conflict between the Conditions of Contract and Technical
Specifications given in the Scope & Specifications, the later shall prevail; similarly
drawing/data sheets shall have precedence over technical specifications.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-IV (Form of Contract)
Sheet 3 of 3
The object of the Contract is the performance of all the Works by the Contractor on a fixed price
basis so as to result in Provisional Acceptance of the Plant capable of achieving Guaranteed
Performance, within the Time for Completion, in strict accordance with all the requirements of the
Contract and the Contractor acknowledges, agrees and undertakes that the performance of its
obligations under the Contract would result in the achievement of the object of the Contract.
This Contract shall become effective upon the date after formal execution of the Contract by the
duly authorized representatives of OGDCL and Contractor provided that all of the following
conditions have been fulfilled:
The Contractor and OGDCL agree that this Contract, including all the documents incorporated by
reference earlier express all of the covenants and agreements of the parties and that this Contract
integrates, combines and supersedes all earlier negotiations and “Understanding” whether written or
verbal. It is also understood that no modification or alteration of this Contract shall be valid or
binding on either party, unless agreed in writing by both the parties.
IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed by their duly
authorized representatives and their respective corporate seals to be affixed as of the day first above
mentioned.
By: By:
Title: Title:
Witness: Witness:
1. 1.
(Name) (Name)
2. 2.
(Name) (Name)
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
V – CONDITIONS OF CONTRACT
Section-V (Conditions of Contract)
Sheet 2 of 14
TABLE OF CONTENTS
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 3 of 14
1.0 DEFINITIONS
1.1 Terms
c) “Applicable Law” means the law and any other instruments having the force of law in the
Islamic Republic of Pakistan, as they may be issued and in force from time to time.
d) “Contract” means the Agreement entered into between OGDCL and the Supplier, as recorded in
the Contract Form signed by both parties, including all attachments and appendices thereto
and all documents incorporated by reference therein.
e) “Contract Price” means the price payable to the Supplier under the Contract for the full and
proper performance of its contractual obligations.
f) “FOB” have the meaning assigned to them in the International Rules for the interpretation of
Trade Terms (INCOTERMS 2010).
g) “CFR (C&F)” have the meaning assigned to them in the International Rules for the
interpretation of Trade Terms (INCOTERMS 2010).
h) “Foreign Currency” means any currency other than the currency of the Government of Islamic
Republic of Pakistan.
i) “Goods or Equipment/Material” means all equipment and materials i.e. Amine Sweetening Unit
(Complete Amine unit with Acid Gas Flare System and D-min Water System) including their
spare parts, which the Supplier is required to supply to OGDCL under the Contract.
k) “Local Currency” means the currency of the Government of the Islamic Republic of Pakistan.
l) “Supplier” means the individual, firm or corporation design, fabrication, supply and
commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and
D-min Water System)
m) “Specifications” means the technical information on the materials, i.e. Amine Sweetening Unit
(Complete Amine unit with Acid Gas Flare System and D-min Water System) given in Scope of
work and Tender Document.
n) “Site” means the place where the material and equipment purchased under the Contract will
be installed and is located within the premises of OGDCL’s Jhal Magsi Gas Field.
o) “Warranty Period” means the period of twelve (12) month from the date of commissioning of
Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water
System) or twenty four (24) months from the date of shipment, whichever occurs first.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 4 of 14
2.0 APPLICATION
2.1 These Conditions shall apply to the extent that they are not superseded by provisions in other parts of
the Contract.
3.0 STANDARDS
3.1 The materials supplied under this Contract shall conform to the Standards mentioned in the Scope and
Specifications. In each case where reference is made to any specific National or International
Standards, other recognized and authoritative Standards ensuring equal or higher quality will also be
acceptable. In case your offer conforms to Standards other than stipulated in the Scope and
Specifications you are required to submit alongwith your bid one copy of the Standards in English
Language and evidence that Standard used is a recognized and authoritative Standard, which ensures
equal or higher quality. Your bid shall be declared non-responsive and rejected if you do not submit
required evidence and a copy of such Standards in English Language with your bid and it is subject to
acceptance by OGDCL / Engineering Consultant. In case where metric or foot-pounds-second (F.P.S.)
system is specified only those Standards will be considered.
4.1 The Supplier shall not, without OGDCL's prior written consent, disclose the Contract, or any provision
thereof, or any specification, plan, drawing, sample or information furnished by or on behalf of
OGDCL in connection therewith, to any person other than a person employed by the Supplier in the
performance of the Contract. Disclosure to any such employed person shall be made in confidence
and shall extend only so far as may be necessary for purposes of such performance.
4.2 The Supplier shall not, without OGDCL's prior written consent, make use of any document or
information enumerated in Clause 4.1 except for purposes of performing the Contract.
4.3 Any documents, other than the Contract itself, enumerated in Clause 4.1 shall remain the property of
OGDCL and shall be returned (all copies) to OGDCL on completion of Supplier's performance under the
Contract, if so required by OGDCL.
5.1 The Supplier shall indemnify and hold OGDCL harmless against all actions, claims, demands, costs,
charges, damages and expenses arising from or incurred by reason of any infringement of patent,
trade mark or industrial design rights arising from use of the material or any part thereof.
6.1 The Supplier shall carryout all inspection, examinations and tests and provide certification as per
requirements stipulated in the Contract Documents, industry’s practice and instructions of
OGDCL/Engineering Consultant
6.2 OGDCL/Engineering Consultant will participate in tests conducted at manufacturers works and pre-
shipment inspection of the equipment and material. For test and inspection conducted on the
premises of the manufacturer’s works all reasonable facilities and assistance (including access to
drawings and production data) shall be furnished to the inspectors at no charge to OGDCL. The
participation/presence for acceptance of such test by OGDCL/Engineering Consultant shall not relieve
the Supplier from its obligations liabilities under the Contract.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 5 of 14
6.3 Should any inspected or tested equipment, material fails to conform to the Specifications, the
OGDCL/Engineering Consultant may reject them and the Supplier shall either replace the rejected
equipment/material and installation work or make all alterations necessary to meet specification
requirements free of cost to OGDCL.
6.4 OGDCL/Engineering Consultant right to inspect and where necessary, reject the equipment, material
shall in no way be limited or waived by reason of the equipment, material and installation work
having previously been inspected, tested and passed by the OGDCL/Engineering Consultant or its
representative.
6.5 Nothing in Clause 6.0 shall in any way release the Supplier from any warranty, obligations or liabilities
under this Contract.
7.1 OGDCL has the option to take delivery of the equipment either on the basis FOB port of shipment or
CFR Karachi (INCOTERMS 2010). (Applicable for Foreign Bidders)
7.2 OGDCL has the option to take delivery of the equipment either on the basis Ex-works or at Site.
(Applicable for Local Bidders)
7.3 Delivery shall be deemed to have been made when the equipment and material has been shipped or
arrived at Karachi Port/at Site (whichever is the case) and all documentation specified in 7.5 have
been submitted to OGDCL.
7.4 The timely delivery shall be the essence of the Contract, as OGDCL has to meet its obligations for
completion of the Project. Accordingly, the Supplier is required to complete the Design, Fabrication,
Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare
System and D-min Water System) within seven (07) months from the date of letter of credit
established by OGDCL. The supervision of installation/erection and pre-commissioning and
commissioning services will be provided by the Supplier as per OGDCL’s schedule and requirements.
The supervision of installation/erection and commissioning of Amine Sweetening Unit (Complete
Amine unit with Acid Gas Flare System and D-min Water System) is required to be completed with in
30 days from the date of arrival of the Package at site.
7.5 Immediately after shipment, the Supplier shall send to OGDCL by courier, the following copies of
shipping documents:
7.6 The above documents should be received by Manager (Foreign) Procurement at the latest ten (10)
days before arrival of the equipment/materials at the Karachi Port and if not so received, the
Supplier will be responsible for any expenses resulting from any delay in customs clearance caused
thereby and extension of the period of insurance coverage by corresponding period of delay
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 6 of 14
8.0 INSURANCE
8.1 Insurance from port of shipping/delivery will be covered by openers and declaration shall be made by
the beneficiary to Insurance Company i.e. M/s National Insurance Corporation NIC Building, Abbasi
Shaheed Road. off Shahrah-e-Faisal Road, Karachi (Pakistan) , Fax : 0092-21-9202734 and Dy. Chief
Accountant (Imports),OGDCL, Islamabad, Fax No. 0092-51-9209803-07, immediately after shipment
giving full details of shipment as follows;
i) Contract number
ii) Insurance cover note number and date
iii) Quantity
iv) Description of equipment/material and value
v) Name of the vessel
vi) Bill of lading number and date
vii) Port of loading
viii) Date of shipment
ix) Expected date of arrival at Karachi Port
8.2 The equipment/material supplied under the Contract shall be fully insured for transportation from
Suppliers works to Jhal Magsi Site. (Applicable for local bidder)
9.0 TRANSPORTATION
9.1 Where the Supplier is required under the Contract to deliver the Amine Unit on FOB basis, transport
of the equipment, upto and including the point of putting the equipment on board of the vessel at the
specified port of loading, shall be arranged and paid for by the Supplier, and the cost thereof shall be
included in the Contract Price.
9.2 Where the Supplier is required under the Contract to deliver Amine Unit on CFR basis, transport of the
Amine Unit to Karachi (Pakistan) shall be arranged and paid for by the Supplier, and the cost thereof
shall be included in the Contract Price.
9.3 Supplier is required under the Contract to deliver the equipment/material at Jhal Magsi Site. The
transportation and Insurance cost shall be specified in the Contract and shall be arranged and paid for
by the Supplier. (Applicable for local bidder)
9.4 The transportation shall be made by the Supplier in accordance with the terms specified by OGDCL in
its Scope of Work and Specifications.
9.5 No shipment shall be made without the prior authorization of OGDCL. Any unauthorized shipment will
either be returned without prior notice or stored by OGDCL at the Supplier's expense and risk.
The Supplier shall submit to OGDCL one (1) week before shipment:
– A list of packages which by virtue of their nature, size or weight may give rise to difficulties in
transport or handling.
– The probable time table of shipment in accordance with the schedule so that deliveries are
made in the most convenient order for Site Work.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 7 of 14
11.0 WARRANTY
11.1 The Supplier warrants to OGDCL that the supplied equipment under this Contract shall be brand new,
designed, manufactured/fabricated as per requirements and fit for the intended purpose. The
supplied equipment shall have no defect arising from design, materials or workmanship or from any
act or omission of the Supplier that may develop under normal use of the supplied equipment under
the conditions prevailing at the project site.
11.2 The foregoing warranty shall be remain valid for a period of twelve (12) months from the date of
completion of Performance Test of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare
System and D-min Water System) or Twenty Four (24) months from the date of shipment, whichever
occurs first.
11.3 If the supplied equipment fails to meet the warranty conditions set forth in Clause 11.1 OGDCL shall
promptly notify the Supplier in writing about the defects and claims under the warranty. Upon receipt
of such notice the Supplier shall within the time specified by OGDCL repair/ replace the defective
material and or portion of works, with no cost or expense to OGDCL. The repaired or replaced
material or works shall be warranted by Supplier for further twelve (12) months from the date of
repair(s) or replacement(s).
If the Supplier having been notified, fails to remedy the defect(s) within the specified time, OGDCL
shall proceed to take remedial actions as may be necessary, at the Supplier’s risk and cost. All costs
thereof shall be charged to the Supplier or recovered from performance bond. The Supplier shall have
no objection to the above and hereby acknowledges the rights of OGDCL to recover such sums as a
debt due to OGDCL from defaulting Supplier. It is understood that in this case the Supplier shall not
be relieved from the provided warranties and contractual obligations.
11.4 The Supplier shall also provide back-up guarantee of respective original manufacturer of equipment.
12.0 PRICE
Price charged by the Supplier for equipment/material delivered under the Contract shall not vary
from the prices quoted by the Supplier in his bid.
In consideration of the due performance of the obligations of the Supplier under the Contract, OGDCL
shall pay the Supplier an amount of US$_____________ or Pak Rupees_____________for Design,
Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas
Flare System and D-min Water System) as per Scope & Specifications.
The above price of the Contract covers the total payment for Supplier’s obligations under the
Contract.
This price shall be firm lumpsum price and not subject to any escalation or alteration regardless of
any circumstances whatsoever even unforeseeable at present. The price shall include duties, taxes
and levies payable on equipment, machinery and other items and services being supplied/provided
under the Contract in country of origin/ exporting country and the Supplier will assume full and
exclusive liability on this account.
OGDCL shall provide boarding/lodging and transport to supplier’s representatives, visiting the Jhal
Magsi Project Site for providing Commissioning and expert specialized services. The boarding/lodging
will be provided at Jhal Magsi Project Site. The transport will be provided at site from and to nearest
civil airport.
The withholding tax deductions shall be made as per prevailing laws/ regulations.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 8 of 14
13.0 PAYMENT
13.1 The payment of the Contract Price shall be made by OGDCL through two separate irrevocable letters
of credit (L/C) i.e. First for Supply of equipment and Second for Services. The Letter of Credits to be
established in accordance with the requirements of State Bank of Pakistan, Custom authorities and
other government organizations in Pakistan and direct bank transfer. The terms and conditions of L/C
is given in Attachment-I.
The Bank charges for establishment of L/C, additional confirmation and any subsequent amendments
in L/C will be borne as follows:
a) All charges of the Bank for letter of credit opening will be borne by OGDCL.
b) All charges of the Corresponding Bank such as negotiation of documents, adding confirmation to
credit etc. will be to the account of beneficiary/Supplier.
c) All Bank charges for any amendment/extension in L/C or revalidation of L/C if required
extension will be to the account of Supplier.
A) Supply of Equipment
First irrevocable Letter of Credit (L/C) in currency of Contract shall be established in favour of
Supplier through a Pakistani bank and with Supplier’s correspondent bank for the contract price of
supply of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min
Water System) including spares and optional items. The L/C shall be valid for a period of twelve
(12) months. The payments terms of L/C are as follows:
– Ten (10) percent of the Contract Price for Supply of Amine Sweetening Unit (Complete Amine
unit with Acid Gas Flare System and D-min Water System) including Spares and optional items
shall be paid by OGDCL to Supplier as down (advance) payment against a Bank Guarantee of
equivalent amount as per format given in Attachment-II issued by a Scheduled Pakistani Bank
or International Bank operating in Pakistan acceptable to OGDCL. The down (advance) payment
shall be effected on submission of Supplier’s down (advance) payment original invoice duly
verified by OGDCL
This Bank Guarantee shall be valid upto the successful Commissioning of Amine Sweetening
Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System) and issuance
of Provisional Acceptance Certificate.
– Ten (10) percent of Contract Price for Supply of Amine Sweetening Unit (Complete Amine unit
with Acid Gas Flare System and D-min Water System) including Spares and optional items shall
be paid by OGDCL after design review meetings and Hazop study on submission of agreed
Minutes of Meetings (MOM) and Hazop study reports.
– Fifty Five (55) percent of Contract Price for Supply of Amine Sweetening Unit (Complete Amine
unit with Acid Gas Flare System and D-min Water System) including Spares and optional items
shall be paid by OGDCL on shipment of the complete equipment/package.
The payment under the L/C shall be effected upon submission of following documents upon
each shipment of equipment/package component:
i) Clean board ocean vessel bills of lading. (applicable for foreign bidder)
ii) Full set of clean Truck receipt (applicable for local bidder)
iii) Original detailed invoice showing equipment/package description, quantity unit price
and total price strictly in line with the Contract.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 9 of 14
– Ten (10) percent of the Contract Price for Supply of Amine Sweetening Unit (Complete Amine
unit with Acid Gas Flare System and D-min Water System) including Spares and optional items
shall be released under the L/C upon delivery of Complete Packages at Karachi Port,
Pakistan (applicable for foreign bidder) or at Jhal Magsi Site (Applicable for local bidder) and
on submission of Supplier’s original invoice with delivery challan accompanied by OGDCL
certificate that the complete equipment/package has been delivered at Karachi Port,
Pakistan (applicable for foreign bidder) or at Jhal Magsi Site (Applicable for local bidder).
– Fifteen (15) percent of the Contract Price for Supply of Amine Sweetening Unit (Complete
Amine unit with Acid Gas Flare System and D-min Water System) including Spares and
optional items shall be released after thirty (30) days of successful commissioning of Amine
Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
and issuance of Provisional Acceptance Certificate by OGDCL and submission of Supplier’s
original invoice verified by OGDCL and accompanied by OGDCL’s Acceptance Certificate.
B) Services
Second irrevocable Letter of Credit (L/C) in currency of Contract shall be established in favour of
Supplier through a Pakistani bank and with Supplier’s correspondent bank for the contract price of
providing Services. The payments terms of L/C are as follows:
Training at Site
The lumpsum charges for training after completion of training shall be paid by OGDCL against
Supplier’s invoice duly verified by OGDCL.
Supplier’s request(s) for payment shall be made to OGDCL in writing accompanied by an invoice
describing, as appropriate, the equipment delivered and services performed, and by shipping
documents, submitted pursuant to relevant clauses and upon fulfillment of other obligations
stipulated in the Contract.
14.1 OGDCL will not pay any commission to any Bidder or his local agent against this tender and/or
resulting Contract in local or foreign currency whatsoever.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 10 of 14
15.0 AMENDMENTS
15.1 No variation in or modification of the terms of the Contract shall be made except by written
amendment signed by the parties.
16.0 ASSIGNMENT
16.1 The Supplier shall not assign, in whole or in part, its obligations to perform under the Contract,
except with prior written consent of OGDCL.
17.1 Delivery of the Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min
Water System) shall be made by the Supplier in accordance with the time schedule specified in the
Conditions of Contract.
17.2 An unjustified prolonged delay by the Supplier in the performance of his delivery obligations shall
render the Contract liable to any or all of the following sanctions:
17.3 If at any time during the performance of the Contract the Supplier should encounter conditions
impeding timely delivery of the Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare
System and D-min Water System) and performance of the Services, the Supplier shall promptly notify
the OGDCL in writing of the fact of the delay, its likely duration and its cause(s). As soon as
practicable after receipt of the notice from the Supplier, the OGDCL shall evaluate the situation and
may at its discretion extend the Supplier's time for performance, in which case the extension shall be
ratified by the parties by amendment of the Contract.
18.1 Subject to Clause 20.0 of these Conditions of Contract, If the supplier fails to deliver any or all of the
goods within the delivery schedule, OGDCL without prejudice to other remedies under Contract,
deduct from the due payment from (L/C) or Performance Bond as liquidated damages, a sum
equivalent to 1.0 percent of the Contract value per week or part there of for first two weeks. 1.5
percent per week for next two weeks and 2.5 percent per week exceeding five weeks up to maximum
extent of 10 percent of Contract value. In addition to above if contracted goods are not received in
accordance with the contractual delivery schedule and emergency material/stock have to be
procured from the alternate sources at short notice, the supplier shall be bound to pay OGDCL, the
entailing expenditure accrued as such. Further penalty shall be imposed for late delivery as provided
in the contract/work order.
19.1 OGDCL may, without prejudice to any other remedy for breach of Contract, by written notice of
default sent to the Supplier, terminate this Contract in whole or in part provided that:
a) The Supplier fails to deliver equipment within the time periods(s) specified in the Contract, or
any extension thereof granted by OGDCL; or
b) The Supplier fails to perform any other obligations(s) under the Contract, and provided that the
Supplier in either of the above cases does not remedy his failure within a period of ten days
after receipt of the default notice.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 11 of 14
19.2 In the event, OGDCL terminates the Contract in whole or in part pursuant to Clause 19.1, OGDCL may
procure, upon such terms and in such manner, as he deems appropriate, material similar to those
undelivered, and the Supplier shall be liable to any excess cost for such similar material, which may
be deducted from his Bank Guarantee.
This Contract is subject to force majeure. Force majeure are contingencies caused by neither of the
parties and which are enforceable at the time of concluding this Contract and are uncontrollable and
render further performance of contractual obligations impossible or impracticable. This includes acts
of God, acts of war, acts of Government, blockades, revolutions, strikes, civil disturbances, riots,
floods, power breakdown but is not limited thereto.
Upon the occurrence of such contingency, the party suffering there from, shall immediately but in no
case later than seven (7) days from the occurrence of such contingency, give the other party notice in
writing of the happening of such event. Such notice shall be accompanied by relevant proof thereof.
Neither party shall be deemed to be in default of its contractual obligations if performance thereof is
prevented by force majeure and the time limits, if any, laid down for the performance of such
obligation shall accordingly be extended by a period equal to that during which the force majeure
contingencies remain in force.
If the force majeure contingencies continuously last for seven (7) days, both parties will discuss
necessary arrangements for further implementation of the Contract and either party shall be entitled
to terminate this Contract by giving seven (7) days written notice to the other. Such termination shall
be without prejudice to the respective rights and obligations for the parties which arise prior to
termination. In case of termination of the Contract OGDCL or Supplier shall present a detailed
account of their respective claims which shall be settled by negotiations. If no settlement is reached
by negotiations, the matter shall be referred to Arbitration.
21.1 OGDCL may at any time terminate this Contract by giving written notice to the Supplier, without
compensation to the Supplier, if the Supplier becomes bankrupt or otherwise insolvent, provided that
such termination shall not prejudice or affect any right of action or remedy which has accrued or will
accrue thereafter to the OGDCL
22.1 OGDCL may, by written notice to the Supplier, terminate the Contract, in whole or in part, at any
time at its convenience. The action of termination shall specify that the termination is for the
convenience of the OGDCL, the extent to which performance of work under the Contract is
terminated, and the date upon which such termination becomes effective.
22.2 The equipment that are complete and ready for shipment within 30 days after receipt of notice of
termination by the Supplier, shall be purchased by the OGDCL at the Contract terms and prices. For
the remaining equipment the OGDCL may elect:
i) to have any portion completed and delivered at the Contract terms and prices; and/or
ii) to cancel the remainder and pay to the Supplier an agreed amount for partially completed
equipment and for materials and parts previously procured by the Supplier.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 12 of 14
23.1 If any difference or dispute arises out of or in connection with the Contract the OGDCL and the
Supplier shall make every effort to resolve amicably by direct informal negotiations.
23.2 If, after thirty (30) days from the commencement of such informal negotiations, the OGDCL and the
Supplier have been unable to resolve amicably a Contract dispute, the dispute may be referred to
Arbitration of two arbitrators, one arbitrator to be appointed by each party. In case of disagreement
between the arbitrators, the matter shall be referred to an Umpire to be appointed by the arbitrators
prior to their entering upon the reference. The Umpire shall be a retired judge of High Court or the
Supreme Court of Pakistan. The venue of arbitrator shall be Islamabad, Pakistan. Such Arbitrators and
Umpire shall together proceed to adjudicate the dispute in accordance with the Pakistan Arbitration
Act, 1940, as amended from time to time. The award shall be final and binding on the parties.
23.3 The Contract shall be governed by Pakistani Law and the arbitration language shall be English.
23.4 The Supplier shall not suspend the performance of its responsibilities and obligations under the
Contract unless authorized by the OGDCL in writing to do so.
24.1 The Contract shall be written in English language. All the communications and notifications between
the OGDCL and the Supplier as well as all documents, drawings, instructions, manuals and any other
writings, which are exchanged between the parties shall be written in English language.
25.1 Within ten (10) days of the receipt of notification of intent to award the Contract from OGDCL, the
successful Bidder shall furnish a Performance Bond in the Form of Bank Guarantee for an amount of
ten (10) percent of the Contract Price in US Dollars (for foreign bidder) or in Pak Rupees (for local
bidder).
25.2 As a guarantee for the faithful performance of the obligations under the Contract, the Supplier shall
establish such Guarantee in favor of OGDCL as per Contract Documents.
25.3 The said Guarantee and the terms of the said security shall be in accordance with format given in
Annexure-XIII. The procurement of such guarantee and the cost of the security to be so entered into
shall be at the expense of the Supplier.
25.4 The proceeds of the Performance Bond/Guarantee shall be payable to OGDCL as compensation for any
loss resulting from the Supplier’s failure to fulfill its obligations under the Contract (including
warranty/performance guarantee).
25.5 The Performance Bond/Guarantee shall be released to the Supplier after twelve (12) months from the
date of completion of Performance Test of Amine Unit or Twenty Four (24) months from the date of
shipment, which ever occurs first provided that the Supplier has performed and fulfilled
warranty/obligations in pursuance of the Conditions of the Contract, to the entire satisfaction of
OGDCL. If Supplier is unable to meet its obligations the Performance Bond/Guarantee will be
extended or encashed as per OGDCL’s discretion.
26.1 The Supplier shall guarantee that the Amine Sweetening Unit (Complete Amine unit with Acid Gas
Flare System and D-min Water System) being supplied is of sufficient size capacity and proper
material to fulfill satisfactorily operating conditions specified in the datasheets/specifications.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 13 of 14
26.4 A Performance Test will be conducted on mutually agreed dates after commissioning to establish
Performance as per requirements indicated in data sheets. After completion of Performance Test the
OGDCL will issue a Provisional Acceptance Certificate (PAC). The Performance Test shall be
performed within 60 days from the start-up of Amine Sweetening Unit (Complete Amine unit with Acid
Gas Flare System and D-min Water System).
26.5 For testing Plant site instrumentation/ equipment will be utilized. If supplier wants any other
procedure then he has to built-in his design and arranges any relevant specialized tool required for
the test.
26.3 If the Amine Sweetening Unit does not achieve performance guarantee requirements, the Supplier
shall take remedial actions at its own cost shall carry out repairs, modifications and replacements to
enable the modified unit to meet the desired level of performance requirements.
26.6 If after all such remedial actions the Amine Sweetening Unit still fail to meet performance guarantee
requirements during three (3) months period the Supplier shall pay to OGDCL as Liquidated Damages
and not as a penalty an amount equal to two (02) percent of the contract price for each one (1) PPM
increase of H2S in Sweet Gas against guaranteed figure of 4 PPM.
27.0 NOTICES
27.1 Any notice given by one party to the other pursuant to the Contract shall be given in writing or by fax
and confirmed in writing to the address specified in 27.3.
27.2 A notice shall be effective when delivered or on the notice's effective date, whichever is later.
27.3 For the purpose of all notices, the following shall be address of the OGDCL and Supplier:
28.1 Any taxes, duties, fees, levies and other relevant charges, present or future, assessed or payable
outside Pakistan by the Supplier for equipment and material being supplied and/or by the expatriate
personnel deputed by the Supplier in connection with the services performed under the Contract shall
be the exclusive responsibility of the Supplier. (applicable for foreign bidder)
28.2 Any taxes, duties, fees, levies and other relevant charges, present or future, assessed or payable
inside Pakistan by the Supplier for equipment and material being supplied and/or by the expatriate
personnel deputed by the Supplier in connection with the services performed under the Contract shall
be the exclusive responsibility of the Supplier. (applicable for local bidder)
28.3 The Supplier shall be responsible and pay all taxes on its income outside Pakistan under the Contract
and under the laws of Pakistan.
28.4 The Supplier shall also be responsible for any income taxes levied on the, Supplier’s expatriate
personnel, under the laws of Pakistan and for all social security issuances and other contributions for
the Supplier’s expatriate personnel regardless of whether such contributions are levied on employer
or employee or both in Pakistan.
28.5 The Supplier shall indemnity OGDCL against any claim, which might occur due to noncompliance by
Contract of any legal obligation regarding the taxes, duties, fees, levies, or other charges, including
any other payments to the Government or Governmental Agencies.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Section-V (Conditions of Contract)
Sheet 14 of 14
30.1 OGDCL may at any time, by a written order given to Supplier make changes within the scope of the
Contract in any one or more of the following:
30.2 If any such change causes an increase or decrease in the cost of, or the time required for Supplier’s
performance of any part of the Contract, an equitable adjustment (to be mutually agreed) shall be
made in the Contract Price or Project Completion Schedule, or both, and the Contract shall
accordingly be amended. Any claims by Supplier for adjustment under this Clause must be asserted
within 30 days from the date of Change Orders.
The Contract shall be interpreted in accordance with the law applicable in the Islamic Republic of
Pakistan.
Jhal Magsi Development Project – Design, Fabrication, Supply and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min Water System)
Conditions of Contract
Page 1 of 4
ATTACHMENT-I
1. CONSIGNEE
The material must be consigned to Chief Stores Officer. Oil & Gas Development Company Limited,
Plot No.21, West Wharf Road, Karachi. Telephone No. 021-2313119-23. Fax No. 021-2311040.
2. PACKING
The Packing of the material must conform to the International Standards.
3. MARKING
3.1 All Packages/Boxes must bear the Purchase Order No. as shipping Marks, Country of Origin and
Weight in Kilograms (Gross/Net). The marks must tally with shipping documents like B/L and
manifest there should not be any difference.
3.2 In addition to the above mentioned shipping marks, the following procedure of color code
marking to be adopted / made on each side of the package/box/container while dispatching the
material:-
“There will be an isosceles triangle with or less than six inches side, triangle and letters will be in
black. On bid packages/boxes/container, the sides or triangle and letters will be increased
appropriately. Underneath the triangle there will be two color code bars in “GREEN” color size
1/2
six inches in light and 1 ” in width. If the above color codes marking is not
appropriate/suitable, the sizes and color may be changed”
4. SHIPPING DOCUMENTS
Shipping documents shall normally consist of the following:
4.2 Detailed invoice showing commodity description, quantity, unit/total price, total No. of
packages, etc. etc containing original signatures.
4.3 Packing List, (Showing total number of packages, gross/net weights & measurement and Box
No. in case of more than one boxes such as Box No. 1/10, 2/10......... 10/10 and so on and
details of material in each box.
4.6 Mill Inspection/quality certificate/test report showing analysis (in case of chemical only).
4.7 Certificate of compliance certifying that the materials supplied conform to the Contract
specification and are brand new.
4.8 Certificate of compliance of the credit terms as per Clause 2 (above) in respect of Packing.
4.9 Insurance declaration. A copy of the Fax sent to Insurance Co. in compliance to Clause 9.
4.12 Certificate from 3rd party inspector issued by any one of the following:
1. Lloyds.
2. SGS
3. Moody International
4. Velosi
a) Complete, first and last consignment (if all the contractual material is shipped in one
lot).
b) First partial Shipment/Second partial shipment (and so on) Final and last shipment as
the case may be if shipments are effected in parts.
5.2 All invoices should be signed, and must indicate value of the each item total value & also
show 'SHIPPING MARKS' as provided in the contract.
6. SHIPMENT INTIMATION
5.1 The beneficiary within 24-48 hours of making shipment must send Fax to:
i. Chief Stores Officer, Plot No. 21 West Wharf, Karachi. Fax No. 021-2311040.
ii. Manager (Procurement)-Foreign, OGDCL House Plot NO. 3 (New No. 3013) F-6/G6, Blue
Area, Jinnah Avenue, Islamabad, Fax No. 0092- 51-9209803-7 intimating them the
following;
a) The beneficiary immediately upon making shipments(s) should negotiate the original
clean shipping documents free from any discrepancy with negotiating bank as indicated
in the L/C.
b) If clean documents free from discrepancy are not negotiated within negotiation period
mentioned in the L/C. or if the documents are withheld by the Bank on account of any
discrepancy whatsoever the demurrage or financial impact if any incurred due to late
negotiation of clean documents will be on beneficiary's account.
c) Original/negotiable documents must contain at least four sets of the shipping documents
mentioned under Clause No. 5 above including one set of the parts catalogue, brochures,
technical literature, etc., invariably.
d) The original shipping documents should be dispatched through courier service by the
negotiating bank at the beneficiary's cost within 24-48 hours after receipt from the
beneficial.
e) The discrepant documents with minor discrepancies will be accepted subject to the
consent of Procurement Department to facilitate prompt clearance of the consignment
on the condition that demurrage, if any. Due to the discrepancies reported by L/C
opening bank will be on beneficiary account.
Six complete sets of non-negotiable shipping documents including one set of parts
catalogue brochures/technical literature etc. should be received by the following
immediately upon shipment is effected:
Two complete sets of non-negotiable shipping documents along with one set of parts
catalogue brochure/technical literature etc. should be received by the following
immediately upon shipment is effected:
The shipping documents should be couriered through any good reliable courier
company at shippers cost so that the same must be received at least 10 days before
arrival of the vessel.
8. INSURANCE
Insurance from port of shipping/delivery will be covered by openers and declaration shall be made by
the beneficiary to Insurance Company i.e. M/s National Insurance Corporation NIC Building, Abbasi
Shaheed Road. off Shahrah-e-Faisal Road, Karachi (Pakistan) , Fax 0092-21-99-202734 and Chief
Accountant (Imports),OGDCL, Islamabad, Fax No. 0092-51-9209803-07, immediately after shipment
giving full details of shipment e.g. value of shipment description of material, name of vessel. B/L No.
with date, port of shipment, contract and Letter of Credit Numbers.
9.1 If clean documents are not negotiated within negotiation period of the L/C or documents are
withheld by bank on account of any discrepancy, the demurrage charges- if any incurred due
to late negotiation of the clean documents and paid by the OGDCL will be realized from the
beneficiary directly by raising debit advice, or by deducting the amount paid from the L/C
value or by encashing Performance Bond (if provided) to the extent of demurrage amount. In
case the demurrage amount exceeds the value of Performance Bond the balance amount will
be payable by the beneficiary.
9.2 Transshipment is totally prohibited under this L/C. The beneficiary must ensure that no
transshipment takes place against this L/C. any demurrage paid by OGDCL due to
transshipment will be on beneficiary's account.
9.3 Any demurrage paid by OGDCL due to inconsistency in B/L and manifest will be recovered
from beneficiary.
week or part there of for first two weeks. 1.5 percent per week for next three weeks and 2.5 percent
per week exceeding five weeks up to maximum extent of 10 percent of Contract value. In addition to
above if contracted goods are not received in accordance with the contractual delivery schedule and
emergency material/stock have to be procured from the alternate sources at short notice, the
supplier shall be bound to pay OGDCL, the entailing expenditure accrued as such. Further penalty
shall be imposed for late delivery as provided in the contract/work order.
13.1 All Charges of the bank for credit opening will be borne by the OGDCL.
13.2 All charges of corresponding bank such as negotiation of documents, adding confirmation to
credit etc. will be to the account of beneficiary.
13.3 All charges for amendments/extension in L/C will be to the account of beneficiary.
ATTACHMENT-II
Since you have awarded M/s (Name and address of Contractor) hereinafter called “The Contractor” Contract
No. _________________ dated __________ hereinafter called “The Contract” for Design, Fabrication, Supply
and Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min
Water System) for Jhal Magsi Development Project.
AND WHEREAS you have agreed to pay to the Contractor an Advance (Down) Payment of US$.____________ or
in Pak Rs. ________ against a bank guarantee for safeguarding the earlier mentioned Advance (Down)
payment.
AND WHEREAS we ______ (the Guarantor) hereby irrevocably and unconditionally guarantee the payment to
you of US$ ___________ equivalent Pak Rs. ________ representing the amount of the Advance (Down) Payment
and accordingly covenant and agree as follows:
a) Upon your first and simple demand in writing We (the Guarantor) shall immediately and forthwith pay
you the amount of guarantee without any recourse to Contractor/account party or any other party and
without any question, contestation, deferment and asking for any statement of default, reason or
justification.
b) Any payment made hereunder shall be made free and clear of, and without deduction for or on account
of, any present or future taxes, levies, imposts, duties, charges, fees, deductions or withholdings of any
nature whatsoever and by whomsoever imposed.
c) The covenants herein contained constitute unconditional and irrevocable, independent and direct
obligations of the Guarantor. No alteration in the terms of the Contract or in the extent or nature of the
work to be performed thereunder and no allowance of time by you or other forbearance or concession
or any other act or omission by you which but for this provision might exonerate or discharge the
Guarantor shall in any way release the Guarantor from any liability hereunder.
d) This Guarantee shall remain valid and in full force till successful Design, Fabrication, Supply and
Commissioning of Amine Sweetening Unit (Complete Amine unit with Acid Gas Flare System and D-min
Water System) and issuance of Acceptance Certificate or issue of statement of discharge by your
authorized representative or return of original guarantee whichever is later.
e) This Guarantee shall be binding on us and our successor in interest.
f) This Guarantee shall be construed in accordance with laws and regulations of Islamic Republic of
Pakistan.
__________________________
GUARANTOR (BANK)
___________________________
Date _______________________
Address _____________________
____________________________