PROJECT STAGE Discipline/Area DELIVERABLES

Pre-FEED Project Engineering Market Research


Evaluate alternatives
Environmental Assessment
FEED Project Engineering Design Basis Memorandum
PFD/Pipeline Schematic
Cost Estimate
Schedule
Pipeline Engineering Hydraulics/pipe sizing
Compression/Pumping requirment study
Routing Study and Selection report
Wall thicnkess calcs/ material selection
Leak detection philosophy
PC/OP Philosophy
Buyonacy calcs and measures
Surge analysis
Detail piping stress analysis
buried pipeline analysis
pipeline specs
Tie-in list
Horizontal/S-Bend Bend list
valve list
Crossings Hydrotechincal Assessment
Crossing List
Drawings Alignment sheets
Crossing Drawings
Crossing calculations, HDD etc
typical detail drawings
Equipment list
Line list
Cathodic Protection CP Study report (by third-party)
Coating selection and report
Procurement Long lead items
line pipe, valves
equipment
Induction Bends
Engineering Work Package
Above Ground Facilities
SOFTWARE/Spreadsheet Key Considerations

HYSIS, PIPECALC
rment study
Google Earth/ KMZ file shortest route, parallel to exisitng road, ROW
CSA spreadsheet

spreadsheet
Stoner,
ceaser 2
ceaser 2

BY Environmnetal Company (ISL etc.) Primary/Secondary e


Typical/Engineered
topo surveys Depth of cover, bends

pipeline toolbox, HDD spreadsheet