CALCULO DE MATERIAL PARA ASSENTAMENTO DE ALVENARIA

PAREDE 384.1

QUANTIDADE DE BLOCO SERAMICO 9218.4 TIJOLOS

ÁREA TOTAL DA PAREDE: 3456.9 LITROS

CONSUMO DE ARGAMASSA 1:6 135 LATAS

26

LATA DE CIMENTO 1 26 LATAS


LATA DE AREIA 6 154 LATAS

QUANTIDADE PRINCIPAL DE CIMENTO/AREAIA

TOTAL DE CIMENTO 13 SACOS


TOTAL DE AREAIA 2.8 M³
CALCULO DE MATERIAL PARA REVESTIMENTO - REBOCO

AREA DE REBOCO: 679.26 M²

VOLUME DE REBOCO 13.5852 M³


M³ x 1000 13585.2 L

VOLUME TOTAL REBOCO X 2 27170.4 L

TRAÇO 1:2:5 144 L

MASEIRA 188.68333

LATA DE CIMENTO 188.68333 LATAS


LATA DECAL 377.36667 LATAS
LATA DE AREIA 943.41667 LATAS

QUANTIDADES PINCIPAIS

TOTAL DE CIMENTO 94 SC
TOTAL DE CAL 377 SC
TOTAL DE AREIA 17 M³
CALCULO DE MATERIAL PARA REVESTIMENTO - REBOCO

AREA DE REBOCO: 84.99 M²

VOLUME DE REBOCO 1.6998 M³


M³ x 1000 1699.8 L

VOLUME TOTAL REBOCO X 2 3399.6 L

TRAÇO 1:2:5 144 L

MASEIRA 23.608333

LATA DE CIMENTO 23.608333 LATAS


LATA DECAL 47.216667 LATAS
LATA DE AREIA 118.04167 LATAS

QUANTIDADES PINCIPAIS

TOTAL DE CIMENTO 12 SC
TOTAL DE CAL 47 SC
TOTAL DE AREIA 2 M³
CALCULO DE MATERIAL PARA CONCRETO - 25MPA

VOLUME DE CONCRETO: 1.50 M³

+40% 2.1 M³
2100 L

TRAÇO1:2:3 108

MASSEIRAS 19

LATA DE CIMENTO (1) 19 LATAS


LATA DE AREAIA (2) 39 LATAS
LATA DE PEDRA (3) 58 LATAS

QUANTIDADES PRINCIPAIS

TOTAL DE CIMENTO 10 SC
TOTAL DE AREIA 1 M³
TOTAL DE PEDRA 1.05 M³
CALCULO DE MATERIAL PARA PISO

AREA DE REBOCO: 66 M²

VOLUME DE REBOCO 3.3 M³


M³ x 1000 3300 L

VOLUME TOTAL REBOCO X 2 6600 L

TRAÇO 1:2:5 144 L

MASEIRA 45.833333

LATA DE CIMENTO 45.833333 LATAS


LATA DECAL 91.666667 LATAS
LATA DE QUEBRADINHO 229.16667 LATAS

QUANTIDADES PINCIPAIS

TOTAL DE CIMENTO 23 SC
TOTAL DE CAL 92 SC
TOTAL DE QUEBRADINHO 4 M³
CALCULO DE MATERIAL PARA REVESTIMENTO - REBOCO

AREA DE REBOCO: 764.23 M²

VOLUME DE REBOCO 3.82115 M³


M³ x 1000 3821.15 L

VOLUME TOTAL REBOCO X 2 7642.3 L

TRAÇO 1:2:5 144 L

MASEIRA 53.071528

LATA DE CIMENTO 53.071528 LATAS


LATA DECAL 106.14306 LATAS
LATA DE AREIA 265.35764 LATAS

QUANTIDADES PINCIPAIS

TOTAL DE CIMENTO 27 SC
TOTAL DE CAL 106 SC
TOTAL DE AREIA 5 M³