Field Investigation
Deep Boring (Incl. setup & moving of Drilling rig)
CPT (Incl. Setup & moving of CPT)
SPT every 2.0 m depth
Undisturbed Soil Sampling, UDS every 5m depth
Borrow Pit Sampling
Soil Resistivity
Core Box
Sample Transportation from Site to Lab
Laboratory Testing
Natural Moisture Content
Unit Weight of Soil
Specific Gravity
Atterberg Limit (LL, PL, PI)
Grain Size Analysis & Hydrometer Test
Unconfine Compression Test
Direct Shear Test
Consolidation Test
Report
Soil Investigation Report, Analysis & Recommendation
Sub Total A
B TOPOGRAPHIC SURVEY
Field Survey
Topographical Survey Execution
Benchmarks Installation
Report
Topographical Report
Sub Total B
C BATHYMETRI SURVEY
Field Survey
Bathymetri Survey Execution
Report
Bathymetri Report
Sub Total C
D HYDROLOGY SURVEY
Preparation
Mob/Demob Equipment & Crew
Local transportation
Accommodation
Hydrology Survey
Tidal
Speed current
Rain water intensity
Report
Hydrology Report
Sub Total D
Total = A + B + C + D
Note: 1. The listed works here should be take as reference (but not limited to).
2. All works (at 2 locations, Tanjung Kramat and Tanjung Selor) shall be execute within 1 month.
3. Proposal validity shall be 6 months (180 DAYS) from submission date.
VOLUME
SPECIFICATION UNIT
T. Kramat
Ls 1.00
Ls 1.00
Ls 1.00
Point 2.00
50m deep; ASTM D 1452, D 2113, D 3550, or SPT >= 50 (3 times) Point 5.00
ASTM D 3441, Pen. rate 2 cm/sec up to 200 kg/cm2 Point 10.00
ASTM D 1586-84 ea 125.00
ASTM D 1587-83 ea 50.00
ea 3.00
ASTM D 1125, G 57 ea 5.00
ea 50.00
Ls 1.00
Ls 1.00
Report: one (1) original and two (2) copies & one (1) CD Softcopy Ls 1.00
Ls 1.00
Ls 1.00
Ls 1.00
Ls 1.00
Ls 1.00
Ls 1.00
limited to).
r) shall be execute within 1 month.
ission date.
VOLUME
T. Selor
1.00
1.00
1.00
2.00
5.00
10.00
125.00
50.00
3.00
5.00
50.00
1.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
1.00
1.00
19,200.00
4.00
1.00
2,500.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00