Professional Documents
Culture Documents
Purpose
Please complete the questions in the scoping questionnaire and choose relevant options suitable for you. Q
from the predefined options list that is based on the service scope. Your responses will be used to define the
answered in the project preparation phase (Start phase) . The questionnaire may be discussed and finalized
Selected options will be implemented in the step "Implement Options" in the Deploy phase.
1. Mandatory
2. Configuration Extension
3. Development
The five project types will utlise one or more of these predefined options.
1. Blueprint Accelerator
Results
Scoping questions and the selected options are documented.
Target Audience
Customer - The scoping questionnaire helps the customer and SAP project team to gain a better understand
SAP Project Team - Gains a better understanding of the prospect's requirements and expectations and gives
s List for Rapid deployment for discrete
Manufacturing Execution V3.61
v2.3 01 Feb 2013
13 SAP AG. All rights reserved
vant options suitable for you. Questions in the scoping questionnaire should help you identify the right options
ponses will be used to define the final solution and complete the configuration. These questions are typically
may be discussed and finalized during one of the workshops (kick-off workshop or select options workshop).
e Deploy phase.
o get different people to complete each section. They can put their names next to the questions they have
ave
ect.
Scoping Questionnaire for Rapid deployment for
with SAP Manufacturing Executio
v2.3 01 Feb 2013
© 2012-2013 SAP AG. All rights reserved
# Question
1 General
2.1 Materials
2.2 BOMs
3 Technical Environment
3.9 Number and type of documents to be managed, such as labels or shop floor travelers
4 Machine Integration
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Scoping Questionnaire for Rapid deployment f
Manufacturing Execu
v2.3 01 Feb 2013
© 2012-2013 SAP AG. All rights r
No: Questions
5.10 Number of operations to maintain standard cycle times (for dashboarding only)
Transactional Information
Choose one… Choose one… Choose one… Choose one… Choose one…
Choose one… Choose one… Choose one… Choose one… Choose one…
Choose one… Choose one… Choose one… Choose one… Choose one…
Choose one… Choose one… Choose one… Choose one… Choose one…
ring with SAP
Response/Comments
Options List for Rapid deployment for discrete manufacturing with SAP
Manufacturing Execution V3.61
V2.3 01 Feb 2013
© 2012-2013 SAP AG. All rights reserved
Blueprint Accelerator X
Production Orders
1.3 Select Order Types (Multiple OK) This is required because...Without this.... <Name>
Repetitive Orders X
Labels
1.4 Select Document Types to Print (Multiple OK) Traveler This is required because...Without this.... <Name>
Pack List X
Vendor X
External Serial
External Lot
Select Activity Hook Point Programs to Use (Multiple
1.8 This is required because...Without this.... <Name>
OK)
Select Activity Hook Point Programs to Use (Multiple
1.8 SFC This is required because...Without this.... <Name>
OK)
INV(entory)
Inventory_SFC
Select Activity Hook Point Programs to Use (Multiple Check Configuration (As-Built)
1.9 This is required because...Without this.... <Name>
OK) Document Printing
Failure X
1.10 Types of Non-Conformance Codes (Multiple OK) Defects This is required because...Without this.... <Name>
Repairs
1.13 Report Usage (Multiple OK) Device History Report This is required because...Without this.... <Name>
NC Log Report
Production Report
Comment Report
Hold Report
SFC Report
2.1 Ability to Log Non-Conformances For configuring Non-Conformances. Yes This is required because... <Name>
2.2 Usage of Scheduling Standards For Production Performance Dashboard Yes Without this.... <Name>
2.3 Usage of Message Board For using the Message Board. Yes Without this.... <Name>
2.4 Notifications of Messages via Email. Will notifications need to be distributed via email? Yes Without this.... <Name>
An operation that is used to stop further
manufacturing processing on a non-conformed or
2.5 Usage of Material Review Board Yes Without this.... <Name>
suspect product until a decision is made on how to
disposition the product.
Page 18