QUANTITY
Item Bases (PTS) Detailed list of settlement elements Unit
Subtotals Total sum
1 2 3 4 5 6
2.6.1 D.02 04 01 01 reinforcement of bedding by adding extra material, m2 241731
mixing and thickening up to the depth of 40cm (acc. to
List 6.1)
TENDER COST ESTIMATE - V.I1 -1 ROAD CONSTRUCTION BRANCH Motorway A1 with junctions
Unit
Basis Unit Value
Item Detailed list of settlement elements price
(PTS)
Name Quantity PLN PLN
1 2 3 4 5 6 7
2 6 1 D.02.04 01.01 reinforcement of bedding by adding extra m 241.731
material, mixing and thickening up to the depth
of40cm
Question 591 (set 12.5)
Tender Cost Estimate - V.1.1-1 Road construction branch: Motorway A1 with junctions, item 10.1.1.
Please specify the thickness of exit pavements.
Answer 591
The thickness of individual layers for each exit is specified in STWiOR D. 10.07.01 and in drawings. The Ordering
Party cahnged STWiOR D.10.07.01 and TENDER COST ESTIMATE - V.I.1 and QUANTITY SURVEY - V.II.01
ROAD CONSTRUCTION BRANCH Motorway A1 with junctions under paragraph 10.1 in the letter Ref. No.
GDDKiA O/BY R-2/284/44/33/2009 dated 2010- 02-25.
Majm592^^
Tender Cost Estimate - V.1.1-1 Road construction branch: Motorway A1 with junctions, item 7.5. Please change
item description to steel protective barriers. Answer # 592
The Ordering Party alters description of item 7.5. in Tender Cost Estimate V.I.l -1 ROAD
TENDER COST ESTIMATE - Y.1.1 -1 ROAD CONSTRUCTION BRANCH Motorway A1 with junctions
Unit
Basis Unit Value
Item Detailed list of settlement elements price
(PTS)
Name Quantity PLN PLN
1 2 3 4 5 6 7
7.5 D.07.05.01 Steel protective barriers xxx xxx xxx xxx
Question No. 593 (set # 12.8)
Tendr Cost Estimate - V.1.1-1 Road construction branch; Motorway Al with junctions, Item 2.4.1. Please explain
what type of reinforcement (type 1 or type 2) should be used for valuation of the above item. Please also specify
in m2 quantity of polypropylene geotextile, m2 of geograte of rigid nodes, m3 of broken aggregate, m3 of all-in
aggregate and m2 of cement stabilized ground to valuate the above cost item. Answer .593:
The Ordering Party answered to the above question in answer 581 (set 46.7), the letter Ref. No. GDDKiA-O/BY-
R-2/284/44/41/2009 dated 15.03.2010.
Tender Cost Estimate - V.1.1-1 Road construction branch: Motorway A1 with junctions, item 6.2.2. Please send
usa technical specification related to geotextile laying.
2
Answer 594
The term biotextile is synonymous with anti-erosion mat. Relevant specification number is D,06.01.01.05. The
Ordering Party changes the title in Quantit Survey and Tender Cost Estimate.
TENDER COST ESTIMATE - V.l.1 -1 ROAD CONSTRUCTION BRANCH: Motorway Al with junctions
Item Unit Unit price Value
Basis Detailed list of elements
units
(PTS) of settlement elements
Name Quantity PLN PLN
1 |2 3 4 5 6 7
6.2.2 D 06.01 01.05 Reinforcement of slopes with anti-erosion mat m 894.191
QUANTITY
Item Bases (PTS) Detailed list of settlement elements Unit Subtotals Total
sum
1 2 3 4 5 6
6.2 2 D 06.01.01 .05 Reinforcement of slopes with anti-erosion mat M2 894 191
Question 595 (set 12. 10)
Tender Cost Estimate - V.1.1-2 MOP Otłoczyn, Roadconstruction branch, Item 3.2.1. Please specify the
thickness of all-in aggregate draining layer. Answer 595
The draining layer is of variable thickness due to difference between the minimum crossfall of draining layer and
roadway cross slope. The thickness of draining layer is presented in drawings of right sections and cross-
sections.
Question No. 596 (set # 12.11)
Tender Cost Estimate - V.1.1-2 MOP Kałęczynek, Road construction branch, Item 3.2.1. Please specify the
thickness of all-in aggregate draining layer. Answer 596:
The draining layer is of variable thickness due to difference between the minimum crossfall of draining layer and
roadway pavement. The thickness of draining layer is presented in drawings of right sections and cross-sections.
Tender Cost Estimate - V.1.1-1 Road construction branch: Motorway A1 with junctions, item 1.2.5.
Please correct description of the cost items mentioned above.
Answer 597
The Ordering Party alters description of item 1.2.5. in Tender Cost Estimate V.I.1 -1 ROAD CONSTRUCTION
BRANCH Motorway A1 with junctions under paragraph 1.2.5
TENDER COST ESTIMATE - V.l.1 -1 ROAD CONSTRUCTION BRANCH: MotorwayA1 with junctions
Unit
Unit Value
price
Item Bases (PTS) Detailed list of settlement elements
Name Quanti PLN PLN
ty
1 2 3 4 5 6 7
1.2.5 D.01.02.01.22 Cutting and grubbing of undergrowth and regrowth ha 0,29
within State Forests
Question No. 598 (set # 12.14)
Tender Cost Estimate - V.1.1-6 Engineering facilities: Please indicate where is the design for generator
foundation in the documentation ?
Answer # 598
The Ordering Party answered to the above question in answer 473 (set 44.11), the letter Ref. No. GDDKiA-O/BY-
R-2/284/44/40/2009 dated 12.03.2010.
4
Question 599 (set_12J^)
Refers to the design forretaining walls Ml, M2, M3, M4 Vol. 3/21. Please indicate an item of cost estimate
enabling these retaining wall to be priced ? Answer 599
Retaining walls shall be priced in Tender Cost Estimate:
VOL._V_I_2_ENGINEERING FACILITIES: 4_KO.__ RETAINING WALLS
Question 600 (set_12^16J,
Refers to Tender Cost Estimate V.1.2 - 5. Please supplement columns 4 and 5 to includelaying of tape sealing
the expansion joint, Tricosal A24 - 36m. Answer # 600
The Ordering Party changes TENDER COST ESTIMATE - V.1.2 - 5 Engineering facilities, Fire Protection
Tanksand COST ESTIMATE- V.III.05 - Engineering facilities, Item 3.
TENDER COST ESTIMATE - V.l.2 - 5 Obiekty Engineering facilities_______________Fire Protection Tanks
Unit price
Unit of measure Value
quantity
Nr Podstawy (SST) LIST OF SETTLEMENT ELEMENTS
Name Quantit PLN PLN
y
1 2 3 4 5 6 7
FIRE PROTECTION TANKS - 2 pieces at km
178+480, km 178+568
3 D.10 11 01 CONCRETE AND REINFOCED CONCRETE
STRUCTURES
Foundation slab of the tank made of
concreteC30/37, 30cm thick. Construction of
complete structural components together with m3 51.9
geological and surveying services, shuttering,
reinforcing, accessories and concreting.
Laying Trisocal A24 tape sealing the expanion
m 36
joint.
QUANTITY SURVEY - V.III.05 - Engineering facilities
No. Unit of measure
Bases (PTS) LIST OF SETTLEMENT ELEMENTS
of Name Quantity
1 2 3 4 5
3 D.10 11 01 CONCRETE AND REINFORCED CONCRETE STRUCTURES
Unit Value in
Item Bases (PTS) LIST OF SETTLEMENT ELEMENTS
Name Quantity PLN
Question,607 (set 12,23)
Please explain could gravel concrete be used for manufacturing piles? Technical Specifictaion M.21.03.02 does
not precise it, but the use of gravel concrete for pile cementing causes worse compactability. Answer # 607
The Ordering Party upholds the requirement that granite or basalt grit are to bed used in concrete grade B30 and
better, in compliance with the Ordinance of the Minister of Transport and Marine Management of 30 May 2000 on
technical specifications to be conformed by engineering structures and its locations (Dz. Ust. No. 63, item 735,
§165.2.).
Question No. 608 (set # 12.24)
According to the provisions of M.21.03.02. samples of concrete used for piles should be test in the same way as
those of structural concrete. In TS for section III it was written that samples taken during pile concreting shall be
tested for strength and watertighness. Whereas watertighness should be at least W6, while for piles in running
water and aggressive environment - at least W8. Could the rdering Party alter the provisions of TS so that pile
concrete samples to be tested only for: watertightness and compressive strength, wile watertightness should be
at least W6. Answer 608
The Ordering Party upholds the provisions of STWiOR M.21.03.02.
7
Answer 609 (set 12.25)
Please explain in which tender cost estimate item for bridges reinforced backfill a n d a s s e m b l i n g o f i
steel strips are to be priced ? The scope of these works ois defined by TS M-29.08.01.41, that has not been
used została in any tender cost estimate . Answer 609:
The cost of backfilling under item corresponding to STWiOR M-29.03.01.11 "Backfilling in the area of pillars
and retaining walls ", cost of steel strip assembly under coresponding to STWiOR M-29.08.01.11
"Manufacture and installation of facing panels".
Refers to TS D.05.01-01.01 and D.10.10.01.02. Please specify mesh size
for geo-mesh of the height of 10 cm and 20 cm.
Answer 6010 (set 12.26)
Cellular geo-mesh of small mesh and weld spacing approx. 330 mm or similar, depending on the
manufacturer.
Question 611 (set 12.29)
Tender ocost estimate - V.I.1-1 Branch: road construction Motorway Al with junctions Item 10.2.1 Accordin to
description of the item c e l l u la r geo-mesh should be filled with humus, while technical specification
D.10.10.01.02 does not indicate such material . Please explain. Answer611
TS D.10.10.01.02 contains all information pertaining the material filling cellular geo-mesh, including humus ,
e.g.: section 2.2.5, section 5.7, 5.8. - The Orderin Party changes STWiOR (file name:
TOM_IV_II._SST_ZESZYT10._pyt. 12.29.pdf).
Question 612 (set 12.31}
Please confirm that it is possible to use moorway mesh of pressure welded nodes made of wires of the
minimum strength 588MPa, according to OST D-07.06.01 and Technical Approval issued byIBDiM in
Warsaw. The strength parameters specified under 2.1.1 PTS applyonly to dragged (node) meshes and result
merely from technology of manufacture. Answer 612
Parameters of the mesh should comply with PTS. Question 6ls
Please confirm that it is possible to use a zinc protective coating ochronnej of high purity (99,995%) that
provides significantly better anticorrosion protection than zinc andaluminium alloys. Question No. 614 (set #
12.33)
Question is inaccurate. TPS M~14.02.02 allows the use of zinc of purity 99,99%
Vol. IV - Technical Specifications, Vol. IV.II Road construction works D. 04.02.01.01 Draining and
cutting off layers Please indicate tender cost estimate item and specify quantity geotextile to be built in.
Answer_614
Cost estimate items, related to these specifications are mentioned under item 2.4 TS D.04.02.01.25. Geotextile
should be included into unit price for construction of components in which it was used - section 2.4 and
section 3.1 of Quantity Survey / Tender Cost Estimate Vol. "Rain water sewerage system and treatment
devices". The specification includes appropriate references to corresponding provisions.
Question No. 614 (set # 12.34)
Tender cost estimate - V.I. 1 - 1 B r a n c h : r o a d c o n s t r u c t i o n Motorway Al with junctions, Item 4.2.1
Please specify how many m2 of geotextile should be priced under the above mentioned item of tender cost
estimate ?.
8
Question 615
The design does not the use of geotextile under item 4.2.1. Geotextile mentioned in TS D.04.02.01 section 2.4
refers to other components and should be included into its unit price withrelevant entries. Including geotextile
into TS D.04.02.01 resultsfrom the fact that water from draining layers is discharged to drains that were built by
using geotextile.
Question No. 616 (set # 12.36)
Among bridge specifications ST M.28.10.03. is missing. Please
supplement.
Answer # 616
The Ordering Party suplemented the missing STWiOR enclosed to the letters Ref. No. GDDKiA-O/BY-R-
2/284/44/34/2009 and GDDKiA-O/BY-R-2/284/44/35/2009 dated2010-03-01.
Question617 (set12.37)
Please explain where acoustic baffles built on bridges are to be priced ? (e.g. for facility PZ-168).
Answerj_61Z Tender Cost Estimate:
TOM_V_I_3_12_KOSZTORYS JDFERTOWY.....Elementy„Ochrony_.akustycznej (section 4.2,
4.5 etc.)
Question No. 618 (set # 12.38)
Please explain where in tender cost estimate antiglare shields on bridges are to be valuated? In technical
specifications M.28.03.02. i M.28.05.02. there is noinformation on antiglaze shields and zquantity survey does not
specify the amount of shields on individual facilities (e.g. facilityPZ-168)
Antiglare shields are included into Traffic Organization Plan, appraisal of antiglare shields is included into tender
cost estimate for Road construction branch.
Question 619 (set12.39)
Please confirm that under items"Fitting latterns on the cornice" or "Anchoring latterns to the cornice" should not
include purchase of latterns ? If thee items price of latterns is taken into account, then we ask you for completing
TS by adding lattern data.
Answer # 619
Latterns (lamp posts) are included into PTS VOL. IV.II ROAD CONSTRUCTION WORKS, Book D.07.00.00
Traffic safety devices part D.07.07.01 Road lighting.
Quantity SurveyVOL_V__IV_01_ POWER ENGINEERING BRANCHQuestion 620 (set 12.40}
Refers to tender cost estimate V.1.2-2. The mentioned TS D.02.03.01 applies to construction of embankments.
Should this cost estimate refer toTS D.02.04.02,0 i. > Answer620
The Ordering Party changes TENDER COST ESTIMATE- V.1.2 - 2 Engineering structures Retaining wall made
of gabion baskets and QUANTITY SURVEY - V.III.02 -Engineering structures.
TENDER COST ESTIMATE - V.l 2 - 2 Engineering structures Retaining wall made of gabion baskets
D.02 .04 .02 01 Construction of othe gravity retaining wll with pressure welded
gabion baskets
Question No. 621 (set # 12.41)
Refers to tender cost estimate V.1.2 - 2. What material sould be used to build footing for gabion basket retainng
wall ? In coste estimate and technical description concrete B10 is mentionedwhile TS D.02.04.02.01. (unless
this TS is deemed by the Ordering Party as appropriate for tender cost estimate V.I.2-2) specifies aggregate
D/31,5. Answer 621
The Ordering Party changes the Tender Cost Estimate and Quantity Survey, item 2.7 and PTS D.02.04.02.01
(replaced with SST D.02.04.02.01 and SST D.02.04.02.02)
1. SST D.02.04.02.01 - For
a) Quantity survey - Vol. V.III.02 Engineering facilities: Gabion wall
b) Tender cost estimate - Vol. V.1.2-2 Engineering facilities: Gabion wall
2. SST D.02.04.02.01 - For
a) a) Quantity survey - Vol. V.1 1 .01 Road construction branch; item 2.7 and 2.7.1: Construction of embankment
reinforcement with gabion baskets of pressure welded type
e.g. drawing 04.5-3/2-2-PW-l, Technical description Vol. 2 Road design, 01 Descriptive part "AlODl-01.01_opis
techniczny _PW"
b) Tender cost estimate- Vol. V . 1.1-1 Road construction branch, item 2.7 and2.7.1: Construction of embankment
reinforcement with gabion baskets of pressure welded type
e.g. drawing 04.5-3/2-2-PW-l, Technical description Vol. 2. Road design, 01 Descriptive part A1OD1-01.01
Technical description "PW"
The tender cost estimate and quantity survey for road construction branch was changed under items 2.7 and
2.7.1. to:
TENDER COST ESTIMATE - V.l.1 -1 ROAD CONSTRUCTION BRANCH: Motorway A1 with junctions
Unit
Unit Value
Basis price
Item Detailed list of settlement elements
(PTS) Name Quantit PLN PLN
y
1 2 3 4 5 6 7
2.7 D.02.04.02. Construction of embankment reinforcement with xxx xxx xxx xxx
gabion baskets
2.7.1 D.02.04.02.02 Construction of embankment reinforcement with m3 158
gabion baskets of pressure welded type
QUANTITY SURVEY - y.11.01 -Road construction branch Motorway A1 with junctions
QUANTITY
Item Bases (PTS) Detailed list of settlement elements Unit Subtotals Total
sum
1 2 3I 4 5 6
2.7 D.02.04.02. Construction of embankment reinforcement X X X
with gabion baskets
2.7.1 D.02.04.02. 02 Construction of embankment slope m3 158
reinforcementwith gabion baskets of pressure
welded type
12
Figures for valuation purposes are included into enclosed STWiOR (file name;
TOM_IV_II_SST_ZESZYT2_D.02.04.02_odp do pyt 9.7.p d f ) .
Refers to tender cost estimateV.1.2-5. Under section 4 of TS D.10.00.00 (exactly D.10.11.01) under section 2
no parameters are specied for such materials as: ladder, cover, hydrant, valves, gully, DN75 pipe. Please
indciate another TS or compelte D.10.11.01. Answer 622
Tender cost estimate V.1.2-5. Section 4 ia assigned to STWiOR D.10.11.01. Quantity Survey and Tender Cost
Estimate were amended in section 4 and attached to answer please find TT D.10.11.01. (file name:
TOM_IV_II_SST_ZESZYT10_pyt.l2.42.pdf)
TENDER COST ESTIMATE - V.l.2 - 5 Engineering structures Fire Protection Tanks