ISSUED FOR DETAIL DESIGN SUBMITTAL


ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

DESIGN CALCULATION OF

STRUCTURE LIFT COLUMN H BEAM 200

CARGO LIFT
FiPER
BY

20/11/2017
DATE
NO.

C
B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OR FOR CARGO LIFT A CK EBI-CK-L-2 1 of 0
ORDERING MATERIALS
UNTIL APPROVED DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D

TABLE OF CONTENT
CHK'D

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1 INTRODUCTION

2 DESIGN CODE
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

3 DESIGN CRITERIA
3.1 Material Specifications
DESCRIPTION

4 COMPUTER SIMULATION
4.1 COORDINATE SYSTEM
4.2 MEMBER PROPERTIES & MATERIALS

5 DESIGN LOAD & LOAD COMBINATION


5.1 MODELLED WEIGHT
5.2 NON-MODELLED WEIGHT
5.3 LOAD COMBINATION

6 RESULT SUMMARY
6.1 CARGO LIFT STRUCTURES LOADS ANALYSIS
6.1.1STRESS
FiPER
BY

6.1.2DEFLECTION
6.1.3AXIAL FORCE DIAGRAM
20/11/2017
DATE

6.1.4SHEAR FORCE DIAGRAM


6.1.5MOMENTS DIAGRAM
NO.

C
B
A

REVISIONS 7 SOLIDWORKS SIMULATION OUTPUT – LOADS ANALYSIS


PREPARED (See Attachment)
BY: ANDRI 8 SOLIDWORKS SIMULATION OUTPUT – STRESS & DISPLACEMENT
DATE: 19.12.17 (See Attachment)
CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 2 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D

1. INTRODUCTION
CHK'D

This calculation report aims to check the structural integrity of CARGO LIFT
Structures during Sustain by centralized load. The Calculation report also specifies
the design of Sustain load. The design calculation done by means of computer

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
simulation of SOLIDWORKS SIMULATION 2016 V8i and Excel Spreadsheet. The
Result summary will show the Utilization Ratio of Lift Structures from the computer
modelling. The design calculation will be carried out and base on the AISC ASD
Design Codes and Specification.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

2. DESIGN CODE and REFERENCES :


1. ASTM A36 -- American Standard for Testing Material (Low Carbon Steel)
DESCRIPTION

2. AISC -- American Institute of Steel Construction (9th edition -1989)


# Allowable Span (Deflec
= L/240 OR (Lenght/ 240)

3. ASD/ LRFD -- ALLOWABLE STRENGHT DESIGN / LOAD RESISTANCE FACTOR DESIGN


# Allowable Strength De= < Yield Strength (250 MPa)

3. DESIGN CRITERIA
3.1. Material Specifications :
ASTM A36
Property Value Units
FiPER
BY

Elastic Modulus 200 N/mm^2


Poisson's Ratio 0.26 N/A
20/11/2017

N/mm
DATE

Shear Modulus 79300 ^2


Mass Density 7850 kg/m^3
NO.

Tensile Strength 400 N/mm^2 (Mpa)


C
B
A

REVISIONS Compressive Strength - N/mm^2


PREPARED Yield Strenght 250 N/mm^2 (Mpa)
BY: ANDRI Thermal Expansion Coefficient /K
DATE: 19.12.17 Thermal Conductivity W/(m·K)
CHECKED Specific Heat J/(kg·K)
BY: FIRMAN Material Damping Ratio N/A
DATE: 19.12.17

APPROVED Weld electrode


BY: FIRMAN AWS A5.1 E7016
DATE: 19.12.17 Tensile Strength 480 N/mm^2 (Mpa)
ENG'. DEPT (EBI) Yield strength > 380 N/mm^2 (Mpa)
BY:

DATE:

APPROVED (EBI) Note:


BY: See catalogue from material
DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 3 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D

4. COMPUTER SIMULATION
CHK'D

4.1. COORDINATE SYSTEM


The Model uses a set of 3D-Orthogonal axis system following right hand rule

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
=+ X direction --- The Longitudinal direction of Structure
=+ Y direction --- The Vertical Axis
=+ Z direction --- The Lateral direction of Structure
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

Figure 3.1:
DESCRIPTION

CARGO LIFT Structure


FiPER
BY

20/11/2017
DATE
NO.

C
B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 4 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D

4.2. MEMBER PROPERTIES AND MATERIAL


CHK'D

Structure and Frame Structure simulation are being carried out by SOLIDWORKS
software. The Properties and element of Structure are being assigned base on the
software Property Library as per Structure Drawings.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Length W (Kg)/ (Unit Total W/
No. Description Specification Qty
/ (Mtr) or Mtr) (Kg)
1 COLUMN H BEAM 150 4.0 7.35 186.3 745.2
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

2 BEAM WF 200 2.0 2.70 65.2 130.40


2.0 2.54 59.9 119.80
DESCRIPTION

4.0 2.39 57.2 228.80


4.0 2.25 49.4 197.60

3 BEAM WF 300 2.0 2.7 86.4 172.80


FiPER
BY

20/11/2017
DATE
NO.

C
B
A

REVISIONS 1,595 Kg
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED Material design Yield


No. Member Description Material Grade Remark
BY: FIRMAN Strength (Mpa)
DATE: 19.12.17 1 H-200 X 200 X 8 X 12 ASTM 36 250 COLUMN
APPROVED 2 WF 200 X 100 ASTM 36 250 BEAM
BY: FIRMAN 3 WF 300 X 150 ASTM 36 250 BEAM
DATE: 19.12.17

ENG'. DEPT (EBI)

BY: Note:
DATE: All Material are conservatively assigned as ASTM A36 or equivalent with
APPROVED (EBI) Yield Strength of 36 ksi = 250 MPa as stated in the Lift Structure Datasheet
BY:
Doc. No: XXX.XXXX.XX/XX Rev. 0
DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 5 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D

5. DESIGN LOAD & LOAD COMBINATION


CHK'D

5.1 Modelled Weight


The modelled weight of the Lift Structure is to be considered as the Selfweight of
the Structure Structure without Equipment and Misc Structures. The load factor of

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10% is applied to simulate any uncertain weight during fabrication.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

5.2 Non-Modelled Weight


Equipment such As Room 1, Room 2 and or other Equipment weight is considered
in the non-modelled weight. Total of the Non Modelled Weight is the remaining of
DESCRIPTION

weight of Structure 1,59 Ton deducted by Self Weight of Lift Structure +10% .

5.3 Load Combination

Total Fabrication Weight : 1.8 Ton » » » »(1.386 Ton (X) 1,1)


Equipment
1 Room 1 : ### Ton
2 Room 2 : ### Ton
FiPER
BY

Total : 8.8 Ton


20/11/2017
DATE

Modelled Weight + Non-Modelled Weight = Total Selfweight of Cargo Lift Structu


NO.

Structure Integrity during Load = 2 X (R)


C
B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 6 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D

LIFT STRUCTURE DESIGN


CHK'D

1. CENTER OF GRAVITY (COG)

COG

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a. SECTION I X = 1.500 M
Y = 2.250 M
WEIGHT = 7,000.00 Kg
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

X TOTAL x W TOTAL = 10500 Kg.m


TOTAL (Y) X TOTAL (W) = 15750 Kg.m
DESCRIPTION

WEIGHT TOTAL = 7000 Kg


COG X = 2.705 M
Y = 2.556 M
FiPER
BY

20/11/2017
DATE
NO.

C
B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 7 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D

1,1 CENTER OF GRAVITY (COG) FRAME Structure DETAIL


CHK'D

WEIGHT = 1,754 KG
X = 2.705 M
COG
Y = 2.556 M

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

1,2 CENTER OF GRAVITY (COG) FOR PACKAGE

ALL CARGO LIFT EQUIPMENT W.X = 18,935 KG.M


W.Y = 17,892 KG.M

Structure DETAIL W.X = 4,744.73 KG.M W.X TOTAL = 28,680 KG.M


FiPER
BY

W.Y = 4,483.38 KG.M W.Y TOTAL = 27,375 KG.M


20/11/2017
DATE

WEIGHT TOTAL = 8,754 KG = 19,614.52 lbs


X = 3.276 M = 3,276.16 MM = 128.98 inch
COG
NO.

Y = 3.127 M = 3,127.16 MM = 123.12 inch


C
B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 8 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D

2 Structural analysis for load condition


CHK'D

Length of Structural Members


L1 = 2,705.00 mm = ### in
L2 = 2,556.00 mm = ### in

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

FiPER
BY

20/11/2017
DATE

2.1 Along X - axis


NO.

F F = 19,615 lbs
C
B
A

REVISIONS = 8,754 kg.


PREPARED L2 = 2,556 mm = 100.63 in
BY: ANDRI a b a = x - L1 = 571 mm = 22.49 in
DATE: 19.12.17 Lp1 b = L2 - a = 1,985 mm = 78.14 in
CHECKED

BY: FIRMAN The maximum bending moment of the structure is equal to either the maximum bending moment at x-axis M m1
DATE: 19.12.17 or the maximum bending moment at y-axis Mm2, whichever is the greater.
F .a .b
APPROVED M m1 
L2
BY: FIRMAN Maximum bending moment along x - axis : = 342,506 in-lbs
DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 9 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD PT FiPER
INDONESIA
CHK'D
CHK'D

2.2 Along Y - axis

F F = 19,614.52 lbs

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
aL2 y = 100.63 in = 2,556.00 mm
a b = 123.12 in = 3,127.17 mm
b  L2  a
L4 = 22.49 in = 571.17 mm
ISSUED FOR DETAIL DESIGN SUBMITTAL

F .a.b
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

M m2 
L2
Maximum bending moment at y - axis : = 539,630 in-lbs
DESCRIPTION

Therefore, maximum bending moment of structure : Mmax. = 539,630 in-lbs


FiPER
BY

20/11/2017
DATE
NO.

C
B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 10 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D

3 Bending stress and deflection of structure in load condition


CHK'D

H-BEAM 150 X 150 X 7 X 10mm


Structure material ASTM-36

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
t Number of parallel beams N = 4
h d
Yield stress Sy = ### psi
y
Allowablel bending stress Sa = ### psi
s
M section modulus
Minimum required
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

Z MIN  max

b Sy N
= 3.37 in3
DESCRIPTION

Beam Dimensions :
d = 150 mm = 5.906 in.
y = 65 mm = 2.559 in.
t = 7.5 mm = 0.295 in.
b = 150 mm = 5.906 in.
s = 10 mm = 0.394 in.
h = 130 mm = 5.118 in.
h = d - 2s

Ix 
bd 3
 h3 b  t  
Moment of Inertia 12 = 38.676 in4

bd  h3 b  t  
FiPER

3
BY

Zx 
 6d 
20/11/2017

Section Moduluis = 13.098 in3


DATE

Modulus of Elasticity E = 2.90E+07 psi


A  bd   h b  t  
NO.

C
B
A

REVISIONS Area = 6.161 sq.in.


PREPARED
M max
BY: ANDRI Bending Stress of structure in load Condition Sb 
DATE: 19.12.17
Zx  N
= 1.03 psi
CHECKED

BY: FIRMAN Sb < Sa ACCEPTABL


DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 11 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D

4 Deflection of structure in load condition.


CHK'D

F X - axis

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
a b F = 19,614.52 lbs.
L = L2 = 100.63 in.
a = x-L1 = 22.49 in.
R1 R2 b = L2 - a = 78.14 in.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

L4

Da 
Fb L 2
 b2  3
DESCRIPTION

Maximum allowable deflection 3 EI x L 3 = 0.666 in.

Fa 2 b 2
Dd 
3EI x L
Actual deflection of structure in load condition = 0.1789 in.

Dd < Da ACCEPTABL

F
a b
FiPER
BY

Y - axis L = L2 = 100.63 in.


20/11/2017

a=y = 123.12 in.


DATE

R1 R2 b=L-a = 22.49 in.


L2

L 
NO.

3
C
B
A

Fb 2
 b2
REVISIONS Da 
3EI x L 3
PREPARED Maximum allowable deflection = 0.710 in.
BY: ANDRI 2 2
Fa b
DATE: 19.12.17 Dd 
3EI x L
CHECKED Actual deflection of structure in load condition = 0.4440 in.
BY: FIRMAN

DATE: 19.12.17 Dd < Da ACCEPTABL


APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 12 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D

6. RESULT SUMARY
CHK'D

6.1 LIFT STRUCTURE LOAD

6.1.1STRESS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Name Type Min Max
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL

127.226 N/mm^2
TXY: Shear in Y 0 N/mm^2 (MPa)
Stress1 (MPa)
Dir. on YZ Plane Element: 403
Element: 18
Lift Structure-Stress-Stress1
DESCRIPTION

FiPER
BY

20/11/2017
DATE
NO.

C
B
A

REVISIONS
PREPARED Name Maximum Stress Allowable Stress Remarks
BY: ANDRI
Stress 127 Mpa 250 Mpa ACCEPTABLE
DATE: 19.12.17

CHECKED Lift Structure-Stress-Stress1


BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 13 of
CONSTRUCTION OR FOR
DESIGN CALCULATION of CARGO LIFT STRUCTURE
A CK EBI-CK-L-2 20 0
ORDERING MATERIALS
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D
CHK'D

6.1.2DEFLECTION

Name Type Min Max


URES:
0 mm 3.13841 mm

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Displacement Resultant
Node: 82 Node: 394
Displacement
Lift Structure-Displacement-Displacement1
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

FiPER
BY

20/11/2017
DATE

As Per AISC for Allowable Span = L/220


NO.

B
A

REVISIONS
PREPARED Name Max. Deflection Allow. Deflection Remarks
BY: ANDRI
Displacement 3.1 mm 11.6 mm ACCEPTABLE
DATE: 19.12.17

CHECKED Lift Structure-Displacement-Displacement1


BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 14 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D
CHK'D

6.1.3AXIAL FORCE DIAGRAM

Name Type Min Max


Shear Moment Axial Force (N) -21,329.80 55,831.60

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Lift Structure-ShearMoments-AxialForce
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

A 20/11/2017 FiPER
BY
DATE
NO.

REVISIONS
PREPARED
BY: ANDRI
DATE: 19.12.17
CHECKED
BY: FIRMAN
DATE: 19.12.17
APPROVED
BY: FIRMAN
DATE: 19.12.17
ENG'. DEPT (EBI)
BY:

DATE:

APPROVED (EBI)
BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OR FOR
ORDERING MATERIALS
CARGO LIFT A CK EBI-CK-L-2 15 of 0
UNTIL APPROVED DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D
CHK'D

6.1.4SHEAR FORCE DIAGRAM

Name Type Min Max


Shear Moment Shear Force (N) -50,932.70 51,253.20

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Lift Structure-ShearMoment-ShearForce
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

A 20/11/2017 FiPER
BY
DATE
NO.

C
B

REVISIONS
PREPARED

BY: ANDRI
DATE: 19.12.17
CHECKED
BY: FIRMAN
DATE: 19.12.17
APPROVED
BY: FIRMAN
DATE: 19.12.17
ENG'. DEPT (EBI)
BY:

DATE:

APPROVED (EBI)
BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OR FOR
ORDERING MATERIALS
CARGO LIFT A CK EBI-CK-L-2 16 of 0
UNTIL APPROVED DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D
CHK'D

6.1.5MOMENT DIAGRAM

Name Type Min Max


Shear Moment Moment (N.m) -16,768.0 16,921.8

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Lift Structure-Displacement-Displacement1
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

A 20/11/2017 FiPER
BY
DATE
NO.

6.1.6RESULTANT FORCES
B

REVISIONS
PREPARED
BY: ANDRI
DATE: 19.12.17
CHECKED
BY: FIRMAN
DATE: 19.12.17
APPROVED
BY: FIRMAN
DATE: 19.12.17
ENG'. DEPT (EBI)
BY:

DATE:

APPROVED (EBI)
BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OR FOR
ORDERING MATERIALS
CARGO LIFT A CK EBI-CK-L-2 17 of 0
UNTIL APPROVED DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D

CATALOGUE H-BEAM 200 X 200


CHK'D

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

FiPER
BY

20/11/2017
DATE
NO.

B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 18 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D

CATALOGUE WF
CHK'D

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

FiPER
BY

20/11/2017
DATE
NO.

B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 19 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA
APPVD
CHK'D

TYPICAL YIELD and ULTIMATE STRENGTHS


CHK'D

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL

ISSUED FOR BASE DESIGN SUBMITTAL


DESCRIPTION

FiPER
BY

20/11/2017
DATE
NO.

B
A

REVISIONS
PREPARED

BY: ANDRI

DATE: 19.12.17

CHECKED

BY: FIRMAN

DATE: 19.12.17

APPROVED

BY: FIRMAN

DATE: 19.12.17

ENG'. DEPT (EBI)

BY:

DATE:

APPROVED (EBI)

BY:

DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR CARGO LIFT 20 of
CONSTRUCTION OR FOR A CK EBI-CK-L-2 0
ORDERING MATERIALS DESIGN CALCULATION of CARGO LIFT STRUCTURE 20
UNTIL APPROVED
CIRACAS AKARTA TIMUR JOB ORDER NO TBA DWG CONT SHT TBA