CIVIL WORKS

Project: Sugar Refinery Plant BILL OF QUANTITY Owner: Durrah Advanced Development Co.
Location: King Fahd Industrial Port Yanbu, KSA FINAL Rev. Date: 9 May 2018

ITEM DESCRIPTION UNIT QTY U/PRICE TOTAL PRICE

DIVISION 2
2 SITE CONSTRUCTION
2.1 EXCAVATION
2.1.1 Excavation for foundation in all soils of whatever nature
encountered to the lines and grades required for
foundations, keeping the saftey of adjacent structure in
consideration by properly protecting the sides of trenches,
compacting the bottom of excavated surface, dispose of
surplus etc., complete the job, as per drawings in all
respect.

Supply Pipe
Pipeline 16301
Valve pits 459
Meter Chambers 82
Air Relief Pits 67
Thrust blocks 951
Manholes 267
Culverts 306
Pipe Bridge Foundation 620

Return Pipe M3
Pipeline 6718
Culverts 90
Thrust blocks 297
Out fall structure 605

Industrial Waste
Pipeline 4263
Meter Chamber 29
Thrust blocks 53

Process & PotableWater


Pipeline 2790
Valve pits/ Meter & air chamber 55
Thrust blocks 22

Sewer pipe 75

Electrical Works
Electrical Room 918
Duct Banks 1486
Inspection Chamber 449

Sub Total
2.2 BACK FILLING AND COMPACTION

2.2.1 Backfilling arround foundations and substructure element


area, Structural backfilling above the fill of selected and
approved soil ) up to the required level in layers of 300
mm thick maximum with 95% compaction, with 25 ton
roller as per ASTMD 1557 Standard including compaction
test (as per recommended by client or consultant) for each
layer, complete in all respect.

M3

Supply Pipe 9832


Culverts 153
Pipe Bridge Foundation 655
Thrust blocks 422

TYA & Associates Page 1 of 7 CIVIL WORKS


CIVIL WORKS
Project: Sugar Refinery Plant BILL OF QUANTITY Owner: Durrah Advanced Development Co.
Location: King Fahd Industrial Port Yanbu, KSA FINAL Rev. Date: 9 May 2018

Return Pipe 3386


Culverts 27
Thrust blocks 143

Industrial Waste Pipe 2400


Culverts 35
Thrust blocks 37

Process & Potable Water M3 2207


Thrust blocks 17

Sewer pipe 60

Electrical Works 1625


Electrical Room 646
Duct Banks 803
Inspection Chamber 176
Sub Total
2.2.2 Pipe bedding material shall be sand or gravel as per the
requirements of the backfill materials and the same as that
utilized for select material in the remainder of the pipe
zone. The bedding shall be compacted to a minimum 95%
Standard Proctor Density (refer to soil report)

M3
Supply Pipe 3690
Return Pipe 1174
Industrial Waste 973
Process & Potable Water 581
Sewer pipe 8

Sub Total
Dewatering by lowering and controlling groundwater levels M3 54000
and hydrostatic pressures to permit excavation and approx.
construction to be performed in near-dry conditions. (Lump
sum)
Sub Total

TYA & Associates Page 2 of 7 CIVIL WORKS


CIVIL WORKS
Project: Sugar Refinery Plant BILL OF QUANTITY Owner: Durrah Advanced Development Co.
Location: King Fahd Industrial Port Yanbu, KSA FINAL Rev. Date: 9 May 2018

ITEM DESCRIPTION UNIT QTY U/PRICE TOTAL PRICE

DIVISION 3

3 CONCRETE WORKS
Prior to any substructure work, the contractor shall check
and coordinate the design of the reinforced concrete
foundations and related structures, and shall submit shop
drawings and calculations for consultant's review and
approval.

3.1 SUBSTRUCTURE

Providing and laying plain cement concrete having


cylindrical compressive strength 140 Kg/cm2 at 28 days,
using sulphate resisting cement type V, conforming to
3.1.1 ASTM C-150 including formwork, curing test, etc.,
complete as per drawings and specification.

Supply Pipe
Valve pits 7
Meter Chambers 2
Air Relief Pits 1
Thrust blocks 18
Manholes 5
Culverts 9
Pipe Bridge Foundation 15

Return Pipe
Culverts 5
Thrust blocks M3 7
Out fall structure 11

Industrial Waste
Culverts 4
Meter Chambers 2
Thrust blocks 3

Process & Potable Water 3


Meter Chamber 2
Thrust blocks 1

Electrical Works
Electrical Room 34
Duct Banks 60
Inspection Chamber 16

TYA & Associates Page 3 of 7 CIVIL WORKS


CIVIL WORKS
Project: Sugar Refinery Plant BILL OF QUANTITY Owner: Durrah Advanced Development Co.
Location: King Fahd Industrial Port Yanbu, KSA FINAL Rev. Date: 9 May 2018

3.1.2 Reinforced Concrete


Providing and laying reinforced cement concrete of
cylindrical compressive strength 280 Kg/cm2 at 28 days
conforming to ASTM C-155, for services shall be
coordinated as per supplier details etc., complete as per
specifications and drawings. Along with standard water
proofing membranes including formwork, curing test, etc.,
complete as per drawings and specification.

Including but not limited to Concrete


Encasements/Culverts, Meter Chambers, Valve Box,
Thrust Blocks. Manholes, , Transformer Pad etc.

Supply Pipe 1049


Valve pits 177
Meter Chambers 29
Air Relief Pits 19
Thrust blocks 375
Manholes 98
Culverts 128
Pipe Bridge Foundation 229

Return Pipe
Culverts M3 60
Thrust blocks 133
Out fall structure 187

Industrial Waste
Culverts 22
Meter Chambers 15
Thrust blocks 29

Process & Potable Water


Meter Chamber 18
Thrust blocks 3

Electrical Works
Electrical Room 229
Duct Banks 265
Inspection Chamber 300
Sub Total

TYA & Associates Page 4 of 7 CIVIL WORKS


CIVIL WORKS
Project: Sugar Refinery Plant BILL OF QUANTITY Owner: Durrah Advanced Development Co.
Location: King Fahd Industrial Port Yanbu, KSA FINAL Rev. Date: 9 May 2018

ITEM DESCRIPTION UNIT QTY U/PRICE TOTAL PRICE

DIVISION 4

4.0 MASONRY

4.1 Supply and construct CMU BLOCK WALL with all


accessories including ties and joints reinforcement as per
drawings and specifications, complete in all respects.

M2 285

4.1.1 20 cm thick wall (Electrical Room)

Sub Total

DIVISION 7
7 THERMAL AND MOISTURE PROTECTION

7.1 Supply and install 300-micron thick polyethylene vapor


barrier under P.C. for foundation, grade beams and slab
on grade, as shown in the drawings and specifications,
complete in all respects.

Supply Pipe
Valve pits 80
Meter Chambers 15
Air Relief Pits 13
Thrust blocks 211
Manholes 46
Culverts 84
Pipe Bridge Foundation 148

Return Pipe
Culverts 30
M2
Thrust blocks 70
Out fall structure 121

Industrial Waste
Culverts 39
Meter Chambers 13
Thrust blocks 9

Process & Potable Water


Meter Chamber 13
Thrust blocks 3

Electrical Works
Electrical Room 348
Duct Banks 550
Inspection Chamber 21
Sub Total
7.2 WATER PROOFING

TYA & Associates Page 5 of 7 CIVIL WORKS


CIVIL WORKS
Project: Sugar Refinery Plant BILL OF QUANTITY Owner: Durrah Advanced Development Co.
Location: King Fahd Industrial Port Yanbu, KSA FINAL Rev. Date: 9 May 2018

7.2.1 Supply and apply two coats of liquid bituminous paint to all
concrete surfaces that comes in direct contact with
earth/soil as shown on drawing, complete in all respects.
(Awazil or approved equal).

Supply Pipe
Valve pits 320
Meter Chambers 75
Air Relief Pits 52
Thrust blocks 844
Manholes 184
Culverts 336
Pipe Bridge Foundation 296

Return Pipe
Culverts 120
Thrust blocks M2 280
Out fall structure 242

Industrial Waste
Culverts 156
Meter Chambers 65
Thrust blocks 36

Process & Potable Water


Meter Chamber 65
Thrust blocks 12

Electrical Works
Electrical Room 522
Duct Banks 1925
Inspection Chamber 105

7.2.2 Supply and cast 300kg/m3 roof foam concrete to create


slops minimum 50mm deep and 2% slope at roof, as per
drawings and specifications, complete in all respects. M2 160
(Electrical Room)

Sub Total

ITEM DESCRIPTION UNIT QTY U/PRICE TOTAL PRICE

DIVISION 8
8 DOORS & WINDOWS

8.1 DOORS
8.1.1 Supply and install 45mm thick Steel Frame with 44mm
thick painted Steel door with all required hardware at
Electrical room, as per drawings and specifications,
complete in all respects.

D-1 = 2000mm wide x 2150mm High EA 3


D-2 = 1000mm wide x 2150mm High EA 1

8.2 WINDOWS
8.2.1 Supply and install powder coated aluminum framed
louver with mastic sealant and other accessories to be
EA
approved and supplied by specialist, as per the approved
shop drawing and specification, complete in all respects.

W1 = 2000mm wide x 1200mm high Nos 5


Sub Total

TYA & Associates Page 6 of 7 CIVIL WORKS


CIVIL WORKS
Project: Sugar Refinery Plant BILL OF QUANTITY Owner: Durrah Advanced Development Co.
Location: King Fahd Industrial Port Yanbu, KSA FINAL Rev. Date: 9 May 2018

ITEM DESCRIPTION UNIT QTY U/PRICE TOTAL PRICE

DIVISION 9
9.0 FINISHES
9.1.1 Epoxy coating on the floor as per drawings and
M² 160
specification, complete with all respect.

9.1 INTERNAL WALLS


9.1.1 Smooth Cement plastering for CMU block walls, as per
drawing and specification, complete in all respect.. M2 260

9.1.2 Supply and apply emulsion paint FINISH ON SMOOTH


CEMENT PLASTER FOR For Walls of approved colour
including priming, filling & two final coats of paint, as per
drawings and specification, complete in all respects. M2 260
(JOTUN, HEMPEL or approved equal).

9.2 CEILING
9.2.1 Smooth Cement plastering for soffit of structural slab, as
per drawing and specification, complete in all respect.. M2 160

9.2.2 Supply and apply emulsion paint FINISH ON SMOOTH


CEMENT PLASTER FOR For soffit of structural slab of
approved colour including priming, filling & two final coats
of paint, as per drawings and specification, complete in all M2 160
respects. (JOTUN, HEMPEL or approved equal).

9.3 EXTERNAL WALLS

9.3.1 Cement plastering 18mm thick for CMU block walls, as


per drawing and specifications complete in all respects. M² 300

9.3.2 Supply and apply emulsion paint of approved color


including priming, filling and two final coats, as per
drawings and specification, complete in all respects. M² 300
(JOTUN, HEMPEL or approved equivalent)

Sub Total

Grand Total

CODES, REGULATIONS & STANDARDS:

The following Codes, Regulations, and Standards are supposed to be used for the development of detailed design
drawings:

The Detailed design will be based on local governing codes and requirements, as well as the listed
industry standards and any owner standards. If conflicts exist between the different codes,
industry standards and owner standards, then the more stringent will be used.

Royal Commission for Jubail and Yanbu General Design Criteria and Technical Guidelines –Current Edition
ASTM standards, current edition
Marafiq Standard Specifications-Current Edition
General Design Criteria and Technical Guidelines & Standard Drawings – Current Edition, RCJY/Directorate
General
ACI 318 for YanbuEdition
- Current Project

Saudi Building Code (SBC)


ASCE- Current Edition
MATERIALS SPECIFICATIONS
MasterSpec 1994
Materials specifications are based on the 16 division, MasterSpec 1994 organization standard issued by the
American Institute of Architects.

TYA & Associates Page 7 of 7 CIVIL WORKS