CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable2 8.665 13.798 -8.346 -13.773 319.3 25.5 100.0 98.8 1.16
Cable3 8.232 5.119 -7.915 -5.093 316.2 25.3 100.2 97.3 2.90
685.1 1091.3
ETAP
Project: UNIT 3 Page: 2
12.6.0H
Location: UNSIKA Date: 05-03-2018
Contract: SN:
Engineer: Anggi-Rinaldy Revision: Base
Study Case: LF
Filename: Rinaldy-Anggi Config.: Normal