introduced from last 2 to 3 years for the benefit  Work zone safety for travelling
of general public. Bridge and flyover construction public.
of late are exceeding period of completion 5 to 3.4.2 ABC reduces
6 years in many cases, however generally 1km  Traffic impacts
length of bridge is taking about 2 years presently.
That means progress achieved per day is 1.40 M,  On site construction time
where as in our neighbouring countries it is 1410  Weather related delay
meters a day. We should seriously introspect about 3.4.3 ABC can also minimise
our weaknesses in the system to immediately put it  Environmental impacts
in, course correction mode. As such it is imperative  Impact to existing roadway alignment
to shift over to Accelerated Bridge Construction
 Utility relocations
(ABC) methods to implement flyover and bridge
projects. Where a bridge takes months or years, a 3.5 Measurement of Effectiveness of ABC
bridge utilising ABC may be completed in matter of Two time matrix are used for gauging the
weeks, days or even hours. In order to minimise effectiveness of ABC.
mobility impact which occur due to on site
 On site construction time
construction activity, the ABC is phenomenal shift
in the project planning and procurement approach.  Mobility impact time
The additional in-built benefits of ABC are quality, The on-site construction time and mobility impact
safety, durability, social cost and environmental time need to be reduced to the least possible to
impact. make ABC a success.
3.2 The broader meaning of ABC in the 3.6 ABC Technology Means
construction is, innovative planning with designs, 3.6.1 Planning shall be on fast track
materials and construction methods in a safe and 3.6.2 Designs, communications on fast tract
cost effective manner to reduce on site construction 3.6.3 Construction on fast track
time. Whereas conventional bridge construction
3.6.4 Quality control and testing on fast track
does not significantly reduce on-site construction
6.6.5 All aspects related to the project on fast
time, which are highly time consuming and weather
track
dependent.
3.7 Strategies of ABC Systems are:
3.3 ABC Technology is that which Uses
3.7.1 Bridge shall be as light as possible
3.3.1 Innovative planning
3.3.2 Innovative designs  Size to be manageable for
transportation and installation.
3.3.3 Innovative materials
3.3.4 Construction in safe manner  Simplified transportation and erection
of bridge components
3.3.5 Construction in cross effective manner
 Can improve load rating of
3.4 Reduced Cost to the Society
existing piers and foundations
Total monetary cost of construction can be measured 3.7.2 Bridge should be as simple as possible
in two ways, one is actual cost of construction in
 Fewer girders
rupees, second is monetary cost to the society
by way of diversions, loss of productive time to  Fewer field splices
citizens etc measured in rupees. The intent of ABC  Fewer bracing systems
is to reduce construction time there by reducing  No temporary bracing to be removed.
cost to the society. Advantages of ABC are; 3.7.3 Bridge shall be as simple to erect as possible
3.4.1 The ABC improves  Fewer workers on site
 Total project delivery time  Fewer cast-in place operations
 Site Constructability  No false work structures required for
 Material quality & its durability pre-fabricated elements & systems.