Professional Documents
Culture Documents
OBRA :
META :
AÑO : CODIGO:
18.00 PLANILLAS
19.00 TAREAJES
31.00 OBSERVACIONES
32.00 CONCLUSIONES
33.00 RECOMENDACIONES
34.00 ANEXOS
35.00 OTROS
DE CONTABILIDAD
OK
OK
OK
OK
OK
OK
OK
OK
FALTA
OK
OK
OK
FALTA
OK
OK
INCOMPLETO Falta Conformidad de los Servicios
OK
OK
OK
OK
OK
NO TIENE
NO TIENE
OK
OK
META : 004
01 2.6.2.3.2.4 COST. POR CONST. POR ADM. DIRECTA-PERSONAL S/. 199,978.00 100% S/. 191,910.16
02 2.6.2.3.2.5 COSTO DE CONST. POR ADM. DIRECTA - BIENES S/. 181,690.00 100% S/. 175,320.83
07
03 2.6.2.3.2.6 COSTO DE CONST. POR ADM. DIRECTA - SERVICIOS S/. 11,000.00 100% S/. 7,245.00
04 2.6.3.2.9.99 COSTO DE CONST. POR ADM. DIREC- MAQUINARIAS Y EQUIPOS S/. 19,000.00 100% S/. 16,965.00
TOTAL EJECUTADO S/. 411,668.00 100% S/. 391,440.99
ASIGNADO AL 100%
% SALDO PIA %
ASIGNACION
ITEM RUBRO CLASIFICADOR DESCRIPCION PRESUPUESTAL SEGÚN
PIA
2 GASTOS PRESUPUESTADOS
2.6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2.6.2 CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2.6.2.3 OTRAS ESTRUCTURAS
2.6.2.3.2 INFRAESTRUCTURA VIAL
2.6.2.3.2.4 COSTO DE CONST. POR ADM. DIRECTA-PERSONAL S/. 199,978.00 S/. 166,112.32 S/. 25,797.84 S/. 191,910.16 S/. 8,067.84
PLANILLA DE PAGO MES DE ENERO S/. 2,369.79
PLANILLA DE PAGO MES DE FEBRERO S/. 27,654.33
PLANILLA DE PAGO MES DE MARZO S/. 33,542.33
PLANILLA DE PAGO MES DE ABRIL S/. 39,921.78
PLANILLA DE PAGO MES DE MAYO S/. 33,981.75
PLANILLA DE PAGO MES DE JUNIO S/. 28,642.34
PLANILLA DE PAGO MES DE JULIO COD:2989 S/. 23,601.11
PLANILLA DE PAGO MES DE JULIO COD:3000 S/. 2,196.73
2.6.2.3.2.5 COSTO DE CONST. POR ADM. DIRECTA - BIENES S/. 181,690.00 S/. 0.00 S/. 175,320.83 S/. 0.00 S/. 175,320.83 S/. 164,857.75 S/. 6,462.38 S/. 171,320.13 S/. 4,000.70
VESTUARIO O/C Nº S/. 0.00 S/. 4,157.50 S/. 0.00 S/. 4,157.50 S/. 3,888.50 S/. 0.00 S/. 3,888.50 S/. 269.00
CHALECO CON BOLSILLO Y ACCESORIOS DE SOPORTE 0315-2014 UND - - 15 S/. 450.00 - - 15 S/. 450.00 S/. 30.00 14 S/. 420.00 - - 14 S/. 420.00 1.00 30.00
GUANTES DE CUERO C-35 0315-2014 PAR - - 15 S/. 135.00 - - 15 S/. 135.00 S/. 9.00 15 S/. 135.00 - - 15 S/. 135.00 - -
MASCARILLA PARA POLVO DE BUENA CALIDAD 0315-2014 UND - - 15 S/. 52.50 - - 15 S/. 52.50 S/. 3.50 5 S/. 17.50 - - 5 S/. 17.50 10.00 35.00
GUANTES DE JEBE 0315-2014 PAR - - 15 S/. 127.50 - - 15 S/. 127.50 S/. 8.50 15 S/. 127.50 - - 15 S/. 127.50 - -
LENTES DE SEGURIDAD PANORAMICO CON BANDA ELASTICA ANTI
0315-2014 UND - - 15 S/. 112.50 - - 15 S/. 112.50 S/. 7.50 7 S/. 52.50 - - 7 S/. 52.50 8.00 60.00
EMPAÑANTE DE B/CALIDAD
PROTECTOR DE CABEZA (CASCOS DE SEGURIDAD) 0315-2014 UND - - 15 S/. 120.00 - - 15 S/. 120.00 S/. 8.00 10 S/. 80.00 - - 10 S/. 80.00 5.00 40.00
PROTECTOR DE CABEZA PARA INGENIERO CON SOPORTE 6 PUNTOS 0315-2014 UND - - 2 S/. 76.00 - - 2 S/. 76.00 S/. 38.00 2 S/. 76.00 - - 2 S/. 76.00 - -
ZAPATOS DE SEGURIDAD C/PUNTA DE ACERO DE BUENA CALIDAD (1 PAR
TALLA 36, 1 PAR TALLA 37, 4 PARES TALLA 39, 4 PARES TALLA 40 Y 5 0315-2014 PAR - - 15 S/. 1,650.00 - - 15 S/. 1,650.00 S/. 110.00 15 S/. 1,650.00 - - 15 S/. 1,650.00 - -
PARES TALLA 41)
ZAPATOS DE SEGURIDAD ORIGINAL FOUNDATION ST-P/10612 G-20
T:BUENA CALIDAD (T:3840,42)
0315-2014 PAR - - 3 S/. 1,044.00 - - 3 S/. 1,044.00 S/. 348.00 3 S/. 1,044.00 - - 3 S/. 1,044.00 - -
CAPOTINES IMPERMEABLES CON CAPUCHA ANLUC 3.5 MM DE OBRA DE
B/CALIDAD
0315-2014 UND - - 15 S/. 390.00 - - 15 S/. 390.00 S/. 26.00 11 S/. 286.00 - - 11 S/. 286.00 4.00 104.00
MATERIALES DE CONSTRUCCION O/C Nº S/. 0.00 S/. 166,606.58 S/. 0.00 S/. 166,606.58 S/. 156,998.20 S/. 6,462.38 S/. 163,460.58 S/. 3,146.00
ALAMBRE NEGRO RECOCIDO N° 08 0329-2014 KG - - 50 S/. 190.00 - - 50 S/. 190.00 S/. 3.80 10 S/. 38.00 - - 10 S/. 38.00 40.00 152.00
ALAMBRE NEGRO RECOCIDO N° 16 0329-2014 KG - - 80 S/. 304.00 - - 80 S/. 304.00 S/. 3.80 80 S/. 304.00 - - 80 S/. 304.00 - -
CLAVOS C/C 2 1/2" 0329-2014 KG - - 60 S/. 228.00 - - 60 S/. 228.00 S/. 3.80 60 S/. 228.00 - - 60 S/. 228.00 - -
CLAVOS C/C 2" 0329-2014 KG - - 30 S/. 114.00 - - 30 S/. 114.00 S/. 3.80 30 S/. 114.00 - - 30 S/. 114.00 - -
CLAVOS C/C 3" 0329-2014 KG - - 60 S/. 228.00 - - 60 S/. 228.00 S/. 3.80 60 S/. 228.00 - - 60 S/. 228.00 - -
LIJA DE FIERRO Nº 40 0352-2014 UND - - 50 S/. 100.00 - - 50 S/. 100.00 S/. 2.00 25 S/. 50.00 - - 25 S/. 50.00 25.00 50.00
INGRESADO GASTOS EJECUTADOS EN OBRA SALDO EN OBRA DE
PROGRAMADO
CLASIFICADOR DESCRIPCION O/C ó O/T Nº UNID C/CHICA ABA.-O/C ABA.-O/S TOTAL PRECIO MES ANT. PTE. MES ACUMULADO MATERIALES
S/ ANALITICO
CAN MONTO CANT MONTO CANT MONTO CANT MONTO UNIT. CANT MONTO CANT MONTO TOT. UTILIZ. TOTAL GASTO CANT MONTO
YUTE 0211-2014 ML - - 20 S/. 130.00 - - 20 S/. 130.00 S/. 6.50 9 S/. 58.50 - - 9 S/. 58.50 11.00 71.50
YESO DE 25 KG. 0211-2014 BLS - - 12 S/. 156.00 - - 12 S/. 156.00 S/. 13.00 9 S/. 117.00 - - 9 S/. 117.00 3.00 39.00
ARENA FINA DE RIO 0429-2014 M3 - - 10 S/. 950.00 - - 10 S/. 950.00 S/. 95.00 10 S/. 950.00 - - 10 S/. 950.00 - -
0566-2014 M3 - - 90 S/. 5,040.00 - - 90 S/. 5,040.00 S/. 56.00 90 S/. 5,040.00 - - 90 S/. 5,040.00 - -
0429-2014 M3 - - 90 S/. 5,040.00 - - 90 S/. 5,040.00 S/. 56.00 90 S/. 5,040.00 - - 90 S/. 5,040.00 - -
ARENA GRUESA DE RIO
0468-2014 M3 - - 90 S/. 5,040.00 - - 90 S/. 5,040.00 S/. 56.00 90 S/. 5,040.00 - - 90 S/. 5,040.00 - -
0610-2014 M3 - - 60 S/. 3,360.00 - - 60 S/. 3,360.00 S/. 56.00 60 S/. 3,360.00 - - 60 S/. 3,360.00 - -
0566-2014 M3 - - 90 S/. 5,220.00 - - 90 S/. 5,220.00 S/. 58.00 90 S/. 5,220.00 - - 90 S/. 5,220.00 - -
0429-2014 M3 - - 90 S/. 5,220.00 - - 90 S/. 5,220.00 S/. 58.00 90 S/. 5,220.00 - - 90 S/. 5,220.00 - -
PIEDRA CHANCADA DE 3/4"
0468-2014 M3 - - 90 S/. 5,220.00 - - 90 S/. 5,220.00 S/. 58.00 90 S/. 5,220.00 - - 90 S/. 5,220.00 - -
0610-2014 M3 - - 75 S/. 4,350.00 - - 75 S/. 4,350.00 S/. 58.00 75 S/. 4,350.00 - - 75 S/. 4,350.00 - -
0400-2014 BOL - - 1,500 S/. 29,398.50 - - 1,500 S/. 29,398.50 S/. 19.60 1,500 S/. 29,398.50 - - 1,500 S/. 29,398.50 - -
0525-2014 BOL - - 1,500 S/. 29,398.50 - - 1,500 S/. 29,398.50 S/. 19.60 1,500 S/. 29,398.50 - - 1,500 S/. 29,398.50 - -
CEMENTO PORTLAND TIPO I (42.5KG)
0570-2014 BOL - - 1,500 S/. 29,398.50 - - 1,500 S/. 29,398.50 S/. 19.60 1,500 S/. 29,398.50 - - 1,500 S/. 29,398.50 - -
0706-2014 BOL - - 500 S/. 9,799.50 - - 500 S/. 9,799.50 S/. 19.60 500 S/. 9,799.50 - - 500 S/. 9,799.50 - -
GASOL 90 OCT PLUS GAL - - 130 S/. 1,781.00 - - 130 S/. 1,781.00 S/. 13.70 - S/. 0.00 130.00 S/. 1,781.00 130 S/. 1,781.00 - -
PETROLEO D2 GAL - - 346 S/. 4,681.38 - - 346 S/. 4,681.38 S/. 13.53 - S/. 0.00 346.00 S/. 4,681.38 346 S/. 4,681.38 - -
FIERRO CORRUGADO DE 1/2" X 9.00 M 0268-2014 VAR - - 45 S/. 1,170.00 - - 45 S/. 1,170.00 S/. 26.00 42 S/. 1,092.00 - - 42 S/. 1,092.00 3.00 78.00
FIERRO LISO DE 5/8" X 6.00 M 0268-2014 VAR - - 66 S/. 2,653.20 - - 66 S/. 2,653.20 S/. 40.20 66 S/. 2,653.20 - - 66 S/. 2,653.20 - -
TABLAS DE 1/2" x 8" x 10' MADERA TORNILLO 0208-2014 UND - - 30 S/. 462.00 - - 30 S/. 462.00 S/. 15.40 30 S/. 462.00 - - 30 S/. 462.00 - -
TABLAS DE 1" x 8" x 10' MADERA ROBLE CORRIENTE, CEPILLADO 01
CARA
0208-2014 UND - - 150 S/. 2,160.00 - - 150 S/. 2,160.00 S/. 14.40 150 S/. 2,160.00 - - 150 S/. 2,160.00 - -
CUARTONES DE 4"X 4" X 10" MADERA EUCALIPTO 0208-2014 UND - - 20 S/. 486.00 - - 20 S/. 486.00 S/. 24.30 20 S/. 486.00 - - 20 S/. 486.00 - -
CUARTONES DE 2"x 2"x10' MONTAÑA 0208-2014 UND - - 120 S/. 888.00 - - 120 S/. 888.00 S/. 7.40 120 S/. 888.00 - - 120 S/. 888.00 - -
CUARTONES DE 2"x 2"x10' EUCALIPTO 0208-2014 UND - - 150 S/. 922.50 - - 150 S/. 922.50 S/. 6.15 150 S/. 922.50 - - 150 S/. 922.50 - -
TABLA DE 1"x8"x10' TORNILLO 1 CARA CEPILLADA 0208-2014 UND - - 100 S/. 2,980.00 - - 100 S/. 2,980.00 S/. 29.80 100 S/. 2,980.00 - - 100 S/. 2,980.00 - -
TRIPLAY LUPUNA DE 4' x 8' x 4MM. 0208-2014 PLAN - - 8 S/. 196.00 - - 8 S/. 196.00 S/. 24.50 8 S/. 196.00 - - 8 S/. 196.00 - -
TUBERIA PVC Ø 3/4" SAP X 5 M 0190-2014 UND - - 45 S/. 441.00 - - 45 S/. 441.00 S/. 9.80 45 S/. 441.00 - - 45 S/. 441.00 - -
CINTA MASKING DE 1" 0453-2014 UND - - 30 S/. 75.00 - - 30 S/. 75.00 S/. 2.50 30 S/. 75.00 - - 30 S/. 75.00 - -
ASFALTO RC-250 0204-2014 GLN - - 100 S/. 1,250.00 - - 100 S/. 12.50 60 S/. 750.00 - - 60 S/. 750.00 40.00 500.00
DISOLVENTE 0453-2014 GLN - - 45 S/. 1,552.50 - - 45 S/. 1,552.50 S/. 34.50 14 S/. 483.00 - - 14 S/. 483.00 31.00 1,069.50
PINTURA ESMALTE DE TRAFICO (15 NEGRO, 10 AMARILLOS, 15
BLANCOS )
0453-2014 GLN - - 40 S/. 2,520.00 - - 40 S/. 2,520.00 S/. 63.00 26 S/. 1,638.00 - - 26 S/. 1,638.00 14.00 882.00
ACEITE 20W50 PARA MOTOR GASOLINERO 0280-2014 GLN - - 7 S/. 455.00 - - 7 S/. 455.00 S/. 65.00 3 S/. 195.00 - - 3 S/. 195.00 4.00 260.00
GRASA PARA MAQUINARIA 0280-2014 GLN - - 4 S/. 88.00 - - 4 S/. 88.00 S/. 22.00 2 S/. 44.00 - - 2 S/. 44.00 2.00 44.00
MARCO Y TAPA DE Fº Fº DE 125 KG. 0289-2014 PZA - - 8 S/. 2,960.00 - - 8 S/. 2,960.00 S/. 370.00 8 S/. 2,960.00 - - 8 S/. 2,960.00 - -
HERRAMIENTAS O/C Nº S/. 0.00 S/. 3,861.30 S/. 0.00 S/. 3,861.30 S/. 3,275.60 S/. 0.00 S/. 3,275.60 S/. 585.70
ALICATE DE BUENA CALIDAD 0457-2014 UND - - 1 S/. 23.00 - - 1 S/. 23.00 S/. 23.00 - S/. 0.00 - - - S/. 0.00 1.00 23.00
BARRETAS ACERADA ALMA LLENA DE 2" 0457-2014 UND - - 3 S/. 177.00 - - 3 S/. 177.00 S/. 59.00 3 S/. 177.00 - - 3 S/. 177.00 - -
BROCHA DE 4" 0457-2014 UND - - 15 S/. 90.00 - - 15 S/. 90.00 S/. 6.00 11 S/. 66.00 - - 11 S/. 66.00 4.00 24.00
AZUELA CON MANGO DE MADERA 0457-2014 UND - - 3 S/. 66.00 - - 3 S/. 66.00 S/. 22.00 - S/. 0.00 - - - S/. 0.00 3.00 66.00
BRUÑA DE CENTRO 0457-2014 UND - - 5 S/. 16.00 - - 5 S/. 16.00 S/. 3.20 4 S/. 12.80 - - 4 S/. 12.80 1.00 3.20
CARRETILLA TIPO BUGGI CON RODAJE Y MANGO GALVANIZADO 0457-2014 UND - - 8 S/. 896.00 - - 8 S/. 896.00 S/. 112.00 7 S/. 784.00 - - 7 S/. 784.00 1.00 112.00
CORDEL DE NYLON 0457-2014 UND - - 2 S/. 34.00 - - 2 S/. 34.00 S/. 17.00 1 S/. 17.00 - - 1 S/. 17.00 1.00 17.00
FLEXOMETRO DE 5 MTS. 0457-2014 UND - - 12 S/. 154.80 - - 12 S/. 154.80 S/. 12.90 12 S/. 154.80 - - 12 S/. 154.80 - -
HOJAS DE SIERRA 0457-2014 KG - - 20 S/. 90.00 - - 20 S/. 90.00 S/. 4.50 20 S/. 90.00 - - 20 S/. 90.00 - -
LLANTA PARA CARRETILLA CON RODAJE Y ARO 0457-2014 UND - - 15 S/. 360.00 - - 15 S/. 360.00 S/. 24.00 15 S/. 360.00 - - 15 S/. 360.00 - -
CILINDRO DE PLASTICO DE 50 GLN 0457-2014 UND - - 2 S/. 150.00 - - 2 S/. 150.00 S/. 75.00 2 S/. 150.00 - - 2 S/. 150.00 - -
CILINDRO METALICO DE 50 GLN 0457-2014 UND - - 2 S/. 104.00 - - 2 S/. 104.00 S/. 52.00 2 S/. 104.00 - - 2 S/. 104.00 - -
RASTRILLO DE 14 DIENTES 0457-2014 UND - - 6 S/. 72.00 - - 6 S/. 72.00 S/. 12.00 4 S/. 48.00 - - 4 S/. 48.00 2.00 24.00
PICOS CON MANGO 0457-2014 UND - - 9 S/. 252.00 - - 9 S/. 252.00 S/. 28.00 5 S/. 140.00 - - 5 S/. 140.00 4.00 112.00
LAMPAS 0457-2014 UND - - 9 S/. 211.50 - - 9 S/. 211.50 S/. 23.50 6 S/. 141.00 - - 6 S/. 141.00 3.00 70.50
INGRESADO GASTOS EJECUTADOS EN OBRA SALDO EN OBRA DE
PROGRAMADO
CLASIFICADOR DESCRIPCION O/C ó O/T Nº UNID C/CHICA ABA.-O/C ABA.-O/S TOTAL PRECIO MES ANT. PTE. MES ACUMULADO MATERIALES
S/ ANALITICO
CAN MONTO CANT MONTO CANT MONTO CANT MONTO UNIT. CANT MONTO CANT MONTO TOT. UTILIZ. TOTAL GASTO CANT MONTO
MANGUERA REFORZADA DE 3/4" 0457-2014 ML - - 100 S/. 130.00 - - 100 S/. 130.00 S/. 1.30 100 S/. 130.00 - - 100 S/. 130.00 - -
NIVEL DE MANO DE 12" 0457-2014 UND - - 3 S/. 40.50 - - 3 S/. 40.50 S/. 13.50 1 S/. 13.50 - - 1 S/. 13.50 2.00 27.00
LLAVE CRAYSHON DE 10" 0457-2014 UND - - 1 S/. 36.50 - - 1 S/. 36.50 S/. 36.50 - S/. 0.00 - - - S/. 0.00 1.00 36.50
LLAVE STILSON DE 10" 0457-2014 UND - - 1 S/. 45.00 - - 1 S/. 45.00 S/. 45.00 - S/. 0.00 - - - S/. 0.00 1.00 45.00
PLANCHA DE BATIR 0457-2014 UND - - 4 S/. 30.00 - - 4 S/. 30.00 S/. 7.50 3 S/. 22.50 - - 3 S/. 22.50 1.00 7.50
PLANCHA DE PULIR 0457-2014 UND - - 4 S/. 36.00 - - 4 S/. 36.00 S/. 9.00 4 S/. 36.00 - - 4 S/. 36.00 - -
PLASTICO GRUESO TRIPLE ANCHO 0457-2014 ROLLO - - 150 S/. 525.00 - - 150 S/. 525.00 S/. 3.50 150 S/. 525.00 - - 150 S/. 525.00 - -
PLOMADA NACIONAL METALICA 0457-2014 UND - - 3 S/. 27.00 - - 3 S/. 27.00 S/. 9.00 1 S/. 9.00 - - 1 S/. 9.00 2.00 18.00
CINTA DE SEGURIDAD 0457-2014 UND - - 3 S/. 114.00 - - 3 S/. 114.00 S/. 38.00 3 S/. 114.00 - - 3 S/. 114.00 - -
WINCHA DE 100 MTS. 0457-2014 UND - - 1 S/. 82.00 - - 1 S/. 82.00 S/. 82.00 1 S/. 82.00 - - 1 S/. 82.00 - -
TUBO RECTANGULAR 100 x 50 x 3 mm x 6mts. 0457-2014 UND - - 1 S/. 99.00 - - 1 S/. 99.00 S/. 99.00 1 S/. 99.00 - - 1 S/. 99.00 - -
UTILES DE ESCRITORIO O/C Nº S/. 0.00 S/. 695.45 S/. 0.00 S/. 695.45 S/. 695.45 S/. 0.00 S/. 695.45 S/. 0.00
ARCHIVADOR D/CARTON C/PALANCA, ANILLO Y SUJETADOR METALICO,
0384-2014 UND - - 8 S/. 26.00 - - 8 S/. 26.00 S/. 3.25 8 S/. 26.00 - - 8 S/. 26.00 - -
C/BROCHE METALICO O PLASTICO D/LOMO ANCHO T. OFICIO
CINTA ADHESIVA TRANSPARENTE T:1 1/2" X 72 YD 0384-2014 PQTE - - 4 S/. 7.60 - - 4 S/. 7.60 S/. 1.90 4 S/. 7.60 - - 4 S/. 7.60 - -
CUADERNO ENGRAPADO CUADRICULADO D/56 GR. T:A-4 X 92 HOJAS 0384-2014 UND - - 7 S/. 24.50 - - 7 S/. 24.50 S/. 3.50 7 S/. 24.50 - - 7 S/. 24.50 - -
CUADERNO DE OBRA DE 100 FOLIOS X CUADRIPLICADO 0384-2014 UND - - 3 S/. 55.50 - - 3 S/. 55.50 S/. 18.50 3 S/. 55.50 - - 3 S/. 55.50 - -
FOLDER D/PLASTICO C/SUJETADOR SUPERIOR COLORES VARIADOS T:
OFICIO
0384-2014 UND - - 4 S/. 20.00 - - 4 S/. 20.00 S/. 5.00 4 S/. 20.00 - - 4 S/. 20.00 - -
FOLDER MANILA SIN REFUERZO T:A4 BOLSA X 25 UND. 0384-2014 UND - - 3 S/. 13.50 - - 3 S/. 13.50 S/. 4.50 3 S/. 13.50 - - 3 S/. 13.50 - -
PAPEL CARBON P/ESCRITURA MANUAL COLOR AZUL T/A4 CARPETA X 100
0384-2014 Caja - - 1 S/. 12.80 - - 1 S/. 12.80 S/. 12.80 1 S/. 12.80 - - 1 S/. 12.80 - -
UND.
GRAPAS 23/23 X 1000 UNID. 0384-2014 Caja - - 2 S/. 5.00 - - 2 S/. 5.00 S/. 2.50 2 S/. 5.00 - - 2 S/. 5.00 - -
BOLIGRAFO D/TINTA LIQUIDA COLOR AZUL D/PUNTA FINA DIAMETRO
D/PUNTA: 0,1 MM A 0,9 MM.
0384-2014 Caja - - 3 S/. 6.60 - - 3 S/. 6.60 S/. 2.20 3 S/. 6.60 - - 3 S/. 6.60 - -
BOLIGRAFO D/TINTA LIQUIDA COLOR NEGRO D/PUNTA FINA DIAMETRO
0384-2014 Caja - - 3 S/. 6.60 - - 3 S/. 6.60 S/. 2.20 3 S/. 6.60 - - 3 S/. 6.60 - -
D/PUNTA: 1 MM A 1,5 MM.
BOLIGRAFO D/TINTA LIQUIDA COLOR ROJO D/PUNTA FINA DIAMETRO
D/PUNTA: 1 MM A 1,5 MM.
0384-2014 Caja - - 3 S/. 6.60 - - 3 S/. 6.60 S/. 2.20 3 S/. 6.60 - - 3 S/. 6.60 - -
BOLIGRAFO D/TINTA SECA COLOR AZUL D/PUNTA FINA DIAMETRO
D/PUNTA: 0,1 MM A 0,9 MM.
0384-2014 Caja - - 8 S/. 2.40 - - 8 S/. 2.40 S/. 0.30 8 S/. 2.40 - - 8 S/. 2.40 - -
BOLIGRAFO D/TINTA SECA COLOR NEGRO D/PUNTA FINA DIAMETRO
D/PUNTA: 0,1 MM A 0,9 MM.
0384-2014 Caja - - 8 S/. 2.40 - - 8 S/. 2.40 S/. 0.30 8 S/. 2.40 - - 8 S/. 2.40 - -
BOLIGRAFO D/TINTA SECA COLOR ROJO D/PUNTA FINA DIAMETRO
0384-2014 Caja - - 8 S/. 2.40 - - 8 S/. 2.40 S/. 0.30 8 S/. 2.40 - - 8 S/. 2.40 - -
D/PUNTA: 0,1 MM A 0,9 MM.
PAPEL BOND D/80 GR. T: A-4 PAQUETE X 500 UNID. 0384-2014 Caja - - 10 S/. 129.80 - - 10 S/. 129.80 S/. 12.98 10 S/. 129.80 - - 10 S/. 129.80 - -
PAPEL LUSTRE COLORES VARIADOS T: 50 CM X 70 CM. 0384-2014 Caja - - 10 S/. 3.00 - - 10 S/. 3.00 S/. 0.30 10 S/. 3.00 - - 10 S/. 3.00 - -
PORTAMINA C/PUNTA METALICA ANCHO D/TRAZO: 0,5 MM. 0384-2014 Caja - - 12 S/. 59.76 - - 12 S/. 59.76 S/. 4.98 12 S/. 59.76 - - 12 S/. 59.76 - -
CUADERNO ANILLO SIMPLE CUADRICULADO D/56 GR. T: A-4 X 200 HOJAS 0384-2014 Caja - - 2 S/. 15.00 - - 2 S/. 15.00 S/. 7.50 2 S/. 15.00 - - 2 S/. 15.00 - -
GOMA EN BARRA D/20 GR. O 21 GR. 0384-2014 Caja - - 1 S/. 1.90 - - 1 S/. 1.90 S/. 1.90 1 S/. 1.90 - - 1 S/. 1.90 - -
CORRECTOR LIQUIDO TIPO LAPICERO 0384-2014 Caja - - 3 S/. 5.40 - - 3 S/. 5.40 S/. 1.80 3 S/. 5.40 - - 3 S/. 5.40 - -
PLUMON RESALTADOR F RECTANGULAR COLORES VARIADOS D/PUNTA
BISELA
0384-2014 Caja - - 3 S/. 5.40 - - 3 S/. 5.40 S/. 1.80 3 S/. 5.40 - - 3 S/. 5.40 - -
FORRO D/PLASTICO T: A-4 O CARTA X 5MT. 0384-2014 Caja - - 2 S/. 9.60 - - 2 S/. 9.60 S/. 4.80 2 S/. 9.60 - - 2 S/. 9.60 - -
REGLA DE PLASTICO T:30 CM 0384-2014 Caja - - 4 S/. 2.80 - - 4 S/. 2.80 S/. 0.70 4 S/. 2.80 - - 4 S/. 2.80 - -
BORRADOR DE CAUCHO P/TINTA Y LAPIZ T/GRANDE 0384-2014 Docena - - 6 S/. 2.40 - - 6 S/. 2.40 S/. 0.40 6 S/. 2.40 - - 6 S/. 2.40 - -
TINTA P/TAMPON COLOR (01 AZUL, 01 NEGRO) 0384-2014 Mill. - - 2 S/. 3.60 - - 2 S/. 3.60 S/. 1.80 2 S/. 3.60 - - 2 S/. 3.60 - -
FASTENER METALICO CAJA X 50 UND. 0384-2014 Caja - - 1 S/. 3.50 - - 1 S/. 3.50 S/. 3.50 1 S/. 3.50 - - 1 S/. 3.50 - -
TABLERO DE MADERA C/MANIJA DE PRESION T/OFICIO 0384-2014 UND - - 2 S/. 9.00 - - 2 S/. 9.00 S/. 4.50 2 S/. 9.00 - - 2 S/. 9.00 - -
TIJERA METALICA C/MANGO PLASTICO T/8" 0384-2014 UND - - 2 S/. 5.60 - - 2 S/. 5.60 S/. 2.80 2 S/. 5.60 - - 2 S/. 5.60 - -
CLIPS METALICO ESTANDAR CAJA X 100 UNID. 0384-2014 UND - - 3 S/. 1.80 - - 3 S/. 1.80 S/. 0.60 3 S/. 1.80 - - 3 S/. 1.80 - -
CD X 25 UNID. 0384-2014 UND - - 1 S/. 25.00 - - 1 S/. 25.00 S/. 25.00 1 S/. 25.00 - - 1 S/. 25.00 - -
ENGRAMPADOR C/YUNQUE GIRATORIO T:CHICO C: 16 A 25 HOJAS
B/CALIDAD
0384-2014 UND - - 1 S/. 12.00 - - 1 S/. 12.00 S/. 12.00 1 S/. 12.00 - - 1 S/. 12.00 - -
PERFORADOR 0384-2014 UND - - 1 S/. 12.00 - - 1 S/. 12.00 S/. 12.00 1 S/. 12.00 - - 1 S/. 12.00 - -
TONER 85 - A HP 0252-2014 UND - - 1 S/. 195.99 - - 1 S/. 195.99 S/. 195.99 1 S/. 195.99 - - 1 S/. 195.99 - -
INGRESADO GASTOS EJECUTADOS EN OBRA SALDO EN OBRA DE
PROGRAMADO
CLASIFICADOR DESCRIPCION O/C ó O/T Nº UNID C/CHICA ABA.-O/C ABA.-O/S TOTAL PRECIO MES ANT. PTE. MES ACUMULADO MATERIALES
S/ ANALITICO
CAN MONTO CANT MONTO CANT MONTO CANT MONTO UNIT. CANT MONTO CANT MONTO TOT. UTILIZ. TOTAL GASTO CANT MONTO
2.6.2.3.2.6 COSTO DE CONST. POR ADM. DIRECTA - SERVICIOS O/T Nº S/. 11,000.00 S/. 0.00 S/. 0.00 S/. 7,245.00 S/. 7,245.00 S/. 1,250.00 S/. 5,995.00 S/. 7,245.00 S/. 3,755.00
SERV. DE ELABORACION DE CONTROL VISIBLE DE ALMACEN UND - - - - 400 S/. 200.00 400 S/. 200.00 S/. 0.50 - - 400 S/. 200.00 400 S/. 200.00 - -
SERV. DE ELABORACION DE CONTROL DE INGRESO Y SALIDA DE
UND - - - - 200 S/. 100.00 200 S/. 100.00 S/. 0.50 - - S/. 100.00 200 S/. 100.00 - -
MATERIALES 200
SERV. DE ELABORACION DE PARTES DIARIOS DE MAQUINARIA UND - - - - 2 S/. 70.00 2 S/. 70.00 S/. 35.00 - - 2 S/. 70.00 2 S/. 70.00 - -
SERV. DE ELABORACION DE PARTES DIARIOS DE RECEPCION DE
UND - - - - 2 S/. 70.00 2 S/. 70.00 S/. 35.00 - - S/. 70.00 2 S/. 70.00 - -
AGREGADOS 2
SERVICIO DE CONFECCION DE PLACA RECORDATORIA S/DISEÑO
ADJUNTO
0649-2014 UND - - - - 1 S/. 250.00 1 S/. 250.00 S/. 250.00 - - 1 S/. 250.00 1 S/. 250.00 - -
SERVIVIO DE FOTOCOPIADO T/A-4 0105-2014 UND - - - - 6,000 S/. 300.00 6,000 S/. 300.00 S/. 0.05 - - 6,000 S/. 300.00 6,000 S/. 300.00 - -
SERVICIO DE CONFECCION DE GIGANTOGRAFIA DE 4.80 x 3.60M. A TODO
0150-2014 UND - - - - 1 S/. 1,250.00 1 S/. 1,250.00 S/. 1,250.00 1 S/. 1,250.00 - 1 S/. 1,250.00 - -
COSTO INCLUYE 02 CASTILLOS METALICOS E INSTALACION -
SERVICIO DE CONSTRUCCION DE TACHOS ECOLOGICOS METALICOS DE
0663-2014 UND - - - - 6 S/. 3,720.00 6 S/. 3,720.00 S/. 620.00 - - S/. 3,720.00 6 S/. 3,720.00 - -
3 CUERPOS SEGÚN DISEÑO 6
SERVICIO DE CONSTRUCCION DE SEÑAL INFORMATIVA 0664-2014 UND - - - - 5 S/. 985.00 5 S/. 985.00 S/. 197.00 - - 5 S/. 985.00 5 S/. 985.00 - -
SERVICIO DE CONSTRUCCION DE SEÑALIZACION REGLAMENTARIA 0664-2014 UND - - - - 1 S/. 300.00 1 S/. 300.00 S/. 300.00 - - 1 S/. 300.00 1 S/. 300.00 - -
SERVICIO DE DISEÑO DE MEZCLA F'C=210KG/CM2 --- UND - - - - - S/. 0.00 - S/. 0.00 S/. 0.00 - - - - - S/. 0.00 - -
SERVICIO DE DISEÑO DE MEZCLA F'C=175KG/CM2 --- UND - - - - - S/. 0.00 - S/. 0.00 S/. 0.00 - - - - - S/. 0.00 - -
SERVICIO DE ROTURA DE CONCRETO (PROBETA) --- UND - - - - - S/. 0.00 - S/. 0.00 S/. 0.00 - - - - - S/. 0.00 - -
SERVICIO DE DENSIDAD DE CAMPO --- UND - - - - - S/. 0.00 - S/. 0.00 S/. 0.00 - - - - - S/. 0.00 - -
SERVICIO DE PROCTOR MODIFICADO --- UND - - - - - S/. 0.00 - S/. 0.00 S/. 0.00 - - - - - S/. 0.00 - -
2.63.29.99 MAQUINARIAS Y EQUIPOS O/C Nº S/. 19,000.00 S/. 0.00 S/. 0.00 S/. 16,965.00 S/. 16,965.00 S/. 16,965.00 S/. 0.00 S/. 16,965.00 S/. 2,035.00
MANGUERA PARA VIBRADORA DE CONCRETO DE 1 1/2" x 6.00 MTS 0285-2014 UND - - - - 1 S/. 370.00 1 S/. 370.00 S/. 370.00 1 S/. 370.00 - - 1 S/. 370.00 - -
SIERRA CIRCULAR DE 7 1/4" DE 1200 WATTS PARA CORTAR MADERA 0285-2014 UND - - - - 1 S/. 395.00 1 S/. 395.00 S/. 395.00 1 S/. 395.00 - 1 S/. 395.00 - -
-
CORTADORA ELECTRICA PARA ACERO DE 7" MODELO KG 2001 2000W
0285-2014 UND - - - - 1 S/. 400.00 1 S/. 400.00 S/. 400.00 1 S/. 400.00 - 1 S/. 400.00 - -
8400RPM -
COMPACTADORA TIPO PLANCHA DE 9 HP 0285-2014 UND - - - - 1 S/. 2,850.00 1 S/. 2,850.00 S/. 2,850.00 1 S/. 2,850.00 - - 1 S/. 2,850.00 - -
TOTAL S/. 411,668.00 S/. 0.00 S/. 175,320.83 S/. 24,210.00 S/. 199,530.83 S/. 183,072.75 S/. 12,457.38 S/. 195,530.13 S/. 9,790.70
DESCRIPCION EJECUCIO
OBRA
: MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MA
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUAYNATE CRUZ
IMPLEMENTOS DE SEGURIDAD
07
IMPLEMENTOS DE SEGURIDAD 07
IMPLEMENTOS DE SEGURIDAD
07
IMPLEMENTOS DE SEGURIDAD
07
IMPLEMENTOS DE SEGURIDAD 07
IMPLEMENTOS DE SEGURIDAD
07
CLASE RUBRO
COMBUSTIBLE 07
COMBUSTIBLE 07
CLASE RUBRO
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
MATERIALES DE CONSTRUCCION 07
CLASE RUBRO
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
HERRAMIENTAS 07
CLASE RUBRO
UTILES DE ESCRITORIO
07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
UTILES DE ESCRITORIO 07
2.63.29.99
CLASE RUBRO
MAQUINARIAS Y EQUIPOS
07
MAQUINARIAS Y EQUIPOS 07
MAQUINARIAS Y EQUIPOS 07
MAQUINARIAS Y EQUIPOS 07
MAQUINARIAS Y EQUIPOS 07
DESCRIPCION EJECUCION PRESUPUESTAL POR FUENTE DE FINACIA
RUBRO 07
: MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II ETAPA)
ZAPATOS DE SEGURIDAD C/PUNTA DE ACERO DE BUENA CALIDAD (1 PAR TALLA 36, 1 PAR TALLA 37, 4 PARES TALLA 39,
4 PARES TALLA 40 Y 5 PARES TALLA 41)
ZAPATOS DE SEGURIDAD ORIGINAL FOUNDATION ST-P/10612 G-20 T:BUENA CALIDAD (T:3840,42)
CAPOTINES IMPERMEABLES CON CAPUCHA ANLUC 3.5 MM DE OBRA DE B/CALIDAD
GASTO TOTAL DE IMPLEMENTOS DE SEGURIDAD
DESCRIPCION
PETROLEO
GASOLINA 90 OCT
GASTO TOTAL DE COMBUSTIBLE
DESCRIPCION
ALAMBRE NEGRO RECOCIDO N° 08
ALAMBRE NEGRO RECOCIDO N° 16
CLAVOS C/C 2 1/2"
CLAVOS C/C 2"
CLAVOS C/C 3"
LIJA DE FIERRO Nº 40
YUTE
YESO DE 25 KG.
ARENA FINA
ARENA GRUESA
DESCRIPCION
ARCHIVADOR D/CARTON C/PALANCA, ANILLO Y SUJETADOR METALICO, C/BROCHE METALICO O PLASTICO D/LOMO
ANCHO T. OFICIO
CINTA ADHESIVA TRANSPARENTE T:1 1/2" X 72 YD
CUADERNO ENGRAPADO CUADRICULADO D/56 GR. T:A-4 X 92 HOJAS
CUADERNO DE OBRA DE 100 FOLIOS X CUADRIPLICADO
FOLDER D/PLASTICO C/SUJETADOR SUPERIOR COLORES VARIADOS T: OFICIO
FOLDER MANILA SIN REFUERZO T:A4 BOLSA X 25 UND.
PAPEL CARBON P/ESCRITURA MANUAL COLOR AZUL T/A4 CARPETA X 100 UND.
GRAPAS 23/23 X 1000 UNID.
BOLIGRAFO D/TINTA LIQUIDA COLOR AZUL D/PUNTA FINA DIAMETRO D/PUNTA: 0,1 MM A 0,9 MM.
BOLIGRAFO D/TINTA LIQUIDA COLOR NEGRO D/PUNTA FINA DIAMETRO D/PUNTA: 1 MM A 1,5 MM.
BOLIGRAFO D/TINTA LIQUIDA COLOR ROJO D/PUNTA FINA DIAMETRO D/PUNTA: 1 MM A 1,5 MM.
BOLIGRAFO D/TINTA SECA COLOR AZUL D/PUNTA FINA DIAMETRO D/PUNTA: 0,1 MM A 0,9 MM.
BOLIGRAFO D/TINTA SECA COLOR NEGRO D/PUNTA FINA DIAMETRO D/PUNTA: 0,1 MM A 0,9 MM.
BOLIGRAFO D/TINTA SECA COLOR ROJO D/PUNTA FINA DIAMETRO D/PUNTA: 0,1 MM A 0,9 MM.
PAPEL BOND D/80 GR. T: A-4 PAQUETE X 500 UNID.
PAPEL LUSTRE COLORES VARIADOS T: 50 CM X 70 CM.
PORTAMINA C/PUNTA METALICA ANCHO D/TRAZO: 0,5 MM.
CUADERNO ANILLO SIMPLE CUADRICULADO D/56 GR. T: A-4 X 200 HOJAS
GOMA EN BARRA D/20 GR. O 21 GR.
CORRECTOR LIQUIDO TIPO LAPICERO
PLUMON RESALTADOR F RECTANGULAR COLORES VARIADOS D/PUNTA BISELA
FORRO D/PLASTICO T: A-4 O CARTA X 5MT.
REGLA DE PLASTICO T:30 CM
BORRADOR DE CAUCHO P/TINTA Y LAPIZ T/GRANDE
TINTA P/TAMPON COLOR (01 AZUL, 01 NEGRO)
FASTENER METALICO CAJA X 50 UND.
TABLERO DE MADERA C/MANIJA DE PRESION T/OFICIO
TIJERA METALICA C/MANGO PLASTICO T/8"
CLIPS METALICO ESTANDAR CAJA X 100 UNID.
CD X 25 UNID.
ENGRAMPADOR C/YUNQUE GIRATORIO T:CHICO C: 16 A 25 HOJAS B/CALIDAD
PERFORADOR
TONER 85-A
GASTO TOTAL DE UTILES DE ESCRITORIO
MAQUINARIAS Y EQUIPOS
DESCRIPCION
RUBRO 07
BOSQUES (II ETAPA)
TOTAL
S/. 2,369.79
S/. 27,654.33
S/. 33,542.33
S/. 39,921.78
S/. 33,981.75
S/. 28,642.34
S/. 25,797.84
DE MANO DE OBRA S/. 191,910.16
TOTAL
S/. 450.00
S/. 135.00
S/. 52.50
S/. 127.50
S/. 112.50
S/. 120.00
S/. 76.00
S/. 1,650.00
S/. 1,044.00
S/. 390.00
LEMENTOS DE SEGURIDAD S/. 4,157.50
TOTAL
S/. 4,681.38
S/. 1,781.00
DE COMBUSTIBLE S/. 6,462.38
TOTAL
S/. 190.00
S/. 304.00
S/. 228.00
S/. 114.00
S/. 228.00
S/. 100.00
S/. 130.00
S/. 156.00
S/. 950.00
S/. 5,040.00
S/. 5,040.00
S/. 5,040.00
S/. 3,360.00
S/. 5,220.00
S/. 5,220.00
S/. 5,220.00
S/. 4,350.00
S/. 29,398.50
S/. 29,398.50
S/. 29,398.50
S/. 9,799.50
S/. 1,170.00
S/. 2,653.20
S/. 462.00
S/. 2,160.00
S/. 486.00
S/. 888.00
S/. 922.50
S/. 2,980.00
S/. 196.00
S/. 441.00
S/. 75.00
S/. 1,250.00
S/. 1,552.50
S/. 2,520.00
S/. 455.00
S/. 88.00
S/. 2,960.00
ERIALES DE CONSTRUCCION S/. 160,144.20
TOTAL
S/. 23.00
S/. 177.00
S/. 90.00
S/. 66.00
S/. 16.00
S/. 896.00
S/. 34.00
S/. 154.80
S/. 90.00
S/. 360.00
S/. 150.00
S/. 104.00
S/. 72.00
S/. 252.00
S/. 211.50
S/. 130.00
S/. 40.50
S/. 36.50
S/. 45.00
S/. 30.00
S/. 36.00
S/. 525.00
S/. 27.00
S/. 114.00
S/. 82.00
S/. 99.00
DE HERRAMIENTAS S/. 3,861.30
TOTAL
S/. 26.00
S/. 7.60
S/. 24.50
S/. 55.50
S/. 20.00
S/. 13.50
S/. 12.80
S/. 5.00
S/. 6.60
S/. 6.60
S/. 6.60
S/. 2.40
S/. 2.40
S/. 2.40
S/. 129.80
S/. 3.00
S/. 59.76
S/. 15.00
S/. 1.90
S/. 5.40
S/. 5.40
S/. 9.60
S/. 2.80
S/. 2.40
S/. 3.60
S/. 3.50
S/. 9.00
S/. 5.60
S/. 1.80
S/. 25.00
S/. 12.00
S/. 12.00
S/. 195.99
UTILES DE ESCRITORIO S/. 695.45
TOTAL
S/. 200.00
S/. 100.00
S/. 70.00
S/. 70.00
S/. 250.00
S/. 300.00
S/. 1,250.00
S/. 3,720.00
S/. 985.00
S/. 300.00
---
---
---
---
---
AL DE SERVICIOS S/. 7,245.00
TOTAL
S/. 12,950.00
S/. 370.00
S/. 395.00
S/. 400.00
S/. 2,850.00
AL DE SERVICIOS S/. 16,965.00
SUPUESTAL RUBRO 18 S/. 391,440.99
BALANCE DE EJECUCION PRESUPUESTAL Y GASTO FINAL
RUBRO 07
OBRA : MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II ETAPA)
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUAYNATE CRUZ
ASIGNACION
ITEM RUBRO CLASIFICADOR DESCRIPCION % GASTO FINAL
PRESUPUESTAL TOTAL
01 2.6.2.3.2.4 COST. POR CONST. POR ADM. DIRECTA-PERSONAL S/. 199,978.00 100% S/. 191,910.16
02 RUBRO 07 2.6.2.3.2.5 COSTO DE CONST. POR ADM. DIRECTA - BIENES S/. 181,690.00 100% S/. 175,320.83
03 2.6.2.3.2.6 COSTO DE CONST. POR ADM. DIRECTA - SERVICIOS S/. 11,000.00 100% S/. 7,245.00
04 2.6.3.2.9.99 COSTO DE CONST. POR ADM. DIREC- MAQUINARIAS Y EQUIPOS S/. 19,000.00 100% S/. 16,965.00
TOTAL EJECUTADO S/. 411,668.00 100% S/. 391,440.99
FINAL
JULIO % ACUMULADO %
S/. 25,797.84 12.90% S/. 191,910.16 95.97%
JULIO % ACUMULADO %
S/. 6,462.38 3.56% S/. 175,320.83 96.49%
JULIO % ACUMULADO %
S/. 5,995.00 54.50% S/. 7,245.00 65.86%
JULIO % ACUMULADO %
S/. 0.00 0.00% S/. 16,965.00 89.29%
RESUMEN POR ESPECIFICAS DE GASTOS
OBRA
: MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II
ETAPA)
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
OBRA : MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II ETAPA)
META : 004
SALDO
TOTAL
S/. 8,067.84
S/. 6,369.17
S/. 3,755.00
S/. 2,035.00
RELACION DE
RUBRO
MES : JULIO
OBRA : MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
CANTIDAD UNID
15 UND
15 PAR
15 UND
15 PAR
15 UND
15 UND
2 PAR
15 UND
3 UND
15 UND
50 KG
80 KG
60 KG
30 KG
60 KG
50 UND
20 ML
12 BLS
10 M3
90 M3
90 M3
90 M3
90 M3
90 M3
90 M3
60 M3
75 M3
1500 BOL
1500 BOL
1500 BOL
500 BOL
GLN
GLN
RELACION DE
RUBRO
MES : JULIO
OBRA : MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
CANTIDAD UNID
45 VAR
66 VAR
30 UND
150 UND
20 UND
120 UND
150 UND
100 UND
8 PLANCHA
100 GLN
45 GLN
30 UND
40 GLN
7 GLN
4 GLN
45 UND
8 PZA
1 UND
3 UND
15 UND
3 UND
5 UND
8 UND
2 UND
12 UND
20 KG
15 UND
2 UND
2 UND
6 UND
9 UND
9 UND
RELACION DE
RUBRO
MES : JULIO
OBRA : MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
CANTIDAD UNID
100 ML
3 UND
1 UND
1 UND
4 UND
4 UND
150 ROLLO
3 UND
3 UND
1 UND
1 UND
8 UND
4 UND
7 UND
3 UND
4 UND
3 BOLSA
1 CARP.
2 CAJA
3 UND
3 UND
3 UND
8 UND
8 UND
8 UND
10 PAQU.
10 PLIEGO
12 UND
2 UND
1 UND
3 UND
3 UND
2 UND
RELACION DE
RUBRO
MES : JULIO
OBRA : MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
CANTIDAD UNID
4 UND
6 UND
2 UND
1 CAJA
2 UND.
2 UND.
3 CAJA
1 CONO
1 UND
1 UND
1 UND
1 UND
1 UND
1 UND
1 UND
1 UND
RELACION DE PECOSAS
RUBRO 07
: MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II ETAPA)
DESCRIPCION
VESTUARIO
CHALECO CON BOLSILLO Y ACCESORIOS DE SOPORTE
GUANTES DE CUERO C-35
MASCARILLA PARA POLVO DE BUENA CALIDAD
GUANTES DE JEBE
LENTES DE SEGURIDAD PANORAMICO CON BANDA ELASTICA ANTI EMPAÑANTE DE B/CALIDAD
PROTECTOR DE CABEZA (CASCOS DE SEGURIDAD)
PROTECTOR DE CABEZA PARA INGENIERO CON SOPORTE 6 PUNTOS
ZAPATOS DE SEGURIDAD C/PUNTA DE ACERO DE BUENA CALIDAD (1 PAR TALLA 36, 1 PAR TALLA 37, 4 PARES TALLA
ZAPATOS DE SEGURIDAD ORIGINAL FOUNDATION ST-P/10612 G-20 T:BUENA CALIDAD (T:3840,42)
CAPOTINES IMPERMEABLES CON CAPUCHA ANLUC 3.5 MM DE OBRA DE B/CALIDAD
MATERIALES DE CONSTRUCCION
ALAMBRE NEGRO RECOCIDO N° 08
ALAMBRE NEGRO RECOCIDO N° 16
CLAVOS C/C 2 1/2"
CLAVOS C/C 2"
CLAVOS C/C 3"
LIJA DE FIERRO Nº 40
YUTE
YESO DE 25 KG.
ARENA FINA
ARENA GRUESA
PIEDRA CHANCADA DE 3/4"
ARENA GRUESA
PIEDRA CHANCADA DE 3/4"
ARENA GRUESA
PIEDRA CHANCADA DE 3/4"
ARENA GRUESA
PIEDRA CHANCADA DE 3/4"
CEMENTO PORTLAND TIPO I (42.5KG)
CEMENTO PORTLAND TIPO I (42.5KG)
CEMENTO PORTLAND TIPO I (42.5KG)
CEMENTO PORTLAND TIPO I (42.5KG)
PETROLEO
GASOLINA 90 OCT
RELACION DE PECOSAS
RUBRO 07
: MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II ETAPA)
DESCRIPCION
DESCRIPCION
DESCRIPCION
PECOSA
Nº00259-14
Nº00233-14
Nº00258-14
Nº00154-14
Nº00357-14
Nº00557-14
Nº00482-14
Nº00556-14
Nº00555-14
Nº00554-14
Nº00569-14
Nº00568-14
E PECOSAS
O 07
O - JR. LOS BOSQUES (II ETAPA)
PECOSA
Nº00235-14
Nº00155-14
Nº00156-14
Nº00481-14
Nº00174-14
Nº00157-14
Nº00234-14
Nº00480-14
E PECOSAS
O 07
O - JR. LOS BOSQUES (II ETAPA)
Nº00480-14
PECOSA
Nº00200-14
E PECOSAS
O 07
O - JR. LOS BOSQUES (II ETAPA)
Nº00200-14
PECOSA
Nº00096-14
Nº00257-14
Nº00303-14
INVENTARIO FISICO
MES : JULIO
: MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II
OBRA
ETAPA)
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
INGRESO
SEGÚN
ITEM DESCRIPCION UND STOCK P.UNIT TOTAL
PECOSA
MATERIALES
1 Fierro Corrugado 1/2" x 9m Varilla 3 Nº00235-14 S/. 26.00 S/. 78.00
2 Alambre Negro Nº08 Kg 40 Nº00233-14 S/. 3.80 S/. 152.00
3 Grasa para Maquinaria Gln 2 S/. 22.00 S/. 44.00
Nº00174-14
4 Aceite 20w50 para motor Gln 4 S/. 65.00 S/. 260.00
5 Asfalto RC-250 Gln 40 Nº00156-14 S/. 12.50 S/. 500.00
6 Yute Nacional Mt 11 S/. 6.50 S/. 71.50
Nº00154-14
7 Yeso (bolsa de 25Kg) Mt 3 S/. 13.00 S/. 39.00
8 Lija de Fierro Nº40 Mt 25 Nº00258-14 S/. 2.00 S/. 50.00
9 Pinturas de Trafico Gln 14 S/. 63.00 S/. 882.00
Nº00481-14
10 Disolvente Jet Trafic Gln 31 S/. 34.50 S/. 1,069.50
IMPLEMENTOS SEGURIDAD
1 Chaleco con Bolsillo Und 1 S/. 30.00 S/. 30.00
2 Protector de Cabeza Und 5 S/. 8.00 S/. 40.00
3 Lentes de Seguridad Und 8 Nº00259-14 S/. 7.50 S/. 60.00
4 Capotines Impermeables Und 4 S/. 26.00 S/. 104.00
5 Mascarilla para polvo Und 10 S/. 3.50 S/. 35.00
HERRAMIENTAS
1 Buggi con rodaje y mango Und 1 S/. 112.00 S/. 112.00
2 Alicate Und 1 S/. 23.00 S/. 23.00
3 Azuelas Und 3 S/. 22.00 S/. 66.00
4 Brochas 4" Und 4 S/. 6.00 S/. 24.00
5 Bruña de Centro Und 1 S/. 3.20 S/. 3.20
6 Cordel Nylon Rollo 1 S/. 17.00 S/. 17.00
7 Rastrillos Und 2 S/. 12.00 S/. 24.00
Nº00480-14
8 Picos Und 4 S/. 28.00 S/. 112.00
9 Lampas Und 3 S/. 23.50 S/. 70.50
10 Nivel de Mano 12" Und 2 S/. 13.50 S/. 27.00
11 Llave Stilson Und 1 S/. 36.50 S/. 36.50
12 Llave Crayshon Und 1 S/. 45.00 S/. 45.00
13 Plancha de Batir Und 1 S/. 7.50 S/. 7.50
14 Plomadas Und 2 S/. 9.00 S/. 18.00
TOTAL= S/. 4,000.70
VALORIZACION DE COSTO DE PRODUCCION
RUBRO 07
OBRA : MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II ETAPA)
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUAYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
20.80%
S/. 33,981.75 17.71%
S/. 28,642.34 14.92%
S/. 25,797.84 13.44%
ACUMULADO AL MES DE ACUMULADO AL MES DE ACUMULADO AL MES DE ACUMULADO AL MES DE
ABRIL MAYO JUNIO JULIO
% MONTO % MONTO % MONTO %
53.93% S/. 137,469.98 71.63% S/. 166,112.32 86.56% S/. 191,910.16 100.00%
SALDO AL MES DE ABRIL SALDO AL MES DE MAYO SALDO AL MES DE JUNIO SALDO AL MES DE JULIO
% MONTO % MONTO % MONTO %
46.07% S/. 54,440.18 28.37% S/. 25,797.84 13.44% S/. 0.00 0.00%
VALORIZACION DE COSTO DE MATE
RUBRO 07
OBRA : MEJORAMIENTO VIAL JR. MANZANOS TRAMO JR. MANTARO - JR. LOS BOSQUES (II ETAPA)
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUAYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
ARENA GRUESA
GASTOS EJECUTADOS
MARZO ABRIL MAYO JUNIO JULIO
% MONTO % MONTO % MONTO % MONTO %
S/. 190.00 0.11%
S/. 304.00 0.18%
S/. 228.00 0.14%
S/. 114.00 0.07%
S/. 228.00 0.14%
S/. 100.00 0.06%
0.08%
0.09%
S/. 950.00 0.57%
S/. 5,040.00 3.03%
S/. 5,040.00 3.03%
S/. 3,360.00 2.02%
S/. 5,040.00 3.03% ---
S/. 5,220.00 3.13%
S/. 5,220.00 3.13%
S/. 4,350.00 2.61%
S/. 5,220.00 3.13% ---
S/. 9,799.50 5.88%
S/. 29,398.50 17.65%
S/. 29,398.50 17.65%
S/. 29,398.50 17.65%
S/. 4,681.38
S/. 1,781.00
S/. 1,170.00 0.70%
S/. 2,653.20 1.59%
0.28%
1.30%
0.29%
0.53%
0.55%
1.79%
0.12%
0.26%
S/. 75.00 0.05%
0.75%
S/. 1,552.50 0.93%
S/. 2,520.00 1.51%
S/. 455.00 0.27%
S/. 88.00 0.05%
S/. 2,960.00 1.78%
ACUMULADO AL MES DE ACUMULADO AL MES DE ACUMULADO AL MES DE ACUMULADO AL MES DE ACUMULADO AL MES DE
MARZO ABRIL MAYO JUNIO JULIO
% MONTO % MONTO % MONTO % MONTO %
6.05% S/. 18,561.70 11.14% S/. 28,821.70 17.30% S/. 160,144.20 96.12% S/. 166,606.58 100.00%
SALDO AL MES DE MARZO SALDO AL MES DE ABRIL SALDO AL MES DE MAYO SALDO AL MES DE JUNIO SALDO AL MES DE JULIO
% MONTO % MONTO % MONTO % MONTO %
93.95% S/. 148,044.88 88.86% S/. 137,784.88 82.70% S/. 6,462.38 3.88% S/. 0.00 0.00%
COSTO DE MAQUINARIA Y EQU
RUBRO 07
OBRA : MEJORAMIENTO VIAL JR. ISABEL FLORES DE OLIVA TRAMO AV. INDEPENDENCIA - JR. JAZMINES - I ETAPA
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUAYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
GASTOS EJECUTADOS
MARZO ABRIL MAYO JUNIO JULIO
% MONTO % MONTO % MONTO % MONTO %
2.18%
S/. 370.00
2.33%
S/. 395.00
2.36%
S/. 400.00
S/. 2,850.00 16.80%
ACUMULADO AL MES DE ACUMULADO AL MES DE ACUMULADO AL MES DE ACUMULADO AL MES DE ACUMULADO AL MES DE
MARZO ABRIL MAYO JUNIO JULIO
% MONTO % MONTO % MONTO % MONTO %
0.00% S/. 16,965.00 100.00% S/. 16,965.00 100.00% S/. 16,965.00 100.00% S/. 16,965.00 100.00%
SALDO AL MES DE MARZO SALDO AL MES DE ABRIL SALDO AL MES DE MAYO SALDO AL MES DE JUNIO SALDO AL MES DE JULIO
% MONTO % MONTO % MONTO % MONTO %
100.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
MATERIALES USADOS DE STOCK
OBRA : MEJORAMIENTO VIAL JR. ISABEL FLORES DE OLIVA TRAMO AV. INDEPENDENCIA - JR. JAZMINES I ETAPA
META : 004
SUPERVISOR DE OBRA : ING. JENNY MARLENE BLANCO QUINCHO
RESIDENTE DE OBRA : ING. CRISTHIAN K. SALOME DIAZ
ALMACENERA : STA. ANA HUAYNATE CRUZ
FECHA DE INICIO : 28 DE ENERO DEL 2014
CANTIDAD SEGÚN
Nº ORD. DESCRIPCION DE ARTICULOS UND UTILIZADO SALDO
DE STOCK PECOSA Nº
1 25 Cemento Tipo I Portland Bolsa 25 0