You are on page 1of 7

𝑘𝑔

𝑊 = 200
𝑚2
L=3 L=3
𝐼 = 200𝑐𝑚2

𝐸 = 2𝑥105 𝑘𝑔/𝑐𝑚2

L=3

K = EI/L

EC = 15000 √fc
EJERCICIO:

F`c= 350 kg/cm3


Io = ab/12 ⇒ a ⇒ ab2/12 L= 3.5 m
CM = 0.71 kg/m
b
Cv= 0.4 kg/m
Columna
a ⇒ ab2/12 𝑊𝑙 2 1.6𝑋3.52
𝑀𝐶 = =
b 12 12
v͢ ͢ 𝐶𝑀 = 1.69 𝑡𝑜𝑛. 𝑚
fy a ⇒ ab2/12 𝐶𝑣 = 1.4 𝑐𝑚 + 1.7 𝑐𝑣
b 𝐶𝑣 = 1.66
𝐸𝐼/𝑙
Cd = =1
Ʃ𝐸𝐼/𝐿

𝐸𝐼
𝐿
Cd = 𝐸𝐼 𝐸𝐼
+
𝐿 𝐿

0 0
𝐸𝐼
𝐿
Cd = 𝐸𝐼 𝐸𝐼 𝐸𝐼 𝐸𝐼𝑉 𝐼𝐼𝑉
+ + +
𝐿 𝐿 𝐿 𝐿𝐼𝑉

2i 3ei

𝑆𝐼 𝐸𝐼 = 𝐸𝐼𝐼 > 𝐸𝐼𝐼𝐼 = 𝐸𝐼𝑉 , ʌ 𝐿 = 𝐿2 = 𝐿3 = 𝐿4

0 0
0 0
2𝑖 2 𝐼 1
𝑐𝑑2−1 = = 𝑐𝑑2−3 = =
3𝑖 3 2𝐼 + 𝐼 3

𝐼 1 3𝐼 3
𝑐𝑑3−2 = = 𝑐𝑑3−4 = =
𝐼 + 3𝑖 4 3𝐼 + 𝐼 4

-1.29 (Unidades) 1.51


0 -0.001
0 0.006
0.01 -0.009
-0.04 0.035
0.02 -0.07
-0.21 0.282
0.59 -0.42
1.69 1.69
1/3 1/4

-0.21

-1.81
-1.3
0

0
0
0
0
1.1

0.1
0

0
0
0
0
1296

2/3 3/4

-0.6

-0.1

0.8
0
0

0
0
0
0.56

0.07

0.01

0.65
0
0

0 0

Cargas muertas: RNE E.020

Concreto armado el peso lm3 es (2.4 tonf 2.4 tonflm3)


MÉTODO DE MUTO

A B C D

ÁREA TOTAL = 85m2


ÁREA COLUMNAS =

12(0.60𝑥0.30) = 2.16𝑚2

ÁREA VIGAS=

Eje A-A, B-B

2𝑥(7 − (3𝑥0.30))𝑥0.30 = 3.66𝑚2

Eje C-C, D-D

2𝑥(6 − (3𝑥0.30))𝑥0.30 = 3.06𝑚2

Eje 1-1, 4-4

2𝑥(5 − (2𝑥0.60))𝑥0.30 = 2.28𝑚2

Eje 2-2, 3-3

2𝑥(15 − (4𝑥0.60))𝑥0.30 = 7.56𝑚2

16.56𝑚2

ÁREA DE LOSA = 𝐴𝑇 − (𝐴𝑐 + 𝐴𝑣) = 66.28𝑚2

ÁREA DE ACABADOS = 𝐴𝑐 + 𝐴𝑣 = 82.84𝑚2

CARGA MUERTA=

PCD=2.16𝑥12.0𝑥2.4 = 62.21

PVIGA=3(16.56𝑥0.60𝑥2.4) = 71.54

PLOSA=3(66.28𝑥0.16𝑥2.4) = 76.35

PACAB=(82.84𝑥0.20)𝑥3 = 49.704

PTOTAL=(82.84𝑥0.15)𝑥3 = 37.278

297.082𝑚2

CARGA VIVA=

TAB MOVIL=(82.84𝑥0.05) = 4.14

ACABADOS x S/C= (82.84𝑥0.04) = 33.14

37.28𝑚2

𝑃𝑇𝑂𝑇𝐴𝐿 = 𝐶𝑀 + 𝐶𝑉 = 269.75
PACAB= 120𝑘𝑔/𝑚2 → 𝑒 = 0.06𝑚 = 6𝑐𝑚

100𝑘𝑔/𝑚2 → 𝑒 = 0.05𝑚 = 5𝑐𝑚

Eje x, 1-1

C.M.

P.P viga : 0.30 x 0.4=


P.P losa : (3-(0.30 x 0.15)) x 0.16 x 2.4=
Acab. Tob. (AT)

Pocab: AT x 0.12=
P. tab: AT x0.15=
CM
C.V.

Cv:AT x 0.40=
Tob. Hob= AT x 0.05=

Area losa ( ) =3.80 x (

Eje y: D - D
C.M.: (AT= 4 .10/2 =2.05

PPVIGA: 2.05 X 0.30 X 2.4

Pi LOSA: 2.05 X 0.16 X 2.4

P. ACAB:2.05 X 0.12

P. TAB: 2.05M X 015 TN/M

C.V.= 2.05 X 0.40=

Tab. Movil= 2.05 X 0.05=

Lv: 4.10/2 Lv: 1.55

0.775
2.05 2.05 0.775

𝑍𝑈𝐶𝑆
𝑉= 𝑅
𝑥𝑃

Z= Chimbote= Z4=0.45

V=Clínica=categoría=1.50

S=Flexible=S3=1.10

R=Portico Concreto Armado=8x0.9x1


0.45𝑥1.5𝑥2.5𝑥1.10𝑥333.13
𝑉= 72
𝑉 = 85.89 𝑡𝑜𝑛.
NIVEL PESO(P) hi(N) Pixh (%Pixh) Vi Fi
3 111.04 12.0 1332.48 50% 4294.5 42.945
2 111.04 8.0 888.32 33.35% 2862.71 71.5721
1 111.04 4.0 494.16 16.67& 1431.786 85.89

10.73 tn
𝐾𝑜 = 100000𝑐𝑚4

𝐼𝑐 = 𝐼𝑣 = 30𝑥604
17.89 tn
𝐿 = 4.0𝑚 𝐿𝑣 = 4.4𝑚
tn
𝐸 = 15000√210𝑘𝑔𝑐𝑚3

21.47 tn 𝐹𝑣 = 4200𝑘𝑔/𝑐𝑚2

10.73 tn
VP VP

17.89 tn
tn
VP 30x60 VP 30x60

21.47 tn

VP 30x60 VP 30x60

You might also like