Professional Documents
Culture Documents
CLIENT : DESIGN BY :
JOB NO. : DATE: REVIEW BY :
Wood Beam Design Base on NDS 2005
CONCENTRATED LOADS P1 P2 P3
Dead (kips) 0.65 0.6 1.2
Live (kips) 0.26 0.4 1
Location from Left End (ft) 4 8 15
SLOPE 4 : 12 ( q = 18.43 0
)
Code Designation
1 Select Structural, Douglas Fir-Larch D
2 No. 1, Douglas Fir-Larch
3 No. 2, Douglas Fir-Larch #N/A
4 Select Structural, Southern Pine
5 No. 1, Southern Pine
6 No. 2, Southern Pine
Choice => 3
ANALYSIS
DETERMINE REACTIONS, MOMENTS & SHEARS
w DL ,1 d
R 2 0.5 w LL ,1 L1 w DL ,2 w LL ,2 L1 0.5 L 2 L 2 P 8.34 kips X1 = 4.80 ft
cos q cos q L1 L1 X2 = 5.20 ft
X3 = 2.00 ft
w DL ,1 w
R1 w LL ,1 L1 DL ,2 w LL ,2 L 2 P R 2 3.27 kips
cos q cos q
w DL ,2
Mmax = 9.1 ft-kips M Min 0.5 w LL ,2 L 22 P 3 L 2 8.7 ft-kips
Vmax = cos q
6.95 kips, at R2 left.
CD CM Ct Ci CL CF CV Cc Cr
1.25 1.00 1.00 1.00 #N/A #N/A 1.00 1.00 1.00
P 3a 32 L a 3 w 2a 33 4 L 3a 3
D End cos q #N/A #N/A
3EI 24 EI
#N/A 2 L2 / 360 = 0.20 in #N/A
0.06415 Pb 2 2 4
1.5 5w1L
D Mid L b cos q #N/A #N/A
EIL 384 EI
#N/A L1 / 360 = 0.40 in #N/A