ANALISA HARGA SATUAN

*
S65 no pic

/Uploaded by/
Nuryono Putranto

<https://utrisakti.academia.edu/NuryonoPutranto>
* //*top 0.1%*
* //*27,204*
* //

Download XLSX
<https://www.academia.edu/attachments/31948993/download_file?
st=MTQyOTUyNTM2MiwxMTguOTcuNjguMTk0&s=swp-toolbar&ct=MTQyOTUyNjIxMCwzMzY4NQ==>
Paper load

Loading Preview

KOEFISIENPENGALI
I.PEKERJAAN PERSIAPAN GALIAN DAN URUGAN
1
1 M2Pekerjaan Persiapan / Pembersihan LokasiTenaga
0.1000HariPekerjaRp.60,000.00Rp.6,000.00
0.0500HariMandorRp.90,000.00Rp.4,500.00 JumlahRp.
10,500.00
2
1 M'Pekerjaan Pengukuran Site & Pemasangan BouwplankBahan
0.0070M3Papan Kayu Klas III - 2,5/30Rp.1,600,000Rp.11,200.00
0.0120M3Kaso Kayu Klas III - 5/7Rp.1,600,000Rp.19,200.00 0.0200KgPaku
2" - 4"Rp.13,000Rp.260.00 Rp.30,660.00
Tenaga
0.1000HariTukang KayuRp.80,000Rp.8,000.00 0.0100HariKepala
TukangRp.85,000Rp.850.00 0.0500HariMandorRp.90,000Rp.4,500.00
Rp.13,350.00 TotalJumlahRp.
44,010.00
3
1 M3Pekerjaan Galian TanahTenaga
0.5250HariPekerjaRp.60,000Rp.31,500.00
0.0525HariMandorRp.90,000Rp.4,725.00 Rp.36,225.00 TotalJumlahRp.
36,225.00
4
1 M3Pekerjaan Urugan Tanah KembaliTenaga
0.1920HariPekerjaRp.60,000Rp.11,520.00
0.0190HariMandorRp.90,000Rp.1,710.00 Rp.13,230.00 TotalJumlahRp.
13,230.00
5
1 M3Pekerjaan urugan PasirBahan
1.2000M3Pasir UrugRp.75,000.00Rp.90,000.00 Rp.90,000.00
Tenaga
DAFTAR ANALISA BAHAN DAN TENAGA
NO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA
2012
:

KOEFISIENPENGALINO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA


2012
:
0.3000HariPekerjaRp.60,000.00Rp.18,000.00
0.0100HariMandorRp.90,000.00Rp.900.00 Rp.18,900.00 TotalJumlahRp.
108,900.00
4
LSDireksi Keet
Rp.1,500,000.00Rp.1,500,000.00 JumlahRp.
1,500,000.00
5
LSSarana Air & Listrik Kerja
2.0000BulanAir KerjaRp.125,000.00Rp.250,000.00 2.0000BulanListrik
KerjaRp.150,000.00Rp.300,000.00 2.0000BulanAir
BedengRp.200,000.00Rp.400,000.00 2.0000BulanListrik
BedengRp.250,000.00Rp.500,000.00 TotalJumlahRp.
1,450,000.00 II.PEKERJAAN PONDASI
1
1 M3Pasangan Batu KosongBahan
1.2000M3Batu Kali/Batu GunungRp.80,000.00Rp.96,000.00 `Rp.96,000.00
Tenaga
0.2400HariPekerjaRp.60,000.00Rp.14,400.00
0.0080HariMandorRp.90,000.00Rp.720.00 Rp.15,120.00 TotalJumlahRp.
111,120.00
2
1 M3Pasangan Pondasi Kali 1:5Bahan
1.1000M3Batu Kali/Batu GunungRp.80,000.00Rp.88,000.00 0.5440M3Pasir
PasangRp.75,000.00Rp.40,800.00 2.7200ZakSemen
PortlandRp.57,000.00Rp.155,040.00 Rp.283,840.00
Tenaga
1.5000HariPekerjaRp.60,000.00Rp.90,000.00 0.6000HariTukang
BatuRp.80,000.00Rp.48,000.00 0.0600HariKepala
TukangRp.85,000.00Rp.5,100.00 0.0750HariMandorRp.90,000.00Rp.6,750.00
Rp.149,850.00 JumlahRp.
433,690.00 III.PEKERJAAN BETON BERTULANG (Pembesian 150 Kg Besi Untuk
Setiap 1 M3 Beton)UNTUK PLAT FONDASI SETEMPAT (Fondasi
Telapak)A.Pekerjaan Pembesian Per 1 Kg Besi Polos / Ulir

KOEFISIENPENGALINO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA


2012
:
Bahan
1.0000KgBesi BetonRp.9,400.00Rp.9,400.00 0.0150KgKawat
BetonRp.20,000.00Rp.300.00 Rp.9,700.00
Tenaga
0.0075HariPekerjaRp.60,000.00450.00 0.0300HariTukang
BesiRp.80,000.002,400.00 0.0006HariKepala TukangRp.85,000.0051.00
0.0003HariMandorRp.90,000.00Rp.27.00 Rp.2,928.00 JumlahRp.
12,628.00
= Untuk Pembesian 100 Kg Besi Diperoleh
Rp.1,262,800.00 B.Pekerjaan 1 M3 Beton sp. 1:2:3Bahan
6.7200M3Semen PortlandRp.57,000.00383,040.00 0.5400LbrPasir
PasangRp.75,000.0040,500.00 0.8100KgKerikil /
SplitRp.215,000.00174,150.00 Rp.597,690.00
Tenaga
2.0000HariPekerjaRp.60,000.00120,000.00 0.3500HariTukang
BatuRp.80,000.0028,000.00 0.0350HariKepala TukangRp.85,000.002,975.00
1.0000HariMandorRp.90,000.0090,000.00 Rp.240,975.00 JumlahRp.
838,665.00
= Untuk Per M3 Beton Diperoleh
Rp.838,665.00
= 1 M3 Beton Bertulang Fondasi Plat Setempat sp. 1:2:3 & 150 Kg Besi =
Rp.2,101,465.00 IV.PEKERJAAN BETON BERTULANG (Pembesian 150 Kg Besi
Untuk Setiap 1 M3 Beton)UNTUK SLOOF, KOLOM DAN BALOKA.Pekerjaan
Pembesian Per 1 Kg Besi Polos / Ulir

KOEFISIENPENGALINO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA


2012
:
Bahan
1.0000KgBesi BetonRp.9,400.00Rp.9,400.00 0.0150KgKawat
BetonRp.20,000.00Rp.300.00 Rp.9,700.00
Tenaga
0.0075HariPekerjaRp.60,000.00450.00 0.0300HariTukang
BesiRp.80,000.002,400.00 0.0006HariKepala TukangRp.85,000.0051.00
0.0003HariMandorRp.90,000.00Rp.27.00 Rp.2,928.00 JumlahRp.
12,628.00
= Untuk Pembesian 150 Kg Besi Diperoleh
Rp.1,894,200.00 B.Pekerjaan Bekisting Per 1 M2Bahan
0.0400M3Balok Kayu Klas IIIRp.1,600,000.0064,000.00 0.3500LbrTeakwood 9
mmRp.95,000.0033,250.00 0.4000KgPaku 2" - 4"Rp.13,000.005,200.00
Rp.102,450.00
Tenaga
0.3000HariPekerjaRp.60,000.0018,000.00 0.3300HariTukang
KayuRp.80,000.0026,400.00 0.0330HariKepala TukangRp.85,000.002,805.00
0.0060HariMandorRp.90,000.00540.00 Rp.47,745.00 JumlahRp.
101,570.00
= Untuk Bekisting Per M3 Beton = 4 M2 Diperoleh
Rp.203,140.00 C.Pekerjaan 1 M3 Beton sp. 1:2:3Bahan
6.7200M3Semen PortlandRp.57,000.00383,040.00 0.5400LbrPasir
PasangRp.75,000.0040,500.00 0.8100KgKerikil /
SplitRp.215,000.00174,150.00 Rp.597,690.00
Tenaga
2.0000HariPekerjaRp.60,000.00120,000.00 0.3500HariTukang
BatuRp.80,000.0028,000.00 0.0350HariKepala TukangRp.85,000.002,975.00
1.0000HariMandorRp.90,000.0090,000.00 Rp.240,975.00 JumlahRp.
838,665.00
= Untuk Per M3 Beton Diperoleh
Rp.838,665.00
= 1 M3 Beton Bertulang Kolom/Balok sp. 1:2:3 & 150 Kg Besi Diperoleh =
Rp.2,936,005.00 V.PEKERJAAN BETON BERTULANG (Pembesian 100 Kg Besi Untuk
Setiap 1 M3 Beton)

KOEFISIENPENGALINO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA


2012
:
UNTUK DINDINGA.Pekerjaan Pembesian Per 1 Kg Besi Polos / UlirBahan
1.0000KgBesi BetonRp.9,400.00Rp.9,400.00 0.0150KgKawat
BetonRp.20,000.00Rp.300.00 Rp.9,700.00
Tenaga
0.0075HariPekerjaRp.60,000.00450.00 0.0300HariTukang
BesiRp.80,000.002,400.00 0.0006HariKepala TukangRp.85,000.0051.00
0.0003HariMandorRp.90,000.00Rp.27.00 Rp.2,928.00 JumlahRp.
12,628.00
= Untuk Pembesian 100 Kg Besi Diperoleh
Rp.1,262,800.00 B.Pekerjaan Bekisting Per 1 M2Bahan
0.0400M3Balok Kayu Klas IIIRp.1,600,000.0064,000.00 0.3500LbrTeakwood 9
mmRp.95,000.0033,250.00 0.4000KgPaku 2" - 4"Rp.13,000.005,200.00
Rp.102,450.00
Tenaga
0.3000HariPekerjaRp.60,000.0018,000.00 0.3300HariTukang
KayuRp.80,000.0026,400.00 0.0330HariKepala TukangRp.85,000.002,805.00
0.0060HariMandorRp.90,000.00540.00 Rp.47,745.00 JumlahRp.
150,195.00
= Untuk Bekisting Per M3 Beton = 4 M2 Diperoleh
Rp.600,780.00 C.Pekerjaan 1 M3 Beton sp. 1:2:3Bahan
6.7200M3Semen PortlandRp.57,000.00383,040.00 0.5400LbrPasir
PasangRp.75,000.0040,500.00 0.8100KgKerikil /
SplitRp.215,000.00174,150.00 Rp.597,690.00
Tenaga
2.0000HariPekerjaRp.60,000.00120,000.00 0.3500HariTukang
BatuRp.80,000.0028,000.00 0.0350HariKepala TukangRp.85,000.002,975.00
1.0000HariMandorRp.90,000.0090,000.00 Rp.240,975.00 JumlahRp.
838,665.00
= Untuk Per M3 Beton Diperoleh
Rp.838,665.00
= 1 M3 Beton Bertulang Dinding sp. 1:2:3 Dengan 100 Kg Besi Diperoleh =
Rp.2,702,245.00

KOEFISIENPENGALINO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA


2012
:
VI.PEKERJAAN BETON LANTAI KERJA sp. 1:3:5
1
1 M3Lantai Kerja sp. 1:3:5Bahan
4.3600ZakSemen PortlandRp.57,000.00Rp.248,520.00 0.5200M3Pasir
PasangRp.75,000.00Rp.39,000.00 0.8700M3Kerikil /
SplitRp.215,000.00Rp.187,050.00 Rp.474,570.00
Tenaga
1.6500HariPekerjaRp.60,000.00Rp.99,000.00 0.2500HariTukang
BatuRp.80,000.00Rp.20,000.00 0.0250HariKepala
TukangRp.85,000.00Rp.2,125.00 0.0800HariMandorRp.90,000.00Rp.7,200.00
Rp.128,325.00 JumlahRp.
602,895.00 VII.PEKERJAAN PASANGAN DAN PLESTERAN
1
1 M2Pasangan Dinding Bata Merah sp. 1:3Bahan
70.0000BuahBata MerahRp.700.00Rp.49,000.00 0.0470M3Pasir
PasangRp.75,000.00Rp.3,525.00 0.2874ZakSemen
PortlandRp.57,000.00Rp.16,381.80 Rp.68,906.80
Tenaga
0.2133HariPekerjaRp.60,000.00Rp.12,800.00 0.0667HariTukang
BatuRp.80,000.00Rp.5,333.33 0.0067HariKepala
TukangRp.85,000.00Rp.566.67 0.0100HariMandorRp.90,000.00Rp.900.00
Rp.19,600.00 JumlahRp.
88,506.80
2
1 M2Pasangan Dinding Bata Merah sp. 1:5Bahan
70.0000BuahBata MerahRp.700.00Rp.49,000.00 0.0540M3Pasir
PasangRp.75,000.00Rp.4,050.00 0.1936ZakSemen
PortlandRp.57,000.00Rp.11,035.20 Rp.64,085.20
Tenaga
0.2133HariPekerjaRp.60,000.00Rp.12,800.00 0.0667HariTukang
BatuRp.80,000.00Rp.5,333.33 0.0067HariKepala
TukangRp.85,000.00Rp.566.67 0.0100HariMandorRp.90,000.00Rp.900.00
Rp.19,600.00 JumlahRp.
83,685.20
3
1 M2Pasangan Dinding Hollow Brick sp. 1:5Bahan

KOEFISIENPENGALINO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA


2012
:
9.5000BuahHollow BrickRp.2,300.00Rp.21,850.00 0.0772M3Pasir
PasangRp.75,000.00Rp.5,790.00 0.4852ZakSemen
PortlandRp.57,000.00Rp.27,656.40 Rp.55,296.40
Tenaga
0.3000HariPekerjaRp.60,000.00Rp.18,000.00 0.1500HariTukang
BatuRp.80,000.00Rp.12,000.00 0.0150HariKepala
TukangRp.85,000.00Rp.1,275.00 0.0150HariMandorRp.90,000.00Rp.1,350.00
Rp.32,625.00 JumlahRp.
87,921.40
4
1 M2Plesteran Dinding sp. 1:3Bahan
0.0190M3Pasir PasangRp.75,000.00Rp.1,425.00 0.1296ZakSemen
PortlandRp.57,000.00Rp.7,387.20 Rp.8,812.20
Tenaga
0.1333HariPekerjaRp.60,000.00Rp.8,000.00 0.1000HariTukang
BatuRp.80,000.00Rp.8,000.00 0.0100HariKepala
TukangRp.85,000.00Rp.850.00 0.0067HariMandorRp.90,000.00Rp.600.00
Rp.17,450.00 JumlahRp.
26,262.20
5
1 M2Plesteran Dinding sp. 1:5Bahan
0.0220M3Pasir PasangRp.75,000.00Rp.1,650.00 0.0864ZakSemen
PortlandRp.57,000.00Rp.4,924.80 Rp.6,574.80
Tenaga
0.1333HariPekerjaRp.60,000.00Rp.8,000.00 0.1000HariTukang
BatuRp.80,000.00Rp.8,000.00 0.0100HariKepala
TukangRp.85,000.00Rp.850.00 0.0067HariMandorRp.90,000.00Rp.600.00
Rp.17,450.00 JumlahRp.
24,024.80
6
1 M2Acian DindingBahan
0.1500ZakSemen PortlandRp.57,000.00Rp.8,550.00 Rp.8,550.00
Tenaga
0.0576HariPekerjaRp.60,000.00Rp.3,456.00 0.0640HariTukang
BatuRp.80,000.00Rp.5,120.00 0.0064HariKepala
TukangRp.85,000.00Rp.544.00 0.0048HariMandorRp.90,000.00Rp.432.00
Rp.9,552.00 JumlahRp.
18,102.00

KOEFISIENPENGALINO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA


2012
:
VIII.PEKERJAAN PENUTUP LANTAI DAN DINDING
1
1 M2Pasangan Granit Lantai Essenza 40 x 40 cmBahan
6.2500BuahGranit EssenzaRp.42,500.00Rp.265,625.00 0.1760ZakSemen
PortlandRp.57,000.00Rp.10,032.00 0.0215M3Pasir
PasangRp.75,000.00Rp.1,612.50 1.3000KgSemen
WarnaRp.8,500.00Rp.11,050.00 Rp.288,319.50
Tenaga
0.4480HariPekerjaRp.60,000.00Rp.26,880.00 0.1493HariTukang
BatuRp.80,000.00Rp.11,946.67 0.0147HariKepala
TukangRp.85,000.00Rp.1,246.67 0.0227HariMandorRp.90,000.00Rp.2,040.00
Rp.42,113.33 JumlahRp.
330,432.83
2
1 M2Pasangan Keramik Lantai 40 x 40 cmBahan
6.2500BuahUbin Keramik 40 x 40 cmRp.13,600.00Rp.85,000.00
0.2276ZakSemen PortlandRp.57,000.00Rp.12,973.20 0.0420M3Pasir
PasangRp.75,000.00Rp.3,150.00 1.5000KgSemen
WarnaRp.8,500.00Rp.12,750.00 Rp.113,873.20
Tenaga
0.4133HariPekerjaRp.60,000.00Rp.24,800.00 0.2333HariTukang
BatuRp.80,000.00Rp.18,666.67 0.0233HariKepala
TukangRp.85,000.00Rp.1,983.33 0.0200HariMandorRp.90,000.00Rp.1,800.00
Rp.47,250.00 JumlahRp.
161,123.20
3
1 M2Pasangan Keramik Lantai 20 x 20 cmBahan
25.0000BuahUbin Keramik 20 x 20 cmRp.3,500.00Rp.87,500.00
0.2276ZakSemen PortlandRp.57,000.00Rp.12,973.20 0.0420M3Pasir
PasangRp.75,000.00Rp.3,150.00 1.5000KgSemen
WarnaRp.8,500.00Rp.12,750.00 Rp.116,373.20
Tenaga
0.4133HariPekerjaRp.60,000.00Rp.24,800.00 0.2333HariTukang
BatuRp.80,000.00Rp.18,666.67 0.0233HariKepala
TukangRp.85,000.00Rp.1,983.33 0.0200HariMandorRp.90,000.00Rp.1,800.00
Rp.47,250.00 JumlahRp.
163,623.20
3
1 M2Pasangan Keramik Lantai 20 x 25 cm

KOEFISIENPENGALINO.SATURAIAN BAHAN DAN UPAHHARGAJUMLAHBAHANHARGA


2012
:
Bahan
20.0000BuahUbin Keramik 20 x 25 cmRp.4,250.00Rp.85,000.00
0.2276ZakSemen PortlandRp.57,000.00Rp.12,973.20 0.0420M3Pasir
PasangRp.75,000.00Rp.3,150.00 1.5000KgSemen
WarnaRp.8,500.00Rp.12,750.00 Rp.113,873.20
Tenaga
0.4133HariPekerjaRp.60,000.00Rp.24,800.00 0.2333HariTukang
BatuRp.80,000.00Rp.18,666.67 0.0233HariKepala
TukangRp.85,000.00Rp.1,983.33 0.0200HariMandorRp.90,000.00Rp.1,800.00
Rp.47,250.00 JumlahRp.
161,123.20 IX.PEKERJAAN ATAP
1
1 M2Rangka Atap Baja RinganBahan
9.0000KgRangka Baja RinganRp.9,000.00Rp.81,000.00
22.0000BuahSekrupRp.250.00Rp.5,500.00 Rp.86,500.00
Tenaga
0.1350HariPekerjaRp.60,000.00Rp.8,100.00 0.4125HariTukang
BesiRp.80,000.00Rp.33,000.00 0.0189HariKepala
TukangRp.85,000.00Rp.1,606.50 0.0135HariMandorRp.90,000.00Rp.1,215.00
Rp.43,921.50 JumlahRp.
130,421.50
2
1 M'Pekerjaan Listplank Kayu Klas IIBahan
0.0210M3Papan Kayu Klas IIRp.4,500,000.00Rp.94,500.00 0.0500KgPaku
4"Rp.13,000.00Rp.650.00 Rp.95,150.00
Tenaga
0.2200HariPekerjaRp.60,000.00Rp.13,200.00 0.3300HariTukang
BatuRp.80,000.00Rp.26,400.00 0.0330HariKepala
TukangRp.85,000.00Rp.2,805.00 0.0090HariMandorRp.90,000.00Rp.810.00
Rp.43,215.00 JumlahRp.
138,365.00
3
1 M2Pasang Genteng Press PlateBahan
11.0000BuahGenteng Press PlateRp.6,500.00Rp.71,500.00 0.0300KgPaku
2"Rp.13,000.00Rp.390.00 Rp.71,890.00
Tenaga
0.2000HariPekerjaRp.60,000.00Rp.12,000.00
Download XLSX
<https://www.academia.edu/attachments/31948993/download_file?s=swp-sidebar>
//

ANALISA HARGA SATUAN

S65 no pic

/Uploaded by/
Nuryono Putranto

//
30 Pages
DOWNLOAD
<https://www.academia.edu/attachments/31948993/download_file?
st=MTQyOTUyNTM2MiwxMTguOTcuNjguMTk0&s=popover>
////
Sign In <https://www.academia.edu/login>

*Sign up*

Before we can start your download,


please take a moment to join our community
of 20,580,820 academic researchers.

// *Connect*
// *Connect*

//* Sign up with email*

*We're sorry. There were some errors with your registration:*


By signing up, you agree to our Terms <https://www.academia.edu/terms>
Loading//

Download

Download PDFs for


over 5.6 Million papers

Share

Share your papers


with other researchers

Analytics

See analytics on your


profile & papers

Follow

Follow other people


in your field

×Close

*Log In*

//*Log In *with *Facebook*


//*Log In *with *Google*
or
Email:
Password:
Remember me on this computer

or reset password <javascript:void(0)>

Enter the email address you signed up with and we'll email you a reset link.

Need an account? Click here to sign up <https://www.academia.edu/signup>

* Job Board <https://www.academia.edu/Jobs>


* About <https://www.academia.edu/about>
* Press <https://www.academia.edu/press>
* Blog <https://medium.com/@academia>
* Stories <https://www.academia.edu/stories>
* Terms <https://www.academia.edu/terms>
* Privacy <https://www.academia.edu/privacy>
* Copyright <https://www.academia.edu/copyright>
* // *We're Hiring!* <https://www.academia.edu/hiring>
* // *Help Center* <http://support.academia.edu/>

Academia © 2015
scribd. scribd. scribd. scribd. scribd.
of 30

You might also like