Professional Documents
Culture Documents
t>> [s]
0 0 0 0 0
879B
RS 611 Ser.No. SPCJ 4D29
IL2
IL3
INSTANTANEOUS OR DEFINITE
TIME HIGH-SET EARTH-FAULT 50 N
PROTECTION START 1
Prot. functions
Start current of I> stage, definite time 0.5 ... 5.0 x In 0.5 ... 5.0 x In 0.5 ... 5.0 x In
Start current of I> stage, inverse time 0.5 ... 2.5 x In 0.5 ... 2.5 x In 0.5 ... 2.5 x In
Start current of I>> stage 0.5 ... 40 x In and ∞ 0.5 ... 40 x In and ∞ 0.5 ... 40 x In and ∞
-
I
I 0
+ +
Rx Tx
SPA-ZC_
+ (~)
- (~)
U aux +
5A
1A
5A
1A
5A
1A
5A
1A
~ + + + + + +
F E D C B A
U2 + -
TS1 SS1 SS2 SS3 TS2
1 1 TRIP
1 1 1 LATCHING
R
U3 SGB/6
SGB/7
SPCJ 4D29
SGR1/1
SGR1/3
SGR1/5
SGR1/7
SGR2/3
SGR2/5
SGR2/7
SGR2/2
SGR2/4
SGR2/6
SGR2/8
SGR3/1
SGR3/2
SGR3/3
SGR3/4
SGR3/5
SGR3/6
SGR3/7
SGR3/8
SGR2/1
SGR1/4
SGR1/8
IRF
SGR1/2
SGR1/6
U1
3I> T1
SGB/1
T2
3I>> T3
SGB/2
T4
T5
Io>
SGB/3
T6
Io>> T7
SGB/4
T8
Connections
SGB/5
RC SETTINGS I/O
SGB/8 SGF/4
SPAJ 140 C RESET T9 0.1...1s
U1
I L1 I L2 I L3 I o IRF
I >> / I n
t >> [s]
Indicator for signalling of internal relay faults I o >/ I n
t o > [s ]
ko
Digital display for readout of numerical parameters, i.e. I o >> /I n
SGB
Indicator showing that the main trip relay of the protection SGR
TRIP
relay has operated
879B
SPCJ 4D29
I L1 I L2 I L3 I o IRF
Use the RESET/STEP push-button to:
- reset operation indicators
- step forward or backward in main menus or submenus
- set adjustable parameter values when in the setting mode I >/I n
RESET
STEP
t > [ s]
k
Use the PROGRAM push-button to: I >> / I n
- enter a submenu from the main menu t >> [s]
- enter the setting mode of an adjustable parameter I o >/ I n
t o >>[s]
Use both push-buttons simultaneously to: SGF
PROGRAM
879B
- carry out an output relay test SPCJ 4D29
Actual operate time t> or 1 Operate time t> or 2 Operate time t> or
multiplier k for stage I> multiplier k multiplier k
Actual operate time t>> 1 Operate time t>> 2 Operate time t>>
of stage I>>
Actual operate time to> 1 Operate time to> or 2 Operate time to> or
or multiplier ko multiplier ko multiplier ko
I L1 I L2 I L3 I o IRF
Low-set stage I>:
Start current I> at definite time 0.5 ... 5.0 x In
Start current I> at inverse time 0.5 ... 2.5 x In*)
RESET
I >/I n STEP
t > [ s]
Operate time t> at definite time 0.05 ... 300 s k
I >> / I n
Time multiplier k> at inverse time 0.05 ... 1.00 t >> [s]
I o >/ I n
High-set stage I>>: t o > [s ]
ko
t o >>[s]
PROGRAM
SGF
Operate time t>> 0.04 ... 300 s SGB
SGR
*) Any setting greater than 2.5 x In will be regarded as equal to 2.5 x In TRIP
879B
SPCJ 4D29
I L1 I L2 I L3 I o IRF
Low-set stage Io>:
Start current Io>, 0.1 ... 0.8 x In
RESET
t > [ s]
Time multiplier k at inverse time 0.05...1.00 k
I >> / I n
t >> [s]
High-set stage Io>>: I o >/ I n
t o > [s ]
Start current Io>> 0.1...10 x In or infinite ko
I o >> /I n
t o >>[s]
Operate time to>> 0.05...300 s PROGRAM
SGF
SGB
SGR
TRIP
879B
SPCJ 4D29
I L1 I L2 I L3 I o IRF
Switchgroup SGB for routing of blocking signals and for I >/I n STEP
t > [ s]
selection of the latching function for the trip relay k
I >> / I n
t >> [s]
Switchgroups SGR1, SGR2 and SGR3 for configuration of I o >/ I n
the output relays t o > [s ]
ko
I o >> /I n
t o >>[s]
PROGRAM
SGF
SGB
SGR
TRIP
879B
SPCJ 4D29
SIGNAL 1
SS2 C
SGF2 / 8 (AR3)
SGR3 / 5
SGR1 / 5 SIGNAL 2
SGR3 / 6 SS3 B
SGR2 / 5
Io> to>, ko
SGR2 / 6
Io SGR1 / 6 (AR1)
Output signals
SGR1 / 8
TRIP
RESET
SGB / 4
SGB / 5 REMOTE SETTINGS
SGB / 8
RELAY RESET SIGNAL DIAGRAM SPCJ 4D29 SPTU ___R1
Default programming
RXIDG characteristic
SGF PROGRAM
Long-term inverse
Extremely inverse
SGB
RI characteristic
Main set
Normal inverse
SGR
Very inverse
Not in use
TRIP
Setting
Second set SPCJ 4D29
Yes
No
SGF1 1 Operation characteristic 0 1 0 1 0 1 0 1 0 x 1=
2 of the low-set overcurrent 0 0 1 1 0 0 1 1 0 x 2=
3 stage (I>) 0 0 0 0 1 1 1 1 0 x 4=
4 Circuit breaker failure protection selected 1 0 0 x 8=
5 Energizing will double the I>> setting 1 0 0 x 16 =
6 Operation characteristic 0 1 0 1 0 1 0 1 0 x 32 =
7 of the low-set earth-fault 0 0 1 1 0 0 1 1 0 x 64 =
8 stage (Io>) 0 0 0 0 1 1 1 1 0 x 128 =
Checksum =
(Default = 000)
Default programming
SGF PROGRAM
SGB
Main set
SGR
TRIP
Setting
Second set SPCJ 4D29
Yes
No
SGF2 1 Manual resetting of I> start indication 1 0 0 x 1=
2 Manual resetting of I>> start indication 1 0 0 x 2=
3 Manual resetting of Io> start indication 1 0 0 x 4=
4 Manual resetting of Io>> start indication 1 0 0 x 8=
5 I>> stage is blocked 1 0 0 x 16 =
6 Io>> stage is blocked 1 0 0 x 32 =
7 I>> start signal to autoreclose output AR1 1 0 0 x 64 =
8 Io> start signal to autoreclose output AR2 0 0 x 128 =
Io>> start signal autoreclose output AR3 1
Checksum =
(Default = 000)
Default programming
SGF PROGRAM
SGB
Main set
SGR
TRIP
Setting
SPCJ 4D29
Second set
Yes
No
SGB 1 BS input = I> stage blocking 1 0 0 x 1=
2 BS input = I>> stage blocking 1 0 0 x 2=
3 BS input = Io> stage blocking 1 0 0 x 4=
4 BS input = Io>> stage blocking 1 0 0 x 8=
5 BS input or command V150 activates the second setting 1 0 0 x 16 =
6 Overcurrent unit latches the relay A (signal TS2) 1 0 0 x 32 =
7 Earth-fault unit latches the relay A (signal TS2) 1 0 0 x 64 =
8 BS input resets latched output relay and recorded values 1 0 0 x 128 =
Checksum =
(Default = 000)
Default programming
SGF PROGRAM
SGB
Main set
SGR
TRIP
Setting
Second set SPCJ 4D29
Yes
No
SGR1 1 I> start signal routed to relay D (signal SS1) 1 0 1 x 1=
2 I> start signal routed to relay A (signal TS2) 1 0 1 x 2=
3 I>> start signal routed to relay D (signal SS1) 1 0 0 x 4=
4 I>> start signal routed to relay A (signal TS2) 1 0 1 x 8=
5 Io> start signal routed to relay D (signal SS1) 1 0 0 x 16 =
6 Io> start signal routed to relay A (signal TS2) 1 0 1 x 32 =
7 Io>> start signal routed to relay D (signal SS1) 1 0 0 x 64 =
8 Io>> start signal routed to relay A (signal TS2) 1 0 1 x 128 =
Checksum =
(Default = 171)
Default programming
SGF PROGRAM
SGB
Main set
SGR
TRIP
Setting
SPCJ 4D29
Second set
Yes
No
SGR2 1 I> operate signal routed to relay C (signal SS2) 1 0 1 x 1=
2 I> operate signal routed to relay B (signal SS3) 1 0 0 x 2=
3 I>> operate signal routed to relay C (signal SS2) 1 0 1 x 4=
4 I>> operate signal routed to relay B (signal SS3) 1 0 0 x 8=
5 Io> operate signal routed to relay C (signal SS2) 1 0 0 x 16 =
6 Io> operate signal routed to relay B (signal SS3) 1 0 1 x 32 =
7 Io>> operate signal routed to relay C (signal SS2) 1 0 0 x 64 =
8 Io>> operate signal routed to relay B (signal SS3) 1 0 1 x 128 =
Checksum =
(Default = 165)
Default programming
SGF PROGRAM
SGB
Main set
SGR
TRIP
Setting
SPCJ 4D29
Second set
Yes
No
SGR3 1 I> operate signal routed to relay E (signal TS1) 1 0 0 x 1=
2 I> operate signal routed to relay E (signal TS1) 1 0 0 x 2=
3 I>> operate signal routed to relay E (signal TS1) 1 0 0 x 4=
4 I>> operate signal routed to relay E (signal TS1) 1 0 0 x 8=
5 Io> operate signal routed to relay E (signal TS1) 1 0 0 x 16 =
6 Io> operate signal routed to relay E (signal TS1) 1 0 0 x 32 =
7 Io>> operate signal routed to relay E (signal TS1) 1 0 0 x 64 =
8 Io>> operate signal routed to relay E (signal TS1) 1 0 0 x 128 =
Checksum =
(Default = 000)
• The trip reason and phase conditions can be read on the front of the relay
• The latest five values of the measured values are stored in the memory
• The number of starts of all the protection stages available in the memory
1 IL1 1 2 3 4
2 IL2 1 2 3 4
3 IL3 1 2 3 4
4 tI> 1 2 3 4 5 nI>
5 tI>> 1 2 3 4 5 nI>>
6 Io 1 2 3 4
7 tIo> 1 2 3 4 5 nIo>
8 tIo>> 1 2 3 4 5 nIo>>
Missing protection or
Without self-supervision nonselective operation
With self-supervision
Memory circuits
-RAM Rotating "one" One byte per 10 ms
-ROM Check-sum
-EEPROM Write and read
of constant
162
139 ±1
136
PANEL
CUT-OUT
Semi-flush mounting a b
RAISING FRAME a b
SPA-ZX 111 176 74
SPA-ZX 112 136 114
SPA-ZX 113 96 154
263
177 –0 (4U)
158
115
101,6
+0,4
7
10
ø6
21,5
312
292
177 –0 (4U)
101,6
+0,4
7
21,5
115 98