You are on page 1of 2

Clint RHD

Afra Corporaation Ltd. Contractor :Monico Ltd.


Project NCBP
BORE HOLE NO 05 Location : Naniarchar Rangamati METHOD OF BORING :WASH BORING DATE OF STARTING : 13.04.2018
BORE DEPTH :21.0m Northing : DIAMETER OF BORING :100mm DATE OF COMPLETION : 13.04.2018
R.L. : 30.775 m Easting : INCLINATION :VERTICAL GROUND WATER LEVEL : 25.99 m
Blows on Sample Index

Thickness (m)
Standard penetration
Sample No.

Diameter
of boring
spoon per 6" Disturbed
Sample
Type of

Depth

Layer
Description of resistance (S P T)
Date

(m)

Log
penetration Undisturbed
Strata Materials
MSN MoneyCentralBlows perMajor Indicies
Investor

SPT
6"

6"

6"
0.30m/1ft Remarks
0 10 20 30 40 50 60
0

0
D-1 1.5 1 1 1 2 3 5
D-2 4.5 Brown Loose Silty Sand
3 1 2 2 4 6 ##
D-3 4.5 2 3 5 8 ## ##
D-4 6 3 5 6 11 ## ##

100 mm (4") ɸ
D-5 7.5 Brown Medium Dense Silty 5 7 10 17 ## ##
6
Sand
D-6 9 5 8 11 19 ## ##
13.04.2018

D-7 10.5 8 11 15 26 ## ##
D-8 12 9 14 18 32
D-9 13.5 14 17 21 38
6 Brown Dense Fine Sand
D-10 15 17 21 25 46
D-11 16.5 20 22 28 50
D-12 18 21 23 29 52
Brown Very Dense Fine
D-13 4.5
19.5 Sand 21 25 28 53
D-14 21 23 27 30 57

Page 1 of 2
Page 2 of 2

You might also like