You are on page 1of 134

BOQ, Abstract and Item Rates of F.Y.

2066/67 Kathmandu/Bha
Rate including
S.N. Description for BOQ Description for Abstract and Comparative chart
Unit 15% overhead
sfo{ ;d"x …sÚ M– ;fO{6 ;kmf ug]{ sfd
1 12-30 cm dia tree cutting work 12-30 cm dia tree cutting work Nos. 41.11
2 137 cm dia tree cutting work 137 cm dia tree cutting work Nos. 1265.00
3 Removing roots of tree Removing roots of tree Nos. 126.50
4 Thick bush and plant cutting work Thick bush and plant cutting work sq.m. 12.65
5 Surface dressing work Surface dressing work sq.m. 3.16
6 Upper earth cutting work Upper earth cutting work sq.m. 50.60
Site preparation work with cleaning and disposal Site preparation work
of debrises, uprooting roots, solid wastes etc. all
7 complete . sq.m. 18.97
sfo{ ;d"x …vÚ M– df6f] sf6\g] / k'g]{ sfd
8 Earthwork in excavation in ordinary soils Earthwork in excavation in ordinary soils cu.m. 228.01
Earthwork in excavation in hard/boulder mix soils Earthwork in excavation in hard/boulder mix soils
in foundation including 10m hauling distance and
9 1.5 m. lift all complete. cu.m. 260.59
Earth filling in 150 mm thick layer, watering, Earth filling in 150 mm thick layer with watering and
ramming including supply of filling materials ramming
10 within 10 m distance all complete. cu.m. 158.12
10.1 Earth filling in 150 mm thick layer, watering, Earth filling in 150 mm thick layer, watering, ramming
ramming including supply of filling materials including supply of filling materials within 6 km
within 6 km distance all complete. distance. cu.m. 390.21
11 Earth filling including supply of filling materials Earth filling including supply of filling materials within
within 10 m distance all complete. 10 m distance. cu.m. 79.06
12 Pumping out of water from foundation or pit. Pumping out of water from foundation or pit. cu.m. 20.23
12.1 Pumping out of water from foundation or pit. Pumping out of water from foundation or pit. per hour 202.32
13 Sand filling including supply of filling materials, Sand filling including supply of filling materials.
watering, ramming etc. all complete
cu.m. 1377.12
sfo{ ;d"x …uÚ M– O{+6fsf] sfd
14 Machine made Brickwork in 1:3 C/S mortar up Machine made Brickwork in 1:3 C/S mortar up to
to ground floor in perfect line level finish ground floor.
including wetting the bricks, racking the joints
and curing the work for at least 7 days all
complete. cu.m. 9783.88
15 Machine made Brickwork in 1:3 C/S mortar in Machine made Brickwork in 1:3 C/S mortar in
superstructure in perfect line level finish superstructure.
including wetting the bricks, racking the joints
and curing the work for at least 7 days all
complete. cu.m. 9946.75
16 Machine made Brickwork in 1:4 C/S mortar up Machine made Brickwork in 1:4 C/S mortar up to
to ground floor in perfect line level finish ground floor.
including wetting the bricks, racking the joints
and curing the work for at least 7 days all
complete. cu.m. 9395.21
17 Machine made Brickwork in 1:4 C/S mortar in Machine made Brickwork in 1:4 C/S mortar in
superstructure in perfect line level finish superstructure.
including wetting the bricks, racking the joints
and curing the work for at least 7 days all
complete. cu.m. 9558.07
18 Machine made Brickwork in 1:5 C/S mortar up Machine made Brickwork in 1:5 C/S mortar up to
to ground floor in perfect line level finish ground floor.
including wetting the bricks, racking the joints
and curing the work for at least 7 days all
complete. cu.m. 9316.09
19 Machine made Brickwork in 1:5 C/S mortar in Machine made Brickwork in 1:5 C/S mortar in
superstructure in perfect line level finish superstructure.
including wetting the bricks, racking the joints
and curing the work for at least 7 days all
complete. cu.m. 9478.95
20 Machine made Brickwork in 1:6 C/S mortar up Machine made Brickwork in 1:6 C/S mortar up to
to ground floor in perfect line level finish ground floor .
including wetting the bricks, racking the joints
and curing the work for at least 7 days all
complete. cu.m. 9044.37

1
21 Machine made Brickwork in 1:6 C/S mortar in Machine made Brickwork in 1:6 C/S mortar in
superstructure in perfect line level finish superstructure.
including wetting the bricks, racking the joints
and curing the work for at least 7 days all
complete. cu.m. 9207.23
22 Good quality local chimney made Brickwork in Good quality local chimney made Brickwork in 1:3
1:3 C/S mortar up to ground floor in perfect line C/S mortar up to ground floor.
level finishe including wetting the bricks, racking
the joints and curing the work for at least 7 days
all complete. cu.m. 9136.32
23 Good quality local chimney made Brickwork in Good quality local chimney made Brickwork in 1:3
1:3 C/S mortar in superstructure in perfect line C/S mortar in superstructure.
level finish including wetting the bricks, racking
the joints and curing the work for at least 7 days
all complete. cu.m. 9299.18
24 Good quality local chimney made Brickwork in Good quality local chimney made Brickwork in 1:4
1:4 C/S mortar up to ground floor in perfect line C/S mortar up to ground floor .
level finishe including wetting the bricks, racking
the joints and curing the work for at least 7 days
all complete. cu.m. 8760.26
25 Good quality local chimney made Brickwork in Good quality local chimney made Brickwork in 1:4
1:4 C/S mortar in superstructure in perfect line C/S mortar in superstructure.
level finish including wetting the bricks, racking
the joints and curing the work for at least 7 days
all complete. cu.m. 8923.12
26 Good quality local chimney made Brickwork in Good quality local chimney made Brickwork in 1:6
1:6 C/S mortar up to ground floor in perfect line C/S mortar up to ground floor.
level finishe including wetting the bricks, racking
the joints and curing the work for at least 7 days
all complete. cu.m. 8396.80
27 Good quality local chimney made Brickwork in Good quality local chimney made Brickwork in 1:6
1:6 C/S mortar in superstructure in perfect line C/S mortar in superstructure.
level finish including wetting the bricks, racking
the joints and curing the work for at least 7 days
all complete. cu.m. 8559.66
28 Local chimney made Brickwork in mud mortar Local chimney made Brickwork in mud mortar for up
for up to ground floor in perfect line level finish to ground floor .
including wetting the bricks and racking the joints
all complete. cu.m. 6821.00
29 Local chimney made Brickwork in mud mortar Local chimney made Brickwork in mud mortar for
for superstructure in perfect line level finish superstructure .
including wetting the bricks and racking the joints
all complete. cu.m. 6983.86
sfo{ ;d"x …3Ú M– 9'Ëfsf] sfd
30 Rubble masonry in 1:3 C/S mortar in perfect line Rubble masonry in 1:3 C/S mortar
level finish including, racking the joints and
curing the work for at least 7 days all complete.
cu.m. 7001.61
31 Rubble masonry in 1:4 C/S mortar in perfect line Rubble masonry in 1:4 C/S mortar.
level finish including, racking the joints and
curing the work for at least 7 days all complete.
cu.m. 6573.37
32 Rubble masonry in 1:6 C/S mortar in perfect line Rubble masonry in 1:6 C/S mortar.
level finish including, racking the joints and
curing the work for at least 7 days all complete.
cu.m. 5924.54
33 Dry rubble masonry work in perfect line level Dry rubble masonry work.
finish all complete. cu.m. 2779.89
34 Rubble masonry in mud mortar in perfect line Rubble masonry in mud mortar.
level finish including, racking the joints all
complete. cu.m. 2956.43
35 Rubble masonry work in inclined level in 1:3 C/S Rubble masonry work in inclined level in 1:3 C/S
mortar in perfect line level finish including, mortar.
racking the joints and curing the work for at least
7 days all complete. cu.m. 7358.11
36 Rubble masonry work in inclined level in 1:4 C/S Rubble masonry work in inclined level in 1:4 C/S
mortar in perfect line level finish including, mortar.
racking the joints and curing the work for at least
7 days all complete. cu.m. 6942.48

2
37 Rubble masonry work in inclined level in 1:6 C/S Rubble masonry work in inclined level in 1:6 C/S
mortar in perfect line level finish including, mortar.
racking the joints and curing the work for at least
7 days all complete. cu.m. 6281.04
38 Dressed stone masonry in 1:6 C/S mortar in Dressed stone masonry in 1:6 C/S mortar.
perfect line level finish including, racking the
joints and curing the work for at least 7 days all
complete. cu.m. 4535.74
39 Rubble masonry soling work in foundation . Rubble masonry soling work in foundation . cu.m. 2315.16
sfo{ ;d"x …ªÚ M– l;d]G6 s+qmL6sf] sfd
40 Plain cement Concrete (PCC) in 1:5:10 ratio for Plain cement Concrete (PCC) in 1:5:10 ratio for
foundations, flooring and walls with approved foundations, flooring and walls.
quality of cement and sand and crushed stone
aggregate including mixing, laying, curing etc all
complete in approval of site engineer.
cu.m. 5715.29
41 Plain cement Concrete (PCC) in 1:4:8 ratio for Plain cement Concrete (PCC) in 1:4:8 ratio for
foundations, flooring and walls with approved foundations, flooring and walls.
quality of cement and sand and crushed stone
aggregate including mixing, laying, curing etc all
complete in approval of site engineer.
cu.m. 6233.52
42 Plain cement Concrete (PCC) in 1:3:6 ratio for Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved foundations, flooring and walls.
quality of cement and sand and crushed stone
aggregate including mixing, laying, curing etc all
complete in approval of site engineer.
cu.m. 6881.32
43 Plain cement Concrete (PCC) in 1:2:4 ratio for Plain cement Concrete (PCC) in 1:2:4 ratio for
foundations, flooring and walls with approved foundations, flooring and walls .
quality of cement and sand and crushed stone
aggregate including mixing, laying, curing etc all
complete in approval of site engineer.
cu.m. 8057.98
44 Plain cement Concrete (PCC) for RCC works Plain cement Concrete (PCC) for RCC works (1:2:4)
(1:2:4) for slab/lintels with approved quality of for slab/lintels
cement and sand and crushed stone aggregate
including mixing, laying, curing etc all complete
in approval of site engineer. cu.m. 8914.73
45 Plain cement Concrete (PCC) for RCC works Plain cement Concrete (PCC) for RCC works
(1:1.5:3) for slab/lintels with approved quality of (1:1.5:3) for slab/lintels,tie beam
cement and sand and crushed stone aggregate
including mixing, laying, curing etc all complete
in approval of site engineer. cu.m. 9973.88
46 Plain cement Concrete (PCC) for RCC works Plain cement Concrete (PCC) for RCC works (1:1:2)
(1:1:2) for super structure with approved quality for super structure.
of cement and sand and crushed stone
aggregate including mixing, laying, curing etc all
complete in approval of site engineer.
cu.m. 12691.25
47 Tor steel reinforcement bar of fe 415/500 grade Tor steel reinforcement bar of fe 415/500 grade.
including straightening, cleaning, cutting, binding
& fixing in position with annealed tying binding
wire as per drawing, design & instruction all
complete. MT 84983.58
47.1 Tor steel reinforcement bar of fe 415/500 grade Tor steel reinforcement bar of fe 415/500 grade.
including straightening, cleaning, cutting, binding
& fixing in position with annealed tying binding
wire as per drawing, design & instruction all
complete. kg 84.98
sfo{ ;d"x …rÚ M– kmdf{sf] sfd
48 Formwork, shuttering, centering with approved Formwork, shuttering, centering with approved
materials for all works necessary propping, materials.
scaffolding, staging, supporting inclusive of
wedging and cutting holes for utilization till the
support if fully unyielding nett. sq.m. 456.41

3
49 Formwork, shuttering, centering with approved Formwork, shuttering, centering with approved
materials for column and beam necessary materials for column and beam .
propping, scaffolding, staging, supporting
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding nett.
sq.m. 646.21
50 Formwork, shuttering, centering with 19mm thick Formwork, shuttering, centering with 19mm thick
waterproof ply board and steel post for all works waterproof ply board and steel post
necessary propping, scaffolding, staging,
supporting inclusive of wedging and cutting
holes for utilization till the support if fully
unyielding nett.
sq.m. 486.12
50.1 Formwork, shuttering, centering with approved Formwork, shuttering, centering with approved
materials for beam upto 0.30 m necessary materials for beam upto 0.30 m depth.
propping, scaffolding, staging, supporting
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding nett.
sq.m. 669.76
51 Formwork, shuttering, centering with approved Formwork, shuttering, centering with approved
materials for 0.30m to 0.80 m deep beam materials for 0.30 to 0.80 m.deep beam.
necessary propping, scaffolding, staging,
supporting inclusive of wedging and cutting
holes for utilization till the support if fully
unyielding nett.
sq.m. 545.33
51.1 Formwork, shuttering, centering with 19mm thick Formwork, shuttering, centering with 19mm thick
waterproof ply for beam with steel pipe waterproof ply for beam with steel pipe propping.
propping, scaffolding, staging, supporting
inclusive of wedging and cutting holes for
utilization till the support if fully unyielding nett.
sq.m. 629.46
51.2 Formwork, shuttering, centering with 19mm thick Formwork, shuttering, centering with 19mm thick
waterproof ply for column, necessary propping, waterproof ply for column.
scaffolding, staging, supporting inclusive of
wedging and cutting holes for utilization till the
support if fully unyielding nett.
sq.m. 752.45
52 Wooden plank bracingwork in trench with Wooden plank bracing work in 1.5m to 3.0m deep
approved materials for depth from 1.5 m to less trench.
than 3.0m sq.m. 140.78
53 Wooden plank bracing work in trench with Wooden plank bracing work in trench deeper than
approved materials for depth more than 3.0m 3.0m. sq.m. 145.45
sfo{ ;d"x …5Ú M– 5fgfsf] sfd
54 0.5 mm CGI sheet roofing with proper shape & 0.50mm CGI sheet roofing.
size, all necessary nails, screws, bolts, nuts
washers, J or L hooks etc as per drawing &
instruction all complete. sq.m. 712.83
55 0.41 mm CGI sheet roofing with proper shape & 0.41mm CGI sheet roofing.
size, all necessary nails, screws, bolts, nuts
washers, J or L hooks etc as per drawing &
instruction all complete. sq.m. 618.31
55.1 0.45mm colour CGI sheet roofing with proper 0.45 mm colour CGI sheet roofing.
shape & size, all necessary nails, screws, bolts,
nuts washers, J or L hooks etc as per drawing &
instruction all complete. sq.m. 819.28
56 0.50mm colour CGI sheet roofing including fixing 0.50mm colour CGI sheet roofing.
in proper shape & size with all necessary rails,
screws, bolts & nuts washers, J & L hocks etc as
per drawing & instruction all complete.
sq.m. 879.37
57 0.50mm colour GI plain sheet for ridge cover on 0.50mm colour GI plain sheet for ridge cover on
roofing including fixing in proper shape & size roofing.
with all necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete. r.m. 551.46
57.1 0.50mm colour GI plain sheet for ridge cover on 0.50mm colour GI plain sheet for ridge cover on
roofing including fixing in proper shape & size roofing.
with all necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete. sq.m. 919.11

4
58 0.50mm GI plain sheet for gutter on roofing 0.5mm GI plain sheet for gutter on roofing.
including fixing in proper shape & size with all
necessary rails, screws, bolts & nuts washers, J
& L hocks etc as per drawing & instruction all
complete. r.m. 577.98
58.1 0.50mm GI plain sheet for gutter on roofing 0.5mm GI plain sheet for gutter on roofing.
including fixing in proper shape & size with all
necessary rails, screws, bolts & nuts washers, J
& L hocks etc as per drawing & instruction all
complete. sq.m. 963.30
58.2 0.50mm Colour GI plain sheet for gutter on 0.5mm GI colour sheet for gutter on roofing.
roofing including fixing in proper shape & size
with all necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete. r.m. 651.05
58.3 0.50mm Colour GI plain sheet for gutter on 0.5mm GI colour sheet for gutter on roofing.
roofing including fixing in proper shape & size
with all necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete. sq.m. 1085.09
59 Slate roofing work . Slate roofing work . sq.m. 1185.80
60 Machine made clay tiles on roofing including Machine made clay tiles on roofing .
fixing in proper shape & size as per drawing &
instruction all complete. sq.m. 293.53
61 Clay tile ridge roofing work . Clay tile ridge roofing work . r.m. 128.79
sfo{ ;d"x …hÚ M– sf7sf] sfd
62 20 mm thick salwood false ceiling fiting woth 20 mm thick salwood false ceiling fiting woth 40mmx
40mmx 20mm bidding joint 20mm bidding joint sq.m. 3032.14
63 Well seasoned salwood chaukhats for Well seasoned salwood chaukhats works
fixed/openable door/windows with good finish of
approved quality incuding fixing in postion with
necessary M.S. hold fasts as per drawing and
instruction all complete. cu.m. 99087.11
64 Making and fitting fixing sal wood Panelled door Making and fitting fixing sal wood Panelled door
shutter with 38 mm thick sal wood frame shutter wok
including all necessary hardware fitting all
complete. sq.m. 5579.33
65 Fixing of glazed shutter in 38x75 mm thick sal Fixing of glazed shutter in 38x75 mm thick sal wood
wood frame with 3mm thick plain glass fitted frame with 3mm thick plain glass fitted.
including all necessary hardware fittings all
complete. sq.m. 4000.54
66 Fixing of glazed shutter in 38x75 mm thick sal Fixing of glazed shutter in 38x75 mm thick sal wood
wood frame with 4mm thick plain glass fitted frame with 4mm thick plain glass fitted.
including all necessary hardware fittings all
complete. sq.m. 4062.86
67 Fixing of glazed shutter in 38x75 mm thick sal Fixing of glazed shutter in 38x75 mm thick sal wood
wood frame with 5mm thick plain glass fitting frame with 5mm thick plain glass.
including all necessary hardware fittings all
complete. sq.m. 4168.78
68 Fixing of glazed shutter in 38x75 mm thick sal Fixing of glazed shutter in 38x75 mm thick sal wood
wood frame with 6mm thick plain glass fitting frame with 6mm thick plain glass.
including all necessary hardware fittings all
complete. sq.m. 4262.26
69 Making and fitting flush door shutter of 38 x 100 Flush door shutter of 38 x 100 mm size sal wood
mm size sal wood frame with 4 mm thick frame with 4 mm thick commercial plywood on both
commercial plywood on both side including all side.
necessary hardware fitting all complete. sq.m. 3416.61
70 Making and fitting fixing flush door shutter of 38 Flush door shutter of 38 x 100 mm size sal wood
x 100 mm size sal wood frame with 6 mm thick frame with 6 mm thick waterproof ply on one side and
waterproof ply on one side and 4mm thick 4mm thick commercial ply on other side
commercial ply on other side including all
necessary hardware fitting all complete. sq.m. 3721.66
71 Making and fitting fixing flush door shutter of 38 Flush door shutter of 38 x 100 mm size sal wood
x 100 mm size sal wood frame with 4 mm teak frame with 4 mm teak ply on both side.
ply on both side including all necessary
hardware fitting all complete. sq.m. 4331.80

5
72 Making and fitting flush door shutter of 38 x 100 Making and fitting flush door shutter of 38 x 100 mm
mm size sal wood frame with 28gauge G.I thick size sal wood frame with 28gauge G.I thick G.I plain
G.I plain sheet on both side including all sheet on both side.
necessary hardware fitting all complete.
sq.m. 3821.79
73 Making and fitting of G.I. Mosquito net shutter G.I. Mosquito net shutter with diamond chicken wire
with diamond chicken wire mesh with 38mm mesh on 38mm thick seasoned salwood frame.
thick seasoned salwood frame including hinges,
towerbolts, handles, locking set etc all complete.
sq.m. 2566.18
73.1 Making and fitting of G.I. Mosquito net shutter G.I. Mosquito net over existing salwood frame.
over existing salwood frame including listi all
complete. sq.m. 270.46
73.2 Making and fitting of G.I. Mosquito net shutter G.I. Mosquito net shutter with 38mm thick seasoned
with 38mm thick seasoned salwood frame salwood frame.
including hinges, towerbolts, handles, locking set
etc all complete. sq.m. 2433.30
74 Fixing of 3 mm thick glass on existing fixed Fixing of 3 mm thick glass on existing fixed frames.
frames of windows, ventilators with wooden
beading & putty s all complete. sq.m. 618.44
75 Fixing of 4 mm thick glass on existing fixed Fixing of 4 mm thick glass on existing fixed frames.
frames of windows, ventilators with wooden
beading & putty s all complete. sq.m. 746.52
76 Fixing of 5 mm thick glass on existing fixed Fixing of 5 mm thick glass on existing fixed frames.
frames of windows, ventilators with wooden
beading & putty s all complete. sq.m. 964.24
77 Fixing of 6 mm thick glass on existing fixed Fixing of 6 mm thick glass on existing fixed frames.
frames of windows, ventilators with wooden
beading & putty s all complete. sq.m. 1156.34
78 Fitting up the 4mm thick plywood false ceiling in 4mm thick plywood false ceiling in existing wooden
existing wooden frame all complete. frame. sq.m. 365.82
79 Partition work with 4mm thick plywood fixed on Partition work with 4mm thick plywood fixed on both
both side with salwood frame (size 50x75mm) side
making 60x90cm room size all complete.
sq.m. 1540.53
80 Partition work with 12mm thick plywood fixed on Partition work with 12mm thick plywood fixed on both
both side with salwood frame (size 38x75mm) side
making 61x91.5cm room size and listi all
complete. sq.m. 2201.95
81 Supply and fixing of one side laminated 18 mm Supply and fixing of one side laminated 18 mm thick
thick partition board partition board sq.m. 1302.74
81.1 Supply and lamination of 4 mm teak ply on Supply and lamination of 4 mm teak ply on hardboard
hardboard and other partition surface with glue and other partition surface with glue
sq.m. 793.86
82 25mm thick local wood false ceiling work with 25mm thick local wood false ceiling work with
salwood frame (size 50x75mm) making salwood frame (size 50x75mm) making 60x90cm
60x90cm room size all complete. room size all complete. sq.m. 1535.77
82.1 6mm thick plywood false ceiling work with 6mm thick plywood false ceiling work with salwood
salwood frame (size 50x75mm) making frame
60x90cm room size all complete. sq.m. 1691.00
83 4mm thick plywood false ceiling work with local 4mm thick plywood false ceiling work with local sallo
sallo frame (size 50x75mm) making 60x90cm frame
room size all complete. sq.m. 977.64
84 Salwood for roofing, of first class finish free from Salwood for roofing.
cracks and wrought including hoisting and fitting
with necessary nails, bolts nuts etc. to fix the
false ceiling all complete work. cu.m. 89641.44
85 Fitting of 25mm thick well seasoned salwood 25mm thick well seasoned salwood evesboard.
evesboard with necessary nails, screws, metal
brackets etc as per drawing and instruction all
complete. sq.m. 2099.78
86 16-20 mm dia bar fixing in window chaukhat 16-20 mm dia bar fixing in window chaukhat. MT 88073.70
sfo{ ;d"x …emÚ M– ˆnf]l/Ësf] sfd
87 38mm thick (1:2:4) P.C.C. for flooring with 38mm thick (1:2:4) P.C.C. for flooring with punning,
approved quality of O.P. cement & sand and
crushed stone aggregate including mixing,
laying, punning, rubbing in hard surface curing
etc all complete. sq.m. 384.49

6
88 50mm thick (1:2:4) P.C.C. for flooring with 50mm thick (1:2:4) P.C.C. for flooring with punning,
approved quality of O.P. cement & sand and
crushed stone aggregate including mixing,
laying, punning, rubbing in hard surface curing
etc all complete. sq.m. 478.60
89 75mm thick (1:2:4) P.C.C. for flooring with 75mm thick (1:2:4) P.C.C. for flooring
approved quality of O.P. cement & sand and
crushed stone aggregate including mixing,
laying, punning, rubbing in hard surface curing
etc all complete. sq.m. 669.27
90 25mm thick mosaic flooring- 5mm thick white 25mm thick mosaic flooring- 5mm thick white cement
cement and marble chips(1:1) on 20mm (1:2:4) and marble chips(1:1)
cement conc. Rubbing and polishing properly.
sq.m. 996.26
91 25mm thick mosaic flooring- 6mm thick white 25mm thick mosaic flooring- 6mm thick white cement
cement and marble chips(1:2) on 19mm thick and marble chips(1:2)
cement plastering (1:2) and rubbing and
polishing properly. sq.m. 1737.26
92 20mm thick mosaic flooring(1:2) with12.5mm 20mm thick mosaic flooring(1:2) with12.5mm thick
thick cement sand plaster(1:4) cement sand plaster(1:4) sq.m. 1688.03
93 Supplying and laying of 20mm thick Terrazzo 20mm thick Terrazzo tiles in 20mm thick cement sand
tiles in 20mm thick cement sand motar (1:4) ratio motar (1:4) ratio
on floors, skirting and wall s all complete.
sq.m. 1788.44
94 Supplying and laying of good quality marble in Marble in cement sand motar (1:2) ratio with
cement sand motar (1:2) ratio with approved approved colour
colour on floors, skirting and wall s all complete.
sq.m. 2617.47
95 Supplying and laying of glazed or non glazed Glazed or non glazed tiles in cement sand mortar
tiles in cement sand mortar (1:4) ratio with (1:4) ratio with approved colour
approved colour on wall and floor all complete.
sq.m. 1546.02
96 Supplying and laying of glazed or non glazed Glazed or non glazed tiles in cement sand mortar
tiles in cement sand mortar (1:4) ratio with (1:4) ratio with Boarder
Boarder approved colour on wall and floor all
complete. sq.m. 1605.95
97 50-60mm thick flag stone paving work in (1:4) 50-60mm thick flag stone paving work in (1:4) C/S
C/S mortar including curing etc all complete. mortar . sq.m. 971.43
98 50-62mm thick flag stone paving work in (1:4) 50-62mm thick flag stone paving work in (1:4) C/S
C/S mortar including curing etc all complete. mortar . sq.m. 864.33
99 50mm thick inter locking concrete block paving 50mm thick inter locking concrete block paving with
with 50mm.th. Stone dust all complete 50mm.th. Stone dust all complete sq.m. 1019.30
100 70mm thick inter locking concrete block paving 70mm thick flag stone paving work on stone dust.
with 50mm.th. Stone dust all complete sq.m. 1058.05
101 25-37.5 mm thick flag stone paving work in (1:4) 25-37.5 mm thick flag stone paving work in (1:4) C/S
C/S mortar including curing etc all complete. mortar.
sq.m. 896.35
102 25 mm thick Telia brick paving work in (1:2) surki 25 mm thick Telia brick paving work in (1:2) surki
mortar and pointing the joints with 1:1 C/S mortar and pointing the joints with 1:1 C/S mortar.
mortar including curing etc all complete. sq.m. 1093.73
103 Local flat brick soiling work in (1:6) Cement Sand Local flat brick soiling work in (1:6) Cement Sand
mortar and pointing joint in (1:2)cement sand . mortar and pointing joint in (1:2)cement sand .
sq.m. 770.87
104 Local brick on edge soiling work in (1:6) Cement Local brick on edge soiling work in (1:6) Cement
Sand mortar and pointing joint in (1:2)cement Sand mortar and pointing joint in (1:2)cement sand .
sand . sq.m. 1076.76
105 Local flat brick soiling work with sand filling. Local flat brick soiling work with sand filling. sq.m. 568.70
106 Dry brick soling brick on edge in foundation and Dry brick soling brick on edge in foundation and floor.
floor. sq.m. 996.43
107 Dry stone soling in foundation and floor including Dry stone soling in foundation and floor
sand filling in joints, leveling, watering etc. all
complete. cu.m. 4080.33
108 Flat dry brick soling on flat in foundation and Flat dry brick soling on flat in foundation and floor
floor including sand filling in joints, leveling,
ramming etc. all complete sq.m. 1015.15
109 Pointing in flat stone paving Pointing in flat stone paving sq.m. 44.63
110 Sand filling in flooring including supply of filling Sand filling in flooring including watering, ramming
materials, watering, ramming etc. all complete etc.
cu.m. 1454.75

7
111 Brick bat filling work Brick bat filling work cu.m. 2078.06
112 3 mm thick cement sand punning on floor, 3 mm thick cement sand punning on floor, skriting,
skriting, dado etc, including mixing laying and dado etc.
rubbing with steel trowel to a hard, smooth and
shining surface and curing all complete. sq.m. 146.54
113 Plain plaster of paris in wall and ceiling including Plain plaster of paris in wall and ceiling
mixing laying and rubbing to a hard, smooth and
shining surface all complete sq.m. 159.91
114 25mm thick sal wood planking work with salwood 25mm thick sal wood planking work with salwood
frame (size 50x75mm) making 60x90cm room frame (size 50x75mm)
size all complete. sq.m. 3440.94
sfo{ ;d"x …`Ú M– Knfi6/sf] sfd
115 12.5mm thick cement sand plaster in (1:3) ratio 12.5mm thick cement sand plaster in (1:3) ratio on
on ceiling of good finish including racking the ceiling.
joint, wetting of surfaces & curing the work all
complete. sq.m. 229.36
116 12.5mm thick cement sand plaster in (1:4) ratio 12.5mm thick cement sand plaster in (1:4) ratio on
on ceiling of good finish including racking the ceiling.
joint, wetting of surfaces & curing the work all
complete. sq.m. 220.36
117 12.5mm thick cement sand plaster in (1:4) ratio 12.5mm thick cement sand plaster in (1:4) ratio on
on wall and Floor of good finish including racking wall and Floor.
the joint, wetting of surfaces & curing the work all
complete. sq.m. 193.91
118 12.5mm thick cement sand plaster in (1:6) ratio 12.5mm thick cement sand plaster in (1:6) ratio on
on wall of good finish including racking the joint, wall.
wetting of surfaces & curing the work all
complete. sq.m. 175.08
119 12.5mm thick lime surki plaster in (1:2) ratio on 12.5mm thick lime surki plaster in (1:2) ratio on wall
wall and ceiling of good finish including racking and ceiling.
the joint, wetting of surfaces & curing the work all
complete. sq.m. 198.85
120.1 20mm thick lime surki plaster in (1:2) ratio on 20mm thick lime surki plaster in (1:2) ratio on wall and
wall and ceiling of good finish including racking ceiling
the joint, wetting of surfaces & curing the work all
complete. sq.m. 264.56
120 20mm thick cement sand plaster in (1:3) ratio on 20mm thick cement sand plaster in (1:3) ratio on wall.
wall of good finish including racking the joint,
wetting of surfaces & curing the work all
complete. sq.m. 273.44
121 20mm thick cement sand plaster in (1:4) ratio on 20mm thick cement sand plaster in (1:4) ratio on floor.
floor of good finish including racking the joint,
wetting of surfaces & curing the work all
complete. sq.m. 257.16
122 20mm thick cement sand plaster in (1:6) ratio on 20mm thick cement sand plaster in (1:6) ratio on wall .
wall of good finish including racking the joint,
wetting of surfaces & curing the work all
complete. sq.m. 227.96
123 25mm thick Leon plaster in wall of good finish 25mm thick Leon plaster in wall.
including racking the joint, wetting of surfaces &
curing the work all complete. sq.m. 187.06
124 12mm thick Leon plaster in wall of good finish 12mm thick Leon plaster in wall.
including racking the joint, wetting of surfaces &
curing the work all complete. sq.m. 140.25
sfo{ ;d"x …6Ú M– /+u /f]ugsf] sfd
125 Colouring with two coat white washing in new Colouring with two coat white washing in new ceiling
ceiling surface to give uniform colouring after surface.
rendering the surface all complete. sq.m. 17.79
126 Colouring with two coat white washing in new Colouring with two coat white washing in new wall
wall surface to give uniform colouring after surface.
rendering the surface all complete. sq.m. 15.19
127 Colouring with three coat white washing in new Colouring with three coat white washing in new
ceiling surface to give uniform colouring after ceiling surface.
rendering the surface all complete. sq.m. 34.91
128 Colouring with three coat white washing in new Colouring with three coat white washing in new wall
wall surface to give uniform colouring after surface.
rendering the surface all complete. sq.m. 29.34

8
129 Colouring with one coat white washing in old Colouring with one coat white washing in old surface.
surface to give uniform colouring after rendering
the surface all complete. sq.m. 8.08
130 Colouring with one coat distemper paint with one Colouring with one coat distemper paint with one coat
coat primer to give uniform colouring after primer.
rendering the surface all complete. sq.m. 59.07
131 Colouring with two coat distemper paint with one Colouring with two coat distemper paint with one coat
coat primer to give uniform colouring after primer.
rendering the surface all complete. sq.m. 81.04
132 Colouring with 1 coats waterproof cement paint Colouring with 1 coats waterproof cement paint of
of approved colour to give uniform colouring approved colour.
after rendering the surface all complete.
sq.m. 29.26
133 Colouring with 2 coats waterproof cement paint Colouring with 2 coats waterproof cement paint of
of approved colour to give uniform colouring approved colour.
after rendering the surface all complete.
sq.m. 64.78
134 1 coats of ready made enamel paint of approved 1 coats of ready made enamel paint of approved
colour over 1 coats of primer Painting over colour over 1 coats of primer.
porperly sanded wooden surface all complete
sq.m. 102.87
135 2 coats of ready made enamel paint of approved
colour over 1 coats of primer. sq.m. 155.75
136 1 coats of ready made plastic emulsion paint of 1 coats of ready made plastic emulsion paint of
approved colour over 1 coats of primer Painting approved colour over 1 coats of primer Painting.
over porperly cleaned surface all complete
sq.m. 114.90
137 2 coats of plastic emulsion paint paint of 2 coats of plastic emulsion paint of approved colour
approved colour over 1 coats of primer Painting over 1 coats of primer Painting
over porperly cleaned surface all complete
sq.m. 177.36
138 Colouring with duracel paint of approved colour Colouring with duracel paint of approved colour on
on brick wall face to give uniform colouring after brick wall face
rendering the surface all complete.
sq.m. 217.71
139 1 coats of apex paint(weather coat) of approved 1 coats of apex paint(weather coat) of approved
colour without primer Painting over porperly colour without primer Painting
cleaned surface all complete sq.m. 85.77
140 2 coats of apex paint(weather coat) of approved 2 coats of apex paint(weather coat) of approved
colour without primer Painting over porperly colour without primer Painting
cleaned surface all complete sq.m. 157.57
141 Two coats of aluminium paint over one coat of Two coats of aluminium paint over one coat of primer
primer in metal surface to give uniform colouring in metal surface
after rendering the surface all complete.
sq.m. 138.30
142 Two coats of red oxide painting in metal surfaces Two coats of red oxide painting in metal surfaces in
in properly sanded surface including sealing properly sanded surface.
voids with putting all complete. sq.m. 141.97
143 1 coats of double boiled linsid oil painting over 1 coats of double boiled linsid oil painting
porperly cleaned surface all complete sq.m. 21.59
144 2 coats of double boiled linsid oil painting over 2 coats of double boiled linsid oil painting
porperly cleaned surface all complete sq.m. 42.17
145 1 coats of commercial varnesh painting over 1 coats of commercial varnesh painting
porperly cleaned surface all complete sq.m. 42.26
146 2 coats of commercial varnesh painting over 2 coats of commercial varnesh painting
porperly cleaned surface all complete sq.m. 80.83
147 1 coats of bitumen (Alkatra) painting over 1 coats of bitumen (Alkatra) painting
porperly cleaned surface all complete sq.m. 32.37
148 2 coats of bitumen (Alkatra) painting over 2 coats of bitumen (Alkatra) painting
porperly cleaned surface all complete sq.m. 55.91
149 Three coats of chapra polishing in wood Three coats of chapra polishing in wood surfaces with
surfaces with approved colour in properly approved colour
sanded surface including sealing voids with
putting all complete. sq.m. 79.66
150 1 coats of Tata red oxide painting over porperly 1 coats of Tata red oxide painting
cleaned surface all complete sq.m. 38.19

9
151 Two coats of tata red oxide painting with Two coats of tata red oxide painting with approved
approved colour in properly cleaned surface colour
including sealing voids with putting all complete.
sq.m. 79.22
sfo{ ;d"x …7Ú M– l6Ksf/ ug]{ sfd
152 Flush pointing work in (1:1) cement sand mortar Flush pointing work in (1:1) cement sand mortar on
on brick works with good finish including curing brick works.
as per instruciton all complete.
sq.m. 129.96
153 Ruled pointing work in (1:1) cement sand mortar Ruled pointing work in (1:1) cement sand mortar on
on brick works with good finish including curing brick works.
as per instruciton all complete.
sq.m. 173.08
154 Flush pointing work in (1:2) cement sand mortar Flush pointing work in (1:2) cement sand mortar on
on brick works with good finish including curing brick works.
as per instruciton all complete.
sq.m. 117.11
155 Ruled pointing work in (1:2) cement sand mortar Ruled pointing work in (1:2) cement sand mortar on
on brick works with good finish including curing brick works.
as per instruciton all complete.
sq.m. 160.23
156 Flush pointing work in (1:3) cement sand mortar Flush pointing work in (1:3) cement sand mortar on
on brick works with good finish including curing brick works.
as per instruciton all complete.
sq.m. 110.36
157 Ruled pointing work in (1:3) cement sand mortar Ruled pointing work in (1:3) cement sand mortar on
on brick works with good finish including curing brick works.
as per instruciton all complete.
sq.m. 153.49
158 Ruled pointing work in (1:1) cement sand mortar Ruled pointing work in (1:1) cement sand mortar on
on boulder stone work with good finish including boulder stone work.
curing as per instruciton all complete.
sq.m. 174.98
159 Ruled pointing work in (1:2) cement sand mortar Ruled pointing work in (1:2) cement sand mortar on
on boulder stone work with good finish including boulder stone work
curing as per instruciton all complete.
sq.m. 150.32
160 Ruled pointing work in (1:3) cement sand mortar Ruled pointing work in (1:3) cement sand mortar on
on boulder stone work with good finish including boulder stone work.
curing as per instruciton all complete.
sq.m. 137.86
161 Ruled pointing work in (1:3) cement sand mortar Ruled pointing work in (1:3) cement sand mortar on
on Asler work with good finish including curing Asler work.
as per instruciton all complete.
sq.m. 85.19
162 Flush pointing work in (1:3) cement sand mortar Flush pointing work in (1:3) cement sand mortar on
on 45 x 45 cm flag stone paving works with good 45 x 45 cm flag stone paving works.
finish including curing as per instruciton all
complete. sq.m. 44.63
163 1:1 cement sand pointing work in Telia floor tile Pointing work in (1:1) cement sand mortar for Telia
with good finishing including curing all complete flooring.
sq.m. 98.31
164 3 mm thick cement sand punning (1:1) on floor, 3 mm thick cement sand punning (1:1) on floor,
skriting, dado etc, including mixing laying and skriting, dado etc.
rubbing with steel trowel to a hard, smooth and
shining surface and curing all complete.
sq.m. 124.05
165 3 mm thick lime plastering work including mixing 3 mm thick lime plastering work.
laying and rubbing with steel trowel to a hard,
smooth and shining surface and curing all
complete. sq.m. 93.46
166 3 mm thick cement plastering work including 3mm thick cement plastering work.
mixing laying and rubbing with steel trowel to a
hard, smooth and shining surface and curing all
complete. sq.m. 144.73
sfo{ ;d"x …8Ú M– jf6/ k|'lkm+u ug]{ sfd

10
167 2 cm thick (1:2) cement sand mortar DPC work 2 cm thick (1:2) cement sand mortar DPC work with
with water proof compound including mixing water proof compound.
laying and rubbing with steel trowel to a hard,
smooth and shining surface and curing all
complete. sq.m. 270.25
168 2.5 cm thick (1:1.5:3) concrete DPC work with 2.5 cm thick (1:1.5:3) concrete DPC work with water
water proof compound including mixing laying proof compound.
and rubbing with steel trowel to a hard, smooth
and shining surface and curing all complete.
sq.m. 306.02
169 3.8 cm thick (1:2:4) concrete DPC work with 3.8 cm thick (1:2:4) concrete DPC work with water
water proof compound including mixing laying proof compound.
and rubbing with steel trowel to a hard, smooth
and shining surface and curing all complete.
sq.m. 368.45
170 1 coats of bitumen (Alkatra) painting over DPC 1 coats of bitumen (Alkatra) painting over DPC
course and covering porperly with river sand . course and covering porperly with river sand .
sq.m. 376.16
171 Supplying and laying of one layer of 500 gauge Supplying and laying of one layer of 500 gauge
Polythene sheet on prepared surface Polythene sheet sq.m. 300.14
172 One layer Tarfelt laying over evenly spread One layer Tarfelt laying over evenly spread roofing
roofing grade bitumen with river sand on cleaned grade bitumen with river sand
surface. sq.m. 565.74
173 Two layer Tarfelt laying over evenly spread Two layer Tarfelt laying over evenly spread roofing
roofing grade bitumen with river sand on cleaned grade bitumen with river sand
surface. sq.m. 921.14
174 One layer damp proof grade Tarfelt laying over One layer damp proof grade Tarfelt laying over evenly
evenly spread roofing grade bitumen with river spread roofing grade bitumen with river sand
sand on cleaned surface. sq.m. 677.07
sfo{ ;d"x …9Ú M– dd{t ;DaGwL sfd
175 Taking out damaged brick from the wall and Taking out damaged brick from the wall and replacing
replacing new in1:6 CM new in1:6 CM cu.m. 11059.46
176 Cleaning old surface with linsid oil and ready Cleaning old surface with linsid oil and ready made
made enamel painting work enamel painting work sq.m. 104.83
177 Dismentaling of old lime surkhi / cement Sand Dismentaling of old lime surkhi / cement Sand plaster
plaster including disposal of the debris out of
site. sq.m. 34.15
178 Dismantling of roof tile in cement mortar Dismantling of roof tile in cement mortar
including disposal of the debris out of site . sq.m. 50.45
179 Dismantling of existing brickwork in mud mortar Dismantling of existing brickwork in mud mortar
including disposal of the debris out of site . including
cu.m. 335.22
180 Dismantling of existing brickwork in cement / Dismantling of existing brickwork in cement / lime
lime surkhi mortar including disposal of the surkhi mortar
debris out of site . cu.m. 670.45
181 Dismantling of RCC work including disposal of Dismantling of RCC work
the debris out of site . cu.m. 3478.75
182 Dismantling of P.C.C./L.C.C. work including Dismantling of P.C.C./L.C.C. work
disposal of the debris out of site. cu.m. 1265.00
sfo{ ;d"x …0fÚ M– kmnfdsf] sfd
183 Making and fitting MS grill including red oxide Making and fitting MS grill including red oxide paint
paint all complete k.g. 107.12
184 3x20mm size M.S. grill with almunium paints as 3x20mm size M.S. grill with almunium paints.
per design and instruction all complete. sq.m. 1728.95
185 4.5x20mm size M.S. grill with almunium paints 4.5x20mm size M.S. grill with almunium paints.
as per design and instruction all complete.
sq.m. 2303.12
186 Supply and fixing of M.S. collapsible gate Supply and fixing of M.S. collapsible gate including
including with primer painting and all necessary with primer peinting.
accessories all complete sq.m. 4162.29
187 Supply and fixing 16/18 gauge M.S. Rolling Supply and fixing 16/18 gauge M.S. Rolling shutter.
shutter with all necessary accessories, all
complete. sq.m. 3585.97
188 Supply and fixing of eaves board made up of Supply and fixing of eaves board made up of 16
16 gauge black sheet including with all gauge black sheet including with all necessary
necessary accessories, all complete. accessories, all complete. sq.m. 113.06
189 GI barbed wire fencing work GI barbed wire fencing work Rm 39.97

11
190 Placing salwood Post @ 3m and 5 layer + 2layer Placing salwood Post @ 3m and 5 layer + 2layer
diagonal barbed wire fencing work diagonal barbed wire fencing work Rm 640.00
sfo{ ;d"x …tÚ M– gofF sfd
191 Aluminium fix panel at sliding windows of Aluminium fix panel at sliding windows of section (88
section (88 x38.1x1.1) with Fly mesh shutter all x38.1x1.1) with Fly mesh shutter all complete
complete sq.m. 7043.89
192 Aluminium sliding window with fixed panels Aluminium sliding window with fixed panels without
without fly mesh shutter of section (88 fly mesh shutter of section (88 x38.1x1.1)
x38.1x1.1) sq.m. 6403.54
193 Aluminium sliding door of section (101 x45x1.1)
Aluminium sliding door of section (101 x45x1.1) sq.m. 7428.10
194 Aluminium casement windows of section (54 x38 Aluminium casement windows of section (54 x38
x1.1) x1.1) sq.m. 5763.19
195 Aluminium casement door of section (101 x45 Aluminium casement door of section (101 x45 x1.1)
x1.1) sq.m. 8324.60
196 Aluminium swing door of section (101x45x1.1) Aluminium swing door of section (101x45x1.1) sq.m. 8964.96
197 Aluminium sliding windows of section (88 x38 Aluminium sliding windows of section (88 x38 x1.1)
x1.1) sq.m. 6147.39
198 Aluminium partition with 5 mm thick glass and 9 Aluminium partition with 5 mm thick glass and 9 mm
mm thick laminated board of section (101 thick laminated board of section (101 x45x1.1)
x45x1.1) sq.m. 6403.54
199 Aluminium partition with 5 mm thick glass and 9 Aluminium partition with 5 mm thick glass and 9 mm
mm thick laminated board of section (64
x38x1.1) sq.m. 5122.83
200 M.S.black pipe roof truss with I.S. or B.S. section M.S.black pipe roof truss with primer painting
including jointing, fixing, erection and primer
painting with all necessary M.S. bed plates, shoe
angles anchor bolts leas sheeting or cement
grouting as per drawing and instructions, all
complete .
kg 126.29
201 M.S. blackpipe purlin with I.S. or B.S. section M.S. blackpipe purlin with primer painting
including jointting , fixing, erection and primer
painting with all necessary M.S. bed plates, shoe
angles, anchor bolts leas sheeting or cement
grouting as per drawing and instructions all
complete .
kg 105.43
202 Supply and fixing of 75X100mm Sisam wood Supply and fixing of 75X100mm Sisam wood handrail
handrail including fittings as per drawing and
instructions all complete Rm 1600.88
203 Supplying and fitting of railing with 20mm X Supplying and fitting of railing with 20mm X 20mm
20mm M.S. square pipe and 75mm X 100mm M.S. square pipe and 75mm X 100mm Sal/Sisam
Sal/Sisam handrail with brass cap including handrail .
welding, joints and primer painting as per
drawing and instructions all complete sq.m. 1600.88
204 Supplying and fitting of railing with 20mm X 20mm X 20mm M.S. squire pipe and 40mm black
20mm M.S. squire pipe and 40mm black pipe pipe handrail i
handrail including welding, joints and primer
painting as per drawing and instructions all
complete sq.m. 952.20
205 1 coats of white washing without primer Painting 1 coats of white washing without primer Painting over
over old Surkhey plastered surface surface all old Surkhey plastered surface
complete sq.m. 26.91
206 1 coats Ramtilak paint over porperly cleaned 1. coats Ramtilak paint over porperly cleaned outer
outer surface of old Durbar wall surface all surface of old Durbar wall surface
complete sq.m. 29.53
207 1 coats of ready made enamel paint of approved 1 coats of ready made enamel paint of approved
colour without primer Painting over porperly colour without primer Painting
sanded surface all complete sq.m. 61.46
208 2 coats of ready made enamel paint without 2 coats of ready made enamel paint of approved
primer Painting over porperly sanded surface all colour without primer Painting
complete sq.m. 114.34
209 1 coats of Plastic emulsion paint of approved 1 coats of Plastic emulsion paint of approved colour
colour without primer Painting over porperly without primer Painting
cleaned surface all complete sq.m. 73.78
210 2 coats of Plastic emulsion paint of approved 2 coats of Plastic emulsion paint of approved colour
colour without primer Painting over porperly without primer Painting
cleaned surface all complete sq.m. 136.24
211 1 coat almunium paint without primer Painting 1 coat almunium paint without primer Painting
over porperly cleaned surface all complete sq.m. 47.53

12
212 2 coat almunium paint without primer Painting 2 coat almunium paint without primer Painting
over porperly cleaned surface all complete sq.m. 96.89
213 1 coat Red oxide paint without primer Painting 1 coat Red oxide paint without primer Painting
over porperly sanded surface all complete sq.m. 46.85
214 2 coat Red oxide paint without primer Painting 2 coat Red oxide paint without primer Painting
over porperly sanded surface all complete sq.m. 93.70
215 Fencing with 10 S.W.G.G.I chain link 2"X2" Fencing with 10 S.W.G.G.I chain link 2"X2" mesh
mesh sized framed on 25X25X4 mm angles and sized framed
50mm Ø M.S. blackpipe post in 2m interval
including jointting , fixing, erection and primer
painting with all necessary M.S. grills and plates
as per drawing and instruc
sq.m. 1910.49
216 Fencing with 62mm X 62mm size mesh made up Fencing with 62mm X 62mm size mesh made up of
of 7mm Ø rods framed on 25X25X4 mm angles 7mm Ø rods framed
and 50mm Ø M.S. blackpipe post in 2m interval
including jointting , fixing, erection and primer
painting with all necessary M.S. grills and plates
as per drawing and inst
sq.m. 1755.49
217 Fabrication and fixing of I.S. or B.S. Standard Fabrication and fixing of I.S. or B.S. Standard iron
iron section with one coat primer painting all section with one coat primer painting.
complete kg 109.00
218 1.2 mm corrugated fiber glass sheet roofing 1.2 mm corrugated fiber glass sheet roofing.
including fixing in proper shape & size with all
necessary rails, screws, bolts & nuts washers, J
& L hocks etc as per drawing & instruction all
complete. sq.m. 1691.85
219 1.2 mm plain fiber glass sheet roofing including 1.2 mm Plain fiber glass sheet roofing.
almunium strip at the joints and fixing in proper
shape & size with all necessary rails, screws,
bolts & nuts washers, J & L hocks etc as per
drawing & instruction all complete.
sq.m. 1888.22
219 1.2 mm fiber glass sheet for ridge including fixing 1.2 mm fiber glass sheet for ridge.
in proper shape & size with all necessary nails,
screws, bolts & nuts washers, J & L hocks etc as
per drawing & instruction all complete.
R.m. 1155.45
220 1.2 mm fiber glass sheet for ridge including fixing 1.2 mm fiber glass sheet for ridge.
in proper shape & size with all necessary nails,
screws, bolts & nuts washers, J & L hocks etc as
per drawing & instruction all complete.
sq.m. 1540.60
221 Cleaning and rubbing old marble floor and wall Cleaning and rubbing old marble floor and wall with
with oxalic acid oxalic acid sq.m. 115.86
222 Cleaning and Polishing old Parket floor Cleaning and Polishing old Parket floor sq.m. 71.65
223 Cleaning, rubbing and Polishing of Old mossaic Cleaning, rubbing and Polishing of Old mossaic floor
floor sq.m. 133.79
224 12.5mm thick cement sand rainwater protection 12.5mm thick cement sand rainwater protection
plaster line in (1:4) ratio including wetting of plaster line in (1:4) ratio
surfaces & curing the work all complete.
Rm 78.55
225 Dismanlting of old CGI sheet roofing work Dismanlting of old CGI sheet roofing work i
including stagging in proper place . sq.m. 25.07
226 1" thick Roofing Tile Shape cutting work in 1:4 1" thick Roofing Tile Shape cutting work in 1:4 CM
CM sq.m. 654.63
227 Fitting & fixing suspended Plain ceiling of water Fitting & fixing suspended Plain ceiling of water
resistance gypsum board with all necessary resistance gypsum board.
hanger, angles, hooks nut bolt all complete.
sq.m. 832.45
228 Fitting & fixing suspended design ceiling of water Fitting & fixing suspended design ceiling of water
resistance gypsum board with all necessary resistance gypsum board.
hanger, angles, hooks nut bolt all complete.
sq.m. 1216.66
229 Fitting & fixing of water resistance gypsum board Fitting & fixing of water resistance gypsum board
false ceiling with all necessary hanger, angles, false ceiling.
hooks nut bolt all complete. sq.m. 1101.40
230 Fitting & fixing of water resistance gypsum board Fitting & fixing of water resistance gypsum board
design false ceiling with all necessary hanger, design false ceiling.
angles, hooks nut bolt all complete. sq.m. 1255.08

13
231 Dry wall partition work with metal stud: Providing Dry wall partition work with metal stud: Providing and
and fixing Gypboard on both side thickness of fixing Gypboard on both side thickness of 75mm
75mm all complete work sq.m. 1869.83
232 Gypsum or Boral plaster board wall panelling : Gypsum or Boral plaster board wall panelling :
Providing and fixing Gypboard or boral plaster Providing and fixing Gypboard or boral plaster board
board finishing all complete work finishing sq.m. 934.91
233 One layer Plastic felt laying over evenly spread One layer Plastic felt laying over evenly spread
roofing grade bitumen with river sand on cleaned roofing grade bitumen with river sand o
surface. sq.m. 562.46
234 Two layer Plastic felt laying over evenly spread Two layer Plastic felt laying over evenly spread
roofing grade bitumen with river sand on cleaned roofing grade bitumen with river sand
surface. sq.m. 914.59
235 Supplying and fixing Armstrong Mineral Board Supplying and fixing Armstrong Mineral Board for
for suspended false ceiling with necessary suspended false ceiling
frames and hooks all complete sq.m. 1754.56
236 Elastocrete cementitious elastomeric water Elastocrete cementitious elastomeric water proofing
proofing coating 2 components capacity per kg. coating 2 components capacity per kg. 6 sq.ft 2 coat
6 sq.ft 2 coat including supply and applying all
complete work sq.m. 601.93
237 Supplying & fixing of spiral staircase with Supplying & fixing of spiral staircase with 100mm
100mm black pipe post, 20mm squire pipe black pipe post, 20mm squire pipe railing , 32mm
railing , 32mm handrail, width of staircase 75cm handrail, width of staircase 75cm .
including red oxide primer coat and necessary
fittings Rm 8588.84
238 Fixing machinemade clay tile on 1:4 cement Fixing machinemade clay tile on 1:4 cement sand
sand mortar over wall surface mortar over wall surface sq.m. 2068.89
239 Supplying nd fitting readymade carved wooden Supplying nd fitting readymade carved wooden door
door shuter for entrance door including carved shuter for entrance door including carved chaukhat
chaukhat frame all complete frame all complete sq.m. 17929.92
240 Carved salwood Ankhi jhyal dhoka fitting Carved salwood Ankhi jhyal dhoka fitting sq.m. 6403.54
241 UPVC (80x50)mm size sliding white colour UPVC (80x50)mm size sliding white colour
window with 5mm glass pannel fixing all window with 5mm glass pannel fixing
complete sq.m. 8391.26
242 UPVC (60x60)mm size white colour UPVC (60x60)mm size white colour casement
casement window with 5mm glass pannel window with 5mm glass pannel fixing
fixing all complete sq.m. 9516.04
243 UPVC (100x60)mm,9mm th. Board and 5 UPVC (100x60)mm,9mm th. Board and 5 mm th
mm th glass white color doors with glass white color doors
necessary accessories all complete; sq.m. 10081.41
244 UPVC (60x60)mm size,9mm th. white UPVC (60x60)mm size,9mm th. white colour
colour partition board /5mm glass pannel partition board /5mm glass pannel fixing
fixing all complete sq.m. 10414.68
245 Supplying and fixing of (80x50) mm th. White
Supplying and fixing of (80x50) mm th.
White color casement windows(double color casement windows(double glazing glass),
glazing glass), etc all complete. etc sq.m. 9349.40
246
UPVC (60x60)mm size white colour swing UPVC (60x60)mm size white colour swing door
door with 5mm glass pannel fixing all with 5mm glass pannel fixing
complete; sq.m. 6558.27
247 Carbon Fibre UPVC Roofing Sheet including the
Carbon Fibre UPVC Roofing Sheet
including the cost of material and labour cost of material and labour fitting, fixing,
fitting, fixing, all complete job (3mm Thick) sq.m. 1896.71
Carbon Fibre UPVC Roofing Sheet
248 Carbon Fibre UPVC Roofing Sheet including the
including the cost of material and labour
fitting, fixing, all complete job (2mm cost of material and labour fitting, fixing,
Thick) . sq.m. 1389.56
249 Making and fitting fixing Plywood Panel door Commercial Plywood Panelled door shutter with
shutter of 38 x 100 mm size sal wood frame with one side Teak ply Lamination
8 mm thick commercial ply on midle and 4mm
thick teak ply on one side including all necessary
hardware fitting all complete. sq.m. 4226.31

14
250 Making and fitting fixing Plywood Panel door Commercial Plywood Panelled door shutter with
shutter of 38 x 100 mm size sal wood frame with both sides Teak ply Lamination
8 mm thick commercial ply on midle and 4mm
thick teak ply on both sides including all
necessary hardware fitting all complete. sq.m. 4664.30
251 Making and fitting fixing Plywood Panel door Water proof Plywood Panelled door shutter with
shutter of 38 x 100 mm size sal wood frame with one side Teak ply Lamination
8 mm thick water proofl ply on midle and 4mm
thick teak ply on one side including all necessary
hardware fitting all complete. sq.m. 4367.14
252 Supplying and fitting Ready made Teak wood Supplying and fitting Ready made Teak wood
Doors,ordinary (Seasoned and Poisoned treated Doors,ordinary
,one side teak) with all neccessary hardware all
complete. sq.m. 3473.90
253 Supplying and fitting Ready made Teak wood Supplying and fitting Ready made Teak wood
Doors,special (Seasoned and Poisoned Doors,special
treated ,one side teak) with all neccessary
hardware all complete. sq.m. 4420.20
254 Supplying and fitting Ready made Teak wood Supplying and fitting Ready made Teak wood
Doors,ordinary (Seasoned and Poisoned treated Doors,ordinary
,one side teak and other side water proof ply
fitting) with all neccessary hardware all
complete. sq.m. 3732.85
255 Supplying and fitting Ready made Teak wood Supplying and fitting Ready made Teak wood
Doors,special (Seasoned and Poisoned Doors,special
treated ,one side teak and other side water proof
ply fitting) with all neccessary hardware all
complete. sq.m. 4420.20
256 Supply and lamination of Sunmica on hardboard Sunmica Lamination on hard board or partition
and other partition surface with glue sq.m. 410.60
257 Supply and lamination of Formica on hardboard Formica Lamination on hard board or partition
and other partition surface with glue sq.m. 861.09
258 Making and fitting fixing Plywood Panel partition Plywood panelled partition with
of 75 x 75 mm size sal wood frame with 12 mm 12mm.commercial plywood and one side teak
thick commercial ply on midle and 4mm thick
teak ply lamination on one side including all
ply lamination
necessary hardware fitting all complete.
sq.m. 2352.40
259 Making and fitting fixing Plywood Panel partition Plywood panelled partition with
of 75 x 75 mm size sal wood frame with 12 mm 12mm.commercial plywood and both sides teak
thick commercial ply on midle and 4mm thick
teak ply lamination on both sides including all
ply lamination
necessary hardware fitting all complete.
sq.m. 2709.90
260 Making and fitting fixing of 12 x 12 mm,solid core 12x12mm.solid core square rod grill work.
squar rod Grill on the frame of 4.5 x 20 mm.
M.S.plate with painting all complete. sq.m. 2605.64
261 Making and fitting fixing of stainless steel pipe Stainless stell handrail work
railling with 38mm.dia.stainless steel pipe
handrail 2 row 25mm.dia.stainless steel pipe in
between handrail and floor and
38mm.dia.stainless stell pipe for vertical post @
2m. c/c including welding , cutt
sq.m. 2203.44
262 2 coats of weather coat (Apex) paint of approved 2 coats of weather coat (Apex) paint with one coat
colour with one coat primer Painting over primer Painting
porperly cleaned surface all complete sq.m. 175.18
263 2 coats of readymade washable distemper paint 2 coats of readymade washable distemper paint
of approved colour with one coat primer Painting with one coat primer
over porperly cleaned surface all complete
sq.m. 82.63
264 Supplying and laying of Godawari(30cm.x30cm) Supplying and laying of Godawari(30cm.x30cm)
marbal in cement sand motar (1:2) ratio with marbal in cement sand motar
approved colour on floors, skirting and wall s all
complete. sq.m. 2830.34
265 Supplying and laying of 16mm thick granite in Supplying and laying of 16mm thick granite in cement
cement sand motar (1:2) ratio with approved sand motar
colour on floors, skirting and wall s all complete.
sq.m. 4484.11

15
266 Supplying and applying white cement putty on Supplying and applying white cement putty on ceiling
ceiling and wall with line and level all complete and wall
sq.m. 179.29
267 Supplying and laying 100mm long 12mmthick Supplying and laying 100mm long 12mmthick
parquate flooring and skirting in line and level parquate skirting
with painting all complete. sq.m. 1398.60
268 Supplying and fitting 100x75mm sal/sisau hand Supplying and fitting sal/sisau hand rail on special
rail on 150x150mm special post,75x75mm sal post, sal wood baluster for railling
wood baluster for railling all complete.
sq.m. 3493.42
269 Supplying & Painting minium 2 coats of
Supplying & Painting minium 2 coats of Japanees Texture paint over cement plastered
Japanees Texture paint over cement plastered surface
surface including cleaning the surface,
preparation all complete an aproved colour
as per office. sq.m. 446.07
270 Supplying and fixing 6mm.waterproof ply false Supplying and fixing 6mm.waterproof ply false ceiling
ceiling on 50x75mm size sal wood of 600x900
panelling all complete sq.m. 1846.23
271 Supplying and laying Teak wood Parqueting on floor
Supplying and laying Teak wood Parqueting on polishing
floor polishing all complete(150mm*30mm*8mm) sq.m. 1536.84
272 Supplying and laying Sisam wood wall panelling Supplying and laying Sisam wood wall panelling on
on wall(with wood frame) polishing all wall(with wood frame)
complete(75mm*16mm) sq.m. 5378.97
273 Heritage Wall Surface Texture (Interior and Heritage Wall Surface Texture (Interior and Exterior)
Exterior) including the cost supplying and fitting (Heritage granular)
(Heritage granular) sq.m. 960.52
274 Heritage Wall Surface Texture (Interior and Heritage Wall Surface Texture (Interior and Exterior)
Exterior) including the cost supplying and fitting (Heritage flakes)
(Heritage flakes) sq.m. 1216.66
275 Heritage Wall Surface Texture (Interior and Heritage Wall Surface Texture (Interior and Exterior)
Exterior) including the cost supplying and fitting (Heritage granite finishing)
(Heritage granite finishing) sq.m. 1728.95
276 Heritage Wall Surface Texture (Interior and Heritage Wall Surface Texture (Interior and Exterior)
Exterior) including the cost supplying and fitting (Heritage roller coat)
(Heritage roller coat) sq.m. 1088.60
277 Heritage Wall Surface Texture (Interior and Heritage Wall Surface Texture (Interior and Exterior)
Exterior) including the cost supplying and fitting (Heritage Top coat plastic lamination)
(Heritage Top coat plastic lamination) sq.m. 256.13
278 Supply and errection of (75mm thick) Supply and errection of (75mm thick) aerocon/rapicon
aerocon/rapicon prefab panel in partition wall.all prefab panel in partition wall.
complete sq.m. 2801.54
279 Supply and errection of (50mm thick) Supply and errection of (50mm thick) aerocon/rapicon
aerocon/rapicon prefab panel in partition wall. All prefab panel in partition wall.
complete sq.m. 2427.69
280 Supply and errection of (40mm thick) Supply and errection of (40mm thick) aerocon/rapicon
aerocon/rapicon prefab panel in partition wall. All prefab panel in partition wall.
complete sq.m. 2016.34
281 Supply and fixing of (40mm Supply and fixing of (40mm thick)aerocon/rapicon
thick)aerocon/rapicon prefab panel cubical prefab panel cubical partition wall
partition wall all complete sq.m. 2139.41
282 Supplying and fixing 6 mm thick Flex-O- Board Supplying and fixing 6 mm thick Flex-O- Board (Water
(Water proof cement board) for false ceiling all proof cement board) for false ceiling
complete sq.m. 409.82
283 Providing and applying Dustban/Permise Providing and applying Dustban/Permise chemicals
chemicals for Anti Termite Treatment all for Anti Termite Treatment
complete. sq.m. 473.85
284 Supplying and laying machine made clay tile in Supplying and laying machine made clay tile in 1:4
1:4 cement mortar on slope roof properly in line cement mortar on slope roof
and level all complete. sq.m. 2073.16
285 25 mm thick C.C. Tile (Red color) paving in 1:4 25 mm thick C.C. Tile (Red color) paving in 1:4
cement mortar cement mortar sq.m. 1296.91
286 25 mm thick C.C. Tile (Grey color) paving in 1:4 25 mm thick C.C. Tile (Grey color) paving in 1:4
cement mortar cement mortar sq.m. 1282.83
Annex-1
287 UPVC Casement Window 60*60 mm White Colour UPVC Casement Window 60*60 mm White Colour With
With 5mm Glass 5mm Glass sq.m. 8573.36

16
288 UPVC Double Glazing Casement Window 60*60 mm UPVC Double Glazing Casement Window 60*60 mm
Frame White Colour With 5mm Glass Frame White Colour With 5mm Glass sq.m. 11777.51
289 UPVC Sliding Window With 50*80 mm White UPVC Sliding Window With 50*80 mm White Colour And
Colour And 5mm Glass With Aluminium Sliding 5mm Glass With Aluminium Sliding Track
Track sq.m. 7980.62
290 UPVC Casement Window 60*60 mm Frame White UPVC Casement Window 60*60 mm Frame White Colour
Colour With 5mm Glass With UPVC Panel Luever With 5mm Glass With UPVC Panel Luever Fixed
Fixed sq.m. 8748.33
291 UPVC Casement Window 60*60 mm Frame White UPVC Casement Window 60*60 mm Frame White Colour
Colour With 5mm Glass With Adjustable Glass Panel With 5mm Glass With Adjustable Glass Panel Luever
Luever sq.m. 7974.67
292 UPVC Sliding Window With 50*80 mm White UPVC Sliding Window With 50*80 mm White Colour
Colour With Aluminium Sliding Track And 5mm With Aluminium Sliding Track And 5mm Glass With
Glass With Adjustable Glass Panel Luever Adjustable Glass Panel Luever sq.m. 7980.62
293 UPVC Door 100mm*60mm White Colour With Top UPVC Door 100mm*60mm White Colour With Top Glass
Glass 5mm And Bottom UPVC Panel 5mm And Bottom UPVC Panel sq.m. 7516.42
294 UPVC Door 100mm*60mm White Colour With Top UPVC Door 100mm*60mm White Colour With Top Glass
Glass 5mm Glass And Bottom 9mm Nepal Board 5mm Glass And Bottom 9mm Nepal Board
sq.m. 7468.81
295 UPVC Door 100mm*60mm White Colour With Top UPVC Door 100mm*60mm White Colour With Top And
And Bottom UPVC Panel Bottom UPVC Panel sq.m. 7825.88
296 UPVC 60*60 mm Partition With Half Board 9mm UPVC 60*60 mm Partition With Half Board 9mm And
And Other Half 5mm Glass Other Half 5mm Glass sq.m. 6740.38
297 UPVC 100mm*60mm Swing Door With Top 5mm UPVC 100mm*60mm Swing Door With Top 5mm Glass
Glass And Bottom UPVC Panel And Bottom UPVC Panel sq.m. 9581.51

17
1000 Sanitary Works Sanitary Works Kathmandu/Bha
Rate including
15% overhead
1001 White glazed earthenware Indian pattern W C White glazed earthenware Indian pattern W C
580mm Orissa Pan with 3.0gallons low level 580mm Orissa Pan with 10 liter low level flushing
flushing cistern with complete accessories cistern .
including bracket, flushing pipe,pipe connector
etc. all complete set Set 9702.35
1002 White glazed earthenware Indian pattern W C White glazed earthenware Indian pattern W C
500mm Orissa Pan with 3.0gallons low level 500mm Indian Pan with 10 liter low level flushing
flushing cistern with complete accessories cistern .
including bracket, flushing pipe,pipe connector
etc. all complete set Set 8650.70
1003 White glazed earthenware Indian pattern W C White glazed earthenware Indian pattern W C
530mm Orissa Pan with 3.0gallons low level 530mm Orissa Pan with 10 liter low level flushing
flushing cistern with complete accessories cistern .
including bracket, flushing pipe,pipe connector
etc. all complete set Set 9714.25
1004 White glazed earthenware Indian pattern W C 580mm Orissa pan complete set
580mm Orissa Pan complete set Set 4126.80
1005 10.0 lit. low level Porceline clay cistern complete 10.0 lit. low level Porceline clay cistern
set Set 5575.54
1006 10.0 lit. low level PVC cistern complete set 10.0 lit. low level PVC cistern Set 4373.39
1007 Porcelain clay white glazed indian pattern Porcelain clay white glazed indian pattern Comode
Comode(Hindustan, Parryware, Classica or eq.) with 10 lts. low level cistern
with 10 lts. low level cistern and seat cover Set 8467.05
1008 Porcelain clay first color indian pattern Porcelain clay first color indian pattern Comode with
Comode(Hindustan, Parryware, Classica or eq.) 10 lts. low level cistern constallation type.
with 10 lts. low level cistern and seat cover
constallation type Set 17390.35
1009 Porcelain clay white glazed indian pattern Porcelain clay white glazed indian pattern Comode
Comode(Hindustan, Parryware, Classica or eq.) with 10 lts. low level cistern constallation type.
with 10 lts. low level cistern and seat cover
constallation type. Set 14123.12
1010 Porcelain clay white galzed European pattern Porcelain clay white glazed European pattern
american standard Comode (Cotto or eq.) with american standard Comode with 10 lts. low level
10 lts. low level cistern and seat cover cistern. Set 17211.82
1011 Porcelain clay white galzed European pattern Porcelain clay white glazed European pattern
american standard one piece Comode (Cotto or american standard one piece Comode with slow
eq.) with slow falling seat cover falling seat cover. Set 35839.23
1012 White glazed oval wash basin 55X40cm with White glazed Oval wash basin 55X40cm all complete
brackets 32mm bottle trap, 32mm CP waste set.
coupling with CP chain and rubber plug, 15mm
fancy type piller cock and ½"x18" pipe
connector etc all complete. Set 7895.80
1013 White glazed Cval wash basin 55X40cm size White glazed Oval wash basin 55X40cm European
European pattern american standard with pattern (american Standard) with mixer all complete
brackets 32mm bottle trap, 32mm CP waste set.
coupling with CP chain and rubber plug, Basin
mixer (jaquar, essco or eqv.) and ½"x18" pipe
connector etc all complete.
Set 8205.27
1014 White glazed Cval wash basin 55X40cm size White glazed Oval wash basin 55X40cm European
European pattern american standard with pattern (american Standard) with mixer and semi
brackets 32mm bottle trap, 32mm CP waste pedestal all complete set.
coupling with CP chain and rubber plug, Basin
mixer (jaquar, essco or eqv.) semi pedestal and
½"x18" pipe connector etc all compl
Set 11478.46
1015 First color glazed wash basin 55X40 cm size First color glazed wash basin 55X40 cm size Indian
Indian pattern with brackets 32mm bottle trap, pattern, cascade type with pedestal etc all complete.
32mm CP waste coupling with CP chain and
rubber plug, cascade type with pedestal and
15mm fancy type piller cock and ½"x18" pipe
connector etc all complete.
Set 8604.70
1016 White glazed wash basin 55X40cm with brackets White glazed 55X40 cm size Indian pattern wash
32mm bottle trap, 32mm CP waste coupling with basin with pedestal and basin mixer etc all
CP chain and rubber plug, 15mm basin mixer complete.
( jaquar or essco or eqv.) with pedestal and
½"x18" pipe connector etc all complete.
Set 9131.67

18
1017 White glazed wash basin 55X40cm with White glazed wash basin 55X40cm all complete set.
brackets 32mm bottle trap, 32mm CP waste
coupling with CP chain and rubber plug, 15mm
fancy type piller cock and ½"x18" pipe
connector etc all complete. Set 4464.32
1018 White glazed Corner wash basin 40X40cm with White glazed Corner wash basin 40X40cm all
brackets 32mm bottle trap, 32mm CP waste complete set.
coupling with CP chain and rubber plug, 15mm
fancy type piller cock and ½"x18" pipe
connector etc all complete. Set 4414.33
1019 Small Lavoratary Sink 45X30x15cm with Small Lavoratary Sink 45X30x15cm complete set.
brackets 32mm bottle trap, 32mm CP waste
coupling with CP chain and rubber plug, 15mm
fancy type piller cock and ½"x18" pipe
connector etc all complete. Set 4946.72
1020 Lavoratary Sink 53X43x18cm with brackets Lavoratary Sink 53X43x18cm complete set.
32mm bottle trap, 32mm CP waste coupling with
CP chain and rubber plug, 15mm fancy type
piller cock and ½"x18" pipe connector etc all
complete. Set 6196.48
1021 Kitchen sink 60X45X25cm with brackets,32mm Kitchen sink 60X45X25cm complete set .
bottle trap, 32mm CP waste coupling all
complete set . Set 7530.13
1022 Urinal 46.5X35.5X26.5cm constallation type with Urinal 46.5X35.5X26.5cm White glazed constallation
necessary accessories all complete set . type with complete set . Set 4378.68
1023 Urinal 46.5X31.5X26.5cm first color Urinal 46.5X35.5X26.5cm first color constallation type
constallation type with necessary accessories all with complete set .
complete set . Set 7257.90
1024 White glazed Urinal 46.5X31.5X26.5cm with Urinal 46.5X35.5X26.5cm White glazed with complete
necessary accessories all complete set . set . Set 2880.45
1025 White glazed 61X41X38cm large flat back White glazed 61X41X38cm large flat back Urinal all
Urinal all complete set. complete set. Set 8252.26
1026 45X35X27.5cm Angle back Urinal all complete 45X35X27.5cm Angle back Urinal all complete set.
set . Set 3674.35
1027 45X35cm Squating Plate Urinal all complete set 45X35cm Squating Plate Urinal all complete set.
. Set 2566.22
1028 68X30cm size Urinal partation all complete set . 68X30cm size Urinal partation all complete set .
Set 2890.50
1029 300 lit. 3 panel solar heater fixing with electric 300 lit. 3 panel solar heater fixing with electric
booster all complete. booster all complete. Set 61127.28
1030 900 lit. G.I water tank fixing all complete. 900 lit. G.I water tank fixing all complete. nos 17904.32
1031 1350 lit. G.I water tank fixing all complete. 1350 lit. G.I water tank fixing all complete. nos 22124.19
1032 1800 lit. G.I water tank fixing all complete. 1800 lit. G.I water tank fixing. nos 26249.24
1033 2250 lit. G.I water tank fixing all complete. 2250 lit. G.I water tank fixing. nos 31162.44
1034 1000 lit capacity PVC water tank HilTake or 1000 lit capacity PVC water tank HilTake or equivalent
equivalent nos 12397.00
1035 500 lit capacity PVC water tank HilTake or 500 lit capacity PVC water tank HilTake or equivalent
equivalent nos 7578.50
1036 2000 lit capacity PVC water tank HilTake or 2000 lit capacity PVC water tank HilTake or equivalent
equivalent nos 22551.50
1037 1HPChinese Water Pump 1HPChinese Water Pump nos 6100.56
1038 1HPChinese Submersible Water Pump 1HPChinese Submersible Water Pump nos 13516.41
1039 1HP Electric motor Submersible Water Pump 1HP Electric motor Submersible Water Pump Italian
Italian nos 28601.13
1040 0.5HP Electric motor Pump monoblock 0.5HP Electric motor Pump monoblock ( crompton)
( crompton) nos 8750.06
1041 1HP Electric motor Pump monoblock 1HP Electric motor Pump monoblock ( crompton)
( crompton) nos 11970.87
1042 1HP Electric motor Pump Multi Stage coupled 1HP Electric motor Pump Multi Stage coupled
( crompton) ( crompton) nos 16784.25
1043 2HP Electric motor Pump multi stage coupled 2HP Electric motor Pump multi stage coupled
( crompton) ( crompton) nos 26639.75
1044 3HP Electric motor Pump monoblock 3HP Electric motor Pump monoblock ( crompton)
( crompton) nos 28157.75
1045 5HP Electric motor Pump monoblock 5HP Electric motor Pump monoblock ( crompton)
( crompton) nos 35040.50
1046 Porecelene clay toilet paper holder Recessed Porecelene clay toilet paper holder Recessed type
type american standard with necessary american standard with necessary accessories.
accessories all complete. nos 871.47

19
1047 Porecelene clay toilet paper holder Recessed Porecelene clay toilet paper holder Recessed type
type with necessary accessories all complete. with necessary accessories.
nos 577.48
1048 Chrome plated toilet paper holder with Chrome plated toilet paper holder with necessary
necessary accessories. accessories. nos 478.68
1049 Recess type Soap Dish , American Standard Recess type Soap Dish , American Standard with
with necessary accessories. necessary accessories. nos 1157.13
1050 Porecelene clay Soap Tray 6"x6" Recessed Porecelene clay Soap Tray 6"x6" Recessed type with
type with necessary accessories all complete. necessary accessories all complete.
nos 764.34
1051 Chrome plated soap tray 6"x6" with necessary Chrome plated soap tray 6"x6" with necessary
accessories accessories nos 478.68
1052 Chrome plated Towel Rod 15mm dia x450mm Chrome plated Towel Rod 15mm dia x450mm long
long American Standard with necessary American Standard with necessary accessories
accessories nos 1861.01
1053 Chrome plated 15mm dia x600mm long heavy C p 15mm dia x600mm long heavy quality towel rod.
quality towel rod nos 648.31
1054 Chrome plated 15mm dia x450mm long heavy C p 15mm dia x450mm long towel rod.
quality towel rod nos 530.20
1055 Supply and fixing of 60 cm CP Glass Shelf 60 cm CP Glass Shelf nos 708.74
1056 Supply and fixing of Porceline Clay Glass Shelf Supply and fixing of Porceline Clay Glass Shelf
European Pattern, American Standard. European Pattern, American Standard. nos 4461.71
1057 55X40cm beveled edge looking mirror of high 55X40cm beveled edge looking mirror of high quality,
quality, standard brand. nos 758.42
1058 60X45cm beveled edge looking mirror of high 60X 45cm beveled edge looking mirror of high quality,
quality modiguard or standard brand. modiguard or standard brand. nos 1740.72
1059 50X40cm beveled edge looking mirror of high 50X40cm beveled edge looking mirror of high
quality quality modiguard or eq. nos 639.40
1060 50X40cm Beveled edge looking mirror of high 50X40cm Beveled edge looking mirror of high
quality European Pattern, American Standard quality European Pattern, American Standard
nos 2307.28
1061 Chrome plate shower rose 7.5 cm dia of Chrome plate shower rose 7.5 cm dia of standard
standard brand brand. nos 1104.00
1062 Pressure Adjustable Shower rose Pressure Adjustable Shower rose nos 1657.47
1063 Supply and fixing of Ordinary type C.P. shower Supply and fixing of Ordinary type C.P. shower rose nos 746.92
rose
1064 Supply and fixing of shower head with arm and Supply and fixing of shower head with arm and
flange European Pattern, Americand Standard flange European Pattern, Americand Standard
nos 3128.95
1065 Supply and fixing of C.P. Flush Valve Americand Supply and fixing of C.P. Flush Valve Americand
Standard Standard nos 4209.33
1066 Supply and fixing of Sensor Flush Valve for Supply and fixing of Sensor Flush Valve for Urinal
Urinal Americand Standard Americand Standard nos 19094.60
1067 C.P. Bibcock 15mm dia heavy type C.P. Bibcock 15mm dia heavy type nos 1039.01
1068 Ordinary type C.P. Bibcock 15mm dia. Ordinary type C.P. Bibcock 15mm dia. nos 764.75
1069 15mm dia. Auto Closing Bibcock with aerator 15mm dia. Auto Closing Bibcock with aerator nos 2621.54
1070 15mm dia. Urinal Auto Closing Valve with built 15mm dia. Urinal Auto Closing Valve with built in nos 2528.70
in Control Cock Control Cock nos 1240.85
1071 C.P. 15mm dia Angle valve European Pattern C.P. 15mm dia Angle valve European Pattern
1072 C.P. 15mm dia Angle valve Ordinary type C.P. 15mm dia Angle valve Ordinary type nos 764.75
1073 15mm dia two way angle valve 15mm dia two way angle valve nos 1419.38
1074 Ordinary type C.P. Pillar cock 15mm dia Ordinary type C.P. Pillar cock 15mm dia. nos 764.75
1075 15mm dia concealed valve ordinary type 15mm dia concealed valve ordinary type. nos 958.76
1076 (G.M.) gate valve 15mm dia full way medium G.M. gate valve 15mm dia nos 1046.84
1077 (G.M.) gate valve 20mm dia full way medium G.M.gate valve 20mm dia nos 1331.30
1078 (G.M.) gate valve 25mm dia full way medium G.M. gate valve 25mm dia nos 2212.70
1079 (G.M.) gate valve 32mm dia full way medium G.M. gate valve 32mm dia nos 3219.65
1080 (G.M.) gate valve 40mm dia full way medium G.M.gate valve 40mm dia nos 4101.65
1081 (G.M.) gate valve 50mm dia full way medium G.M.gate valve 50mm dia nos 6211.97
1082 (G.M.) gate valve 65mm dia full way medium G.M.gate valve 65mm dia nos 10899.18
1083 (G.M.) gate valve 80mm dia full way medium G.M.gate valve 80mm dia nos 15560.35
1084 (G.M.) gate valve 100mm dia full way medium G.M.gate valve 100mm dia nos 27591.39
1085 (G.M.) check valve 15mm dia medium quality (G.M.) check valve 15mm dia nos 790.93
1086 (G.M.) check valve 20mm dia medium quality (G.M.) check valve 20mm dia nos 1320.01

20
1087 (G.M.) check valve 25mm dia medium quality (G.M.) check valve 25mm dia nos 1624.72
1088 (G.M.) check valve 32mm dia medium quality (G.M.) check valve 32mm dia nos 2379.33
1089 (G.M.) check valve 50mm dia medium quality (G.M.) check valve 50mm dia nos 5062.77
1090 (G.M.) check valve 65mm dia medium quality (G.M.) check valve 65mm dia nos 8133.04
1091 (G.M.) check valve 80mm dia medium quality (G.M.) check valve 80mm dia nos 11614.51
1092 (G.M.) check valve 100mm dia medium quality (G.M.) check valve 100mm dia medium quality with
with flange flange nos 18525.97
1093 PVC floor trap 11x7.5 cm all complete. PVC floor trap 11x7.5 cm. nos 283.45
1094 Alumium Gratting 100 mm dia all complete. Alumium Gratting 100 mm dia all complete. nos 57.36
1095 CP Gratting 125 mm dia all complete. CP Gratting 125 mm dia. nos 93.06
1096 CP Gratting 110 mm dia all complete. CP Gratting 110 mm dia. nos 79.97
1097 Fixing or laying 150mm dia cast iron (CI) pipe Fixing or laying 150mm dia cast iron (CI) pipe.
with necessary hardware all complete. Rm 2709.88
1098 Fixing or laying 110mm dia cast iron (CI) pipe Fixing or laying 110mm dia cast iron (CI) pipe.
with necessary hardware all complete. Rm 1512.53
1099 Fixing or laying 75mm dia cast iron (CI) pipe with Fixing or laying 75mm dia cast iron (CI) pipe.
necessary hardware all complete. Rm 1157.19
1100 Fixing or laying 50mm dia cast iron (CI) pipe with Fixing or laying 50mm dia cast iron (CI) pipe.
necessary hardware all complete. Rm 917.04
1101 15mm dia galvanized Iron (GI) pipe medium Fixing/laying 15mm dia (GI) pipe medium class.
class includes fixing/laying with necessary
hardware all complete. Rm 304.18
1102 20mm dia galvanized Iron (GI) pipe medium Fixing/laying 20mm dia (GI) pipe medium class.
class includes fixing/laying with necessary
hardware all complete. Rm 356.55
1103 25mm dia galvanized Iron (GI) pipe medium Fixing/laying 25mm dia (GI) pipe medium class.
class includes fixing/laying with necessary
hardware all complete. Rm 506.14
1104 32mm dia galvanized Iron (GI) pipe medium Fixing/laying 32mm dia (GI) pipe medium class.
class includes fixing/laying with necessary
hardware all complete. Rm 614.77
1105 40mm dia galvanized Iron (GI) pipe medium Fixing/laying 40mm dia (GI) pipe medium class.
class includes fixing/laying with necessary
hardware all complete. Rm 713.70
1106 50mm dia galvanized Iron (GI) pipe medium Fixing/laying 50mm dia (GI) pipe medium class.
class includes fixing/laying with necessary
hardware all complete. Rm 923.58
1107 80mm dia galvanized Iron (GI) pipe medium Fixing/laying 80mm dia (GI) pipe medium class.
class includes fixing/laying with necessary
hardware all complete. Rm 1335.09
1108 Filling 50mm lead caulked joint @ 3 lbs per joint 50mm lead caulked joint @ 3 lbs per joint.
all complete. nos 520.81
1109 Filling 75mm lead caulked joint @ 3 lbs per joint 75mm lead caulked joint @ 3 lbs per joint.
all complete. nos 548.41
1110 Filling 110mm lead caulked joint @ 4 lbs per joint 110mm lead caulked joint @ 4 lbs per joint.
all complete. nos 758.81
1111 Filling 150mm lead caulked joint @ 4lbs per joint 150mm lead caulked joint @ 4lbs per joint .
all complete. nos 764.56
1112 50mm PVC pipe of 6 kg/cm2 and instruction all 50mm PVC pipe of 6 kg/cm2
complete. Rm 159.01
1113 75mm PVC pipe of 4 kg/cm2 and instruction all 75mm PVC pipe of 4 kg/cm2
complete. Rm 242.30
1114 110mm PVC pipe of 4 kg/cm2 and instruction all 110mm PVC pipe of 4 kg/cm2
complete. Rm 451.69
1115 15 lit electric water heater (Geyser) Aeroston 15 lit electric water heater (Geyser) Aeroston
American Standard, all complete. American Standard, all complete. nos 15417.04
1116 25 lit electric water heater (Geyser) all complete. 25 lit electric water heater (Geyser)
nos 16160.95
1117 35 lit electric water heater (Geyser) all complete. 35 lit electric water heater (Geyser).
nos 18619.65
1118 50 lit electric water heater (Geyser) all complete. 50 lit electric water heater (Geyser).
nos 22149.57
1119 Acrylic type bath tub 5'6"x2'6" size all complete. Acrylic type bath tub 5'6"x2'6" size.
nos 13407.27
1120 CP telephonic shower with mixer all complete. CP telephonic shower with mixer.
nos 5167.87
1121 Acrylic type shower tray all complete. Acrylic type shower tray. nos 6677.94

21
1122 15 mm CP Bath Spout European Pattern 15 mm CP Bath Spout European Pattern American
American Standard all complete. Standard all complete. nos 2253.58
1123 Sensor Mixer for basin Battery Operating all Sensor Mixer for basin Battery Operating all complete.
complete. Set 25553.00
1124 CP sink mixer all complete. CP sink mixer. nos 2602.64
1125 CI cover 45x45 cm size (medium) all complete. CI cover 45x45 cm size (medium).
nos 2294.25
1126 CI cover 55x55 cm size ( medium) all complete. CI cover 55x55 cm size ( medium). nos 3008.40
1127 1.5 cm CP flush cock with sreader all complete. 1.5 cm CP flush cock with sreader. nos 2097.83
1128 Flange 80 mm dia size Flange 80 mm dia size nos 1650.80
1129 Flange 100 mm dia size Flange 100 mm dia size nos 1993.59
1130 Motor starter switch all complete. Motor starter switch. nos 4213.23
1131 Pressure sensor switch all complete. Pressure sensor switch. Set 4542.93
1132 Fire post all complete. Fire post. Set 35323.96
1133 20 HP electric motor pump all complete. 20 HP electric motor pump. Set 658662.50
1134 Fire hose reel all complete. Fire hose reel. Set 25920.42
1135 G.M. 25 mm Float Valve G.M. 25 mm Float Valve Set 1078.22
1136 Grab Bar American Standard Grab Bar American Standard Set 5294.48
1137 Euro guard filter all complete. Euro guard filter. Set 21369.54
1138 Kitchen sink stainless steel 90 cm long all Kitchen sink stainless steel 90 cm long.
complete. Set 5506.14
1139 Kitchen sink stainless steel 150 cm long all Kitchen sink stainless steel 150 cm long.
complete. Set 10031.68
1140 15 mm CP water spray all complete. 15 mm CP water spray. nos 1269.74
1141 Hand drayer Chinese Hand drayer Chinese nos 19095.10
1142 4 kg/cm2 (50 mm) HDP pipe all complete. 4 kg/cm2 (50 mm) HDP pipe . Rm 247.18
1143 4 kg/cm2 (110 mm) HDP pipe all complete. 4 kg/cm2 (110 mm) HDP pipe. Rm 617.80
1144 4 kg/cm2 (125 mm) HDP pipe all complete. 4 kg/cm2 (125 mm) HDP pipe. Rm 781.71
1145 4 kg/cm2 (140 mm) HDP pipe all complete. 4 kg/cm2 (140 mm) HDP pipe. Rm 982.50
1146 4 kg/cm2 (150 mm) HDP pipe all complete. 4 kg/cm2 (150 mm) HDP pipe. Rm 1152.51
1147 4 kg/cm2 (180 mm) HDP pipe all complete. 4 kg/cm2 (180 mm) HDP pipe. Rm 1737.12
1148 4 kg/cm2 (200 mm) HDP pipe all complete. 4 kg/cm2 (200 mm) HDP pipe. Rm 2035.61
1149 5 kg fire extinguiser 5 kg fire extinguiser. nos 6458.86
1150 560 mm dia 228 kg CI heavy cover 560 mm dia 228 kg CI heavy cover. Set 16328.53
1151 15mm dia Aeroflex Pipe insulation for hot water 15mm dia Aeroflex Pipe insulation for hot water pipe
pipe all complete. all complete. Rm 150.58
1152 25mm dia Aeroflex Pipe insulation for hot water 25mm dia Aeroflex Pipe insulation for hot water pipe
pipe all complete. all complete. Rm 200.57
1153 32mm dia Aeroflex Pipe insulation for hot water 32mm dia Aeroflex Pipe insulation for hot water pipe
pipe all complete. all complete. Rm 238.65
1154 15mm dia CPVC Pipe SDR 13.5 CTS, 22.5 15mm dia CPVC Pipe SDR 13.5 CTS includes
kg/cm2 includes fixing/laying with necessary fixing/laying with necessary fittings all complete.
fittings all complete. Rm 301.30
1155 20 mm dia CPVC Pipe SDR 13.5 CTS, 22.5 15mm dia CPVC Pipe SDR 13.5 CTS, includes
kg/cm2 includes fixing/laying with necessary fixing/laying with necessary fittings all complete.
fittings all complete. Rm 371.53
1156 25 mm dia CPVC Pipe SDR 13.5 CTS, 22.5 15mm dia CPVC Pipe SDR 13.5 CTS, includes
kg/cm2 includes fixing/laying with necessary fixing/laying with necessary fittings all complete.
fittings all complete. Rm 452.20
1157 32 mm dia CPVC Pipe SDR 13.5 CTS, 22.5 15mm dia CPVC Pipe SDR 13.5 CTS, includes
kg/cm2 includes fixing/laying with necessary fixing/laying with necessary fittings all complete.
fittings all complete. Rm 531.95
1158 40 mm dia CPVC Pipe SDR 13.5 CTS, 22.5 40 mm dia CPVC Pipe SDR 13.5 CTS, includes
kg/cm2 includes fixing/laying with necessary fixing/laying with necessary fittings all complete.
fittings all complete. Rm 693.82
1159 50 mm dia CPVC Pipe SDR 13.5 CTS, 22.5 50 mm dia CPVC Pipe SDR 13.5 CTS, includes
kg/cm2 includes fixing/laying with necessary fixing/laying with necessary fittings all complete.
fittings all complete. Rm 993.77
1160 15 mm dia CPVC Ball Valve, CTS Socket all 15 mm dia CPVC Ball Valve, CTS Socket all
complete. complete. Nos 1077.79
1161 20 mm dia CPVC Ball Valve, CTS Socket all 20 mm dia CPVC Ball Valve, CTS Socket all
complete. complete. Nos 1301.55
1162 25 mm dia CPVC Ball Valve, CTS Socket all 25 mm dia CPVC Ball Valve, CTS Socket all
complete. complete. Nos 1481.28
1163 32 mm dia CPVC Ball Valve, CTS Socket all 32 mm dia CPVC Ball Valve, CTS Socket all
complete. complete. Nos 2969.09
1164 40 mm dia CPVC Ball Valve, CTS Socket all 40 mm dia CPVC Ball Valve, CTS Socket all
complete. complete. Nos 3764.18

22
1165 50 mm dia CPVC Ball Valve, CTS Socket all 50 mm dia CPVC Ball Valve, CTS Socket all
complete. complete. Nos 4827.07
1166 16 mm dia multi-layer PAP Composite pipe 16 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings all
complete. Rm 255.66
1167 20 mm dia multi-layer PAP Composite pipe 20 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings all
complete. Rm 277.09
1168 25 mm dia multi-layer PAP Composite pipe 25 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings all
complete. Rm 350.88
1169 32 mm dia multi-layer PAP Composite pipe 32 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings all
complete. Rm 472.29
1170 40 mm dia multi-layer PAP Composite pipe 40 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings all
complete. Rm 669.87
1171 50 mm dia multi-layer PAP Composite pipe 50 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings all
complete. Rm 919.82
1172 Fixing /laying 150 mm dia NP2 RCC Hume pipe 150 mm dia NP2 RCC Hume pipe including collar with
with collar including 1:4 cement sand mortar all all complete.
complete. Rm 772.80
1173 Fixing /laying 200 mm dia NP RCC Hume pipe
2
200 mm dia NP RCC Hume pipe including collar with
2

with collar including 1:4 cement sand mortar all all complete.
complete. Rm 1014.97
1174 Fixing /laying 300 mm dia NP2 RCC Hume pipe 300 mm dia NP2 RCC Hume pipe including collar with
with collar including 1:4 cement sand mortar all all complete.
complete. Rm 1589.09
1175 Fixing /laying 400 mm dia NP2 RCC Hume pipe 400mm dia NP2 RCC Hume pipe including collar with
with collar including 1:4 cement sand mortar all all complete.
complete. Rm 2069.43
1176 Fixing /laying 600 mm dia NP RCC Hume pipe
2
600 mm dia NP RCC Hume pipe including collar with
2

with collar including 1:4 cement sand mortar all all complete.
complete. Rm 3293.22
1177 Fixing /laying 150 mm dia NP3 RCC Hume pipe 150 mm dia NP3 RCC Hume pipe including collar with
with collar including 1:4 cement sand mortar all all complete.
complete. Rm 1461.25
1178 Fixing /laying 200 mm dia NP3 RCC Hume pipe 200 mm dia NP3 RCC Hume pipe including collar with
with collar including 1:4 cement sand mortar all all complete.
complete. Rm 1952.06
1179 Fixing /laying 300 mm dia NP RCC Hume pipe
3
300 mm dia NP RCC Hume pipe including collar with
3

with collar including 1:4 cement sand mortar all all complete.
complete. Rm 3346.49
1180 Fixing /laying 400 mm dia NP3 RCC Hume pipe 400mm dia NP3 RCC Hume pipe including collar with
with collar including 1:4 cement sand mortar all all complete.
complete. Rm 3710.75
1181 Fixing /laying 600 mm dia NP3 RCC Hume pipe 600 mm dia NP3 RCC Hume pipe including collar with
with collar including 1:4 cement sand mortar all all complete.
complete. Rm 6170.87
1182 Fixing /laying 140 mm dia Plastic Water Gutter 140 mm dia Plastic Water Gutter pipe ( Half Round)
pipe ( Half Round) with necessary fittings all with necessary fittings.
complete. Rm 811.43
1183 Fixing /laying 180 mm dia Plastic Water Gutter 180 mm dia Plastic Water Gutter pipe ( Half Round)
pipe ( Half Round) with necessary fittings all with necessary fittings. Rm 929.63
complete.
1184 Fixing /laying 250 mm dia Plastic Water Gutter 250 mm dia Plastic Water Gutter pipe ( Half Round)
pipe ( Half Round) with necessary fittings all with necessary fittings. Rm 1840.36
1185 complete.
50 mm mm dia UPVC plain Tee. 50 mm mm dia UPVC plain Tee.
nos 115.62
1186 50 mm mm dia UPVC 90 degree bend 50 mm mm dia UPVC 90 degree bend nos 98.96
1187 50 mm mm dia UPVC 45 degree bend. 50 mm mm dia UPVC 45 degree bend. nos 97.77
1188 75 mm dia UPVC vent cowl 75 mm dia UPVC vent cowl nos 126.49
1189 75 mm dia UPVC plain Tee. 75 mm dia UPVC plain Tee. nos 197.25
1190 75 mm dia UPVC door tee. 75 mm dia UPVC door tee. nos 218.57
1191 75 mm dia UPVC 90 degree bend. 75 mm dia UPVC 90 degree bend. nos 170.61
1192 75 mm dia UPVC door bend. 75 mm dia UPVC door bend. nos 194.19
1193 75 mm dia UPVC 45 degree bend. 75 mm dia UPVC 45 degree bend. nos 154.20

23
1194 75 mm dia UPVC Y branch. 75 mm dia UPVC Y branch. nos 210.39
1195 75 mm dia UPVC cross tee. 75 mm dia UPVC cross tee. nos 421.25
1196 75 mm dia UPVC pipe clip. 75 mm dia UPVC pipe clip. nos 15.40
1197 110 mm dia UPVC vent cowl. 110 mm dia UPVC vent cowl. nos 210.55
1198 110 mm dia UPVC plain Tee. 110 mm dia UPVC plain Tee. nos 337.41
1199 110 mm dia UPVC Door Tee 110 mm dia UPVC Door Tee nos 371.84
1200 110 mm dia UPVC 90 degree bend. 110 mm dia UPVC 90 degree bend. nos 284.12
1201 110 mm dia UPVC Door bend. 110 mm dia UPVC Door bend. nos 316.89
1202 110 mm dia UPVC 45 degree bend 110 mm dia UPVC 45 degree bend nos 259.52
1203 110 mm dia UPVC Y branch 110 mm dia UPVC Y branch nos 384.50
1204 110 mm dia UPVC cross tee 110 mm dia UPVC cross tee nos 688.42
1205 110 mm dia UPVC pipe clip 110 mm dia UPVC pipe clip nos 28.16
1206 110 mm dia UPVC gully trap 110 mm dia UPVC gully trap nos 753.63
1207 50 mm dia CI 90 degee bend 50 mm dia CI 90 degee bend nos 419.43
1208 50 mm dia CI Vent Cowl. 50 mm dia CI Vent Cowl. nos 376.58
1209 50 mm dia CI Door Tee 50 mm dia CI Door Tee nos 722.95
1210 50 mm dia CI P or S Trap 50 mm dia CI P or S Trap nos 477.76
1211 50 mm dia CI Plain Tee 50 mm dia CI Plain Tee nos 346.83
1212 50 mm dia CI Y-Branch 50 mm dia CI Y-Branch nos 605.11
1213 50 mm dia CI Door bend 50 mm dia CI Door bend nos 571.78
1214 75 mm dia CI 90 degee bend 75 mm dia CI 90 degee bend nos 562.29
1215 75 mm dia CI Vent Cowl. 75 mm dia CI Vent Cowl. nos 461.13
1216 75 mm dia CI Door Tee 75 mm dia CI Door Tee nos 958.65
1217 75 mm dia CI P or S Trap 75 mm dia CI P or S Trap nos 577.77
1218 75 mm dia CI Plain Tee 75 mm dia CI Plain Tee nos 797.96
1219 75 mm dia CI Y-Branch 75 mm dia CI Y-Branch nos 925.32
1220 75 mm dia CI Door bend 75 mm dia CI Door bend nos 739.65
1221 110 mm dia CI 90 degee bend 110 mm dia CI 90 degee bend nos 845.96
1222 110 mm dia CI Vent Cowl. 110 mm dia CI Vent Cowl. nos 628.14
1223 110 mm dia CI Door Tee 110 mm dia CI Door Tee nos 1260.17
1224 110 mm dia CI P or S Trap 110 mm dia CI P or S Trap nos 756.69
1225 110 mm dia CI Plain Tee 110 mm dia CI Plain Tee nos 1082.82
1226 110 mm dia CI Y-Branch 110 mm dia CI Y-Branch nos 1283.98
1227 110 mm dia CI Door bend 110 mm dia CI Door bend nos 897.14
1228 Hard Soil Cutting (for Well) Hard Soil Cutting (for Well) Cu.m. 1400.66
1229 4' Ø R.C.C. Ring for Well fitting 4' Ø R.C.C. Ring for Well fitting Rm 5319.27
1230 3'6" Ø R.C.C. Ring for Well fitting 3'6" Ø R.C.C. Ring for Well fitting Rm 4467.06
1231 3' Ø R.C.C. Ring for Well fitting 3' Ø R.C.C. Ring for Well fitting Rm 3963.17
1232 2'6" Ø R.C.C. Ring for Well fitting 2'6" Ø R.C.C. Ring for Well fitting Rm 3244.08
3000 Electtrical works Electtrical works
1x20 Watt F.T.L Patti fitting Phillips/Wipro/GE or 1x20 Watt F.T.L Patti fitting Phillips/Wipro/GE or
3001 equivalent equivalent Set 690.00
1x40 Watt F.T.L Patti fitting Phillips/Wipro/GE or 1x40 Watt F.T.L Patti fitting Phillips/Wipro/GE or
3002 equivalent equivalent Set 809.03
1x20 Watt F.T.L Mirrolta FMC 200/140 Phillips or 1x20 Watt F.T.L Mirrolta FMC 200/140 Phillips or
3003 equivalent equivalent Set 1169.96
1x40 Watt F.T.L Mirrolta FMC 200/140 Phillips or 1x40 Watt F.T.L Mirrolta FMC 200/140 Phillips or
3004 equivalent equivalent Set 1527.04
2*18 watt CFL recessed / surface mounting 2*18 watt CFL recessed / surface mounting mirror
3005 mirror optic optic Set 3436.20
3006 1*11 watt CFL mirror optic 1*11 watt CFL mirror optic Set 2079.32
1x40 Watt F.T.L Box Fitting TMC 501/136 HPF 1x40 Watt F.T.L Box Fitting TMC 501/136 HPF
3007 Phillips/Wipro/GE or equivalent Phillips/Wipro/GE or equivalent Set 1591.29
2x40 Watt F.T.L Box Fitting TMC 501/236 HPF 2x40 Watt F.T.L Box Fitting TMC 501/236 HPF
3008 Phillips/Wipro/GE or equivalent Phillips/Wipro/GE or equivalent Set 2389.95
1x40 Watt FTL IndustrialChannel Stove 1x40 Watt FTL IndustrialChannel Stove Enamelled
3009 Enamelled Reflector Phillips/Wipro/GE or eqv Reflector Phillips/Wipro/GE or eqv Set 2570.38
2x40 Watt FTL IndustrialChannel Stove 2x40 Watt FTL IndustrialChannel Stove Enamelled
3010 Enamelled Reflector Phillips/Wipro/GE or eqv Reflector Phillips/Wipro/GE or eqv Set 3309.52
1x40 Watt F.T.L Opalite with Acrylic Difuser TCS 1x40 Watt F.T.L Opalite with Acrylic Difuser TCS
3011 19/136 Philips or equivalent 19/136 Philips or equivalent Set 2451.35
2x40 Watt F.T.L Opalite with Acrylic Difuser TCS 2x40 Watt F.T.L Opalite with Acrylic Difuser TCS
3012 19/236 Philips or equivalent 19/236 Philips or equivalent Set 3993.92
4x18/20 Watt F.T.L Dished Opal Acrylic
Cover/mirror optic TBC 71/420 HPF, 72/420 4x18/20 Watt F.T.L Dished Opal Acrylic Cover/mirror
3013 Philips optic TBC 71/420 HPF, 72/420 Philips Set 6819.22
1x40 Watt F.T.L Mirror Optic HPF 1x40 Watt F.T.L Mirror Optic HPF Phillips/Wipro/GE
3014 Phillips/Wipro/GE or equivalent or equivalent Set 4398.01

24
3000 Electtrical works Electtrical works
2x40 Watt F.T.L Mirror Optic 2x40 Watt F.T.L Mirror Optic HPFPhillips/Wipro/GE
3015 HPFPhillips/Wipro/GE or equivalent or equivalent Set 5422.22
300/500 Watt Halogen Phillips/Wipro/GE or 300/500 Watt Halogen Phillips/Wipro/GE or
3016 equivalent equivalent Set 1982.03
1000 Watt Halogen Phillips/Wipro/GE or
3017 equivalent 1000 Watt Halogen Phillips/Wipro/GE or equivalent Set 4064.96
150 Watt HPSV HPF Phillips/Wipro/GE or
3018 equivalent 150 Watt HPSV HPF Phillips/Wipro/GE or equivalent Set 12297.24
250 Watt HPSV HPF Phillips/Wipro/GE or
3019 equivalent 250 Watt HPSV HPF Phillips/Wipro/GE or equivalent Set 13725.54

3020 20/40 Watt FTL Rod Philips or equivalent 20/40 Watt FTL Rod Philips or equivalent Set 114.26
3021 8 to 11 watt CFL lamp 8 to 11 watt CFL lamp Set 190.44
3022 13 to22 watt CFL lamp 13 to22 watt CFL lamp Set 297.56
20/40 Watt 220 Volt FTL Ballast Philips or
3023 equivalent 20/40 Watt 220 Volt FTL Ballast Philips or equivalent Set 238.05
3024 150 Watt SV Bulb Philips or equivalent 150 Watt SV Bulb Philips or equivalent Rm. 2261.48
3025 250 Watt SV Bulb Philips or equivalent 250 Watt SV Bulb Philips or equivalent Rm. 2856.60
3026 2" PVC Listy 2" PVC Listy Rm. 166.64
3027 1.5" PVC Listy 1.5" PVC Listy Rm. 148.78
3028 0.75" PVC Listy 0.75" PVC Listy Rm. 53.56
3029 0.5" PVC Listy 0.5" PVC Listy Rm. 35.71
0 0 0 0.00
3030 1 Gang one way Switch F 1 Gang one way Switch F Set 214.13
3031 1 Gang one way Switch S 1 Gang one way Switch S Set 223.71
3032 1 Gang 2 way Switch F 1 Gang 2 way Switch F Set 169.75
3033 1 Gang 2 way Switch S 1 Gang 2 way Switch S Set 227.92
3034 2 Gang one way Switch F 2 Gang one way Switch F Set 249.94
3035 2Gang one way Switch S 2Gang one way Switch S 259.52
3036 3 Gang one way Switch F 3 Gang one way Switch F Set 281.13
3037 3 Gang one way Switch S 3 Gang one way Switch S Set 290.71
3038 4 Gang one way Switch F 4 Gang one way Switch F Set 300.31
3039 4 Gang one way Switch S 4 Gang one way Switch S Set 312.19
3040 6 Gang one way Switch F 6 Gang one way Switch F Set 518.27
3041 6 Gang one way Switch S 6 Gang one way Switch S Set 521.64
3042 8 Gang one way Switch F 8 Gang one way Switch F Set 529.85
3043 8 Gang one way Switch S 8 Gang one way Switch S Set 533.22
3044 1 Gang one Bell Push F 1 Gang one Bell Push F Set 221.51
3045 1 Gang one Bell Push S 1 Gang one Bell Push S Set 231.09
6 Amp Uni Socket Switch Combined With
3046 Shutter F 6 Amp Uni Socket Switch Combined With Shutter F Set 337.40
3047 Dimmer Single 400 Watt F Dimmer Single 400 Watt F Set 465.74
3048 Dimmer Single 800 Watt F Dimmer Single 800 Watt F Set 554.22
16/6 Amp Combined S/Socket With Safety
3049 Shutter F 16/6 Amp Combined S/Socket With Safety Shutter F Set 366.67
16/6 Amp Combined S/Socket With Safety
3050 ShutterS 16/6 Amp Combined S/Socket With Safety ShutterS Set 318.08
3051 16 Amp 3 pin Plug Top 16 Amp 3 pin Plug Top Set 109.68
20/25 Amp SP AC motor starter with 6/16 Amp 20/25 Amp SP AC motor starter with 6/16 Amp Power
3052 Power socket socket Set 640.40
3053 DP Switch 16-32 Amp F DP Switch 16-32 Amp F Set 357.19
3054 Telephone Socket Single F Telephone Socket Single F Set 267.86
3055 Buzzer Buzzer Set 151.17
3056 Musical Bell Musical Bell Set 293.61
3057 Ceiling Rose Ceiling Rose Set 62.98
0 0 0 0.00
3058 1 Gang 1 one way Switch F 1 Gang 1 one way Switch F Set 476.50
3059 1 Gang 2 way Switch F 1 Gang 2 way Switch F Set 500.31
3060 2 Gang 2 one way Switch F 2 Gang 2 one way Switch F Set 619.33
3061 3 Gang 3 one way Switch F 3 Gang 3 one way Switch F Set 791.91
3062 4 Gang 4 one way Switch F 4 Gang 4 one way Switch F Set 1037.10
3063 5 Gang 5 one way Switch F 5 Gang 5 one way Switch F Set 1363.23
3064 6 Gang 6 one way Switch F 6 Gang 6 one way Switch F Set 1538.21
3065 5 Amp Pqwer Socket 5 Amp Pqwer Socket Set 701.45
3066 13-15 Amp Power Socket 13-15 Amp Power Socket Set 944.27
3067 T.V Socket T.V Socket Set 500.31
3068 T.Phone Socket T.Phone Socket Set 500.31
3069 Bell Push Bell Push Set 500.31

25
3000 Electtrical works Electtrical works
0 0 0 0.00
3070 16 Amp 415 Volt DP Main Switch S 16 Amp 415 Volt DP Main Switch S Set 915.65
3071 32 Amp 415 Volt DP Main Switch S 32 Amp 415 Volt DP Main Switch S Set 1528.64
3072 63 Amp 415 Volt DP Main Switch S 63 Amp 415 Volt DP Main Switch S Set 3254.50
3073 100 Amp 415 Volt DP Main Switch 100 Amp 415 Volt DP Main Switch Set 5754.03
3074 16 Amp 415 Volt TP Main Switch 16 Amp 415 Volt TP Main Switch Set 1695.27
3075 32 Amp 415 Volt TP Main Switch 32 Amp 415 Volt TP Main Switch Set 2218.98
3076 63 Amp 415 Volt TP Main Switch 63 Amp 415 Volt TP Main Switch Set 4313.82
3077 100 Amp 415 Volt TP Main Switch 100 Amp 415 Volt TP Main Switch Set 7836.96
3078 16 Amp 415 Volt TP Main Switch HRC 16 Amp 415 Volt TP Main Switch HRC Set 1980.93
3079 32 Amp 415 Volt TP Main Switch HRC 32 Amp 415 Volt TP Main Switch HRC Set 2611.77
3080 63 Amp 415 Volt TP Main Switch HRC 63 Amp 415 Volt TP Main Switch HRC Set 6384.86
3081 100 Amp 415 Volt TP Main Switch HRC 100 Amp 415 Volt TP Main Switch HRC Set 8896.29
3082 200 Amp 415 Volt TP Switch HRC 200 Amp 415 Volt TP Switch HRC Set 12378.20
3083 16 Amp 415 Volt Change over Switch 16 Amp 415 Volt Change over Switch Set 1109.75
3084 32 Amp 415 Volt Change over Switch 32 Amp 415 Volt Change over Switch Set 2002.44
3085 63 Amp 415 Volt Change over Switch 63 Amp 415 Volt Change over Switch Set 4323.43
3086 100 Amp 415 Volt Change over Switch 100 Amp 415 Volt Change over Switch Set 8366.71
3087 63 Amp Bus Bar Chamber 63 Amp Bus Bar Chamber Set 4242.11
3088 100 Amp Bus Bar Chamber 100 Amp Bus Bar Chamber Set 5967.97
3089 200 Amp Bus Bar Chamber 200 Amp Bus Bar Chamber Set 7130.69
0 0 0 0.00
60/100 Panel Board with Suitable color,Floor 60/100 Panel Board with Suitable color,Floor
Mounted Double cover,pushTypeSwitch, Size Mounted Double cover,pushTypeSwitch, Size
3090 9"x36"x48" 9"x36"x48" Set 23520.38
60/100 Panel Board with Suitable color,Floor 60/100 Panel Board with Suitable color,Floor
Mounted Double cover,pushTypeSwitch, Size Mounted Double cover,pushTypeSwitch, Size
3091 12"x36"x48" 12"x36"x48" Set 24948.68
150/200 Panel Board with Suitable color,Floor 150/200 Panel Board with Suitable color,Floor
Mounted Double cover,Push Type Switch Size Mounted Double cover,Push Type Switch Size
3092 9"x38"x52" 9"x38"x52" Set 27219.93
250/300 Panel Board with Suitable color,Floor 250/300 Panel Board with Suitable color,Floor
Mounted Double cover,Push Type Switch Size Mounted Double cover,Push Type Switch Size
3093 12"x48"x60" 12"x48"x60" Set 41383.90
400 Panel Board with Suitable color,Floor
Mounted Double cover,Push Type Switch Size 400 Panel Board with Suitable color,Floor Mounted
3094 12"x52"x66" Double cover,Push Type Switch Size 12"x52"x66" Set 49025.31
3095 60 Amp MCCB Siemens made 60 Amp MCCB Siemens made Set 5725.10

26
3000 Electtrical works Electtrical works
3096 100 Amp MCCB Siemens made 100 Amp MCCB Siemens made Set 6320.23
3097 125 Amp MCCB Siemens made 125 Amp MCCB Siemens made Set 12378.60
3098 160 Amp MCCB Siemens made 160 Amp MCCB Siemens made Set 13925.93
3099 200-250 Amp MCCB Siemens made 200-250 Amp MCCB Siemens made Set 26304.53
3100 300-400 Amp MCCB Siemens made 300-400 Amp MCCB Siemens made Set 37135.80
3101 Voltmeter (0-500) Voltmeter (0-500) Set 1181.91
3102 Amp. Meter (0-500) Amp. Meter (0-500) Set 1130.74
3103 Indicator Indicator Set 273.76
3104 Slector Switch Slector Switch Set 821.27
3105 C.T.Coil C.T.Coil Set 1654.45
3106 Energy meter Energy meter Set 2624.50
0 0 0 0.00
3107 Join Box Metal 4"x6" Join Box Metal 4"x6" Set 161.51
3108 Join Box Metal 6"x8" Join Box Metal 6"x8" Set 192.94
3109 Join Box Metal 8"x12" Join Box Metal 8"x12" Set 242.93
3110 Join Box Metal 8"x10" Join Box Metal 8"x10" Set 206.55
3111 Join Box PVC 4"x6" Join Box PVC 4"x6" Set 249.40
3112 Join Box PVC 8"x10" Join Box PVC 8"x10" Set 458.88
0 0 0 0.00
3113 6-32 Amp SP MCB 6-32 Amp SP MCB Nos 130.93
3114 6-32 Amp DP MCB 6-32 Amp DP MCB Nos 428.49
3115 6-32 Amp TP MCB 6-32 Amp TP MCB Nos 797.47
3116 6-32 Amp TPN MCB 6-32 Amp TPN MCB Nos 1166.45
3117 40-60 Amp SP MCB 40-60 Amp SP MCB Nos 273.76
3118 40-60 AmpDP MCB 40-60 AmpDP MCB Nos 714.15
3119 40-60 Amp TP MCB 40-60 Amp TP MCB Nos 1309.28
3120 40-60 Amp TPN MCB 40-60 Amp TPN MCB Nos 1642.55
0 0 0 0.00
3121 6-32 Amp SP MCB 6-32 Amp SP MCB Set 238.05
3122 6-32 Amp DP MCB 6-32 Amp DP MCB Set 964.10
3123 6-32 Amp TP MCB 6-32 Amp TP MCB Set 1368.79
3124 6-32 Amp TPN MCB 6-32 Amp TPN MCB Set 1666.35
3125 40Amp DP MCB 40Amp DP MCB Set 1214.06
3126 63 Amp DP MCB 63 Amp DP MCB Set 1487.81
3127 40Amp TP MCB 40Amp TP MCB Set 1904.40
3128 50 Amp TP MCB 50 Amp TP MCB Set 2023.43
3129 63 Amp TP MCB 63 Amp TP MCB Set 2142.45
0 0 0 0.00
3130 4 Way SPN DB Double Cover 4 Way SPN DB Double Cover Set 1712.64
3131 6 Way SPN DB Double Cover 6 Way SPN DB Double Cover Set 1775.00
3132 8Way SPN DB Double Cover 8Way SPN DB Double Cover Set 2173.50
3133 12 Way SPN DB Double Cover 12 Way SPN DB Double Cover Set 2478.20
3134 16 Way SPN DB Double Cover 16 Way SPN DB Double Cover Set 2611.51
3135 3/4 Way TPN DB Double Cover 3/4 Way TPN DB Double Cover Set 3546.09
3136 6 Way TPN DB Double Cover 6 Way TPN DB Double Cover Set 3926.97
3137 8 Way TPN DB Double Cover 8 Way TPN DB Double Cover Set 4354.99
3138 50 Pair Telephone DB with Crown tag 50 Pair Telephone DB with Crown tag Set 6755.72
0 0 0 0.00
3139 4 wayTPN DB 14"x16"x5" 4 wayTPN DB 14"x16"x5" Set 3368.27
3140 6 wayTPN DB 16"x18"x5" 6 wayTPN DB 16"x18"x5" Set 4212.16
3141 8 wayTPN DB 18"x20"x5" 8 wayTPN DB 18"x20"x5" Set 5148.88
3142 10 wayTPN DB 20"x22"x5" 10 wayTPN DB 20"x22"x5" Set 6190.36
3143 12 wayTPN DB 22"x24"x5" 12 wayTPN DB 22"x24"x5" Set 7335.38
3144 14-16 wayTPN DB 24"x26"x5" 14-16 wayTPN DB 24"x26"x5" Set 8585.14
3145 2 Pole MCB Box 2 Pole MCB Box Set 469.94
3146 4 Pole MCB Box 4 Pole MCB Box Set 544.32
0 0 0 0.00
3147 36" Ceiling Fan 36" Ceiling Fan Set 3320.63
3148 42" Ceiling Fan 42" Ceiling Fan Set 3380.14
3149 48" Ceiling Fan 48" Ceiling Fan Set 3499.16
3150 56" Ceiling Fan 56" Ceiling Fan Set 3677.70
3151 16" Wall Fan 16" Wall Fan Set 4295.25
3152 6 " Exhaust fan 6 " Exhaust fan Set 2614.81
3153 9" Exhaust Fan 9" Exhaust Fan Set 2971.89
3154 12" Exhaust Fan 12" Exhaust Fan Set 3328.96
0 0 0 0.00
Dome Light 6" Milky Type Heavy
3155 Carrier(decorative) Dome Light 6" Milky Type Heavy Carrier(decorative) Set 278.73

27
3000 Electtrical works Electtrical works
3156 Dome Light 6" Brace Base Dome Light 6" Brace Base Set 955.10
3157 Dome Light 8" Milky Type Heavy Carrier Dome Light 8" Milky Type Heavy Carrier Set 332.29
3158 Dome Light 8" Brass Base (decorative) Dome Light 8" Brass Base (decorative) Set 1082.15
3159 1*10 Watt FCL Down Light (conceal light) 1*10 Watt FCL Down Light (conceal light) Set 1651.40

3160 Wall Bracket/Spot Light/Mirror Light ( ordinary) Wall Bracket/Spot Light/Mirror Light ( ordinary) Set 338.24
3161 Bulk head Single Direct Ord. Decon Bulk head Single Direct Ord. Decon Set 487.03
Wall Bracket/Spot Light/Mirror Light best quality Wall Bracket/Spot Light/Mirror Light best quality
3162 Homedec,Decon or ISI eqv. Homedec,Decon or ISI eqv. Set 1022.64
Dome light 8" Silver Cast Milky Base Decorative Dome light 8" Silver Cast Milky Base Decorative set
3163 set Homedec,DECON or ISI Eqv. Homedec,DECON or ISI Eqv. Set 1349.95
Dome light 8" Black Cast Milky Base Decorative Dome light 8" Black Cast Milky Base Decorative set
3164 set Homedec,DECON or ISI Eqv. Homedec,DECON or ISI Eqv. Set 725.08
Bollard Graden light Medium size Bollard Graden light Medium size Homedec,DECON
3165 Homedec,DECON or ISI eqv. or ISI eqv. Set 3758.78
Bollard Graden light Full size Homedec,DECON Bollard Graden light Full size Homedec,DECON or
3166 or ISI eqv. ISI eqv. Set 4205.11
8" Globe type Post top lamp complete set 8" Globe type Post top lamp complete set
3167 Homedec,DECON or ISI eqv.. Homedec,DECON or ISI eqv.. Set 1765.10
10" Globe type Post top lamp complete set 10" Globe type Post top lamp complete set
3168 Homedec,DECON or ISI eqv.. Homedec,DECON or ISI eqv.. Set 3312.43
3169 Exit Light safty sign Exit Light safty sign Set 1022.64
3170 Dinning Lamp Decorative Medium Dinning Lamp Decorative Medium Set 2151.94
3171 Chandlers Lamp 3-5 Lamp Medium Chandlers Lamp 3-5 Lamp Medium Set 12626.14
3172 Chandlers Lamp 6-8 Lamp Medium Chandlers Lamp 6-8 Lamp Medium Set 17625.19
3173 IS 3043 Copper Plate 80x80x3.15 IS 3043 Copper Plate 80x80x3.15 Set 9563.70
3174 IS 3043 Copper Plate 65x65x3.15 IS 3043 Copper Plate 65x65x3.15 Set 7705.71
3175 G.NO 8 Plastic Coated Cu. Wire G.NO 8 Plastic Coated Cu. Wire Rm 179.46
3176 15-100 Watt Bulb (ISI) 15-100 Watt Bulb (ISI) Set 38.48
3177 Festival Light Festival Light Set 148.50
0 0 0 0.00
3178 4 way Indicator With Bell 4 way Indicator With Bell Set 1918.19
3179 6 way Indicator With Bell 6 way Indicator With Bell nos 2835.99
0 0 0 0.00

9 Meter Steel Tubelar Pole ( Bottom 134mm 9 Meter Steel Tubelar Pole ( Bottom 134mm
dia,3300mm ht,155mm dia 2250mm ht,90mm dia,3300mm ht,155mm dia 2250mm ht,90mm dia
dia 2250 ht and 76mm dia 1650mm ht with over 2250 ht and 76mm dia 1650mm ht with over lapping
3180 lapping of 200mm,150mm,100mm respectively) of 200mm,150mm,100mm respectively) Set 15980.40
7 Meter Steel Tubelar Pole ( Bottom 115mm 7 Meter Steel Tubelar Pole ( Bottom 115mm
dia,3300mm ht,90mm dia 2400mm ht, and dia,3300mm ht,90mm dia 2400mm ht, and 76mm dia
76mm dia 1650mm ht with over lapping of 1650mm ht with over lapping of
3181 200mm,150mm,100mm respectively) 200mm,150mm,100mm respectively) Set 14916.32
7 Meter Steel Tubelar Pole ( Bottom 115mm 7 Meter Steel Tubelar Pole ( Bottom 115mm
dia,3100mm ht,90mm dia 2300mm ht, and dia,3100mm ht,90mm dia 2300mm ht, and 76mm dia
3182 76mm dia 1600mm ht with WELDED joints. 1600mm ht with WELDED joints. nos 15409.08
0 0 0 0.00
Concelled Wiring Concelled Wiring
3183 3/22 PVC Coper Wire Nepal, Prakash etc. 3/22 PVC Coper Wire Nepal, Prakash etc. Rm 29.78
3184 3/20 PVC Coper Wire Nepal, Prakash etc. 3/20 PVC Coper Wire Nepal, Prakash etc. Rm 36.95
3185 7/22 PVC Coper Wire Nepal, Prakash etc. 7/22 PVC Coper Wire Nepal, Prakash etc. Rm 48.17
3186 7/20 PVC Coper Wire Nepal, Prakash etc. 7/20 PVC Coper Wire Nepal, Prakash etc. Rm 68.47
3187 7/18 PVC Coper Wire Nepal, Prakash etc. 7/18 PVC Coper Wire Nepal, Prakash etc. Rm 95.28
3188 7/16 PVC Coper Wire Nepal, Prakash etc. 7/16 PVC Coper Wire Nepal, Prakash etc. Rm 171.18
0 0 0 0.00
Concelled Wiring Concelled Wiring 0 0.00
3189 1.5mm2 PVC insulated copper wire 1.5mm2 PVC insulated copper wire Rm 35.19
3190 2.5mm2 PVC insulated copper wire 2.5mm2 PVC insulated copper wire Rm 45.73
3191 4.0mm2 PVC insulated copper wire 4.0mm2 PVC insulated copper wire Rm 62.50
3192 6.0mm2 PVC insulated copper wire 6.0mm2 PVC insulated copper wire Rm 90.60
3193 10.0mm2PVC insulated copper wire 10.0mm2PVC insulated copper wire Rm 136.79
0 0 0 0.00
Surface Wiring Surface Wiring 0 0.00
3194 1/18 PVC Coper Wire Nepal, Prakash etc. 1/18 PVC Coper Wire Nepal, Prakash etc. Rm 30.93
3195 3/22 PVC Coper Wire Nepal, Prakash etc. 3/22 PVC Coper Wire Nepal, Prakash etc. Rm 32.94
3196 3/20 PVC Coper Wire Nepal, Prakash etc. 3/20 PVC Coper Wire Nepal, Prakash etc. Rm 40.11
3197 7/22 PVC Coper Wire Nepal, Prakash etc. 7/22 PVC Coper Wire Nepal, Prakash etc. Rm 54.71
3198 7/20 PVC Coper Wire Nepal, Prakash etc. 7/20 PVC Coper Wire Nepal, Prakash etc. Rm 71.64

28
3000 Electtrical works Electtrical works
3199 7/18 PVC Coper Wire Nepal, Prakash etc. 7/18 PVC Coper Wire Nepal, Prakash etc. Rm 96.70
3200 7/16 PVC Coper Wire Nepal, Prakash etc. 7/16 PVC Coper Wire Nepal, Prakash etc. Rm 185.86
Multistrand Flexible wire( 1 coil=91.44M) Multistrand Flexible wire( 1 coil=91.44M) 0 0.00
Surface Wiring Surface Wiring 0 0.00
3201 1.5mm2 PVC insulated copper wire 1.5mm2 PVC insulated copper wire Rm 38.35
3202 2.5mm2 PVC insulated copper wire 2.5mm2 PVC insulated copper wire Rm 48.89
3203 4.0mm2 PVC insulated copper wire 4.0mm2 PVC insulated copper wire Rm 69.04
3204 6.0mm2 PVC insulated copper wire 6.0mm2 PVC insulated copper wire Rm 93.77
3205 10.0mm2PVC insulated copper wire 10.0mm2PVC insulated copper wire Rm 138.22
0 0 0 0.00
3206 4mm2 4 core Nepal, Prakash Or NS 4mm2 4 core Nepal, Prakash Or NS Rm 294.22
3207 6 mm2 4 core Nepal, Prakash Or NS 6 mm2 4 core Nepal, Prakash Or NS Rm 402.34
3208 10 mm2 4 core Nepal, Prakash Or NS 10 mm2 4 core Nepal, Prakash Or NS Rm 561.83
3209 16 mm2 4 core Nepal, Prakash Or NS 16 mm2 4 core Nepal, Prakash Or NS Rm 842.28
3210 25 mm2 4 core Nepal, Prakash Or NS 25 mm2 4 core Nepal, Prakash Or NS Rm 1255.31
3211 4 mm22 core Nepal, Prakash Or NS 4 mm22 core Nepal, Prakash Or NS Rm 201.39
3212 16 mm2 Cable Shoe 16 mm2 Cable Shoe Rm 67.13
0 0 0 0.00
3213 4mm2 4 core Nepal, Prakash Or NS 4mm2 4 core Nepal, Prakash Or NS Rm 241.85
3214 6 mm2 4 core Nepal, Prakash Or NS 6 mm2 4 core Nepal, Prakash Or NS Rm 329.94
3215 10 mm2 4 core Nepal, Prakash Or NS 10 mm2 4 core Nepal, Prakash Or NS Rm 514.22
3216 16 mm2 4 core Nepal, Prakash Or NS 16 mm2 4 core Nepal, Prakash Or NS Rm 794.67
3217 25 mm2 4 core Nepal, Prakash Or NS 25 mm2 4 core Nepal, Prakash Or NS Rm 1203.15
0 0 0 0.00
3218 1 Pole MCB Box 1 Pole MCB Box Set 469.94
3219 35 mm2 4 core Nepal, Prakash Or NS 35 mm2 4 core Nepal, Prakash Or NS Rm 1709.02
3220 50 mm2 4 core Nepal, Prakash Or NS 50 mm2 4 core Nepal, Prakash Or NS Rm 2458.12
0 0 0 0.00
3221 1 Gang 1 one way Switch F 1 Gang 1 one way Switch F Set 287.41
3222 1 Gang 1 Two way Switch F. 1 Gang 1 Two way Switch F. Set 255.56
3223 2 Gang one way Switch F 2 Gang one way Switch F Set 355.25
3224 3 Gang one way Switch F 3 Gang one way Switch F Set 374.59
3225 4 Gang one way Switch F 4 Gang one way Switch F Set 461.18
3226 6 Gang one way Switch F 6 Gang one way Switch F Set 565.03
3227 13 Amp Round Elat Switch Socket F 13 Amp Round Elat Switch Socket F Set 568.39
3228 Two Switch + Socket Two Switch + Socket Set 446.00
3229 T.V Socket Single T.V Socket Single Set 545.88
3230 Telephone Socket Single Telephone Socket Single Set 601.14
3231 RJ 45 Computer Socket RJ 45 Computer Socket Set 672.15
3232 20 Amp heavy load switch with indicator 20 Amp heavy load switch with indicator Set 1284.84
3233 16 Amp big button switch Socket. 16 Amp big button switch Socket. Set 922.10
3234 Bell push 6 Amp( Net West) Bell push 6 Amp( Net West) Set 361.28
3235 Socket 16 A & 6 A- 6 pin(shutter- Net West) Socket 16 A & 6 A- 6 pin(shutter- Net West) Set 304.36
3236 One gang module plate One gang module plate Set 612.54
3237 Two gang module plate Two gang module plate Set 579.72
3238 Three gang module plate Three gang module plate Set 762.61
3239 Four gang module plate Four gang module plate Set 980.13
3240 Dimmer 300 /500 watt. Dimmer 300 /500 watt. Set 1407.73
3241 4 Way single phaseDB double door. 4 Way single phaseDB double door. Set 1833.39
3242 4 Way single phase DB Single door. 4 Way single phase DB Single door. Set 1023.04
3243 12 Way single phase DB Double Door. 12 Way single phase DB Double Door. Set 2908.12
3244 12 Way single phase DB Single Door. 12 Way single phase DB Single Door. Set 1654.85
3245 4 WayThree phaseDB double door. 4 WayThree phaseDB double door. Set 3867.74
3246 4 WayThree phaseDBSingle door. 4 WayThree phaseDBSingle door. Set 2752.18
3247 6 WayThree phaseDB Double door. 6 WayThree phaseDB Double door. Set 1308.70
3248 6 WayThreephaseDB Singledoor. 6 WayThreephaseDB Singledoor. Set 3273.59
3249 1x40 Box Type Tube Light. Orant lighting 1x40 Box Type Tube Light. Orant lighting Set 1558.66
3250 2x40 Box Type Tube Light. Orant lighting 2x40 Box Type Tube Light. Orant lighting Set 2387.08
3251 1x40 Mirror Optic Tube Light. Orant lighting 1x40 Mirror Optic Tube Light. Orant lighting Set 4593.80
3252 2x40 Mirror Optic Tube Light. Orant lighting 2x40 Mirror Optic Tube Light. Orant lighting Set 5422.22
3253 3x36 CFL concil/surface.Orant Light 3x36 CFL concil/surface.Orant Light Set 7678.93
3254 250 Watt MHL set.Orant Light 250 Watt MHL set.Orant Light Set 13100.80
3255 3 Watt to 13 Watt PL Orant Tube 3 Watt to 13 Watt PL Orant Tube Set 356.50
3256 60 Amp MCCB Tengen 60 Amp MCCB Tengen Set 6537.18
3257 100 Amp MCCB Tengen 100 Amp MCCB Tengen Set 8152.64
3258 200 Amp MCCB Tengen 200 Amp MCCB Tengen Set 17366.15
3259 300 Amp MCCB Tengen 300 Amp MCCB Tengen Set 29220.06

29
3000 Electtrical works Electtrical works
1x20 Watt F.T.L Patti fitting 1x20 Watt F.T.L Patti fitting Crompton,Anchor,Bajaj or
3260 Crompton,Anchor,Bajaj or equivalent equivalent Set 422.19
1x40 Watt F.T.L Patti fitting 1x40 Watt F.T.L Patti fitting Crompton,Anchor,Bajaj or
3261 Crompton,Anchor,Bajaj or equivalent equivalent Set 445.99
1x/40 Watt F.T.L Box fitting 1x/40 Watt F.T.L Box fitting Crompton,Anchor,Bajaj or
3262 Crompton,Anchor,Bajaj or equivalent equivalent Set 652.20
1x/20 Watt F.T.L Box fitting 1x/20 Watt F.T.L Box fitting Crompton,Anchor,Bajaj or
3263 Crompton,Anchor,Bajaj or equivalent equivalent Set 640.30
Garden Post lamp HL 2220 width 165mm height
765mm mild steel post with PL lamp,Homedec or Garden Post lamp HL 2220 width 165mm height
3264 eqv. 765mm mild steel post with PL lamp,Homedec or eqv. Set 9064.30

30
31
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
DIVISION OFFICE, Rajbiraj
Saptari
DETAILED ESTIMATE
F/Y: 2074/075
Project : Construction of District Government Lawyer's office Building
Site : Saptari,Rajbiraj
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
A General works
1 Insurance for the loss of damage to work,
plant,equipment materials property and personel
injury or death to third party all complete. 1 1 P.S

2 Lab test reports as per instruction of engineers


1 1 P.S
all complete.
3 Site clearence work before and after all
1 1 L.S
complete
4 Providing and maintaining camp facilities
(2rooms including furniture and furnishing)as
directed by site engineer and specification 20 20 Month
during the construction period
5 As built drawing (Architecture,sanitary,electrical)
as per instruction by site engineer 1 1 L.S

6 Supply day work labours for whole construction


period as per instruction all complete 70 70 md

B Civil works
1 Earthwork in excavation in ordinary soils
Foundation F (2000*2000) 18 2.000 2.000 2.000 144.00
Wall foundation Gride A-A,B-B,C-C And D-D 4 9.350 0.450 0.900 15.14
Wall foundation Gride 1-1,2-2,3-3 And 4-4 4 7.440 0.450 0.900 12.05
Front intrance Gride B & C 2 1.660 0.450 0.900 1.49
Fronnt Intrannce Wall 1 1.200 0.450 0.900 0.54
Thunuwa room wall Toe wall foundation. 1 6.222 0.450 0.450 1.25
Inquiry regeistration room toe wall 1 5.430 0.450 0.450 1.09
Differently ABLED Room toe wall 1 4.524 0.450 0.450 0.91
Thunuwa room toilet toe wall 1 2.400 0.450 0.450 0.48
Male toilet front toe wall 1 2.053 0.450 0.450 0.41
Male toilet partation toe wall 1 1.360 0.450 0.450 0.27
male & femalel toilet sepration wall. 1 2.130 0.450 0.450 0.43
Male toilet toe wall 1 4.058 0.450 0.450 0.82
Ground floor steps 1 3.600 0.900 0.450 1.45
Ramp 1 4.290 1.500 0.450 2.89
Apron & Drain 1 49.920 0.900 0.450 20.21
Total 203.43 Cu.m

2 Dry brick soling brick on edge in foundation and


floor.
Foundation F (2000*2000) 18 2.000 2.000 72.00
Wall foundation Gride A-A,B-B,C-C And D-D 4 9.350 0.450 16.83
Wall foundation Gride 1-1,2-2,3-3 And 4-4 4 7.440 0.450 13.39
Front intrance Gride B & C 2 1.660 0.450 1.49
Fronnt Intrannce Wall 1 1.200 0.450 0.54
Thunuwa room wall Toe wall foundation. 1 6.222 0.450 2.79
32
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Inquiry regeistration room toe wall 1 5.430 0.450 2.44
Differently ABLED Room toe wall 1 4.524 0.450 2.03
Thunuwa room toilet toe wall 1 2.400 0.450 1.08
Male toilet front toe wall 1 2.053 0.450 0.92
Male toilet partation toe wall 1 1.360 0.450 0.61
male & femalel toilet sepration wall. 1 2.130 0.450 0.95
Male toilet toe wall 1 4.058 0.450 1.82
Ground floor steps 1 3.600 0.900 3.24
Ramp 1 4.290 1.500 6.43
Room floor
Administration room 1 5.260 4.950 26.03
Bayan room 1 3.820 4.950 18.90
Mudha room 1 5.380 4.950 26.63
Thunuwa room 1 5.260 2.900 15.25
Flexible area(passage) 1 9.200 2.900 26.68
Toilet room 1 5.260 4.700 24.72
Staircase room 1 3.820 4.700 17.95
Inquiry Regisration room 1 5.380 4.700 25.28
Entrance area 1 3.740 2.900 10.84
Apron & Drain 1 60.080 0.900 54.07
Total 372.91 Sqm

3 Plain cement concrete(1:3:6) in foundation


Foundation F (2000*2000) 18 2.000 2.000 0.075 5.40
Wall foundation Gride A-A,B-B,C-C And D-D 4 9.350 0.450 0.075 1.26
Wall foundation Gride 1-1,2-2,3-3 And 4-4 4 7.440 0.450 0.075 1.00
Front intrance Gride B & C 2 1.660 0.450 0.075 1.49
Fronnt Intrannce Wall 1 1.200 0.450 0.075 0.54
Thunuwa room wall Toe wall foundation. 1 6.222 0.450 0.075 0.20
Inquiry regeistration room toe wall 1 5.430 0.450 0.075 0.18
Differently ABLED Room toe wall 1 4.524 0.450 0.075 0.15
Thunuwa room toilet toe wall 1 2.400 0.450 0.075 0.08
Male toilet front toe wall 1 2.053 0.450 0.075 0.06
Male toilet partation toe wall 1 1.360 0.450 0.075 0.04
male & femalel toilet sepration wall. 1 2.130 0.450 0.075 0.07
Male toilet toe wall 1 4.058 0.450 0.075 0.13
Ground floor steps 1 3.600 0.900 0.075 0.24
Ramp 1 4.290 1.500 0.075 0.48
Apron & Drain 1 60.980 0.900 0.075 4.11
Total 15.43 cum
4 Plain cement Concrete (PCC) for RCC works
(1:1.5:3) for slab/lintels with approved quality
of cement and sand and crushed stone
aggregate including mixing, laying, curing
etc all complete in approval of site engineer.

Column footing base 18 2.000 2.000 0.300 21.60


Trapezoidal part (0.35/6((2*2+.5*.5)/2))) 18 0.557 10.02
column above trapezoidal part Upto pilinth. 18 0.400 0.400 1.200 3.45
Column 18 0.400 0.400 3.000 8.64
Strap/Foundation Beam
foundation beam grid A-A ,B-B,C-C &D-D 4 14.150 0.300 0.350 5.94
foundation beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.300 0.350 5.14
Foundation BeamFront intrance Gride B & C 2 3.660 0.300 0.350 2.19
Foundation Beam Front Intrannce Wall 1 3.200 0.300 0.350 0.96
Pilinth/Tie beam
Tie beam grid A-A ,B-B,C-C &D-D 4 14.250 0.300 0.350 5.98
Tie beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.300 0.350 5.14
33
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Foundation BeamFront intrance Gride B & C 2 3.660 0.300 0.350 2.19
Foundation Beam Front Intrannce Wall 1 3.200 0.300 0.350 0.96
Thunuwa room wall Toe wall Tie beam.. 1 6.222 0.250 0.250 0.38
Inquiry regeistration room toe wall Tie Beam 1 5.430 0.250 0.250 0.33
Differently ABLED Room toe wall Tie Beam 1 4.524 0.250 0.250 0.28
Thunuwa room toilet toe wall Tie Beam 1 2.400 0.250 0.250 0.15
Male toilet front toe wall Tie beam 1 2.053 0.250 0.250 0.12
Male toilet partation toe wall Tie beam 1 1.360 0.250 0.250 0.08
male & femalel toilet sepration wall Tie beam 1 2.130 0.250 0.250 0.13
Male toilet toe wall Tie beam 1 4.058 0.250 0.250 0.25
Ground floor
Slab beam/floor beam
slab beam grid A-A ,B-B,C-C &D-D 4 14.150 0.300 0.300 5.09
slab beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.300 0.300 4.41
Slab BeamFront intrance Gride B & C 2 3.660 0.300 0.300 2.19
Slab Beam Front Intrannce Wall 1 3.200 0.300 0.300 0.96
Slab 1 16.650 14.750 0.125 30.69
Front portico slab 1 5.300 4.500 0.125 2.98
Staircase
waist slab1 1 2.62 1.065 0.125 0.34
waist slab2 1 2.39 1.065 0.125 0.31
landing slab 1 1.065 1.065 0.125 0.14
Trade & riser(Steps) 11 1.065 0.3 0.075 0.26
first floor
Column 16 0.400 0.400 3.000 7.68
Slab beam/floor beam
slab beam grid A-A ,B-B,C-C &D-D 4 14.250 0.300 0.300 5.13
slab beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.300 0.300 4.41
Slab 1 16.650 14.750 0.125 30.69
Staircase
waist slab1 1 2.62 1.065 0.125 0.34
waist slab2 1 1.98 1.065 0.125 0.26
landing slab 1 1.065 1.065 0.125 0.14
Trade & riser(Steps) 11 1.065 0.3 0.075 0.26
second floor
Column 16 0.400 0.400 3.000 7.68
Slab beam/floor beam
slab beam grid A-A ,B-B,C-C &D-D 4 14.250 0.300 0.300 5.13
slab beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.300 0.300 4.41
Slab 1 16.650 14.750 0.125 30.69
Staircase
waist slab1 1 2.62 1.065 0.125 0.34
waist slab2 1 2.39 1.065 0.125 0.31
landing slab 1 1.065 1.065 0.125 0.14
Trade & riser(Steps) 11 1.065 0.3 0.075 0.26
deduction staircase 3 1.8 2.1 0.125 -1.41
Dedution terrace 1 5.78 5.33 0.125 -3.85
Top roof slab 1 1.8 2.1 0.125 0.47
parapet pillar 16 0.4 0.4 0.9 2.30
Total 216.68 Cu.m
5 Plain cement Concrete (PCC) for RCC works
(1:2:4) for slab/lintels with approved quality
of cement and sand and crushed stone
aggregate including mixing, laying, curing
etc all complete in approval of site engineer.
cu.m
Ground floor
Sillband
34
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Along the Gride A-A & D-D 2 14.25 0.25 0.075 0.53
Along The Gride C-C 1 11.45 0.25 0.075 0.21
Along The Gride 1-1 1 12.15 0.25 0.075 0.22
Along the gride 2-2 & 3-3 2 4.61 0.25 0.075 0.17
2 4.84 0.125 0.075 0.09
Along The Gride 4-4 1 10.75 0.25 0.075 0.20
Thunuwa room wall Toe wall 1 6.222 0.25 0.075 0.11
Inquiry regeistration room toe wall 1 5.430 0.125 0.075 0.05
Differently ABLED Room toe wall 1 4.524 0.125 0.075 0.04
Thunuwa room toilet toe wall 1 2.400 0.125 0.075 0.02
Male toilet front toe wall 1 2.053 0.125 0.075 0.01
Male toilet partation toe wall 1 1.360 0.125 0.075 0.01
male & femalel toilet sepration wall 1 2.130 0.25 0.075 0.03
Male toilet toe wall 1 4.058 0.125 0.075 0.03
1st Floor
Along the Gride A-A & D-D 2 14.25 0.25 0.075 0.53
Along the gride B-B 1 4.410 0.25 0.075 0.08
Along The Gride C-C 1 7.380 0.25 0.075 0.13
1 4.660 0.125 0.075 0.04
Along the Gride 1-1 & 4-4 2 12.250 0.25 0.075 0.45
Along the Gride 2-2 1 4.600 0.25 0.075 0.08
1 4.850 0.125 0.075 0.04
Along Gride 3-3 1 3.700 0.25 0.075 0.06
1 4.100 0.125 0.075 0.03
Toilet wall 1 4.800 0.125 0.075 0.04
Att toilet wall 1 3.680 0.125 0.075 0.03
Library partation wall beside gride 3 1 6.150 0.125 0.075 0.05
Partation wall( btn tolet & pantary) 1 1.000 0.125 0.075 0.00
2nd floor
Along the gride A-A 1 8.880 0.25 0.075 0.16
Along The gride D-D 1 14.250 0.25 0.075 0.26
Along the gride B-B 1 10.430 0.25 0.075 0.19
Along The Gride C-C 1 5.160 0.25 0.075 0.09
Along the gride 1-1 1 12.250 0.25 0.075 0.22
Along the gride 2-2 1 3.700 0.25 0.075 0.06
1 6.750 0.125 0.075 0.06
Along the gride 3-3 1 4.100 0.25 0.075 0.07
1 4.850 0.125 0.075 0.04
Along The Gride 4-4 1 7.650 0.25 0.075 0.14
Dinning & Kitchen room Long wall 1 7.550 0.125 0.075 0.07
Short wall 1 6.020 0.125 0.075 0.05
Att toilet Long wall 1 5.160 0.25 0.075 0.09
Short wall 1 2.800 0.125 0.075 0.02
Ground floor
Lintelband
Along the Gride A-A & D-D 2 14.15 0.25 0.15 1.06
Along The Gride C-C 1 11.45 0.25 0.15 0.42
Along The Gride 1-1 1 12.15 0.25 0.15 0.45
Along the gride 2-2 & 3-3 2 4.61 0.25 0.15 0.34
2 4.84 0.125 0.075 0.09
Along The Gride 4-4 1 10.75 0.25 0.15 0.40
Thunuwa room wall Toe wall 1 6.222 0.25 0.075 0.11
Inquiry regeistration room toe wall 1 5.430 0.125 0.075 0.05
Differently ABLED Room toe wall 1 4.524 0.125 0.075 0.04
Thunuwa room toilet toe wall 1 2.400 0.125 0.075 0.02
Male toilet front toe wall 1 2.053 0.125 0.075 0.01
Male toilet partation toe wall 1 1.360 0.125 0.075 0.01
male & femalel toilet sepration wall 1 2.130 0.25 0.15 0.07
35
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Male toilet toe wall 1 4.058 0.125 0.075 0.03
Reception slab 1 4.81 0.75 0.125 0.45
1st Floor
Along the Gride A-A & D-D 2 14.25 0.25 0.15 1.06
Along the gride B-B 1 5.160 0.25 0.15 0.19
Along The Gride C-C 1 8.880 0.25 0.15 0.33
1 5.560 0.125 0.075 0.05
Along the Gride 1-1 & 4-4 2 12.250 0.25 0.15 0.91
Along the Gride 2-2 1 4.600 0.25 0.15 0.17
1 4.850 0.125 0.075 0.04
Along Gride 3-3 1 4.600 0.25 0.15 0.17
1 4.850 0.125 0.075 0.04
Toilet wall 1 4.800 0.125 0.075 0.04
Att toilet wall 1 3.680 0.125 0.075 0.03
Library partation wall beside gride 3 1 7.800 0.125 0.075 0.07
Partation wall( btn tolet & pantary) 1 1.000 0.125 0.075 0.00
2nd floor
Along the gride A-A 1 8.880 0.25 0.15 0.33
Along The gride D-D 1 14.250 0.25 0.15 0.53
Along the gride B-B 1 10.430 0.25 0.15 0.39
Along The Gride C-C 1 5.160 0.25 0.15 0.19
Along the gride 1-1 1 12.250 0.25 0.15 0.45
Along the gride 2-2 1 4.600 0.25 0.15 0.17
1 7.650 0.125 0.075 0.07
Along the gride 3-3 1 5.000 0.25 0.15 0.18
1 4.850 0.125 0.075 0.04
Along The Gride 4-4 1 7.650 0.25 0.15 0.28
Dinning & Kitchen room Long wall 1 8.450 0.125 0.075 0.07
Short wall 1 6.020 0.125 0.075 0.05
Att toilet Long wall 1 5.160 0.25 0.15 0.19
Short wall 1 2.800 0.125 0.075 0.02
Total 14.41

6 Tor steel reinforcement bar of fe 415/500


grade.
1.75% of PCC for RCC
As per item no. 4 ( =1.75/100*7850*216.68) 29766.00 kg
As per item no. 5 ( =1.75/100*7850*13.02) 1979.57 kg
Total 31745.58 kg
Total 31.75 mt
7 Formwork, shuttering, centering with 19mm
thick waterproof ply for column.
Ground floor
column above trapezoidal part Upto pilinth. 18 1.600 1.200 34.56
Column 18 1.600 3.000 86.40
first floor
column 18 1.600 3.000 86.40
second floor
column 15 1.600 3.000 72.00
Total 279.36 Sq.m

8
Formwork, shuttering, centering with 19mm
thick waterproof ply board and steel post

Column footing base 18 8.000 0.300 43.20


Strap/Foundation Beam
foundation beam grid A-A ,B-B,C-C &D-D 4 14.150 0.700 39.62
foundation beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.700 34.30
36
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Foundation BeamFront intrance Gride B & C 2 3.660 0.700 5.12
Foundation Beam Front Intrannce Wall 1 3.200 0.700 2.24
Pilinth/Tie beam
Tie beam grid A-A ,B-B,C-C &D-D 4 14.250 0.700 39.90
Tie beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.700 34.30
Foundation BeamFront intrance Gride B & C 2 3.660 0.700 5.12
Foundation Beam Front Intrannce Wall 1 3.200 0.700 2.24
Thunuwa room wall Toe wall Tie beam.. 1 6.222 0.500 3.11
Inquiry regeistration room toe wall Tie Beam 1 5.430 0.500 2.71
Differently ABLED Room toe wall Tie Beam 1 4.524 0.500 2.26
Thunuwa room toilet toe wall Tie Beam 1 2.400 0.500 1.20
Male toilet front toe wall Tie beam 1 2.053 0.500 1.02
Male toilet partation toe wall Tie beam 1 1.360 0.500 0.68
male & femalel toilet sepration wall Tie beam 1 2.130 0.500 1.06
Male toilet toe wall Tie beam 1 4.058 0.500 2.02
Ground floor
Slab beam/floor beam
slab beam grid A-A ,B-B,C-C &D-D 4 14.150 0.600 33.96
slab beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.600 29.40
Slab BeamFront intrance Gride B & C 2 3.660 0.600 4.39
Slab Beam Front Intrannce Wall 1 3.200 0.600 1.92
Slab 1 16.650 14.750 245.58
Front portico slab 1 5.300 4.500 23.85
Staircase
waist slab1 1 2.62 1.065 2.79
waist slab2 1 2.39 1.065 2.54
landing slab 1 1.065 1.065 1.13
Trade & riser(Steps) 11 1.065 0.15 1.75
first floor
Slab beam/floor beam
slab beam grid A-A ,B-B,C-C &D-D 4 14.250 0.600 34.20
slab beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.600 29.40
Slab 1 16.650 14.750 245.58
Staircase
waist slab1 1 2.62 1.065 2.79
waist slab2 1 1.98 1.065 2.10
landing slab 1 1.065 1.065 1.13
Trade & riser(Steps) 11 1.065 0.15 1.75
second floor
Slab beam/floor beam
slab beam grid A-A ,B-B,C-C &D-D 4 14.250 0.600 34.20
slab beam grid 1-1 ,2-2,3-3 &4-4 4 12.250 0.600 29.40
Slab 1 16.650 14.750 245.58
Staircase
waist slab1 1 2.62 1.065 2.79
waist slab2 1 2.39 1.065 2.54
landing slab 1 1.065 1.065 1.13
Trade & riser(Steps) 11 1.065 0.15 1.75
deduction staircase 3 1.8 2.1 11.34
Dedution terrace 1 5.78 5.33 30.80
Top roof slab 1 1.8 2.1 3.78
parapet pillar 16 1.6 0.9 23.04
Ground floor
Sillband
Along the Gride A-A & D-D 2 14.25 0.15 4.27
Along The Gride C-C 1 11.45 0.15 1.71
Along The Gride 1-1 1 12.15 0.15 1.82
Along the gride 2-2 & 3-3 2 4.61 0.15 1.38
37
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
2 4.84 0.15 1.45
Along The Gride 4-4 1 10.75 0.15 1.61
Thunuwa room wall Toe wall 1 6.222 0.15 0.93
Inquiry regeistration room toe wall 1 5.430 0.15 0.81
Differently ABLED Room toe wall 1 4.524 0.15 0.67
Thunuwa room toilet toe wall 1 2.400 0.15 0.36
Male toilet front toe wall 1 2.053 0.15 0.30
Male toilet partation toe wall 1 1.360 0.15 0.20
male & femalel toilet sepration wall 1 2.130 0.15 0.31
Male toilet toe wall 1 4.058 0.15 0.60
1st Floor
Along the Gride A-A & D-D 2 14.25 0.15 4.27
Along the gride B-B 1 4.410 0.15 0.66
Along The Gride C-C 1 7.380 0.15 1.10
1 4.660 0.15 0.69
Along the Gride 1-1 & 4-4 2 12.250 0.15 3.67
Along the Gride 2-2 1 4.600 0.15 0.69
1 4.850 0.15 0.72
Along Gride 3-3 1 3.700 0.15 0.55
1 4.100 0.15 0.61
Toilet wall 1 4.800 0.15 0.72
Att toilet wall 1 3.680 0.15 0.55
Library partation wall beside gride 3 1 6.150 0.15 0.92
Partation wall( btn tolet & pantary) 1 1.000 0.15 0.15
2nd floor
Along the gride A-A 1 8.880 0.15 1.33
Along The gride D-D 1 14.250 0.15 2.13
Along the gride B-B 1 10.430 0.15 1.56
Along The Gride C-C 1 5.160 0.15 0.77
Along the gride 1-1 1 12.250 0.15 1.83
Along the gride 2-2 1 3.700 0.15 0.55
1 6.750 0.15 1.01
Along the gride 3-3 1 4.100 0.15 0.61
1 4.850 0.15 0.72
Along The Gride 4-4 1 7.650 0.15 1.14
Dinning & Kitchen room Long wall 1 7.550 0.15 1.13
Short wall 1 6.020 0.15 0.90
Att toilet Long wall 1 5.160 0.15 0.77
Short wall 1 2.800 0.15 0.42
Ground floor
Lintelband
Along the Gride A-A & D-D 2 14.15 0.3 8.49
Along The Gride C-C 1 11.45 0.3 3.43
Along The Gride 1-1 1 12.15 0.3 3.64
Along the gride 2-2 & 3-3 2 4.61 0.3 2.76
2 4.84 0.15 1.45
Along The Gride 4-4 1 10.75 0.3 3.22
Thunuwa room wall Toe wall 1 6.222 0.15 0.93
Inquiry regeistration room toe wall 1 5.430 0.15 0.81
Differently ABLED Room toe wall 1 4.524 0.15 0.67
Thunuwa room toilet toe wall 1 2.400 0.15 0.36
Male toilet front toe wall 1 2.053 0.15 0.30
Male toilet partation toe wall 1 1.360 0.15 0.20
male & femalel toilet sepration wall 1 2.130 0.3 0.63
Male toilet toe wall 1 4.058 0.15 0.60
Reception slab 1 4.81 0.75 3.60
1st Floor
Along the Gride A-A & D-D 2 14.25 0.3 8.55
38
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Along the gride B-B 1 5.160 0.3 1.54
Along The Gride C-C 1 8.880 0.3 2.66
1 5.560 0.15 0.83
Along the Gride 1-1 & 4-4 2 12.250 0.3 7.35
Along the Gride 2-2 1 4.600 0.3 1.38
1 4.850 0.15 0.72
Along Gride 3-3 1 4.600 0.3 1.38
1 4.850 0.15 0.72
Toilet wall 1 4.800 0.15 0.72
Att toilet wall 1 3.680 0.15 0.55
Library partation wall beside gride 3 1 7.800 0.15 1.17
Partation wall( btn tolet & pantary) 1 1.000 0.15 0.15
2nd floor
Along the gride A-A 1 8.880 0.3 2.66
Along The gride D-D 1 14.250 0.3 4.27
Along the gride B-B 1 10.430 0.3 3.12
Along The Gride C-C 1 5.160 0.3 1.54
Along the gride 1-1 1 12.250 0.3 3.67
Along the gride 2-2 1 4.600 0.3 1.38
1 7.650 0.15 1.14
Along the gride 3-3 1 5.000 0.15 0.75
1 4.850 0.15 0.72
Along The Gride 4-4 1 7.650 0.15 1.14
Dinning & Kitchen room Long wall 1 8.450 0.15 1.26
Short wall 1 6.020 0.15 0.90
Att toilet Long wall 1 5.160 0.3 1.54
Short wall 1 2.800 0.15 0.42
Total 1400.62 Sqm

9 Brickwork in cement sand(1:4)mortar with


chimney made bricks for partition walls
Ground floor
Along the gride 2-2, 3-3 2 4.850 0.125 3.000 3.630
Along the gride C-C 1 14.150 0.125 3.000 5.300
Deduction Door D1 3 0.900 0.125 2.100 0.700
Inquiry regeistration room wall 1 5.430 0.125 3.000 2.030
Differently ABLED Room toe wall 1 4.524 0.125 3.000 1.690
Thunuwa room toilet toe wall 1 2.400 0.125 3.000 0.900
Male toilet front toe wall Tie wall 1 2.053 0.125 3.000 0.760
Male toilet partation toe wall 1 1.360 0.125 3.000 0.510
Deduction Door D2 4 0.750 0.125 2.100 -0.780
first floor
Along the gride C-C 1 8.880 0.125 3 3.330
Toilet wall 1 4.800 0.125 3 1.800
Att toilet wall 1 3.680 0.125 3 1.380
Library partation wall beside gride 3 1 7.800 0.125 3 2.920
Partation wall( btn tolet & pantary) 1 1.000 0.125 3 0.370
Deduction D1 3 0.9 0.125 2.1 -0.700
Deduction D2 5 0.75 0.125 2.1 -0.980
2nd Floor
Along the gride 2-2 1 7.650 0.125 3 2.860
Dinning & Kitchen room Long wall 1 8.450 0.125 3 3.160
Short wall 1 6.020 0.125 3 2.250
Att toilet Long wall 1 5.160 0.125 3 1.930
Short wall 1 2.800 0.125 3 1.050
Deduction Door D1 1 0.9 0.125 2.1 -0.230
Door D2 3 0.75 0.125 2.1 -0.590
39
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
10 Brickwork in cement sand(1:6)mortar with
chimney made bricks
Ground floor cu.m
grid A-A , D-D 2 14.25 0.25 2.725 19.410
grid 1-1,4-4 2 12.25 0.25 2.725 16.690
Deduction works 0.000
Windows W1 4 1.2 0.25 1.35 1.620
Door MD 1 1.5 0.25 2.1 0.780
Gride 2-2,3-3 2 4.6 0.25 2.725 6.260
Thunuwa room wall Toe wall 1 6.222 0.25 3 4.660
male & femalel toilet sepration wall 1 2.130 0.25 3 1.590
Deduction Door D2 2 0.750 0.25 2.1 -0.780
First floor
grid A-A , D-D 2 14.25 0.25 2.725 19.410
grid 1-1,4-4 2 12.15 0.25 2.725 16.550
GrideB-B 1 5.16 0.25 2.725 3.510
Gride 2-2,3-3 2 4.6 0.25 2.725 6.260
Deduction works
Windows W1 11 1.2 0.25 1.35 -4.450
W2 5 1.8 0.25 1.35 -3.030
Second floor
grid A-A, 1 8.88 0.25 2.725 6.040
grid B-B 1 10.44 0.25 2.725 7.110
Gride C-C 1 5.16 0.25 2.725 3.510
Gride D-D 1 14.25 0.25 2.725 9.700
Gride 1-1 1 12.25 0.25 2.725 8.340
Gride 2-2,3-3 2 4.6 0.25 2.725 6.260
Gride 4-4 1 7.65 0.25 2.725 5.210
Parapet wall 1 59.2 0.25 0.9 13.320
Deduction works
Windows W1 9 1.2 0.25 1.35 -3.640
Windows W2 2 1.8 0.25 1.35 -1.210
Ventilation V 3 0.7 0.25 0.35 -0.180
Total 142.94

11
Aluminium sliding door of section (101 x45x1.1)
ground floor
Door D1 6 0.9 2.1 11.34
Door D2 5 0.75 2.1 7.87
Door MD 1 1.5 2.1 3.15
First floor 0.00
Door D1 5 0.9 2.1 9.45
Door D2 5 0.75 2.1 7.87
second floor 0.00
Door D1 3 0.9 2.1 5.67
Door D2 3 0.75 2.1 4.72
third floor 0.00
Door D1 1 0.75 2.1 1.57
Total 51.64 Cu.m

12 Aluminium fix panel at sliding windows of


section (88 x38.1x1.1) with Fly mesh shutter all
complete
Ground floor
ground floor
Windows W1 9 1.2 1.35 14.5800
Windosw W2 3 1.8 1.35 7.2900
40
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Ventilation v 5 0.7 0.35 1.2200
1st floor
Windows W1 11 1.2 1.35 17.8200
Windosw W2 3 1.8 1.35 7.2900
Ventilation v 4 0.7 0.35 0.9800
2nd floor
Windows W1 9 1.2 1.35 14.5800
Windosw W2 2 1.8 1.35 4.8600
Ventilation v 3 0.7 0.35 0.7300
Total 69.350 sq.m

13 Aluminium partition with 5 mm thick glass


and 9 mm thick laminated board of section
(64 x38x1.1)
Abhilekh room 1 6.11 1.8 11.00
Assitant jilla Adhibakta 1 6.51 1.8 11.72
Total 22.72 sq.m

14 Flooring and Finishing works


(a) Earth filling in 150 mm thick layer, watering,
ramming including supply of filling materials
within 10 m distance all complete.

Room floor
Administration room 1 5.260 4.950 0.450 11.71
Bayan room 1 3.820 4.950 0.450 8.50
Mudha room 1 5.380 4.950 0.450 11.98
Thunuwa room 1 5.260 2.900 0.450 6.86
Flexible area(passage) 1 9.200 2.900 0.450 12.00
Toilet room 1 5.260 4.700 0.450 11.12
Staircase room 1 3.820 4.700 0.450 8.07
Inquiry Regisration room 1 5.380 4.700 0.450 11.37
Entrance area 1 3.740 2.900 0.450 4.88
Total 86.49 Cu.m

(b) p.c.c.(1:2:4) on the floor


Ground Floor
Room floor
Administration room 1 5.260 4.950 0.075 1.95
Bayan room 1 3.820 4.950 0.075 1.41
Mudha room 1 5.380 4.950 0.075 1.99
Thunuwa room 1 5.260 2.900 0.075 1.14
Flexible area(passage) 1 9.200 2.900 0.075 2.00
Toilet room 1 5.260 4.700 0.075 1.85
Staircase room 1 3.820 4.700 0.075 1.34
Inquiry Regisration room 1 5.380 4.700 0.075 1.89
Entrance area 1 3.740 2.900 0.075 0.81
Ramp 1 4.290 1.500 0.075 0.48
Apron & Drain 1 60.980 0.900 0.075 4.11
Total 18.97 Cu.m
(c) 38mm thick (1:2:4) screeding
Ground Floor
Room floor
Administration room 1 5.260 4.950 26.03
Bayan room 1 3.820 4.950 18.90
Mudha room 1 5.380 4.950 26.63
Thunuwa room 1 5.260 2.900 15.25
41
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Flexible area(passage) 1 9.200 2.900 26.68
Toilet room 1 5.260 4.700 24.72
Staircase room 1 3.820 4.700 17.95
Inquiry Regisration room 1 5.380 4.700 25.28
Entrance area 1 3.740 2.900 10.84
first floor
officer's room 1 5.22 5.13 26.78
Yojna shakha 1 5.13 4.04 20.73
Ast Adhibakta 1 5.445 2.5 13.61
1 4.01 2.5 10.03
Acount room 1 3.18 2.3 7.31
Abhilekha 1 3.180 2.35 7.47
Staircase room 1 3.87 2.8 10.84
second floor
Master bed room 1 3.556 5.2 18.49
Living room 1 4 8.15 32.60
Kitchen 1 3.93 3.51 13.79
Dining room 1 3.93 3.51 13.79
Changing room 2 2.89 1.41 8.15
guest room 1 5.34 4.77 25.47
Trrace area 1 3.77 5.33 20.09
Total 421.44 Sq.m

(d) 3mm. Thick cement sand(1:1) punning works


on skirting plaster
Ground Floor
Room floor
Administration room 1 5.260 4.950 26.03
Bayan room 1 3.820 4.950 18.90
Mudha room 1 5.380 4.950 26.63
Thunuwa room 1 5.260 2.900 15.25
Flexible area(passage) 1 9.200 2.900 26.68
Toilet room 1 5.260 4.700 24.72
Staircase room 1 3.820 4.700 17.95
Inquiry Regisration room 1 5.380 4.700 25.28
Entrance area 1 3.740 2.900 10.84
first floor
officer's room 1 5.22 5.13 26.77
Yojna shakha 1 5.13 4.04 20.72
Ast Adhibakta 1 5.445 2.5 13.61
1 4.01 2.5 10.02
Acount room 1 3.18 2.3 7.31
Abhilekha 1 3.180 2.35 7.47
Staircase room 1 3.87 2.8 10.83
second floor 0.00
Master bed room 1 3.556 5.2 18.49
Living room 1 4 8.15 32.60
Kitchen 1 3.93 3.51 13.79
Dining room 1 3.93 3.51 13.79
Changing room 2 2.89 1.41 8.14
guest room 1 5.34 4.77 25.47
Entrance area 1 3.740 2.900 10.84
Ramp 1 4.290 1.500 6.43
Apron & Drain 1 60.980 0.900 54.88
Total 473.44

(e) Glazed and non glazed tile


42
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Ground floor
Toilet floor(att) 1 0.964 1.186 1.14
wall 1 3.538 1.5 5.30
Female & Male toilet floor 4 0.964 1.36 5.24
Toilet wall 4 3.898 1.5 23.38
first floor
Toilet floor 1 1.42 2.26 3.20
Toilet wall 1 6.61 1.5 9.91
Common toilet floor 2 2.00 1.345 5.38
Wall 2 5.94 1.5 17.82
Second floor
Toilet floor(att) 2 6.13 1.5 18.39
toilet wall 2 6.13 1.5 18.39
Toilet(comon) floor 1 1.27 3.5 4.44

Total 112.59

(f) 16mm. Thick marble laying in c/s(1:2) mortar

ground floor
front entrace steps 1 2.6 3.8 9.88
Back steps 1 5.05 1.2 6.06
passage 1 8.4 2.45 0.00
staircase area 1 3 5.05 0.00
passage skirting 1 16.453 0.15 2.47
staircase skirting 2 3.392 0.18 1.22
landing skirting 1 5.55 0.15 0.83
staircase steps 18 1.2 0.45 9.72
staircase landing 1 3 1.275 3.83
passage infront of staircase 1 3 1.09 3.27
first floor
passage infront of staircase 1 3 1.09 3.27
passage 1 7.03 1.5 10.55
staircase steps 18 1.2 0.45 9.72
staircase skirting 2 2.7 0.24 1.30
staircase landing 1 3 1.275 3.83
landing skirting 1 5.55 0.15 0.83
Varandah 1 3.28 3.047 9.99
1 3.89 1.09 4.24
skirting 2 6.327 0.15 1.90
Back varandah 1 3.89 1.09 4.24
2 4.98 0.15 1.49
second floor
staircase steps 18 1.2 0.45 9.72
staircase skirting 2 2.7 0.24 1.30
staircase landing 1 3 1.275 3.83
landing skirting 1 5.55 0.15 0.83
Passage 1 2.85 4.49 12.80
passage skirting 1 6.065 0.15 0.91
Varandah 1 3.28 3.047 9.99
skirting 2 6.327 0.15 1.90
1 3.89 1.09 4.24
Kitchen slab 1 3.82 0.6 2.29
Back varandah 1 3.89 1.09 4.24
43
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Side varandah 1 3.96 1.325 5.25
Top Floor
staircase steps
18 1.2 0.45 9.72
staircase skirting 2 2.7 0.24 1.30
staircase landing 1 3 1.275 3.83
landing skirting 1 5.55 0.15 0.83
passage 1 6.78 1.31 8.88
ground floor
W 8 1.2 0.25 2.40
W1 5 1.8 0.25 2.25
W2 2 0.75 0.25 0.38

first floor
W 8 1.2 0.25 2.40
W1 4 1.8 0.25 1.80
W2 2 0.75 0.25 0.38

second floor
W 7 1.2 0.25 2.10
W1 4 1.8 0.25 1.80
W2 3 0.75 0.25 0.56
third floor
W 4 1.2 0.25 1.20
W1 2 1.8 0.25 0.90
W2 1 0.75 0.25 0.19
Total 186.83 Sq.m

(g) 12.5mm thick cement sand (1:3) plaster on


the ceilling
Ground Floor
Ground Floor
Room floor
Administration room 1 5.260 4.950 26.03
Bayan room 1 3.820 4.950 18.90
Mudha room 1 5.380 4.950 26.63
Thunuwa room 1 5.260 2.900 15.25
Flexible area(passage) 1 9.200 2.900 26.68
Toilet room 1 5.260 4.700 24.72
Staircase room 1 3.820 4.700 17.95
Inquiry Regisration room 1 5.380 4.700 25.28
Entrance area 1 3.740 2.900 10.84
first floor
officer's room 1 5.22 5.13 26.77
Yojna shakha 1 5.13 4.04 20.72
Ast Adhibakta 1 5.445 2.5 13.61
1 4.01 2.5 10.02
Acount room 1 3.18 2.3 7.31
Abhilekha 1 3.180 2.35 7.47
Staircase room 1 3.87 2.8 10.83
second floor 0.00
Master bed room 1 3.556 5.2 18.49
Living room 1 4 8.15 32.60
44
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Kitchen 1 3.93 3.51 13.79
Dining room 1 3.93 3.51 13.79
Changing room 2 2.89 1.41 8.14
guest room 1 5.34 4.77 25.47
Entrance area 1 3.740 2.900 10.84
Total 412.13 Sq.m

(h) 12.5mm thick cement sand plaster in (1:4)


ratio on wall surface
Inner wall
Ground Floor
Administration room 1 5.260 4.950 61.26
Bayan room 1 3.820 4.950 52.62
Mudha room 1 5.380 4.950 61.98
Thunuwa room 1 5.260 2.900 48.96
Flexible area(passage) 1 9.200 2.900 72.60
Toilet room 1 5.260 4.700 59.76
Staircase room 1 3.820 4.700 51.12
Inquiry Regisration room 1 5.380 4.700 60.48
Entrance area 1 3.740 2.900 39.84
first floor 0.00
officer's room 1 5.22 5.13 62.10
Yojna shakha 1 5.13 4.04 55.02
Ast Adhibakta 1 5.445 2.5 47.67
1 4.01 2.5 39.06
Acount room 1 3.18 2.3 32.88
Abhilekha 1 3.180 2.35 33.18
Staircase room 1 3.87 2.8 40.02
second floor 0.00
Master bed room 1 3.556 5.2 52.54
Living room 1 4 8.15 72.90
Kitchen 1 3.93 3.51 44.64
Dining room 1 3.93 3.51 44.64
Changing room 2 2.89 1.41 51.60
guest room 1 5.34 4.77 60.66
Entrance area 1 3.740 2.900 39.84
parapet wall (inner and outer) 2 59.2 0.9 106.56
deduction
ground floor
Door D1 6 0.9 2.1 -11.34
Door D2 5 0.75 2.1 -7.87
Door MD 1 1.5 2.1 -3.15
First floor
Door D1 5 0.9 2.1 -9.45
Door D2 5 0.75 2.1 -7.87
second floor
Door D1 3 0.9 2.1 -5.67
Door D2 3 0.75 2.1 -4.72
third floor
Door D1 1 0.75 2.1 -1.57
ground floor
Windows W1 9 1.2 1.35 -14.58
Windosw W2 3 1.8 1.35 -7.29
Ventilation v 5 0.7 0.35 -1.22
1st floor
Windows W1 11 1.2 1.35 -17.82
Windosw W2 3 1.8 1.35 -7.29
Ventilation v 4 0.7 0.35 -0.98
45
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
2nd floor
Windows W1 9 1.2 1.35 -14.58
Windosw W2 2 1.8 1.35 -4.86
Ventilation v 3 0.7 0.35 -0.73
Total 1170.94 sq.m
(i) 12.5mm thick cement sand plaster in (1:4)
ratio on wall surface
Outer wall
ground floor
Ground floor wall 1 59.2 3.15 186.48
1st floor wall 1 59.2 3.15 186.48
Apron 1 60.1 0.5 30.05
Below D.P.C level 1 59.2 0.45 26.64
slab projection 1 59.2 0.9 53.28
2nd floor
Wall 1 39.28 3.15 123.73
slab projection 1 39.73 0.9 35.75
ground floor
Windows W1 9 1.2 1.35 -14.58
Windosw W2 3 1.8 1.35 -7.29
Ventilation v 5 0.7 0.35 -1.22
1st floor
Windows W1 11 1.2 1.35 -17.82
Windosw W2 3 1.8 1.35 -7.29
Ventilation v 4 0.7 0.35 -0.98
2nd floor
Windows W1 9 1.2 1.35 -14.58
Windosw W2 2 1.8 1.35 -4.86
Ventilation v 3 0.7 0.35 -0.73
Total 573.06 sq.m

(j) Elastocrete cementitious elastomeric water


proofing coating 2 components capacity per
kg. 6 sq.ft 2 coat including supply and
applying all complete work
third floor
terrace 1 2.65 8.2 21.73
1 6.78 6.89 46.71
1 1.63 4.76 7.76
top floor
terrace 1 3.13 9.75 30.52
1 6.78 7.86 53.29
1 2.91 6.55 19.06

Total 179.07 Sq.m


(k) Providing material & applying pressure
grouting on RCC Roof slab, beam ,shear wall
as per instruction
third floor
terrace slab area 1 2.65 8.2 21.73
1 6.78 6.89 46.71
1 1.63 4.76 7.76
top floor
terrace slab area 1 3.13 9.75 30.52
1 6.78 7.86 53.29
1 2.91 6.55 19.06
Total 179.07 Sq.m
46
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
(l) 25mm. Thick cement sand(1:4) tile shape
butta
first floor
Projected sloped roof slab 2 4.75 0.887 8.43
1 0.9 0.887 0.80
0.5 5 2.7 6.75
slab projection 1 57.24 1.125 64.40
second floor
Projected sloped roof slab 2 4.75 0.887 8.43
1 0.9 0.887 0.80
0.5 5 2.7 6.75
Total 96.34

(m) 20mm thick cement sand rainwater


protection plaster line in (1:4) ratio including
wetting of surfaces & curing the work all
complete.

Ground floor slab 1 64.46 64.46


first floor slab 1 64.46 64.46
second floor slab 1 55.15 55.15
Top floor slab 1 45.14 45.14
Total 229.21 R.m

(n) 60mm thick inter locking concrete block


paving with 50mm.th. Stone dust all
complete
Ramp 1 5.02 1.55 7.78
Total 7.78 sq.m
(o) Supplying and applying white cement putty
on ceiling and wall with line and level all
complete

As per 12.5 mm thick cement sand (1:3) plaster


on the ceiling 412.13
As per 20mm thick cement sand plaster in (1:6)
ratio on innerwall surface 1170.94
As per 12.5mm thick cement sand plaster in
(1:6) ratio on outerwall surface 573.06
Total 2156.13 Sq.m

(p) Fitting & fixing suspended design ceiling of


water resistance gypsum board with all
necessary hanger, angles, hooks nut bolt all
complete.
first floor
meeting 1 5.675 5.725 32.49
Total 32.49 sq.m

(q)
Supplying and laying 100mm long
12mmthick parquate flooring and skirting in
line and level with painting all complete.
first floor
meeting 1 5.675 5.725 32.49
second floor
Master bed room 1 5.775 3.212 18.55
1 3.265 1.61 5.26
47
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
Living room 1 3.795 6.45 24.48
Bed room 1 5.05 4.8 24.24
third floor
guest room 1 3.77 4.82 18.17
Total 123.18 sq.m

22 Supplying and fixing of spiral staircase with


100 mm black pipe post 20mm square pipe
railing 32 mm handrel with of staircase 75
cm including oxide primer coat and
necessary fitting all complete
1 3.125 3.13
Total 3.13 Rm
23 Making and fitting fixing of 12 x 12 mm,solid
core squar rod Grill on the frame of 4.5 x 20
mm. M.S.plate with painting all complete.

ground floor
W 8 1.2 1.8 17.28
W1 5 1.8 1.8 16.20
W2 2 0.75 0.75 1.13
W' 1 2 0.75 1.50
first floor
W 8 1.2 1.8 17.28

W1 4 2 1.8 14.40
W2 2 0.75 0.75 1.13
W' 1 2 0.75 1.50
second floor
W 7 1.2 1.8 15.12
W1 4 1.8 1.8 12.96
W2 3 0.75 0.75 1.69
W' 1 2 0.75 1.50
Third floor
W 4 1.2 1.8 8.64
W1 2 2 1.8 7.20
W2 1 0.75 0.75 0.56
W' 1 2 0.75 1.50
119.58 SQ.M
(21.5*119.58)kg Total 2570.97 Kg

24 Supplying and fitting 50 mm dia stainless


steel staircase railling with 2 rows of
stainless steel balluster of 25mm pipe and
vertical post at 2m c/c
balluster 1 20.34 20.34
vertical pipe 7 0.9 6.30
Total 26.64 Rm
48
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
25 Supplying and fitting 38 mm dia stainless
steel staircase railling 2 rows with vertical
post at 2m c/c
parapet wall FF,SF 2 13.16 0.7 18.42
parapet wall TF 1 45.14 0.7 31.60
parapet wall top floor 1 39.65 0.7 27.76
Total 77.78 Sq.m

25 M.S. blackpipe work with I.S. or B.S. section


including jointting , fixing, erection and
primer painting with all necessary cement
grouting as per drawing and instructions all
complete .
inclined member(50 mm dia) 4 2.2 @ 5.1 44.88
vertical post 65mm dia 4 3 @ 6.53 78.36
purlin(32mm dia) 3 4.72 @ 3.15 44.60
Total kg

26 2 coats of plastic emulsion paint of approved


colour over 1 coat of primer painting over
properly cleaned surface all complete

Ceiling
First floor
Meeting 1 5.675 5.725 32.49
Officer's room 1 5.1 3.21 16.37
1 1.61 3.49 5.62
Second floor
Master bed room 1 5.775 3.212 18.55
1 3.265 1.61 5.26
Store 1 2.4 1.22 2.93
Kitchen+dinning 1 3.77 4.82 18.17
Living room 1 3.795 6.45 24.48
Bed room 1 5.05 4.8 24.24
passage infront of staircase 1 3 1.09 3.27
passage 1 4.49 2.85 12.80
Wall
first floor
officer's room 2 13.41 3 80.46
meeting 2 11.39 3 68.34
second floor
Master bed room 2 13.86 3 83.16
Store 2 3.62 3 21.72
Kitchen+dinning 2 8.59 3 51.54
Living room 2 10.24 3 61.44
Bed room 2 9.85 3 59.10
staircase side 2 3.392 2.5 16.96
Total 606.89 Sq.m

27 Two coats of readymade enamel paint with a


coat of primer
salwood Panel door shutter
outside doors
ground floor
outside D1(1000*2100) 1 0.875 2.25 2.025 3.99
first floor
49
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
outside D1(1000*2100) 2 0.875 2.25 2.025 7.97
second floor
outside D1(1000*2100) 3 0.875 2.25 2.025 11.96
Top floor
outside D1(1000*2100) 1 0.875 2.25 2.025 3.99
Total 27.91 Sq.m

28 Two coats of weather coat paint with a coat


of primer
As per item (20 mm thick cement sand inner 1170.94
plaster ) Total 1170.94 Sq.m

29 Two coats of washable Distemper paint with


a coat of primer
As per item (12.5 mm thick cement sand outer
plaster - Plastic emulsion paint item no.22.) -33.83
564.05 Sq.m
30 2 coats of ready made enamel paint without
primer Painting over porperly sanded
surface all complete
spiral staircase 2.54
same as grill area 119.58
inclined member(50 mm dia) 4 2.2 0.157 1.38
vertical post 65mm dia 4 3 0.204 2.45
purlin(32mm dia) 3 4.72 0.100 1.42
Total 127.38 sq.m

31 Three coats of chapra polishing in wood


surfaces with approved colour in properly
sanded surface including sealing voids with
putting all complete.
salwood carved door
Ground floor
DW (1925*2700) 1 1.2 2.1 2.5 6.3000
Latic window (ankhe jhyal)
Ground floor
DW (1925*2700) 2 0.3 1.2 2.5 1.8000
1 1.95 0.6 2.5 2.9250
plywood door shutter
inside doors
ground floor
Inside D1(1000*2100) 8 0.875 2.25 2.025 31.89
D3(800*2100) 1 0.675 2.25 2.025 3.08
first floor
Inside D1(1000*2100) 4 0.875 2.25 2.025 15.95
second floor
Inside D1(1000*2100) 4 0.875 2.25 2.025 15.95
third floor
Inside D1(1000*2100) 2 0.875 2.25 2.025 7.97
toilet doors
ground floor
D3(800*2100) 2 0.675 2.25 2.025 6.15
D1(1000*2700) 1 0.875 2.25 0.075 0.15
first floor
D3(800*2100) 2 0.675 2.25 2.025 6.15
second floor
D3(800*2100) 3 0.675 2.25 2.025 9.23
third floor
50
S.No. Description of works no. length Breadth Height Quantity Unit Remarks
D3(800*2100) 1 0.675 2.25 2.025 3.08
Total 110.61 sq.m
51

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
DIVISION OFFICE, KAVRE
DHULIKHEL, KAVRE
Ph.No. : 490249
DETAILED ESTIMATE
F/Y: 2067/068

Project : Construction of 50 users septic tank


Site : Saptari,Rajbiraj

S.N. Description of Work No. L B m H Weight Quantity Unit Remarks


m m Kg / m
1 Earthwork in excavation in
hard/boulder mix soils
septic tank 1 5.25 2.4 3 37.80
Total 37.80 cu.m.

2 Rubble masonry soling work in


foundation .
septic tank 1 5.25 2.4 0.15 1.89
Total 1.89 cu.m.

3 Plain cement Concrete (PCC) in 1:3:6


ratio for foundations, flooring and
walls.
septic tank 1 5.25 2.4 0.075 0.94
Total 0.94 cu.m.

4 Rubble masonry in 1:4 C/S mortar.


septic tank long wall 2 5.05 0.35 2.15 7.60
Short wall 3 1.5 0.35 2.15 3.38
Total 10.98 cu.m.

5 Plain cement Concrete (PCC) for RCC


works (1:2:4) for slab/lintels
septic tank 1 5.05 2.2 0.1 1.11
Total 1.11 cu.m.

6 Tor steel reinforcement bar of fe


415/500 grade.
septic tank 10mm dia main bar 36 2.15 0.62 47.98
10mm dia distribution bar 45 1.6 0.62 44.64
10mm dia hook 6 0.9 0.62 3.34
Total 0.10 mt

7 Formwork, shuttering, centering with


approved materials.
septic tank 1 4 1.5 6.00
side (5.02+2.2)*2= 1 14.5 0.1 1.45
Total 7.45 sq.m

8 Plain cement Concrete (PCC) in 1:2:4


ratio for foundations, flooring and
walls .
septic tank floor 1 4 1.5 0.05 0.30
cu.m.
52

S.N. Description of Work No. L B m H Weight Quantity Unit Remarks


m m Kg / m
Total 0.30 cu.m.

9 20mm thick cement sand plaster in


(1:4) ratio on floor.
septic tank floor 1 4 1.5 6.00
septic tank wall 2 4 2.1 16.80
2 1.5 2.1 6.30
partition wall 2 1.5 2.1 6.30
Total 35.40 sq.m

10 3 mm thick cement sand punning (1:1)


on floor, skriting, dado etc.
same sa item no 11 35.40
Total 35.40 sq.m
file:///conversion/tmp/scratch/385344132.xls 53
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
DIVISION OFFICE, KAVRE
DHULIKHEL, KAVRE

DETAILED ESTIMATE

Project : Construction of 3 no. soak pit (inner size 1.05dia)


Site : Saptari,Rajbiraj

Length Breadth Height Weight


S.N. Description of Work No. Quantity Unit Remarks
m m m Kg / m
1 Earthwork in excavation in hard/boulder mix
soils
soak pit (1.95*1.95*3.14)/4= 3 2.984 2.5 22.38
Total 22.38 cu.m.

2 Rubble masonry soling work in


foundation .
soak pit (1.95*1.95*3.14)/4= 3 2.984 0.15 1.34
Total 1.34 cu.m.

3 Rubble masonry in 1:6 C/S mortar.


soak pit (1.40*3.14)= 3 4.4 0.35 0.75 3.46
Total 3.46 cu.m.

4 Dry rubble masonry work.


soak pit (1.40*3.14)= 3 4.4 0.35 1.05 4.85
Total 4.85 cu.m.

5 Rubble masonry soling work in


foundation .
soak pit (1.75*1.75*3.14)/4= 3 2.4 0.1 0.72
Total 0.72 cu.m.

6 Rubble masonry soling work in


foundation .
soak pit 10mm dia main & dis bar 51.33
(1.70+0.60)/2= 72 1.15 0.62
Total 0.05 mt

7 Rubble masonry soling work in


foundation .
soak pit (1.05*1.05*3.14)/4= 3 0.87 2.61
side(1.75*3.14) 3 5.5 0.1 1.65
Total 4.26 cu.m.

8 Sand filling including supply of filling


materials, watering, ramming etc. all
complete
(3.14*1.05*1.05)/4 3 0.865 0.3 0.77
Total 0.77 cu.m.

9 Brick bat filling work


(3.14*1.05*1.05)/4 3 0.865 0.9 2.33
Total 2.33 cu.m
54
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
DIVISION OFFICE, KAVRE
DHULIKHEL, KAVRE

DETAILED ESTIMATE

Project : Construction of 8 no. manhole (Double Cover)


Site : Saptari,Rajbiraj

Length Breadth Height Weight


S.N. Description of Work No. Quantity Unit Remarks
m m m Kg / m
1 Earthwork in excavation in hard/boulder mix soils
man hole 8 1.8 1.05 1 15.12
Total 15.12 cu.m.

2 Rubble masonry soling work in foundation .


man hole 8 1.8 1.05 0.15 2.26
Total 2.26 cu.m.

3 Rubble masonry soling work in foundation .

man hole 8 1.8 1.05 0.075 1.13


Total 1.13 cu.m.

4 Rubble masonry in 1:6 C/S mortar.


man hole long Wall 16 1.8 0.3 0.6 5.18
Short wall 24 0.45 0.3 0.6 1.94
Total 7.12 cu.m.

5 Rubble masonry soling work in foundation .

man hole 8 1.8 1.05 0.1 1.51


Total 1.51 cu.m.

6 Rubble masonry soling work in foundation .


man hole main bar 10mm dia 112 1 0.62 69.44
Distribution bar 10mm dia 112 0.85 0.62 59.02
Total 0.13 mt

7 Rubble masonry soling work in foundation .

man hole 8 1.80 1.05 15.12


Total 15.12 cu.m.

8 Rubble masonry soling work in foundation .

man hole floor 16 0.45 0.45 0.05 0.16


man hole floor sloop 64 0.2 0.2 0.2 0.51
Total 0.67 cu.m.

9 20mm thick cement sand plaster in (1:6) ratio on


floor.
man hole 16 0.45 0.45 3.24
man hole wall 32 0.45 0.6 8.64
32 0.45 0.6 8.64
Total 20.52 sq.m.

10 3 mm thick cement sand punning (1:1) on floor,


skriting, dado etc.
same sa item no 11 20.52
Total 20.52 sq.m.
11 55*55 mm medium C.I cover 16 16
Total 16 no.
55
Government of Nepal
Ministry of Physical Planning & works
Department of Urban Development & Building Construction
DIVISION OFFICE, KAVRE
DHULIKHEL

DETAILED ESTIMATE
F/Y: 2070/71

Project : Construction of 20.00 cu.m under ground Water tank


Site : Saptari,Rajbiraj

Lengt Breadt Height Weight


S.N. Description of Work No. Quantity Unit Remarks
h m h m m Kg / m

1 Earthwork in excavation in hard/boulder mix soils

1 5.1 3.1 2.6 41.10


Total 41.10 cu.m

2 Rubble masonry soling work in foundation .


1 5.1 3.1 0.15 2.37
Total 2.37 cu.m

3 Plain cement Concrete (PCC) in 1:3:6 ratio for


foundations, flooring and walls.
1 5.1 3.1 0.08 1.26
Total 1.26 cu.m

4 Plain cement Concrete (PCC) for RCC works


(1:1.5:3) for slab/lintels,tie beam
Floor 1 4.9 2.9 0.2 2.84
wall 2 4.9 0.2 2.1 4.11
2 2.5 0.2 2.1 2.10
slab 1 4.9 2.9 0.1 1.42
Total 10.47 cu.m

5 Formwork, shuttering, centering with 19mm thick


waterproof ply board and steel post
Floor bed 2 4.9 0.2 1.96
2 2.9 0.2 1.16
wall 4 4.9 2.1 41.16
4 2 2.1 16.80
slab 1 4.9 2.9 14.21
Total 75.29 sq.m

6 Tor steel reinforcement bar of fe 415/500 grade.


1.75% of R.C.C 1:2:4
10.47*1.75/100*7850 1438.32
Total 1.44 mt

7 Elastocrete cementitious elastomeric water


proofing coating 2 components capacity per kg.
6 sq.ft 2 coat
Floor 1 4.5 2.5 11.25
wall 2 4.5 2.1 18.90
2 2.5 2.1 10.50
Total 40.65 sq.m
56

Lengt Breadt Height Weight


S.N. Description of Work No. Quantity Unit Remarks
h m h m m Kg / m

8 12.5mm thick cement sand plaster in (1:4) ratio


on wall and Floor.
as same as Item No 7.00 40.65
Total 40.65 sq.m

9 3 mm thick cement sand punning (1:1) on floor,


skriting, dado etc.
as same as Item No 7.00 40.65
Total 40.65 sq.m
57
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Division Office, Kavre
Detailed Estimate Sheet

Project : Construction of District Government Lawyer's office Building


Site : Saptari,Rajbiraj `
Work title : Landscaping Development Work

S.N.
Description NO Length Breadth Height Quantity Remarks

1 Earthwork in Excavation in foundation


Gate column 2 0.9 0.9 0.9 1.46
total 1.45 cu.m

2 Stone solling in foundation & floor


Gate column 2 0.9 0.9 0.15 0.24
total 0.24 cu.m

3 P.C.C (1:1 1/2:3) M200 for R.C.C Gate column

Trapezoidal part (0.25/6((0.9*0.9+.23*.23)/2))) 2 0.089 0.18


pillar 2 0.23 0.23 3.15 0.33
beam 1 3.7 0.23 0.23 0.20
total 0.70 cu.m

4 Cutting binding in posting of reinforcement


bars 1% of R.C.C 0.70 0.01 7850 0.05 mt

5 Form work (centering and shuttering )


pillar 8 0.30 4.00 9.60
Beam 2 0.23 3.70 1.70
11.30 m2

6 16 gauge Iron gate 1 4.00 2.10 8.40 m2

7 Brick work in 1:4


gate piller 2 0.45 0.45 3.15 1.28
top copling 2 0.6 0.6 0.065 0.05
top copling 2 0.45 0.45 0.065 0.03
deduction RCC piller 2 0.23 0.23 3.15 -0.33
total 1.02 cu.m

8 12.5mm cement plaster


gate piller 2 1.8 2.55 9.18
piller top 2 0.45 0.45 0.405
total 9.59 sq.m

9 Enamel paints without primer paints on iron


gate 1 4 2 2.1 16.80 sq.m
58

10 Earth work in excavation by machine in good


levelling
1 40 20.38 2.5 2038.00
total 2038.00 cu.m

11 Disposal of excavated waste material


including cutting soil and other materials by
trucks within 5 km distance from
construction site. cu.m
earth excavation office building 1 203.43
earth excavation landscape work 2039.45
deduction earth filling -86.49
total 2156.39

12 60mm thick inter locking concrete block


paving with 50mm.th. Stone dust all
complete
1 7.78 6.075 47.26
1 4.581 4.993 22.87
1 10.79 5.05 54.49
1 16.66 1.417 23.61
1 2.096 9.22 19.33
1 5.78 1.2 6.94
total 174.49 sq.m
59
Work title : Compound wall

S.N Particular No L B H Quantity Remarks


1 Earth work 1 165.00 0.60 0.70 69.30 cu.m

2 Stone soling 1 165.00 0.60 0.15 14.85 cu.m

3 R/R Masonry (1:6)


1 165.00 0.60 0.55 54.45
1 165.00 0.45 1.50 111.37
165.82 cu.m

4 Fencing with 62mm X 62mm size mesh made


up of 7mm Ø rods framed on 25X25X4 mm
angles and 50mm Ø M.S. blackpipe post in
2m interval including jointting , fixing,
erection and primer painting with all
necessary M.S. grills and plates as per
drawing and inst
1 165.00 1.00 165.00
total 165.00 sq.m

5 P.C.C (1:2:4) for post


PCC 1:2:4 for top of compound wall 1 165.00 0.45 0.075 5.56
total 5.56 cu.m

7 20mm thick plaster 1:4 inner side 1 165.00 2 330.000 sq.m

8 1:2 rulled pointing on stone wall of outer


surface 1 165.00 1.5 247.500 sq.m

9 form work 2 165.00 0.075 24.75 sq.m

10 2 coats of ready made enamel paint of


approved colour over iron fencing surface all
complete
Same as fencing area 165.00 sq.m
60

Government of Nepal
Ministry of Physical Planning & works
Department of Urban Development & Building Construction
DIVISION OFFICE, KAVRE
DHULIKHEL
Ph.No. : 011-662842
DETAILED ESTIMATE
F/Y: 2069/070
Project : Construction of Guard house building

Site : Saptari,Rajbiraj

S.N Description of works no. length breadth height quantity unit Remarks
1 Earthwork in excavation in foundation in
gravelmixed soil up to a depth of 1.5m
and a lift of 30m. Or more .
Long walls, along 1-1, 4-4 2 9.05 0.80 0.90 13.02
along 2-2 1 1.67 0.35 0.30 0.17
along 3-3 1 2.83 0.80 0.90 2.03
Short walls, along A-A,B-B,C-C,D-D 4 4.57 0.80 0.90 13.16
disabled toilet part 2 1.62 0.80 0.90 2.33
1 2.80 0.80 0.90 2.01
1 3.90 0.80 0.90 2.80
Ramp 1 1.62 1.58 0.45 1.15
Total 36.67 cum.
2 stone soling in foundation
Long walls, along 1-1, 4-4 2 9.05 0.80 0.15 2.17
along 2-2 1 1.67 0.35 0.15 0.08
along 3-3 1 2.83 0.80 0.15 0.33
Short walls, along A-A,B-B,C-C,D-D 4 4.57 0.80 0.15 2.19
disabled toilet part 2 1.62 0.80 0.15 0.38
1 2.80 0.80 0.15 0.33
1 3.90 0.80 0.15 0.46
Ramp 1 1.62 1.58 0.15 0.38
Varandah steps 1 3.30 0.60 0.15 0.29
Floor
bed room 1 2.64 3.54 0.15 1.40
kitchen 1 2.34 3.54 0.15 1.24
toilet 1 2.82 2.05 0.15 0.86
1 2.82 1.26 0.15 0.53
Total 10.64 cum.

3 Plain cement concrete(1:3:6) in


foundation
1 39.21 0.80 0.08 2.35
disabled toilet part 2 1.62 0.80 0.08 0.19
1 2.80 0.80 0.08 0.17
1 3.90 0.80 0.08 0.23
Ramp 1 1.62 1.58 0.08 0.19
Total 3.14 cum.

4 Stone masonary work in cement sand


(1:6) mortar in foundation
1st footing
Long walls, along 1-1, 4-4 2 9.05 0.80 0.3 4.34
along 3-3 1 2.83 0.80 0.3 0.67
Short walls, along A-A,B-B,C-C,D-D 4 4.57 0.80 0.3 4.38
61

S.N Description of works no. length breadth height quantity unit Remarks
2nd footing
Long walls, along 1-1, 4-4 2 8.85 0.60 0.3 3.18
along 3-3 1 2.83 0.60 0.3 0.50
Short walls, along A-A,B-B,C-C,D-D 4 4.37 0.60 0.3 3.14
3rd footing up to plinth
Long walls, along 1-1, 4-4 2 8.65 0.40 0.3 2.07
along 3-3 1 2.83 0.40 0.3 0.33
Short walls, along A-A,B-B,C-C,D-D 4 4.17 0.40 0.3 2.00
steps 1 5.1 0.60 0.30 0.91
1 5.1 0.30 0.15 0.22
Total 21.74 cum.

5 Brick work in cement sand (1:4) mortar in


super structure with chimney made
bricks
Super structure walls
Long walls, along 1-1, 4-4 2 8.65 0.23 2.22 8.83
along 3-3 1 2.83 0.23 2.22 1.44
Short walls, along A-A,B-B,C-C,D-D 4 4.17 0.23 2.22 8.51
disabled toilet part 2 1.62 0.23 2.22 1.65
1 2.80 0.23 2.22 1.43
1 3.90 0.23 2.22 1.99
D1 (0.9*2.10) 3 0.90 0.23 2.1 1.30
D2 (1*2.10) 2 1 0.23 2.1 -0.96
D3 (0.75*2.1) 2 0.75 0.23 2.1 -0.72
W 9 1.2 0.23 1.35 -3.35
sill band 1 36.39 0.23 0.15 -1.25
L And T Band 9 4.15 0.23 0.075 -0.64
Lintel Band 1 36.39 0.23 0.15 -1.25
Total 16.99 cum.

6 Salwood works for chaukhats freme


including iron hold fast etc,
D1 (0.9*2.10) 3 5.1 0.23 0.075 0.26
D2 (1*2.10) 2 5.2 0.23 0.075 0.17
D3 (0.75*2.1) 2 4.95 0.23 0.075 0.17
Total 0.60 cum.

7 38mm. Thick salwood panelled door


shutter with all necessory hardware
materials,
D1 (0.9*2.10) 3 0.75 2.075 4.67
D2 (1*2.10) 2 0.85 2.075 3.53
D3 (0.75*2.1) 2 0.6 2.075 2.49
Total 10.69 sqm.

8 Aluminium fix panel at sliding windows of


section (88 x38.1x1.1) with Fly mesh
shutter all complete
W 9 1.2 1.35 14.58
Total 14.58 sqm.

9 Flooring works:
a Earth work in filling on the floor with filling
materials including compaction complete
62

S.N Description of works no. length breadth height quantity unit Remarks
Floor
bed room 1 2.64 3.54 0.30 2.80
kitchen 1 2.34 3.54 0.30 2.48
toilet 1 2.82 2.05 0.30 1.73
1 2.82 1.26 0.30 1.06
1 1.39 2.35 0.30 0.97
space infront of toilet 1 3.40 0.90 0.30 3.06
Total 8.07 cum.

b p.c.c.(1:2:4) on the floor


Floor
bed room 1 2.64 3.54 0.075 0.70
kitchen 1 2.34 3.54 0.075 0.62
toilet 1 2.82 2.05 0.075 0.43
1 2.82 1.26 0.075 0.26
1 1.39 2.35 0.075 0.24
steps 2 5.1 0.3 0.075 0.22
Total 0.22 cum.

c 3mm. Thick cement punning(1:1) works


Bed room
skating 1 12.36 0.15 1.85
Kitchen
skating 1 11.76 0.15 1.76
steps 2 5.1 0.45 4.59
Total 8.20 sqm.

10 P.C.C.(1:1.5:3) for all kind of R.C.C. works


plinth beam 1 39.21 0.23 0.15 1.35
Ceilling tie beam 1 24.98 0.23 0.15 0.86
gable band 2 4.16 0.23 0.15 0.28
lintel 1 36.39 0.23 0.15 1.25
sill beam 1 32.59 0.23 0.075 0.56
stich band 0.00
L- band 7 2 0.23 0.075 0.24
T 2 2.15 0.23 0.075 0.07
kitchen plat form 1 2.6 0.6 0.075 0.11
Total 4.72 cum.

11 Formwork shuttering and centering with


19mm. Thick waterproof plywood board

plinth beam 1 8.65 0.15 1.2972


Ceilling tie beam 1 24.98 0.15 3.747
gable band 2 4.16 0.15 1.248
lintel 1 36.39 0.15 5.4585
sill beam 1 32.59 0.075 2.44425
stich band
L- band 5 1.2 0.075 0.45
T 4 1.2 0.075 0.36
kitchen plat form 1 2.6 0.6 1.56
opening Base
D1 2 0.9 0.23 0.414
D2 2 1 0.23 0.46
63

S.N Description of works no. length breadth height quantity unit Remarks
D3 1 0.75 0.23 0.1725
W 5 1.2 0.23 1.38
W1 2 1.5 0.23 0.69
Total 19.68145 sqm.

12 Reinforcement steel works including


straighting,cutting, bending and binding
with analed G.I.wire all complete
(1.5% 0f concrete) 1 4.72 0.015 7850 555.78 kgs.
Total 0.56 Mt

13 12.5mm. Thick cement sand(1:4) plaster

internal wall
internal wall :-Bed room(2.640*3.540) 1 12.36 2.22 27.43
Kitchen room(2.34*3.540) 1 11.76 2.22 26.10
Toilet 1 9.27 2.22 20.58
1 7.71 2.22 17.11
1 4.40 2.22 9.76
1 7.48 2.22 16.60
Deduction
D1 3 0.9 2.1 -5.67
D2 2 1 2.1 -4.20
D3 2 0.75 2.1 -3.15
W 5 1.2 1.35 -8.10
W1 2 1.5 1.35 -4.05
Sub Total 92.41 sqm.

outer walls
total wall 1 45.50 2.22 101.01
disabled toilet 1 5.74 2.22 12.74
gable wall 1 3.76 0.9 3.38
Bed room
Skirting 1 12.36 0.15 1.85
Kitchen
skirting 1 11.76 0.15 1.76
outer wall G.L to Pl 1 24.98 0.45 11.24
steps 2 5.1 0.45 4.59
D1 1 0.9 2.1 -1.89
D2 2 1 2.1 -4.20
W 5 1.2 1.35 -8.10
W1 2 1.5 1.35 -4.05
Sub Total 118.33 sqm.
NetTotal 210.74 sqm.

14 38mm thick (1:2:4) screeding


Bed room 1 2.64 3.54 9.35
Kitchen 1 2.34 3.54 8.28
space infront of toilet 1 3.40 0.90 3.06
Total 17.63 Sq.m

15 6mm thick plywood false ceiling in


existing wooden frame.
Bed room 1 2.64 3.54 9.34
Kitchen 1 2.34 3.54 8.28
64

S.N Description of works no. length breadth height quantity unit Remarks
toilet 1 2.59 2.046 5.29
1 2.59 1.264 3.27
1 1.39 2.35 3.26
Total 29.44 sqm.

16 Supplying and fitting black pipe tubler truss


50mm.dia. Rafter 4 2.7 5.1 55.08
tie 50mm.dia (M) 2 3.76 5.1 38.35
Truss rafter 4 2.7 5.1
40mm struts vertical 2 2.1 3.61 15.16
inclined 2 3 3.61 21.66
Total 130.25 kgs.

17 Supplying and fitting 40mm.dia. Black pipe


purlins 8 9.97 3.61 287.93
purline for inclined side roof 4 4.96 3.61 71.62
supports 4 1.2 3.61 17.32
Total 376.87 kgs.

18 0.50mm colour CGI sheet roofing


including fixing in proper shape & size
with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per
drawing & instruction all complete. 2 9.97 2.7 53.83
inclined side roof 2 4.96 0.65 6.44
Total 60.27 sqm.

19 coloured g.i. ridge cover and water gutter


1 9.97 0.6 5.98 sqm.

20 Two coats of washable distemper paint


on the internal wall with a coat of primer
after cleaning the surfaces
quantity same as item no.14 92.41 sqm.

21 Two coats of weather coat on the external


wall and terrace etc Quantity taken from item no 14 118.33 sqm.

22 4.5*20mm MS Grill work


W 9 1.2 1.35 14.58
21.5*12.15 kg 261.225 Kg
Total 261.23 Kg
23 Two coats of ready made enamel paint
with a coat of primer on the doors and
windows
D1 3 0.9 2.25 2.1 -5.67
D2 2 1 2.25 2.1 -4.20
D3 2 0.75 2.25 2.1 -3.15
false ceiling Quantity taken from item no 15 29.44
grill work 261.23
Total 290.665 sqm.
24 glazed and non glazed tile
toilet floor 1 2.59 2.046 5.29914
1 2.59 1.246 3.22714
1 1.39 2.35 3.2665
65

S.N Description of works no. length breadth height quantity unit Remarks
wall 1 13.595 1.5 20.3925
1 7.48 1.5 11.22
kitchen plat form 1 2.6 0.6 1.56
wall 1 3.2 0.6 1.92
Total 46.88528 sqm.
25 Making and fitting of G.I. Mosquito net
shutter with diamond chicken wire mesh
with 38mm thick seasoned salwood frame
including hinges, towerbolts, handles,
locking set etc all complete.

1 0.9 2.1 1.89


Total 1.89 Sq.m
Government of Nepal
Ministry of Urban Development
Department of Urban development and Building Construction
Division Office, Kavre

ESTIMATE OF AS BUILT DRAWINGS PREPARATION COST

F/Y: 070/71

Project : Construction of District Government Lawyer's office Building


Site : Saptari,Rajbiraj

As built Drawing preparation cost


S No Position Mandays Monthly rate Daily rate Amount
1.00 Architect 10.00 24,450.00 815.00 8,150.00
2.00 Structural Engineer 10.00 24,450.00 815.00 8,150.00
3.00 Civil Sub Engineer 10.00 18,000.00 600.00 6,000.00
4.00 Sanitary Sub Engineer 2.00 18,000.00 600.00 1,200.00
5.00 Electrical Sub Engineer 2.00 18,000.00 600.00 1,200.00
6.00 Helper 4.00 15,000.00 500.00 2,000.00
Logistics and Travel expenses 3,592.67
Total 30,292.67
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
DIVISION OFFICE, KAVRE
DHULIKHEL, KAVRE, NEPAL

DETAILED ESTIMATE
F/Y:2070/71

Project : Construction of Retaining wall


Site : Saptari,Rajbiraj

Length Breadth Height Weight


S.N. Description of Work No. Quantity Unit Remarks
m m m Kg / m

A CIVIL WORKS
1 Earthwork in excavation in ordinary
soils in trenches with a lead and lift as
per drawing,specification and
instruction all complete
for retaining wall 1.00 28.50 1.55 0.75 33.13
Total 33.13 Cu. M
2 Supply,laying and compaction of dry
stone soling work in foundation and
floor in true line and level as per
drawing specification and instruction all
complete
for retaining wall 1.00 28.50 1.55 0.15 6.62
Total 6.62 Cu.m
3 Providing mixing and laying PCC
1:3:6(lean concrete) works in
foundation with proper compaction by
needle vibrator and completion to
perfect line,level and fininshing
including curing as per
drawing,specification and instruction

foundation of retaining wall 1 28.50 1.55 0.08 3.31


Total 3.31 cu.m
4 Supplying and laying of hard stone and
erection of random rubble stone
masonry wall by providing bond stone
and through stone as required in
cement sand mortar in 1:6 cement
mortar in true line and level and curing
etc as per specification and instruction
of site engineer

retaining wall foundation 1 28.50 1.55 0.75 33.13


retaining wall superstructure 1 28.50 0.75 1.75 37.40
Total 70.53 cu.m
5 Providing,mixing and laying PCC1:2:4
M15 for foundation,flooring and wall
with approved quality of cement and
sand and crushed stone aggregate
including mixing,laying,curing etc all
complete in approval of site engineer
needle,vibrator and completion to
perfect line,level and finishing including
curing as per drawing,specification and
instructin all complete

top of retaining wall 1 28.50 0.45 0.05 0.64


Total 0.64 cu.m

6 Ruled pointing work in (1:2) cement


sand mortar on boulder stone work with
good finish including curing as per
instruciton all complete.

sq.m
1 28.50 1.75 49.88
Total 49.88 sq.m
69

Rain Water Harvesting


Cost Estimation of Flat roof
S.N. Items of Work No Length T.Length width Height Quantity Unit Remarks
1 4" PVC tee 2 2.00 no
2 4" P V C Elbow 10 10.00 no
3 4' Dia.P V C 45 De. Bend 8 8.00 no
4 Pipe holder with grips and screw 22 22.00 no
5 Outlet Brass tap with set all including 1 1.00 Set
6 4" plastic jali 4 4.00 no
1000 Lit.Hilltake tanksupplying and instaling
work as per specification and instruction all
7 complete. 1.00 One jobs

Site clearance and preparation after all


8 Construction work etc. 1.00 One job

Rain Water Harvesting


Cost Estimation of Catchpit
S.N. Items of Work No Length T.Length width Height Quantity Unit Remarks
1 E/W Excavatiion 1 1.219 1.219 1.219 1.0668 1.59 Cub.m.

2 Flat Brick Soling 1 1.219 1.219 1.219 1.49 Sq.m.

3 P.C.C.(1:3:6) 1 1.219 1.219 1.219 0.10058 0.15 Cub.m.

4 B/M work with (1:4) Cement Mortar


Long Wall 2 0.914 1.828 0.2286 0.914 0.38
Short Wall 2 0.457 0.914 0.2286 0.914 0.19
Total 0.57 Cub.m.

5 12.5 th.(1:4) cement plaster


Base 1 0.4571 0.4571 0.4571 0.21
Wall 1 1.828 1.828 0.914 1.67
Top portion 1 2.743 2.743 0.2286 0.63
Total 2.51 Sq.m.

6 (1:1) Cement Punning


Base 1 0.4571 0.4571 0.4571 0.21
Wall 1 1.828 1.828 0.914 1.67
Top portion 1 2.743 2.743 0.2286 0.63
Total 2.51 Sq.m.

7 Grill Work for cover 1 0.6096 0.6096 0.6096 0.37 Sq.m.

8 Earth filling work


Long Wall 2 1.219 2.438 0.1524 0.9144 0.34
Short Wall 2 0.9144 1.8288 0.1524 0.9144 0.25
Total 0.59 Cub.m.
70

Rain Water Harvesting


Cost Estimation of Recharge Pit
S.N. Items of Work No Length T.Length width Height Quantity Unit Remarks
1 E/W Excavatiion in ordinary soil
Base level 1 0.91 0.91 0.91 0.91 0.76
Top level 1 1.37 1.37 1.37 0.61 1.14
total 1.91 Cub.m.

2 B/M work in (1:4) Cement/sand Mortar


Outer 2 1.37 2.74 0.23 0.56 0.35
Inner 2 0.91 1.83 0.75 0.56 0.76
total 1.11 Cub.m.

3 Sand filling 1 0.91 0.91 0.91 1.83 1.53 Cub.m.

4 12.5 th.(1:4) cement plaster


Perimeter 1 4.57 4.57 0.38 1.74 Sq.m.
71

Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
DIVISION OFFICE, KAVRE
DHULIKHEL

DETAILED ESTIMATE

Project: Garage shed


Site : Saptari,Rajbiraj

Length Breadth Height Weight


S.N. Description of Work No. Quantity Unit Remarks
m m m Kg / m
1 Earthwork in excavation in ordinary soils
4 0.3 0.45 0.45 0.243
Total 0.243 cu.m

2 Rubble masonry soling work


4 0.3 0.45 0.15 0.081
Total 0.081 cu.m

3 PCC 1:2:4
post 4 0.3 0.45 0.3 0.16
Total 0.16 cu..m

4 0.50mm colour CGI sheet roofing including


fixing in proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per drawing &
instruction all complete.
1 4.50 2.50 11.25
Total 11.25 sq.m.
5 0.50mm colour GI plain sheet for ridge cover
on roofing including fixing in proper shape &
size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing
& instruction all complete.

1 4.5 0.45 2.03


Total 2.03 sq.m

6 M.S.black pipe roof truss with I.S. or B.S.


section including jointing, fixing, erection and
primer painting with all necessary M.S. bed
plates, shoe angles anchor bolts leas
sheeting or cement grouting as per drawing
and instructions, all complete .

50mm dia Truss (M)


Bottom member 3 2.50 7.50
inclined member 6 1.60 9.60
Total 17.10
@ 5.10 87.21
40mm dia Struts (M)
vertical member 6 0.75 4.50
3 1.00 3.00
inclined member 6 0.75 4.50
Total 12.00
@ 3.25 39.00
72

Length Breadth Height Weight


S.N. Description of Work No. Quantity Unit Remarks
m m m Kg / m

50mm dia purline (M) 3 4.50 13.50


Total 13.50
@ 5.10 68.85
65mm dia post (M)
4 3.00 12.00
@ 6.51 78.12
146.97
Total 342.03 kg

7 2 coats of ready made enamel paint of


approved colour without primer Painting
65mm dia post (M)
4 3.00 12.00
perimeter = 3.14*0.065 mm dia total 2.45

50mm dia Truss (M)


Bottom member 3 2.50 7.50
inclined member 6 1.60 9.60
17.10
perimeter = 3.14*0.050 mm dia
total 2.68

50mm dia purline (M) 3 4.50 13.50


13.50
perimeter = 3.14*0.050 mm dia
total 6.03
40mm dia Struts (M)
vertical member 6 0.75 4.50
3 1.00 3.00
inclined member 6 0.75 4.50
12.00
perimeter = 3.14*0.040mm dia
total 1.5072
NET Total 12.67 sq.m.
73
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
DIVISION OFFICE KAVRE
DHULIKHEL, NEPAL
F/Y: 2070/071
Phone no: 011-662842

Project : Construction of District Government Lawyer's office Building


Site : Saptari,Rajbiraj

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

I Civil Works
A General works
1 Insurance for the loss of damage to
work, plant,equipment materials
property and personel injury or death
to third party all complete. 1.00 P.S 166,934.06 P.S 166,934.05
2 Lab test reports as per instruction of
engineers all complete. 1.00 P.S 33,892.80 P.S 33,892.80
3 Site clearence work before and after
all complete 1.00 L.S 10,000.00 L.S 10,000.00
4 Providing and maintaining camp
facilities (2rooms including furniture
and furnishing)as directed by site
engineer and specification during the
construction period 20.00 Month 3,000.00 Month 60,000.00
5 As built drawing
(Architecture,sanitary,electrical) as per
instruction by site engineer 1.00 L.S 30,292.67 L.S 30,292.67
6 Supply day work labours for whole
construction period as per instruction
all complete 70.00 md 400.00 md 28,000.00
329,119.52

B EARTH WORKS
Earthwork in excavation in
hard/boulder mix soils in foundation
1 including 10m hauling distance and
1.5 m. lift all complete. 464.12 cu.m. 331.66 cu.m. 153,929.00
Earth filling in 150 mm thick layer,
watering, ramming including supply of
3 filling materials within 10 m distance
all complete. 95.15 cu.m. 231.43 cu.m. 22,021.62

Estimated by Checked by Forward by


Approved by:
74

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

Earth work in excavation by machine


4
in good levelling 2038.00 cu.m. 43.61 cu.m. 88,877.18
Disposal of excavated waste material
including cutting soil and other
5 materials by trucks within 5 km
distance from construction site. 2156.39 cu.m. 432.40 cu.m. 932,423.03
C STONE MASONARY WORKS
Rubble masonry soling work in
1
foundation . 413.20 cu.m. 1794.00 cu.m. 741,282.59
2 Rubble masonry in 1:6 C/S mortar in
perfect line level finish including,
racking the joints and curing the work
for at least 7 days all complete.
#REF! cu.m. 7122.96 cu.m. #REF!
3 Dry rubble masonry work in perfect
line level finish all complete. 4.85 cu.m. 2518.50 cu.m. 12,214.72
4 Rubble masonry in 1:4 C/S mortar in
perfect line level finish including,
racking the joints and curing the work
for at least 7 days all complete.
10.98 cu.m. 8147.25 cu.m. 89,456.80

D BRICK WORKS
1 Good quality local chimney made
Brickwork in 1:4 C/S mortar in ground
floor and abovein perfect line level
finishe including wetting the bricks,
racking the joints and curing the work
for at least 7 days all complete.
#VALUE! cu.m. 13625.31 cu.m. #VALUE!
2 Flat Brick Soling 1.49 sq.m 865.30 sq.m 1,285.80

E P.C.C. WORKS
1 Dry stone soling in foundation and
floor including sand filling in joints,
leveling, watering etc. all complete.

#REF! cu.m. 9217.36 cu.m. #REF!

Estimated by Checked by Forward by


Approved by:
75

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

2 Dry stone soling in foundation and


floor including sand filling in joints,
leveling, watering etc. all complete.

26.52 cu.m. 11219.51 cu.m. 297,541.40


3 Dry stone soling in foundation and
floor including sand filling in joints,
leveling, watering etc. all complete.

17.75 cu.m. 12256.26 cu.m. 217,548.61


4 Dry stone soling in foundation and
floor including sand filling in joints,
leveling, watering etc. all complete.

232.57 cu.m. 14178.37 cu.m. 3,297,420.97


5 Dry stone soling in foundation and
floor including sand filling in joints,
leveling, watering etc. all complete.

34.07 cu.m. 114306.32 cu.m. 3,894,458.94


6 Formwork, shuttering, centering with
19mm thick waterproof ply board and
steel post for all works necessary
propping, scaffolding, staging,
supporting inclusive of wedging and
cutting holes for utilization till the
support if fully unyielding nett.
1558.47 cu.m. 635.25 cu.m. 990,018.98
7 Formwork, shuttering, centering with
19mm thick waterproof ply for column.
279.36 sq.m. 735.15 sq.m. 205,371.50

G METAL WORKS

Estimated by Checked by Forward by


Approved by:
76

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

1 Making and fitting fixing of 12 x 12


mm,solid core squar rod Grill on the
frame of 4.5 x 20 mm. M.S.plate with
painting all complete. 134.53 sq.m 2486.49 sq.m 334,511.50
2 Supplying and fixing of spiral
staircase with 100 mm black pipe post
20mm square pipe railing 32 mm
handrel with of staircase 75 cm
including oxide primer coat and
necessary fitting all complete
3.13 rm 10701.71 rm 33,442.84
3
Supplying and fitting 50 mm dia
stainless steel staircase railling with
stainless steel balluster of 25mm pipe 26.64 rm 4277.44 rm 113,951.00
4 Supplying and fitting 38 mm dia
stainless steel staircase railling 2
rows with vertical post at 2m c/c 77.78 sq.m 2352.93 sq.m 183,003.83
5 Fencing with 62mm X 62mm size
mesh made up of 7mm Ø rods framed
on 25X25X4 mm angles and 50mm Ø
M.S. blackpipe post in 2m interval
including jointting , fixing, erection and
primer painting with all necessary
M.S. grills and plates as per drawing
and inst
165.00 sq.m 2809.43 sq.m 463,555.95
6 supplying and fitting iron compound
gate with 50*50mm. Equal iron angle
frame 8.40 sq.m 7950.37 sq.m 66,783.10
7 M.S.black pipe roof truss with I.S. or
B.S. section including jointing, fixing,
erection and primer painting with all
necessary M.S. bed plates, shoe
angles anchor bolts leas sheeting or
cement grouting as per drawing and
instructions, all complete .
849.15 kg 132.54 kg 112,546.34
8
0.50mm colour CGI sheet roofing
including fixing in proper shape & size
with all necessary rails, screws, bolts
& nuts washers, J & L hocks etc as
per drawing & instruction all complete. 71.52 sq.m 968.11 sq.m 69,239.22

Estimated by Checked by Forward by


Approved by:
77

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

9 0.50mm colour GI plain sheet for


ridge cover on roofing including fixing
in proper shape & size with all
necessary rails, screws, bolts & nuts
washers, J & L hocks etc as per
drawing & instruction all complete.
8.01 sq.m 1104.67 sq.m 8,842.88

H FLOORING & FINISHING WORKS


1 Supplying and laying of good quality
marble 16mm in cement sand motar
(1:2) ratio with approved colour on
floors, skirting and wall s all complete.
186.83 sq.m. 3411.89 sq.m. 637,436.72
2 Supplying and laying of glazed or non
glazed tiles in cement sand mortar
(1:4) ratio with Boarder approved
colour on wall and floor all complete.
159.48 sq.m. 2151.40 sq.m. 343,095.11
3 25mm thick sal wood planking work
with salwood frame (size 50x75mm)
making 60x90cm room size all
complete.
412.13 sq.m. 325.89 sq.m. 134,309.04
4 12.5mm thick cement sand plaster in
(1:4) ratio on wall of good finish
including racking the joint, wetting of
surfaces & curing the work all
complete. 829.42 sq.m. 275.76 sq.m. 228,721.83
5 20mm thick cement sand plaster in
(1:4) ratio on floor of good finish
including racking the joint, wetting of
surfaces & curing the work all
complete. 1536.34 sq.m 367.95 sq.m 565,294.83
6 25mm. Thick cement sand(1:4) tile
shape butta 96.34 sq.m. 695.75 sq.m. 67,031.75
7 60mm thick inter locking concrete
block paving with 50mm.th. Stone
dust all complete 182.28 sq.m. 1265.30 sq.m. 230,632.90

Estimated by Checked by Forward by


Approved by:
78

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

8 3 mm thick cement sand punning


(1:1) on floor, skriting, dado etc,
including mixing laying and rubbing
with steel trowel to a hard, smooth
and shining surface and curing all
complete.
580.72 sq.m. 210.06 sq.m. 121,985.36
9 20mm thick cement sand rainwater
protection plaster line in (1:4) ratio
including wetting of surfaces & curing
the work all complete. 229.21 Rm 164.86 Rm 37,787.56
10 Elastocrete cementitious elastomeric
water proofing coating 2 components
capacity per kg. 6 sq.ft 2 coat
including supply and applying all
complete work 219.72 sq.m. 643.44 sq.m. 141,377.79
11 Brick bat filling work 2.33 cu.m 6788.09 cu.m 15,816.24
12 50mm thick (1:2:4) IPS flooring with
approved quality of O.P. cement &
sand and crushed stone aggregate
including mixing, laying, punning,
rubbing in hard surface curing etc all
complete.
439.07 sq.m. 646.82 sq.m. 283,998.61
13 Providing material & applying
pressure grouting on RCC Roof slab,
beam ,shear wall as per instruction

179.07 sq.m 593.95 sq.m 106,359.69


14 Supplying and applying white cement
putty on ceiling and wall with line and
level all complete 2156.13 sq.m. 182.85 sq.m. 394,247.63
15 Ruled pointing work in (1:2) cement
sand mortar on boulder stone work
with good finish including curing as
per instruciton all complete. 297.38 sq.m 213.72 sq.m 63,554.98
16 Sand filling including supply of filling
materials, watering, ramming etc. all
complete 2.30 cu.m 2088.97 cu.m 4,802.30

I WOOD WORKS

Estimated by Checked by Forward by


Approved by:
79

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

1 Well seasoned salwood chaukhats for


fixed/openable door/windows with
good finish of approved quality
incuding fixing in postion with
necessary M.S. hold fasts as per
drawing and instruction all complete.
52.24 cu.m. 224762.94 cu.m. 11,741,615.98
2 Making and fitting fixing sal wood
Panelled door shutter with 38 mm
thick sal wood frame including all
necessary hardware fitting all
complete. #REF! sq.m. 11314.07 sq.m. #REF!
3 Supplying and fitting readymade
carved salwood door shutter for
entrance door including carved
chaukhat frame all complete. 69.35 sq.m. 21078.93 sq.m. 1,461,823.79
4 Supplying and fitting readymade
carved salwood latic window (ankhe
jhyal) including carved chaukhat
frame all complete. #REF! sq.m. 13349.98 sq.m. #REF!
5 Making and fitting fixing Plywood
Panel door shutter of 38 x 100 mm
size sal wood frame with 8 mm thick
commercial ply on midle and 4mm
thick teak ply on one sides including
all necessary hardware fitting all
complete.
#REF! sq.m. 6640.92 sq.m. #REF!
6 Making and fitting fixing Plywood
Panel door shutter of 38 x 100 mm
size sal wood frame with 6 mm thick
waterproof ply on midle and 4mm
thick teak ply on one sides including
all necessary hardware fitting all
complete.
#REF! sq.m. 6796.35 sq.m. #REF!
7 Making and fitting of G.I. Mosquito net
shutter with 38mm thick seasoned
salwood frame including hinges,
towerbolts, handles, locking set etc all
complete. #REF! sq.m. 4034.09 sq.m. #REF!
8 6mm thick plywood false ceiling in
existing wooden frame. 29.44 sq.m 3294.01 Sq.m 96,975.74

Estimated by Checked by Forward by


Approved by:
80

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

9 Fitting & fixing suspended design


ceiling of water resistance gypsum
board with all necessary hanger,
angles, hooks nut bolt all complete. 32.49 sq.m 1175.53 Sq.m 38,192.23
10 Supplying and laying 100mm long
12mmthick parquate flooring and
skirting in line and level with painting
all complete. 123.18 sq.m 2108.51 Sq.m 259,735.69

J PAINTING WORKS
1 Colouring with two coat distemper
paint with one coat primer to give
uniform colouring after rendering the
surface all complete. 656.46 sq.m. 83.06 sq.m. 54,525.32
2 2 coats of ready made enamel paint
of approved colour over 1 coats of
primer Painting over porperly sanded
wooden surface all complete
318.57 sq.m. 222.52 sq.m. 70,888.94
3 Three coats of chapra polishing in
wood surfaces with approved colour
in properly sanded surface including
sealing voids with putting all
complete. 110.61 sq.m. 112.61 sq.m. 12,456.10
4 2 coats of weather coat (Apex) paint
of approved colour with one coat
primer Painting over porperly cleaned
surface all complete 1289.27 sq.m. 185.70 sq.m. 239,416.69
5 2 coats of ready made enamel paint
without primer Painting over porperly
sanded surface all complete
321.85 sq.m. 161.51 sq.m. 51,981.34
6 2 coats of plastic emulsion paint of
approved colour over 1 coat of primer
painting over properly cleaned surface
all complete 606.89 sq.m. 215.34 sq.m. 130,687.45
K ALUMINIUM WORK
1 #REF! #REF! sq.m. 6057.75 sq.m. #REF!
2

Aluminium partition with 5 mm thick


glass and 9 mm thick laminated board
of section (64 x38x1.1) 22.72 sq.m 5071.60 sq.m 115,206.46
TOTAL OF CIVIL WORKS Sub Total #REF!

Estimated by Checked by Forward by


Approved by:
81

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

II Sanitary Works
1 White glazed earthenware Indian
pattern W C 530mm Orissa Pan with
3.0gallons low level flushing cistern
with complete accessories including
bracket, flushing pipe,pipe connector
etc. all complete set
3.00 Set 10105.82 Set 30,317.46
2 Urinal 46.5X35.5X26.5cm White
glazed with complete set .
1.00 Set 2580.91 Set 2,580.91
3 Porcelain clay white glazed indian
pattern Comode(Hindustan,
Parryware, Classica or eq.) with 10
lts. low level cistern and seat cover
constallation type. 4.00 Set 12574.92 Set 50,299.68
4 White glazed oval wash basin
55X40cm with brackets 32mm bottle
trap, 32mm CP waste coupling with
CP chain and rubber plug, 15mm
fancy type piller cock and ½"x18"
pipe connector etc all complete.
7.00 Set 8144.70 Set 57,012.90
5 Kitchen sink stainless steel 90 cm
long all complete. 3.00 Set 5867.61 Set 17,602.83
6 C.P. Bibcock 15mm dia heavy type 8.00 nos 1380.88 nos 11,047.04
7 C.P. 15mm dia Angle valve Ordinary
type 25.00 nos 946.45 nos 23,661.25
8 15 mm CP water spray all complete.
3.00 nos 1438.24 nos 4,314.72
9 Chrome plated 15mm dia x450mm
long heavy quality towel rod 9.00 nos 689.13 nos 6,202.17
10 Chrome plated soap tray 6"x6" with
necessary accessories 9.00 nos 635.37 nos 5,718.33
11 PVC floor trap 11x7.5 cm all
complete. 10.00 nos 427.34 nos 4,273.40
12 55X40cm beveled edge looking
mirror of high quality, 7.00 nos 921.43 nos 6,450.01
13 Supply and fixing of 60 cm CP Glass
Shelf 7.00 nos 867.67 nos 6,073.69
14 1HP Electric motor Pump monoblock
( crompton) 1.00 nos 13338.06 nos 13,338.06
15 1000 lit hilltake tank supplying and
installing works as per specification 1.00 nos 15064.42 nos 15,064.42
and instruction all complete.

Estimated by Checked by Forward by


Approved by:
82

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

16 2000 lit capacity PVC water tank


HilTake or equivalent 1.00 nos 27519.85 nos 27,519.85
17 Chrome plate shower rose 7.5 cm dia
of standard brand 4.00 nos 756.41 nos 3,025.64
18 15mm dia concealed valve ordinary
type 1.00 nos 1115.46 nos 1,115.46
19 Stainless Steel wall Mixture complate
3.00 Rm 4570.75 Rm 13,712.25
20 CP sink mixer all complete. 1.00 nos 4248.38 nos 4,248.38
21 Porecelene clay toilet paper holder
Recessed type with necessary
accessories all complete. 3.00 nos 1075.76 nos 3,227.28
22 50mm PVC pipe of 6 kg/cm2 and
instruction all complete. 30.00 Rm 234.07 Rm 7,022.10
23 75mm PVC pipe of 6 kg/cm2 and
instruction all complete. 50.00 Rm 426.23 Rm 21,311.50
24 110mm PVC pipe of 6 kg/cm2 and
instruction all complete. 130.00 Rm 819.42 Rm 106,524.60
25 110mm upvc elbow
10.00 nos 329.48 nos 3,294.80
26 110mm dia upvc 45 degree bend
8.00 nos 368.77 nos 2,950.16
27 50 mm mm dia UPVC plain Tee. 10.00 nos 175.35 nos 1,753.50
28 50 mm mm dia UPVC 90 degree bend
11.00 nos 149.16 nos 1,640.76
29 75 mm dia UPVC 90 degree bend. 13.00 nos 244.76 nos 3,181.88
30 75 mm dia UPVC plain Tee. 14.00 nos 287.61 nos 4,026.54
31 75mm dia UPVC vent cowl 1.00 nos 173.35 nos 173.35
32 110 mm dia UPVC vent cowl. 2.00 nos 289.01 nos 578.02
33 110 mm dia UPVC 90 degree bend. 16.00 nos 329.48 nos 5,271.68
34 110 mm dia UPVC plain Tee. 14.00 nos 497.31 nos 6,962.34
35 16 mm dia multi-layer PAP Composite
pipe includes fixing/laying with
necessary fittings all complete. 60.00 Rm 229.04 Rm 13,742.40
36 20 mm dia multi-layer PAP Composite
pipe includes fixing/laying with
necessary fittings all complete. 55.00 Rm 252.85 Rm 13,906.75
37 25 mm dia multi-layer PAP Composite
pipe includes fixing/laying with
necessary fittings all complete. 48.00 Rm 367.16 Rm 17,623.68
38 4 kg/cm2 (110 mm) HDP pipe all
complete. 67.00 Rm 625.08 Rm 41,880.36
39 20mm dia galvanized Iron (GI) pipe
medium class includes fixing/laying 5.00 Rm 507.66 Rm 2,538.30
with necessary hardware all
complete.
Estimated by Checked by Forward by
Approved by:
83

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

40 (G.M.) gate valve 20mm dia full way


medium 2.00 nos 1304.70 nos 2,609.40
41 (G.M.) gate valve 25mm dia full way
medium 1.00 nos 2121.42 nos 2,121.42
42 (G.M.) check valve 20mm dia medium
quality 1.00 nos 1360.85 nos 1,360.85
43 (G.M.) check valve 25mm dia medium
quality 1.00 nos 1960.73 nos 1,960.73
44 300 lit. 3 panel solar heater fixing
with electric booster all complete. 1.00 Set 61662.03 Set 61,662.03
45 5 kg fire extinguiser
4.00 nos 6487.61 nos 25,950.44
46 Euro guard filter all complete.
3.00 Set 21743.28 Set 65,229.84
47 Supply fixing and applying readmade
steel kitchen chimney all complete as 1.00 set 17250.00 set 17,250.00
48 per
25mminstruction of engineer
dia Aeroflex Pipe insulation for
hot water pipe all complete. 30.00 Rm 203.73 Rm 6,111.90
49 55*55 mm medium C.I cover
8.00 nos 3505.33 nos 28,042.64
48 Pressures senser switch for pump
auto switch of all complete set 1.00 Set 4574.55 set 4,574.55
49 pipe clip with grips,screw and plastic
jali all including 26.00 Set 42.60 set 1,107.60
TOTAL OF SANITARY WORKS
779,169.85
III ELECTRICAL WORKS

A. LUMINAIRES ( FIXTURES)

accessories ,screws, gripes, pvc


tape,choke,starter,Tube,bulbs, holder,
1 flexible
Dome typewire etc
CFLall light
complete.
8"black cast
milky base decorative Homedec, 31.00 Set 740.31 Set 22,949.61
2 Decon
Wall typeor ISI eqvt.
CFL etc all
lamp 13complete.
to 22 watt
decorative with glass 28.00 Set 345.17 Set 9,664.76
3 Decon,Homedec
1X40watt Tube or light eqvt.etc
box type all
complete.
Wipro /Ge or eqvt. etc all complete. 25.00 Set 1602.66 Set 40,066.50
4 Mirror light decorative
Homedec,Decon or eqvt.etc all 7.00 Set 1037.87 Set 7,265.09
B complete.
FAN / EXHAUST FAN
Accssories:as per sn A +nut ,bolt,hook

Estimated by Checked by Forward by


Approved by:
84

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

clamp, regulator,flexible wire etc all


complete.
5 36'' ceiling fan Almonard/Bajaj or
eqvt.etc all complete. 27.00 Set 3245.51 Set 87,628.77
6 9"exhaust fan Almonard /Bajaj or
eqvt.etc all complete. 10.00 Set 3276.63 Set 32,766.30
C SOCKET,SWITCH ,JUNCTION BOX
accessories:metal box ,screws ,gripes
clamp, regulator,flexible wire etc all
complete
7 16/6 Amps combined S/socket flush
type CPL,Anchor or eqvt. 60.00 Set 338.70 Set 20,322.00
8 1 gang one way switch CPL, Anchor
or eqvt.etc all complete. 13.00 Set 443.45 Set 5,764.85
9 2gang one way switch CPL,Anchor or
eqvt.etc all complete. 11.00 Set 610.08 Set 6,710.88
10 3 gang one switch CPL,Anchor or
eqvt.etc all complete. 10.00 Set 795.76 Set 7,957.60
11 4 gang one way switch CPL,Anchor
or eqvt.etc all complete.
9.00 Set 990.96 Set 8,918.64
12 5,6 gang one way switch CPL,Anchor
or eqvt.etc all complete.
9.00 Set 1431.35 Set 12,882.15
13 Junction box made of metal with
cover size 6"X4" etc. all complete. 66.00 Set 300.23 Set 19,815.18
D MAIN SWITCH/DB
Accessories ;screws, gripes, nut
bolt,cu bus bar,earth bus bar, neutral
bus bar,fuse, porcelin base , cable
shoe ,phase bar,pvc tape etc all
complete.
14 63 Amps DP Main Switch or eqvt. 1.00 Set 3458.62 Set 3,458.62
15 Distribution board 12 way SPN made
of mild steel sheet double cover
lockable Geco or eqvt.flush type etc
all complete. 3.00 No 2581.23 No 7,743.69
16 Distribution board 8 way SPN made of
mild steel sheet double cover lockable
Geco or eqvt.flush type etc all
complete. 1.00 No 2276.52 No 2,276.52
17 40 Amps DP MCB Siemens
Ge,Merlin gerain or eqvt. for main 4.00 No 1468.76 No 5,875.04

Estimated by Checked by Forward by


Approved by:
85

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

18 6,16,25 Amps. SP MCB


Siemens,Ge,Merlin gerain or eqvt.for
light & power circuit. 60.00 No 345.17 No 20,710.20
E. PANEL BOARD/DB
Accessories: screws, gripes, nut bolt,
cu bus bar, earth bus bar, neutral bus
bar, cu strip for connection, porcelin
base,cable shoe, phase bar, PVC
tapes etc all complete

19 60/100 pannel board with suitable


color, floor mounted double cover
push type switch with size 9"x36"x48"
1.00 set 26178.19 set 26,178.19
20 60 amp. MCCB Siemens/Marlin/Gerlin
or equi. 1.00 set 5454.91 set 5,454.91
21 Amp. Meter with selector switch (0-
500) 1.00 no. 821.27 no. 821.27
22 Volt-meter 0-500v with selector
switch 1.00 no. 1181.91 no. 1,181.91
23 Heavy Duty Indicator for panel board 3.00 no. 273.75 no. 821.25
24 6-32 DB MCB 5.00 no. 833.17 no. 4,165.85
25 6-32 SP MCB 85.00 set 190.44 set 16,187.40
26 32 Amp 415 Volt DP Main Switch 5.00 set 1732.76 set 8,663.80
F. POINT WIRING / WIRES/CABLES
Accessories:HDPE polythene
pipe,srews,pvc tape, grips, circular
box etc al complete.
26 2*2.50 sq mm multi strand flexible
cu .wire for light & fan point in
1/2"HDPE polythene pipe 128.00 Point 1051.24 Point 134,558.72
27 2x4.0 +1x1.5sq.mm multi strand
flexible cu wire for power point in 3/4"
HDPEpolythene pipe. 49.00 Point 1443.97 Point 70,754.53
28 6 sq.mm 4 core unarmoured copper
cable for main switch to DB through
polythene pipe etc all complete.
60.00 Rm 463.64 Rm 27,818.40
29 10 sq.mm 4 core armoured copper
cable for NEA to panel board etc all
complete. 40.00 Rm 751.49 Rm 30,059.60

Estimated by Checked by Forward by


Approved by:
86

S.N. Description of Work Quantity Unit Rate Rs. Per Amount Remarks

Rs

30 8 swg copper wire for earth continuity


from panel board to DB through 1/2"
polythene pipe etc all complete.
100.00 Rm 188.19 Rm 18,819.00
G. TELECOM SYSTEM
Accessories : screws, grips, pvc
tape,HDPE pipe etc all complete.
31 Telephone socket flush type North-
West or eqvt. 15.00 Set 519.62 Set 7,794.30
32 Two pair telephone cu.cable in 1/2"
HDPE polythene pipe etc all
complete. 15.00 Point 542.85 Point 8,142.75
33 Telephone junction box with crone tag
double cover push type lock with etc
all complete. 15.00 Set 300.23 Set 4,503.45
34 20 pair telephone cu.cable for main in
(20mm) HDPE polythene pipe. 40.00 meter 171.02 meter 6,840.80
H. EARTHING
accessories :salt, coal ,cu plate
,HDPEpolythene pipe.,etc all
complete.
35 Earthing with cu plate size 65
cmx65cmx3.15mm with G.N.8 copper
wire for earth continuity from panel
board to earthing site etc all complete.
1.00 Set 16280.37 Set 16,280.37
36 10" Globe type Post top lamp
complete set Homedec,DECON or ISI
eqv.. 2.00 Set 3342.90 Set 6,685.80
E. Air conditioning system
37 Supplying and fixing 2.00 TR capacity
wall mounted split type air
conditioning system
Daikin,Toshiba,Fujitsu,Stulz or eqv
japanese company as per instruction 3.00 Set 181125.00 Set 543,375.00
TOTAL OF ELECTRICAL WORKS Sub Total 1,261,883.70
Total of civil + Sanitary + Electrical Works+provisional sum Rs. #REF!

Estimated by Checked by Forward by


Approved by:
SKJ

Comparative Chart
Project : Construction of District Government Lawyer's office Building
Site : Manthali,Ramechaap
Gajurmukhi/Siddhagadhi
As Per Estimate Kanchharam Const.Pvt.ltd Kankai Thapa JV
JV
S.N. Description of Work Quantity Unit
Modified
Rate Rs. Amount Rs. Rate Amount Rate Amount Rate Amount
Rate
I Civil Works
A General works
1 Insurance for the loss of damage to work,
plant,equipment materials property and
personel injury or death to third party all
complete. 1.000 P.S 166934.06 166,934.05 166934.06 166934.06 166,934.05 166934.06 166,934.05 166934.06 166,934.05
2 Lab test reports as per instruction of
engineers all complete. 1.000 P.S 33892.80 33,892.80 33892.80 33892.80 33,892.80 33892.80 33,892.80 33892.80 33,892.80
3 Site clearence work before and after all
complete 1.000 L.S 10000.00 10,000.00 20000.00 15000.00 15,000.00 32500.00 32,500.00 20000.00 20,000.00
4 Providing and maintaining camp facilities
(2rooms including furniture and furnishing)as
directed by site engineer and specification
during the construction period
20.000 Month 3000.00 60,000.00 1000.00 750.00 15,000.00 3250.00 65,000.00 10000.00 200,000.00
5 As built drawing
(Architecture,sanitary,electrical) as per
instruction by site engineer 1.000 L.S 30292.67 30,292.67 10000.00 7500.00 7,500.00 3250.00 3,250.00 20000.00 20,000.00
6 Supply day work labours for whole
construction period as per instruction all
complete 70.000 md 400.00 28,000.00 300.00 225.00 15,750.00 65.00 4,550.00 300.00 21,000.00
Total of Genertal Works 329,119.52 254,076.85 306126.85 461826.85

B EARTH WORKS
1 Earthwork in excavation in hard/boulder mix
soils in foundation including 10m hauling
distance and 1.5 m. lift all complete.
414.537 cu.m. 331.66 137,485.30 1700.00 1020.00 422,827.61 260.00 107,779.58 150.00 62,180.53
3 Earth filling in 150 mm thick layer, watering,
ramming including supply of filling materials
within 10 m distance all complete.
58.155 cu.m. 231.43 13,458.71 200.00 150.00 8,723.18 130.00 7,560.09 100.00 5,815.45
4 Earth work in excavation by machine in good
levelling 2038.000 cu.m. 43.61 88,877.18 1000.00 600.00 1,222,800.00 325.00 662,350.00 100.00 203,800.00
SKJ

5 Disposal of excavated waste material


including cutting soil and other materials by
trucks within 5 km distance from construction
site. 2143.810 cu.m. 432.40 926,983.44 1040.00 624.00 1,337,737.44 325.00 696,738.25 100.00 214,381.00
C STONE MASONARY WORKS 0.00 0.00 0.00 0.00
1 Rubble masonry soling work in foundation .
77.011 cu.m. 1794.00 138,157.73 4000.00 3000.00 231,033.00 910.00 70,080.01 1000.00 77,011.00
2 Rubble masonry in 1:6 C/S mortar in perfect
line level finish including, racking the joints
and curing the work for at least 7 days all
complete. 127.150 cu.m. 7122.96 905,684.36 9000.00 6750.00 858,262.50 4550.00 578,532.50 5000.00 635,750.00
3 Rubble masonry work in inclined level in 1:4
C/S mortar in perfect line level finish including,
racking the joints and curing the work for at
least 7 days all complete. 0.000 cu.m. 8147.25 0.00 0.00 0.00 0.00 0.00
3 Dry rubble masonry work in perfect line level
finish all complete. 4.850 cu.m. 2518.50 12,214.72 3250.00 2437.50 11,821.87 1690.00 8,196.50 3000.00 14,550.00
4 Rubble masonry in 1:4 C/S mortar in perfect
line level finish including, racking the joints
and curing the work for at least 7 days all
complete. 10.980 cu.m. 8147.25 89,456.80 11000.00 8250.00 90,585.00 4550.00 49,959.00 5000.00 54,900.00
0.00 0.00 0.00 0.00
D BRICK WORKS 0.00 0.00 0.00 0.00
1 Good quality local chimney made Brickwork
in 1:4 C/S mortar in ground floor and abovein
perfect line level finishe including wetting the
bricks, racking the joints and curing the work
for at least 7 days all complete.
159.397 cu.m. 13625.31 2,171,836.78 11500.00 8625.00 1,374,801.17 11700.00 1,864,947.68 9000.00 1,434,575.14
2 Flat Brick Soling 1.486 sq.m 865.30 1,285.80 7000.00 5250.00 7,801.29 975.00 1,448.81 1000.00 1,485.96
0.00 0.00 0.00 0.00
E P.C.C. WORKS 0.00 0.00 0.00 0.00
1 Plain cement Concrete (PCC) in 1:3:6 ratio
for foundations, flooring and walls with
approved quality of cement and sand and
crushed stone aggregate including mixing,
laying, curing etc all complete in approval of
site engineer.
17.452 cu.m. 9217.36 160,859.67 9100.00 6825.00 119,108.64 5850.00 102,093.12 6000.00 104,710.89
2 Plain cement Concrete (PCC) in 1:2:4 ratio
for foundations, flooring and walls with
approved quality of cement and sand and
crushed stone aggregate including mixing,
laying, curing etc all complete in approval of
site engineer.
24.050 cu.m. 11219.51 269,829.21 11500.00 8625.00 207,431.25 8450.00 203,222.50 6000.00 144,300.00
SKJ

3 Plain cement Concrete (PCC) for RCC works


(1:2:4) for slab/lintels with approved quality of
cement and sand and crushed stone
aggregate including mixing, laying, curing etc
all complete in approval of site engineer.
14.550 cu.m. 12256.26 178,328.58 10400.00 7800.00 113,490.00 8450.00 122,947.50 6000.00 87,300.00
4 Plain cement Concrete (PCC) for RCC works
(1:1.5:3) for slab/lintels with approved quality
of cement and sand and crushed stone
aggregate including mixing, laying, curing etc
all complete in approval of site engineer.
218.456 cu.m. 14178.37 3,097,354.72 13000.00 9750.00 2,129,949.25 9100.00 1,987,952.63 900.00 196,610.70
5 Tor steel reinforcement bar of fe 415/500
grade including straightening, cleaning,
cutting, binding & fixing in position with
annealed tying binding wire as per drawing,
design & instruction all complete.
31.692 MT 114306.32 3,622,632.47 80000.00 60000.00 1,901,539.20 84500.00 2,678,001.04 83000.00 2,630,462.56
6 Formwork, shuttering, centering with 19mm
thick waterproof ply board and steel post for
all works necessary propping, scaffolding,
staging, supporting inclusive of wedging and
cutting holes for utilization till the support if
fully unyielding nett.

1567.947 sq.m. 635.25 996,038.55 260.00 195.00 305,749.73 520.00 815,332.62 350.00 548,781.57
7 Formwork, shuttering, centering with 19mm
thick waterproof ply for column. 246.870 sq.m. 735.15 181,486.48 390.00 292.50 72,209.47 585.00 144,418.95 350.00 86,404.50
0.00 0.00 0.00 0.00
G METAL WORKS 0.00 0.00 0.00 0.00
1 Making and fitting fixing of 12 x 12 mm,solid
core squar rod Grill on the frame of 4.5 x 20
mm. M.S.plate with painting all complete.
134.532 sq.m 2486.49 334,511.50 1950.00 1462.50 196,752.48 975.00 131,168.32 2000.00 269,063.22
2 Supplying and fixing of spiral staircase with
100 mm black pipe post 20mm square pipe
railing 32 mm handrel with of staircase 75 cm
including oxide primer coat and necessary
fitting all complete
3.125 rm 10701.71 33,442.84 260.00 195.00 609.37 2600.00 8,125.00 500.00 1,562.50
3 Supplying and fitting 50 mm dia stainless steel
staircase railling with stainless steel balluster
of 25mm pipe 26.640 rm 4277.44 113,951.00 9750.00 7312.50 194,805.00 1950.00 51,948.00 3000.00 79,920.00
4 Supplying and fitting 38 mm dia stainless steel
staircase railling 2 rows with vertical post at
2m c/c 77.777 sq.m 2352.93 183,003.83 5000.00 3750.00 291,663.75 650.00 50,555.05 2000.00 155,554.00
SKJ

5 Fencing with 62mm X 62mm size mesh made


up of 7mm Ø rods framed on 25X25X4 mm
angles and 50mm Ø M.S. blackpipe post in
2m interval including jointting , fixing, erection
and primer painting with all necessary M.S.
grills and plates as per drawing and inst

165.000 sq.m 2809.43 463,555.95 650.00 487.50 80,437.50 650.00 107,250.00 2000.00 330,000.00
6 supplying and fitting iron compound gate with
50*50mm. Equal iron angle frame 8.400 sq.m 7950.37 66,783.10 780.00 585.00 4,914.00 650.00 5,460.00 3000.00 25,200.00
7 M.S.black pipe roof truss with I.S. or B.S.
section including jointing, fixing, erection and
primer painting with all necessary M.S. bed
plates, shoe angles anchor bolts leas sheeting
or cement grouting as per drawing and
instructions, all complete .

849.150 kg 132.54 112,546.34 130.00 97.50 82,792.12 104.00 88,311.60 150.00 127,372.50
8 0.50mm colour CGI sheet roofing including
fixing in proper shape & size with all
necessary rails, screws, bolts & nuts washers,
J & L hocks etc as per drawing & instruction
all complete.
71.520 sq.m 968.11 69,239.22 900.00 675.00 48,276.00 520.00 37,190.40 800.00 57,216.00
9 0.50mm colour GI plain sheet for ridge cover
on roofing including fixing in proper shape &
size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing
& instruction all complete.
8.005 sq.m 1104.67 8,842.88 900.00 675.00 5,403.37 260.00 2,081.30 600.00 4,803.00
0.00 0.00 0.00 0.00
H FLOORING & FINISHING WORKS 0.00 0.00 0.00 0.00
1 Supplying and laying of good quality marble
16mm in cement sand motar (1:2) ratio with
approved colour on floors, skirting and wall s
all complete. 186.828 sq.m. 3411.89 637,436.72 1900.00 1425.00 266,229.95 260.00 48,575.29 3000.00 560,484.12
2 Supplying and laying of glazed or non glazed
tiles in cement sand mortar (1:4) ratio with
Boarder approved colour on wall and floor all
complete. 135.837 sq.m. 2151.40 292,240.32 1600.00 1200.00 163,004.73 325.00 44,147.11 2000.00 271,674.56
3 12.5mm thick cement sand plaster in (1:3)
ratio on ceiling of good finish including racking
the joint, wetting of surfaces & curing the work
all complete. 458.309 sq.m. 325.89 149,358.46 300.00 225.00 103,119.62 390.00 178,740.68 300.00 137,492.83
4 12.5mm thick cement sand plaster in (1:4)
ratio on wall of good finish including racking
the joint, wetting of surfaces & curing the work
all complete. 1863.826 sq.m. 275.76 513,968.69 300.00 225.00 419,360.88 325.00 605,743.49 300.00 559,147.84
SKJ

5 20mm thick cement sand plaster in (1:4) ratio


on floor of good finish including racking the
joint, wetting of surfaces & curing the work all
complete. 1563.925 sq.m 367.95 575,446.35 300.00 225.00 351,883.21 260.00 406,620.60 300.00 469,177.62
6 25mm. Thick cement sand(1:4) tile shape
butta 96.345 sq.m. 695.75 67,031.75 700.00 525.00 50,580.91 585.00 56,361.59 500.00 48,172.30
7 60mm thick inter locking concrete block
paving with 50mm.th. Stone dust all complete
182.275 sq.m. 1265.30 230,632.90 300.00 225.00 41,011.93 520.00 94,783.14 2000.00 364,550.54
8 3 mm thick cement sand punning (1:1) on
floor, skriting, dado etc, including mixing
laying and rubbing with steel trowel to a hard,
smooth and shining surface and curing all
complete.
239.156 sq.m. 210.06 50,237.13 190.00 142.50 34,079.74 260.00 62,180.59 300.00 71,746.83
9 20mm thick cement sand rainwater protection
plaster line in (1:4) ratio including wetting of
surfaces & curing the work all complete.
229.210 Rm 164.86 37,787.56 300.00 225.00 51,572.25 130.00 29,797.30 100.00 22,921.00
10 Elastocrete cementitious elastomeric water
proofing coating 2 components capacity per
kg. 6 sq.ft 2 coat including supply and
applying all complete work 219.722 sq.m. 643.44 141,377.79 60.00 45.00 9,887.48 650.00 142,819.17 100.00 21,972.18
11 Brick bat filling work 2.330 cu.m 6788.09 15,816.24 600.00 450.00 1,048.50 1300.00 3,029.00 1000.00 2,330.00
12 50mm thick (1:2:4) IPS flooring with approved
quality of O.P. cement & sand and crushed
stone aggregate including mixing, laying,
punning, rubbing in hard surface curing etc all
complete.
379.306 sq.m. 646.82 245,342.49 320.00 240.00 91,033.36 455.00 172,584.08 350.00 132,756.98
13 Providing material & applying pressure
grouting on RCC Roof slab, beam ,shear wall
as per instruction 179.072 sq.m 593.95 106,359.69 60.00 45.00 8,058.23 585.00 104,757.00 150.00 26,860.77
14 Supplying and applying white cement putty on
ceiling and wall with line and level all
complete 3264.297 sq.m. 182.85 596,876.79 130.00 97.50 318,269.00 130.00 424,358.66 300.00 979,289.23
15 Ruled pointing work in (1:2) cement sand
mortar on boulder stone work with good finish
including curing as per instruciton all
complete. 297.375 sq.m 213.72 63,554.98 130.00 97.50 28,994.06 195.00 57,988.12 200.00 59,475.00
16 Sand filling including supply of filling
materials, watering, ramming etc. all complete
2.299 cu.m 2088.97 4,802.30 6000.00 4500.00 10,344.98 130.00 298.85 1000.00 2,298.88
0.00 0.00 0.00 0.00
I WOOD WORKS 0.00 0.00 0.00 0.00
SKJ

1 Well seasoned salwood chaukhats for


fixed/openable door/windows with good finish
of approved quality incuding fixing in postion
with necessary M.S. hold fasts as per drawing
and instruction all complete.
2.040 cu.m. 224762.94 458,516.39 230000.00 172500.00 351,900.00 130000.00 265,200.00 200000.00 408,000.00
2 Making and fitting fixing sal wood Panelled
door shutter with 38 mm thick sal wood frame
including all necessary hardware fitting all
complete. 23.089 sq.m. 11314.07 261,234.80 7000.00 5250.00 121,219.21 6500.00 150,080.93 5000.00 115,446.87
3 Supplying and fitting readymade carved
salwood door shutter for entrance door
including carved chaukhat frame all complete.
2.520 sq.m. 21078.93 53,118.90 9000.00 6750.00 17,010.00 5850.00 14,742.00 5000.00 12,600.00
4 Supplying and fitting readymade carved
salwood latic window (ankhe jhyal) including
carved chaukhat frame all complete.
1.449 sq.m. 13349.98 19,344.12 4500.00 3375.00 4,890.37 4550.00 6,592.95 5000.00 7,245.00
5 Making and fitting fixing Plywood Panel door
shutter of 38 x 100 mm size sal wood frame
with 8 mm thick commercial ply on midle and
4mm thick teak ply on one sides including all
necessary hardware fitting all complete.
33.261 sq.m. 6640.92 220,881.14 5000.00 3750.00 124,727.34 3250.00 108,097.03 5000.00 166,303.12
6 Making and fitting fixing Plywood Panel door
shutter of 38 x 100 mm size sal wood frame
with 6 mm thick waterproof ply on midle and
4mm thick teak ply on one sides including all
necessary hardware fitting all complete.
11.001 sq.m. 6796.35 74,764.09 4500.00 3375.00 37,127.10 4550.00 50,052.84 5000.00 55,003.12
7 Making and fitting of G.I. Mosquito net shutter
with 38mm thick seasoned salwood frame
including hinges, towerbolts, handles, locking
set etc all complete.
8.640 sq.m. 4034.09 34,854.53 4500.00 3375.00 29,160.00 3250.00 28,080.00 200.00 1,728.00
8 6mm thick plywood false ceiling in existing
wooden frame. 29.440 sq.m 3294.01 96,975.74 600.00 450.00 13,248.00 650.00 19,136.00 1200.00 35,328.00
9 Fitting & fixing suspended design ceiling of
water resistance gypsum board with all
necessary hanger, angles, hooks nut bolt all
complete. 32.489 sq.m 1175.53 38,192.23 600.00 450.00 14,620.21 585.00 19,006.28 1400.00 45,485.12
10 Supplying and laying 100mm long 12mmthick
parquate flooring and skirting in line and level
with painting all complete.
123.184 sq.m 2108.51 259,735.69 500.00 375.00 46,194.17 520.00 64,055.92 1500.00 184,776.71
0.00 0.00 0.00 0.00
SKJ

J PAINTING WORKS 0.00 0.00 0.00 0.00


1 Colouring with two coat distemper paint with
one coat primer to give uniform colouring after
rendering the surface all complete.
684.047 sq.m. 83.06 56,816.90 100.00 75.00 51,303.49 130.00 88,926.04 200.00 136,809.30
2 2 coats of ready made enamel paint of
approved colour over 1 coats of primer
Painting over porperly sanded wooden
surface all complete 318.573 sq.m. 222.52 70,888.94 190.00 142.50 45,396.70 130.00 41,414.53 200.00 63,714.67
3 Three coats of chapra polishing in wood
surfaces with approved colour in properly
sanded surface including sealing voids with
putting all complete. 110.613 sq.m. 112.61 12,456.10 200.00 150.00 16,591.92 260.00 28,759.33 100.00 11,061.28
4 2 coats of weather coat (Apex) paint of
approved colour with one coat primer Painting
over porperly cleaned surface all complete
1316.855 sq.m. 185.70 244,540.04 190.00 142.50 187,651.89 130.00 171,191.20 200.00 263,371.08
5 2 coats of ready made enamel paint without
primer Painting over porperly sanded surface
all complete 321.846 sq.m. 161.51 51,981.34 195.00 146.25 47,069.97 130.00 41,839.97 150.00 48,276.89
6 2 coats of plastic emulsion paint of approved
colour over 1 coat of primer painting over
properly cleaned surface all complete
606.889 sq.m. 215.34 130,687.45 200.00 150.00 91,033.33 195.00 118,343.33 100.00 60,688.88
K ALUMINIUM WORK 0.00 0.00 0.00 0.00
1 Aluminium sliding windows of section
(88*38*1.3mm) with Fly mesh shutter all
complete 134.160 sq.m. 6057.75 812,707.74 6000.00 4500.00 603,720.00 520.00 69,763.20 5500.00 737,880.00
2 Aluminium partition with 5 mm thick glass and
9 mm thick laminated board of section (64
x38x1.1) 14.895 sq.m 5071.60 75,541.48 5000.00 3750.00 55,856.25 325.00 4,840.87 5000.00 74,475.00
TOTAL OF CIVIL WORKS 21,079,354.94 0.00 15,128,722.97 14306557.54 13712254.24
0.00
II Sanitary Works 0.00
1 White glazed earthenware Indian pattern W C
530mm Orissa Pan with 3.0gallons low level
flushing cistern with complete accessories
including bracket, flushing pipe,pipe connector
etc. all complete set
3.000 Set 10105.82 30,317.46 4500.00 3375.00 10,125.00 6500.00 19,500.00 3000.00 9,000.00
2 Urinal 46.5X35.5X26.5cm White glazed with
complete set . 1.000 Set 2580.91 2,580.91 3900.00 2925.00 2,925.00 3900.00 3,900.00 2000.00 2,000.00
3 Porcelain clay white glazed indian pattern
Comode(Hindustan, Parryware, Classica or
eq.) with 10 lts. low level cistern and seat
cover constallation type. 4.000 Set 12574.92 50,299.68 4900.00 3675.00 14,700.00 3250.00 13,000.00 7000.00 28,000.00
SKJ

4 White glazed oval wash basin 55X40cm with


brackets 32mm bottle trap, 32mm CP waste
coupling with CP chain and rubber plug,
15mm fancy type piller cock and ½"x18" pipe
connector etc all complete.
7.000 Set 8144.70 57,012.90 13000.00 9750.00 68,250.00 2600.00 18,200.00 2500.00 17,500.00
5 Kitchen sink stainless steel 90 cm long all
complete. 3.000 Set 5867.61 17,602.83 6500.00 4875.00 14,625.00 6500.00 19,500.00 3500.00 10,500.00
6 C.P. Bibcock 15mm dia heavy type 8.000 nos 1380.88 11,047.04 1300.00 975.00 7,800.00 9750.00 78,000.00 1000.00 8,000.00
7 C.P. 15mm dia Angle valve Ordinary type
25.000 nos 946.45 23,661.25 1040.00 780.00 19,500.00 390.00 9,750.00 8000.00 200,000.00
8 15 mm CP water spray all complete. 3.000 nos 1438.24 4,314.72 1300.00 975.00 2,925.00 455.00 1,365.00 500.00 1,500.00
9 Chrome plated 15mm dia x450mm long heavy
quality towel rod 9.000 nos 689.13 6,202.17 1300.00 975.00 8,775.00 585.00 5,265.00 400.00 3,600.00
10 Chrome plated soap tray 6"x6" with necessary
accessories 9.000 nos 635.37 5,718.33 650.00 487.50 4,387.50 6500.00 58,500.00 350.00 3,150.00
11 PVC floor trap 11x7.5 cm all complete. 10.000 nos 427.34 4,273.40 650.00 487.50 4,875.00 6500.00 65,000.00 300.00 3,000.00
12 55X40cm beveled edge looking mirror of high
quality, 7.000 nos 921.43 6,450.01 1300.00 975.00 6,825.00 4550.00 31,850.00 500.00 3,500.00
13 Supply and fixing of 60 cm CP Glass Shelf
7.000 nos 867.67 6,073.69 1040.00 780.00 5,460.00 325.00 2,275.00 700.00 4,900.00
14 1HP Electric motor Pump monoblock
( crompton) 1.000 nos 13338.06 13,338.06 13000.00 9750.00 9,750.00 6500.00 6,500.00 10000.00 10,000.00
15 1000 lit hilltake tank supplying and installing
works as per specification and instruction all
complete. 1.000 nos 15064.42 15,064.42 14300.00 10725.00 10,725.00 7150.00 7,150.00 13000.00 13,000.00
16 2000 lit capacity PVC water tank HilTake or
equivalent 1.000 nos 27519.85 27,519.85 27300.00 20475.00 20,475.00 14300.00 14,300.00 26000.00 26,000.00
17 Chrome plate shower rose 7.5 cm dia of
standard brand 4.000 nos 756.41 3,025.64 2600.00 1950.00 7,800.00 975.00 3,900.00 2000.00 8,000.00
18 15mm dia concealed valve ordinary type 1.000 nos 1115.46 1,115.46 1300.00 975.00 975.00 1950.00 1,950.00 1000.00 1,000.00
19 Stainless Steel wall Mixture complate 3.000 Rm 4570.75 13,712.25 3900.00 2925.00 8,775.00 325.00 975.00 2000.00 6,000.00
20 CP sink mixer all complete. 1.000 nos 4248.38 4,248.38 5000.00 3750.00 3,750.00 650.00 650.00 4000.00 4,000.00
21 Porecelene clay toilet paper holder
Recessed type with necessary accessories all
complete. 3.000 nos 1075.76 3,227.28 650.00 487.50 1,462.50 390.00 1,170.00 400.00 1,200.00
22 50mm PVC pipe of 6 kg/cm2 and instruction
all complete. 30.000 Rm 234.07 7,022.10 390.00 292.50 8,775.00 325.00 9,750.00 150.00 4,500.00
23 75mm PVC pipe of 6 kg/cm2 and instruction
all complete. 50.000 Rm 426.23 21,311.50 422.00 316.50 15,825.00 325.00 16,250.00 350.00 17,500.00
24 110mm PVC pipe of 6 kg/cm2 and instruction
all complete. 130.000 Rm 819.42 106,524.60 520.00 390.00 50,700.00 325.00 42,250.00 700.00 91,000.00
25 110mm upvc elbow 10.000 nos 329.48 3,294.80 520.00 390.00 3,900.00 325.00 3,250.00 350.00 3,500.00
26 110mm dia upvc 45 degree bend 8.000 nos 368.77 2,950.16 390.00 292.50 2,340.00 325.00 2,600.00 300.00 2,400.00
27 50 mm mm dia UPVC plain Tee. 10.000 nos 175.35 1,753.50 390.00 292.50 2,925.00 325.00 3,250.00 150.00 1,500.00
SKJ

28 50 mm mm dia UPVC 90 degree bend 11.000 nos 149.16 1,640.76 520.00 390.00 4,290.00 325.00 3,575.00 100.00 1,100.00
29 75 mm dia UPVC 90 degree bend. 13.000 nos 244.76 3,181.88 750.00 562.50 7,312.50 325.00 4,225.00 200.00 2,600.00
30 75 mm dia UPVC plain Tee. 14.000 nos 287.61 4,026.54 750.00 562.50 7,875.00 325.00 4,550.00 250.00 3,500.00
31 75mm dia UPVC vent cowl 1.000 nos 173.35 173.35 750.00 562.50 562.50 650.00 650.00 150.00 150.00
32 110 mm dia UPVC vent cowl. 2.000 nos 289.01 578.02 780.00 585.00 1,170.00 130.00 260.00 200.00 400.00
33 110 mm dia UPVC 90 degree bend. 16.000 nos 329.48 5,271.68 910.00 682.50 10,920.00 130.00 2,080.00 350.00 5,600.00
34 110 mm dia UPVC plain Tee. 14.000 nos 497.31 6,962.34 520.00 390.00 5,460.00 195.00 2,730.00 500.00 7,000.00
35 16 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings
all complete. 60.000 Rm 229.04 13,742.40 190.00 142.50 8,550.00 325.00 19,500.00 300.00 18,000.00
36 20 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings
all complete. 55.000 Rm 252.85 13,906.75 200.00 150.00 8,250.00 390.00 21,450.00 300.00 16,500.00
37 25 mm dia multi-layer PAP Composite pipe
includes fixing/laying with necessary fittings
all complete. 48.000 Rm 367.16 17,623.68 250.00 187.50 9,000.00 325.00 15,600.00 500.00 24,000.00
38 4 kg/cm2 (110 mm) HDP pipe all complete.
67.000 Rm 625.08 41,880.36 260.00 195.00 13,065.00 195.00 13,065.00 700.00 46,900.00
39 20mm dia galvanized Iron (GI) pipe medium
class includes fixing/laying with necessary
hardware all complete. 5.000 Rm 507.66 2,538.30 300.00 225.00 1,125.00 260.00 1,300.00 500.00 2,500.00
40 (G.M.) gate valve 20mm dia full way medium
2.000 nos 1304.70 2,609.40 600.00 450.00 900.00 2600.00 5,200.00 1000.00 2,000.00
41 (G.M.) gate valve 25mm dia full way medium
1.000 nos 2121.42 2,121.42 700.00 525.00 525.00 3250.00 3,250.00 2000.00 2,000.00
42 (G.M.) check valve 20mm dia medium quality
1.000 nos 1360.85 1,360.85 900.00 675.00 675.00 1950.00 1,950.00 500.00 500.00
43 (G.M.) check valve 25mm dia medium quality
1.000 nos 1960.73 1,960.73 800.00 600.00 600.00 3250.00 3,250.00 500.00 500.00
44 300 lit. 3 panel solar heater fixing with
electric booster all complete. 1.000 Set 61662.03 61,662.03 60000.00 45000.00 45,000.00 13000.00 13,000.00 40000.00 40,000.00
45 5 kg fire extinguiser 4.000 nos 6487.61 25,950.44 6000.00 4500.00 18,000.00 9750.00 39,000.00 5000.00 20,000.00
46 Euro guard filter all complete. 3.000 Set 21743.28 65,229.84 10000.00 7500.00 22,500.00 6500.00 19,500.00 5000.00 15,000.00
47 Supply fixing and applying readmade steel
kitchen chimney all complete as per
instruction of engineer 1.000 set 17250.00 17,250.00 80000.00 60000.00 60,000.00 325.00 325.00 22000.00 22,000.00
48 25mm dia Aeroflex Pipe insulation for hot
water pipe all complete. 30.000 Rm 203.73 6,111.90 300.00 225.00 6,750.00 260.00 7,800.00 200.00 6,000.00
49 55*55 mm medium C.I cover 8.000 nos 3505.33 28,042.64 1500.00 1125.00 9,000.00 3250.00 26,000.00 5000.00 40,000.00
48 Pressures senser switch for pump auto switch
of all complete set 1.000 Set 4574.55 4,574.55 7800.00 5850.00 5,850.00 195.00 195.00 1000.00 1,000.00
49 pipe clip with grips,screw and plastic jali all
including 26.000 Set 42.60 1,107.60 600.00 450.00 11,700.00 325.00 8,450.00 100.00 2,600.00
TOTAL OF SANITARY WORKS 779,169.85 0.00 578,430.00 656955.00 764100.00
III ELECTRICAL WORKS 0.00
SKJ

A. LUMINAIRES ( FIXTURES) 0.00


accessories ,screws, gripes, pvc
tape,choke,starter,Tube,bulbs, holder, flexible
wire etc all complete. 0.00
1 Dome type CFL light 8"black cast milky base
decorative Homedec, Decon or ISI eqvt. etc
all complete. 31.000 Set 740.31 22,949.61 1000.00 750.00 23,250.00 195.00 6,045.00 2000.00 62,000.00
2 Wall type CFL lamp 13 to 22 watt decorative
with glass Decon,Homedec or eqvt.etc all
complete. 28.000 Set 345.17 9,664.76 600.00 450.00 12,600.00 455.00 12,740.00 2000.00 56,000.00
3 1X40watt Tube light box type Wipro /Ge or
eqvt. etc all complete. 25.000 Set 1602.66 40,066.50 2500.00 1875.00 46,875.00 325.00 8,125.00 2000.00 50,000.00
4 Mirror light decorative Homedec,Decon or
eqvt.etc all complete. 7.000 Set 1037.87 7,265.09 4900.00 3675.00 25,725.00 1755.00 12,285.00 1500.00 10,500.00
B FAN / EXHAUST FAN 0.00 0.00 0.00 0.00
Accssories:as per sn A +nut ,bolt,hook 0.00 0.00 0.00 0.00
clamp, regulator,flexible wire etc all complete.
0.00 0.00 0.00 0.00
5 36'' ceiling fan Almonard/Bajaj or eqvt.etc all
complete. 27.000 Set 3245.51 87,628.77 6000.00 4500.00 121,500.00 130.00 3,510.00 3000.00 81,000.00
6 9"exhaust fan Almonard /Bajaj or eqvt.etc all
complete. 10.000 Set 3276.63 32,766.30 2500.00 1875.00 18,750.00 130.00 1,300.00 2500.00 25,000.00
C SOCKET,SWITCH ,JUNCTION BOX 0.00 0.00 0.00 0.00
accessories:metal box ,screws ,gripes clamp,
regulator,flexible wire etc all complete
0.00 0.00 0.00 0.00
7 16/6 Amps combined S/socket flush type
CPL,Anchor or eqvt. 60.000 Set 338.70 20,322.00 1300.00 975.00 58,500.00 85.00 5,100.00 200.00 12,000.00
8 1 gang one way switch CPL, Anchor or
eqvt.etc all complete. 13.000 Set 443.45 5,764.85 650.00 487.50 6,337.50 130.00 1,690.00 300.00 3,900.00
9 2gang one way switch CPL,Anchor or eqvt.etc
all complete. 11.000 Set 610.08 6,710.88 750.00 562.50 6,187.50 195.00 2,145.00 300.00 3,300.00
10 3 gang one switch CPL,Anchor or eqvt.etc all
complete. 10.000 Set 795.76 7,957.60 880.00 660.00 6,600.00 195.00 1,950.00 300.00 3,000.00
11 4 gang one way switch CPL,Anchor or
eqvt.etc all complete. 9.000 Set 990.96 8,918.64 900.00 675.00 6,075.00 195.00 1,755.00 500.00 4,500.00
12 5,6 gang one way switch CPL,Anchor or
eqvt.etc all complete. 9.000 Set 1431.35 12,882.15 1000.00 750.00 6,750.00 390.00 3,510.00 900.00 8,100.00
13 Junction box made of metal with cover size
6"X4" etc. all complete. 66.000 Set 300.23 19,815.18 1300.00 975.00 64,350.00 30.00 1,980.00 100.00 6,600.00
D MAIN SWITCH/DB 0.00 0.00 0.00 0.00
Accessories ;screws, gripes, nut bolt,cu bus
bar,earth bus bar, neutral bus bar,fuse,
porcelin base , cable shoe ,phase bar,pvc
tape etc all complete. 0.00 0.00 0.00 0.00
14 63 Amps DP Main Switch or eqvt. 1.000 Set 3458.62 3,458.62 32000.00 24000.00 24,000.00 3250.00 3,250.00 3000.00 3,000.00
SKJ

15 Distribution board 12 way SPN made of mild


steel sheet double cover lockable Geco or
eqvt.flush type etc all complete. 3.000 No 2581.23 7,743.69 3200.00 2400.00 7,200.00 1625.00 4,875.00 4000.00 12,000.00
16 Distribution board 8 way SPN made of mild
steel sheet double cover lockable Geco or
eqvt.flush type etc all complete. 1.000 No 2276.52 2,276.52 2000.00 1500.00 1,500.00 1430.00 1,430.00 4000.00 4,000.00
17 40 Amps DP MCB Siemens Ge,Merlin gerain
or eqvt. for main 4.000 No 1468.76 5,875.04 20000.00 15000.00 60,000.00 975.00 3,900.00 3000.00 12,000.00
18 6,16,25 Amps. SP MCB Siemens,Ge,Merlin
gerain or eqvt.for light & power circuit.
60.000 No 345.17 20,710.20 600.00 450.00 27,000.00 195.00 11,700.00 2000.00 120,000.00
E. PANEL BOARD/DB 0.00 0.00 0.00 0.00
Accessories: screws, gripes, nut bolt, cu bus
bar, earth bus bar, neutral bus bar, cu strip for
connection, porcelin base,cable shoe, phase
bar, PVC tapes etc all complete
0.00 0.00 0.00 0.00
19 60/100 pannel board with suitable color, floor
mounted double cover push type switch with
size 9"x36"x48" 1.000 set 26178.19 26,178.19 6000.00 4500.00 4,500.00 32500.00 32,500.00 5000.00 5,000.00
20 60 amp. MCCB Siemens/Marlin/Gerlin or
equi. 1.000 set 5454.91 5,454.91 6000.00 4500.00 4,500.00 2600.00 2,600.00 2000.00 2,000.00
21 Amp. Meter with selector switch (0-500) 1.000 no. 821.27 821.27 6000.00 4500.00 4,500.00 1950.00 1,950.00 1000.00 1,000.00
22 Volt-meter 0-500v with selector switch 1.000 no. 1181.91 1,181.91 6000.00 4500.00 4,500.00 6500.00 6,500.00 1000.00 1,000.00
23 Heavy Duty Indicator for panel board 3.000 no. 273.75 821.25 600.00 450.00 1,350.00 3250.00 9,750.00 1000.00 3,000.00
24 6-32 DB MCB 5.000 no. 833.17 4,165.85 5000.00 3750.00 18,750.00 3900.00 19,500.00 2000.00 10,000.00
25 6-32 SP MCB 85.000 set 190.44 16,187.40 600.00 450.00 38,250.00 2600.00 221,000.00 500.00 42,500.00
26 32 Amp 415 Volt DP Main Switch 5.000 set 1732.76 8,663.80 2000.00 1500.00 7,500.00 5200.00 26,000.00 1000.00 5,000.00
F. POINT WIRING / WIRES/CABLES 0.00 0.00 0.00 0.00
Accessories:HDPE polythene pipe,srews,pvc
tape, grips, circular box etc al complete.
0.00 0.00 0.00 0.00
26 2*2.50 sq mm multi strand flexible cu .wire for
light & fan point in 1/2"HDPE polythene pipe
128.000 Point 1051.24 134,558.72 100.00 75.00 9,600.00 325.00 41,600.00 400.00 51,200.00
27 2x4.0 +1x1.5sq.mm multi strand flexible cu
wire for power point in 3/4" HDPEpolythene
pipe. 49.000 Point 1443.97 70,754.53 100.00 75.00 3,675.00 195.00 9,555.00 400.00 19,600.00
28 6 sq.mm 4 core unarmoured copper cable for
main switch to DB through polythene pipe etc
all complete. 60.000 Rm 463.64 27,818.40 100.00 75.00 4,500.00 130.00 7,800.00 100.00 6,000.00
29 10 sq.mm 4 core armoured copper cable for
NEA to panel board etc all complete. 40.000 Rm 751.49 30,059.60 100.00 75.00 3,000.00 195.00 7,800.00 100.00 4,000.00
SKJ

30 8 swg copper wire for earth continuity from


panel board to DB through 1/2" polythene
pipe etc all complete. 100.000 Rm 188.19 18,819.00 190.00 142.50 14,250.00 65.00 6,500.00 150.00 15,000.00
G. TELECOM SYSTEM 0.00 0.00 0.00 0.00
Accessories : screws, grips, pvc tape,HDPE
pipe etc all complete. 0.00 0.00 0.00 0.00
31 Telephone socket flush type North-West or
eqvt. 15.000 Set 519.62 7,794.30 1900.00 1425.00 21,375.00 130.00 1,950.00 100.00 1,500.00
32 Two pair telephone cu.cable in 1/2" HDPE
polythene pipe etc all complete. 15.000 Point 542.85 8,142.75 190.00 142.50 2,137.50 1300.00 19,500.00 500.00 7,500.00
33 Telephone junction box with crone tag double
cover push type lock with etc all complete.
15.000 Set 300.23 4,503.45 1000.00 750.00 11,250.00 260.00 3,900.00 100.00 1,500.00
34 20 pair telephone cu.cable for main in (20mm)
HDPE polythene pipe. 40.000 meter 171.02 6,840.80 1100.00 825.00 33,000.00 130.00 5,200.00 100.00 4,000.00
H. EARTHING 0.00 0.00 0.00 0.00
accessories :salt, coal ,cu plate
,HDPEpolythene pipe.,etc all complete. 0.00 0.00 0.00 0.00
35 Earthing with cu plate size 65
cmx65cmx3.15mm with G.N.8 copper wire for
earth continuity from panel board to earthing
site etc all complete. 1.000 Set 16280.37 16,280.37 100000.00 75000.00 75,000.00 390.00 390.00 10000.00 10,000.00
36 10" Globe type Post top lamp complete set
Homedec,DECON or ISI eqv.. 2.000 Set 3342.90 6,685.80 3000.00 2250.00 4,500.00 260.00 520.00 3000.00 6,000.00
E. Air conditioning system 0.00 0.00 0.00 0.00
37 Supplying and fixing 2.00 TR capacity wall
mounted split type air conditioning system
Daikin,Toshiba,Fujitsu,Stulz or eqv japanese
company as per instruction 3.000 Set 181125.00 543,375.00 60000.00 45000.00 135,000.00 32500.00 97,500.00 25000.00 75,000.00
TOTAL OF ELECTRICAL WORKS 1,261,883.70 924,337.50 609305.00 747700.00
Total of civil + Sanitary + Electrical
Works+provisional sum 23,449,528.01 16,885,567.32 15,878,944.39 15,685,881.09
13% VAT 3,048,438.64 2,195,123.75 2,064,262.77 2,039,164.54
Grand total 26,497,966.65 19,080,691.07 17,943,207.16 17,725,045.63
Rank
Difference (6,563,960.69) (7,570,583.62) (7,763,646.92)
Percentage (27.992) (32.285) (33.108)
SKJ

Khampachhe Sherpa Jaya mata Engineering


Taksar Nirman Sewa C.M.Construction Sunkoshi Construction
Ni.Sewa Construction
Modified Rate Modified Rate
Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount
@12% less @15.15%Less

166934.06 166,934.05 166934.06 166934.06 166,934.05 166934.06 166,934.05 166934.06 166934.06 166,934.05 166934.06 166,934.05

33892.80 33,892.80 33892.80 33892.80 33,892.80 33892.80 33,892.80 33892.80 33892.80 33,892.80 33892.80 33,892.80

20000.00 20,000.00 10000.00 8800.00 8,800.00 100000.00 100,000.00 0.00 10000.00 10,000.00

12000.00 240,000.00 4000.00 3520.00 70,400.00 6000.00 120,000.00 5000.00 4242.50 84,850.00 5000.00 100,000.00

30000.00 30,000.00 10000.00 8800.00 8,800.00 100000.00 100,000.00 25000.00 21212.50 21,212.50 20000.00 20,000.00

700.00 49,000.00 600.00 528.00 36,960.00 1000.00 70,000.00 500.00 424.25 29,697.50 400.00 28,000.00
539826.85 0.00 325786.85 590826.85 336586.85 358826.85
0.00
0.00

100.00 41,453.68 300.00 264.00 109,437.73 150.00 62,180.53 300.00 254.55 105,520.36 500.00 207,268.44

80.00 4,652.36 400.00 352.00 20,470.41 200.00 11,630.91 300.00 254.55 14,803.25 500.00 29,077.29

80.00 163,040.00 100.00 88.00 179,344.00 200.00 407,600.00 100.00 84.85 172,924.30 100.00 203,800.00
SKJ

40.00 85,752.40 200.00 176.00 377,310.56 200.00 428,762.00 300.00 254.55 545,706.83 100.00 214,381.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

4500.00 346,549.50 2000.00 1760.00 135,539.36 2000.00 154,022.00 2000.00 1697.00 130,687.66 2000.00 154,022.00

5000.00 635,750.00 4500.00 3960.00 503,514.00 7000.00 890,050.00 4500.00 3818.25 485,490.48 6000.00 762,900.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

3000.00 14,550.00 4000.00 3520.00 17,072.00 6000.00 29,100.00 2500.00 2121.25 10,288.06 5000.00 24,250.00

5500.00 60,390.00 5000.00 4400.00 48,312.00 7500.00 82,350.00 5000.00 4242.50 46,582.65 5000.00 54,900.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

12500.00 1,992,465.47 9000.00 7920.00 1,262,426.12 12000.00 1,912,766.85 9000.00 7636.50 1,217,237.00 11000.00 1,753,369.61
8000.00 11,887.68 600.00 528.00 784.58 6000.00 8,915.76 1000.00 848.50 1,260.83 6000.00 8,915.76
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

7000.00 122,162.71 7000.00 6160.00 107,503.19 7000.00 122,162.71 7500.00 6363.75 111,058.99 6000.00 104,710.89

8500.00 204,425.00 8500.00 7480.00 179,894.00 11000.00 264,550.00 9000.00 7636.50 183,657.82 7000.00 168,350.00
SKJ

8500.00 123,675.00 8500.00 7480.00 108,834.00 11000.00 160,050.00 9000.00 7636.50 111,111.07 9000.00 130,950.00

10000.00 2,184,563.33 10000.00 8800.00 1,922,415.73 12000.00 2,621,476.00 10000.00 8485.00 1,853,601.98 13000.00 2,839,932.33

105000.00 3,327,693.60 96000.00 84480.00 2,677,367.19 90000.00 2,852,308.80 90000.00 76365.00 2,420,184.01 100000.00 3,169,232.00

400.00 627,178.94 500.00 440.00 689,896.83 400.00 627,178.94 300.00 254.55 399,120.99 500.00 783,973.67

600.00 148,122.00 500.00 440.00 108,622.80 500.00 123,435.00 3500.00 2969.75 733,142.18 1000.00 246,870.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

2000.00 269,063.22 2000.00 1760.00 236,775.63 300.00 40,359.48 1000.00 848.50 114,150.07 2500.00 336,329.03

3500.00 10,937.50 2000.00 1760.00 5,500.00 2000.00 6,250.00 1000.00 848.50 2,651.56 6000.00 18,750.00

4000.00 106,560.00 4000.00 3520.00 93,772.80 1000.00 26,640.00 1000.00 848.50 22,604.04 6500.00 173,160.00

3500.00 272,219.50 3000.00 2640.00 205,331.28 2000.00 155,554.00 4500.00 3818.25 296,972.03 6000.00 466,662.00
SKJ

500.00 82,500.00 2000.00 1760.00 290,400.00 300.00 49,500.00 2500.00 2121.25 350,006.25 2000.00 330,000.00

5000.00 42,000.00 2000.00 1760.00 14,784.00 9000.00 75,600.00 3500.00 2969.75 24,945.90 9000.00 75,600.00

210.00 178,321.50 125.00 110.00 93,406.50 250.00 212,287.50 115.00 97.58 82,857.93 120.00 101,898.00

600.00 42,912.00 1200.00 1056.00 75,525.12 1000.00 71,520.00 900.00 763.65 54,616.24 1500.00 107,280.00

600.00 4,803.00 1000.00 880.00 7,044.40 1000.00 8,005.00 900.00 763.65 6,113.01 600.00 4,803.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

2000.00 373,656.08 3500.00 3080.00 575,430.36 2000.00 373,656.08 2500.00 2121.25 396,308.97 3500.00 653,898.14

1000.00 135,837.28 1500.00 1320.00 179,305.20 2000.00 271,674.56 1600.00 1357.60 184,412.69 2000.00 271,674.56

250.00 114,577.36 300.00 264.00 120,993.69 300.00 137,492.83 250.00 212.13 97,218.89 300.00 137,492.83

220.00 410,041.75 250.00 220.00 410,041.75 300.00 559,147.84 240.00 203.64 379,549.55 400.00 745,530.45
SKJ

260.00 406,620.60 260.00 228.80 357,826.13 300.00 469,177.62 500.00 424.25 663,495.35 450.00 703,766.43

0.00 270.00 237.60 22,891.47 1000.00 96,344.60 1200.00 1018.20 98,098.07 600.00 57,806.76

500.00 91,137.63 1600.00 1408.00 256,643.58 1000.00 182,275.27 200.00 169.70 30,932.11 1500.00 273,412.90

500.00 119,578.06 200.00 176.00 42,091.47 400.00 95,662.44 300.00 254.55 60,877.19 150.00 35,873.41

300.00 68,763.00 300.00 264.00 60,511.44 400.00 91,684.00 300.00 254.55 58,345.40 500.00 114,605.00

300.00 65,916.54 500.00 440.00 96,677.59 500.00 109,860.90 350.00 296.98 65,251.88 300.00 65,916.54
8000.00 18,640.00 1000.00 880.00 2,050.40 6000.00 13,980.00 10000.00 8485.00 19,770.05 2000.00 4,660.00

600.00 227,583.40 400.00 352.00 133,515.59 300.00 113,791.70 500.00 424.25 160,920.43 500.00 189,652.83

500.00 89,535.90 1000.00 880.00 157,583.18 300.00 53,721.54 400.00 339.40 60,776.96 450.00 80,582.31

100.00 326,429.74 200.00 176.00 574,516.35 200.00 652,859.49 75.00 63.64 207,731.72 175.00 571,252.05

400.00 118,950.00 300.00 264.00 78,507.00 200.00 59,475.00 350.00 296.98 88,312.94 300.00 89,212.50

4000.00 9,195.54 500.00 440.00 1,011.50 10000.00 22,988.85 1500.00 1272.75 2,925.90 1000.00 2,298.88
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
SKJ

250000.00 510,000.00 250000.00 220000.00 448,800.00 150000.00 306,000.00 250000.00 212125.00 432,735.00 125000.00 255,000.00

5500.00 126,991.56 13000.00 11440.00 264,142.45 7000.00 161,625.62 10000.00 8485.00 195,913.34 4500.00 103,902.18

5000.00 12,600.00 13000.00 11440.00 28,828.80 7000.00 17,640.00 30000.00 25455.00 64,146.60 4000.00 10,080.00

7000.00 10,143.00 15000.00 13200.00 19,126.80 12000.00 17,388.00 30000.00 25455.00 36,884.29 5000.00 7,245.00

2500.00 83,151.56 5000.00 4400.00 146,346.75 5000.00 166,303.12 7500.00 6363.75 211,662.30 4000.00 133,042.50

3500.00 38,502.18 5000.00 4400.00 48,402.75 5000.00 55,003.12 7500.00 6363.75 70,005.22 3800.00 41,802.37

5000.00 43,200.00 4000.00 3520.00 30,412.80 7000.00 60,480.00 3500.00 2969.75 25,658.64 3500.00 30,240.00

800.00 23,552.00 3000.00 2640.00 77,721.60 1000.00 29,440.00 1000.00 848.50 24,979.84 1500.00 44,160.00

800.00 25,991.50 800.00 704.00 22,872.52 1000.00 32,489.37 1200.00 1018.20 33,080.68 1500.00 48,734.06

300.00 36,955.34 200.00 176.00 21,680.46 300.00 36,955.34 1500.00 1272.75 156,783.04 1500.00 184,776.71
0.00 0.00 0.00 0.00 0.00 0.00 0.00
SKJ

0.00 0.00 0.00 0.00 0.00 0.00 0.00

200.00 136,809.30 200.00 176.00 120,392.19 150.00 102,606.98 200.00 169.70 116,082.69 60.00 41,042.79

250.00 79,643.33 250.00 220.00 70,086.13 200.00 63,714.67 200.00 169.70 54,061.89 180.00 57,343.20

300.00 33,183.84 200.00 176.00 19,467.85 500.00 55,306.40 250.00 212.13 23,463.74 150.00 16,591.92

350.00 460,899.39 300.00 264.00 347,649.82 300.00 395,056.62 300.00 254.55 335,205.54 180.00 237,033.97

200.00 64,369.19 200.00 176.00 56,644.89 300.00 96,553.79 200.00 169.70 54,617.26 150.00 48,276.89

200.00 121,377.77 300.00 264.00 160,218.66 250.00 151,722.21 300.00 254.55 154,483.56 180.00 109,239.99
0.00 0.00 0.00 0.00 0.00 0.00 0.00

5500.00 737,880.00 6000.00 5280.00 708,364.80 7500.00 1,006,200.00 5000.00 4242.50 569,173.80 5500.00 737,880.00

5000.00 74,475.00 6000.00 5280.00 78,645.60 7500.00 111,712.50 5000.00 4242.50 63,192.03 4500.00 67,027.50
16299816.23 0.00 15210685.80 17574245.94 0.00 14694353.05 18642439.69
0.00 0.00
0.00 0.00

5000.00 15,000.00 5000.00 4400.00 13,200.00 10000.00 30,000.00 5000.00 4242.50 12,727.50 3000.00 9,000.00

1000.00 1,000.00 10000.00 8800.00 8,800.00 10000.00 10,000.00 3500.00 2969.75 2,969.75 2500.00 2,500.00

3000.00 12,000.00 16000.00 14080.00 56,320.00 9000.00 36,000.00 10000.00 8485.00 33,940.00 4000.00 16,000.00
SKJ

2000.00 14,000.00 7000.00 6160.00 43,120.00 5000.00 35,000.00 3500.00 2969.75 20,788.25 2500.00 17,500.00

1500.00 4,500.00 8000.00 7040.00 21,120.00 10000.00 30,000.00 5000.00 4242.50 12,727.50 2000.00 6,000.00
300.00 2,400.00 1200.00 1056.00 8,448.00 1000.00 8,000.00 2000.00 1697.00 13,576.00 1000.00 8,000.00

300.00 7,500.00 1500.00 1320.00 33,000.00 500.00 12,500.00 1500.00 1272.75 31,818.75 1500.00 37,500.00
450.00 1,350.00 1000.00 880.00 2,640.00 500.00 1,500.00 1000.00 848.50 2,545.50 1000.00 3,000.00

250.00 2,250.00 1000.00 880.00 7,920.00 500.00 4,500.00 1500.00 1272.75 11,454.75 1000.00 9,000.00

200.00 1,800.00 1000.00 880.00 7,920.00 500.00 4,500.00 1000.00 848.50 7,636.50 800.00 7,200.00
600.00 6,000.00 1000.00 880.00 8,800.00 500.00 5,000.00 1000.00 848.50 8,485.00 500.00 5,000.00

1000.00 7,000.00 1000.00 880.00 6,160.00 500.00 3,500.00 2000.00 1697.00 11,879.00 1000.00 7,000.00

500.00 3,500.00 2000.00 1760.00 12,320.00 1000.00 7,000.00 1000.00 848.50 5,939.50 1000.00 7,000.00

60000.00 60,000.00 15000.00 13200.00 13,200.00 15000.00 15,000.00 15000.00 12727.50 12,727.50 1000.00 1,000.00

12000.00 12,000.00 15000.00 13200.00 13,200.00 20000.00 20,000.00 15000.00 12727.50 12,727.50 15000.00 15,000.00

20000.00 20,000.00 30000.00 26400.00 26,400.00 40000.00 40,000.00 30000.00 25455.00 25,455.00 30000.00 30,000.00

2000.00 8,000.00 1000.00 880.00 3,520.00 1000.00 4,000.00 25000.00 21212.50 84,850.00 1000.00 4,000.00
1000.00 1,000.00 2000.00 1760.00 1,760.00 1000.00 1,000.00 1500.00 1272.75 1,272.75 1000.00 1,000.00
4000.00 12,000.00 5000.00 4400.00 13,200.00 1000.00 3,000.00 3500.00 2969.75 8,909.25 3000.00 9,000.00
2000.00 2,000.00 5000.00 4400.00 4,400.00 1000.00 1,000.00 1000.00 848.50 848.50 1500.00 1,500.00

200.00 600.00 200.00 176.00 528.00 500.00 1,500.00 350.00 296.98 890.92 500.00 1,500.00

600.00 18,000.00 200.00 176.00 5,280.00 200.00 6,000.00 400.00 339.40 10,182.00 500.00 15,000.00

900.00 45,000.00 300.00 264.00 13,200.00 300.00 15,000.00 425.00 360.61 18,030.62 550.00 27,500.00

1000.00 130,000.00 400.00 352.00 45,760.00 350.00 45,500.00 425.00 360.61 46,879.62 600.00 78,000.00
100.00 1,000.00 400.00 352.00 3,520.00 500.00 5,000.00 500.00 424.25 4,242.50 500.00 5,000.00
100.00 800.00 500.00 440.00 3,520.00 400.00 3,200.00 500.00 424.25 3,394.00 500.00 4,000.00
150.00 1,500.00 400.00 352.00 3,520.00 300.00 3,000.00 550.00 466.68 4,666.75 400.00 4,000.00
SKJ

150.00 1,650.00 200.00 176.00 1,936.00 200.00 2,200.00 550.00 466.68 5,133.42 400.00 4,400.00
175.00 2,275.00 300.00 264.00 3,432.00 250.00 3,250.00 550.00 466.68 6,066.77 450.00 5,850.00
175.00 2,450.00 500.00 440.00 6,160.00 300.00 4,200.00 550.00 466.68 6,533.45 450.00 6,300.00
500.00 500.00 500.00 440.00 440.00 200.00 200.00 700.00 593.95 593.95 450.00 450.00
500.00 1,000.00 600.00 528.00 1,056.00 200.00 400.00 800.00 678.80 1,357.60 300.00 600.00
800.00 12,800.00 600.00 528.00 8,448.00 400.00 6,400.00 700.00 593.95 9,503.20 300.00 4,800.00
300.00 4,200.00 700.00 616.00 8,624.00 50.00 700.00 700.00 593.95 8,315.30 300.00 4,200.00

300.00 18,000.00 200.00 176.00 10,560.00 200.00 12,000.00 300.00 254.55 15,273.00 150.00 9,000.00

300.00 16,500.00 300.00 264.00 14,520.00 250.00 13,750.00 325.00 275.76 15,166.93 200.00 11,000.00

350.00 16,800.00 400.00 352.00 16,896.00 350.00 16,800.00 350.00 296.98 14,254.80 300.00 14,400.00

1000.00 67,000.00 400.00 352.00 23,584.00 700.00 46,900.00 350.00 296.98 19,897.32 400.00 26,800.00

400.00 2,000.00 500.00 440.00 2,200.00 600.00 3,000.00 500.00 424.25 2,121.25 1000.00 5,000.00

200.00 400.00 2000.00 1760.00 3,520.00 1500.00 3,000.00 1500.00 1272.75 2,545.50 3000.00 6,000.00

300.00 300.00 2500.00 2200.00 2,200.00 2500.00 2,500.00 1600.00 1357.60 1,357.60 2500.00 2,500.00

300.00 300.00 2000.00 1760.00 1,760.00 1500.00 1,500.00 1700.00 1442.45 1,442.45 1500.00 1,500.00

300.00 300.00 2500.00 2200.00 2,200.00 2000.00 2,000.00 1800.00 1527.30 1,527.30 2000.00 2,000.00

200000.00 200,000.00 65000.00 57200.00 57,200.00 70000.00 70,000.00 15000.00 12727.50 12,727.50 50000.00 50,000.00
5000.00 20,000.00 6000.00 5280.00 21,120.00 5000.00 20,000.00 5500.00 4666.75 18,667.00 5000.00 20,000.00
7000.00 21,000.00 10000.00 8800.00 26,400.00 5000.00 15,000.00 5000.00 4242.50 12,727.50 5000.00 15,000.00

5000.00 5,000.00 3000.00 2640.00 2,640.00 20000.00 20,000.00 35000.00 29697.50 29,697.50 10000.00 10,000.00

500.00 15,000.00 200.00 176.00 5,280.00 250.00 7,500.00 400.00 339.40 10,182.00 200.00 6,000.00
1000.00 8,000.00 6000.00 5280.00 42,240.00 2500.00 20,000.00 10000.00 8485.00 67,880.00 5000.00 40,000.00

1000.00 1,000.00 3000.00 2640.00 2,640.00 5000.00 5,000.00 25000.00 21212.50 21,212.50 1000.00 1,000.00

300.00 7,800.00 100.00 88.00 2,288.00 100.00 2,600.00 1000.00 848.50 22,061.00 100.00 2,600.00
814475.00 0.00 648120.00 629600.00 0.00 717809.75 580600.00
0.00 0.00
SKJ

0.00 0.00

0.00 0.00

800.00 24,800.00 1500.00 1320.00 40,920.00 800.00 24,800.00 1000.00 848.50 26,303.50 1000.00 31,000.00

700.00 19,600.00 1000.00 880.00 24,640.00 1000.00 28,000.00 1200.00 1018.20 28,509.60 1500.00 42,000.00

1000.00 25,000.00 2500.00 2200.00 55,000.00 500.00 12,500.00 1500.00 1272.75 31,818.75 1500.00 37,500.00

600.00 4,200.00 2500.00 2200.00 15,400.00 1000.00 7,000.00 1500.00 1272.75 8,909.25 1000.00 7,000.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

3000.00 81,000.00 5000.00 4400.00 118,800.00 3500.00 94,500.00 4000.00 3394.00 91,638.00 4000.00 108,000.00

3000.00 30,000.00 3000.00 2640.00 26,400.00 3500.00 35,000.00 3900.00 3309.15 33,091.50 2500.00 25,000.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

600.00 36,000.00 600.00 528.00 31,680.00 400.00 24,000.00 700.00 593.95 35,637.00 500.00 30,000.00

400.00 5,200.00 500.00 440.00 5,720.00 300.00 3,900.00 500.00 424.25 5,515.25 300.00 3,900.00

500.00 5,500.00 6000.00 5280.00 58,080.00 200.00 2,200.00 600.00 509.10 5,600.10 300.00 3,300.00

600.00 6,000.00 700.00 616.00 6,160.00 400.00 4,000.00 700.00 593.95 5,939.50 400.00 4,000.00

700.00 6,300.00 800.00 704.00 6,336.00 400.00 3,600.00 800.00 678.80 6,109.20 500.00 4,500.00

800.00 7,200.00 800.00 704.00 6,336.00 200.00 1,800.00 800.00 678.80 6,109.20 600.00 5,400.00

600.00 39,600.00 500.00 440.00 29,040.00 150.00 9,900.00 700.00 593.95 39,200.70 100.00 6,600.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00


7000.00 7,000.00 3000.00 2640.00 2,640.00 4000.00 4,000.00 25000.00 21212.50 21,212.50 10000.00 10,000.00
SKJ

5000.00 15,000.00 10000.00 8800.00 26,400.00 3000.00 9,000.00 5000.00 4242.50 12,727.50 2500.00 7,500.00

3000.00 3,000.00 10000.00 8800.00 8,800.00 2500.00 2,500.00 10000.00 8485.00 8,485.00 2000.00 2,000.00

3000.00 12,000.00 200.00 176.00 704.00 1500.00 6,000.00 6000.00 5091.00 20,364.00 1000.00 4,000.00

400.00 24,000.00 200.00 176.00 10,560.00 300.00 18,000.00 500.00 424.25 25,455.00 150.00 9,000.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

7000.00 7,000.00 30000.00 26400.00 26,400.00 30000.00 30,000.00 15000.00 12727.50 12,727.50 50000.00 50,000.00

1000.00 1,000.00 10000.00 8800.00 8,800.00 5500.00 5,500.00 1500.00 1272.75 1,272.75 2500.00 2,500.00
1000.00 1,000.00 2000.00 1760.00 1,760.00 1500.00 1,500.00 1500.00 1272.75 1,272.75 1000.00 1,000.00
1000.00 1,000.00 2000.00 1760.00 1,760.00 1500.00 1,500.00 1500.00 1272.75 1,272.75 2000.00 2,000.00
800.00 2,400.00 500.00 440.00 1,320.00 1000.00 3,000.00 1000.00 848.50 2,545.50 2000.00 6,000.00
800.00 4,000.00 500.00 440.00 2,200.00 1000.00 5,000.00 1000.00 848.50 4,242.50 1500.00 7,500.00
400.00 34,000.00 500.00 440.00 37,400.00 300.00 25,500.00 500.00 424.25 36,061.25 500.00 42,500.00
1000.00 5,000.00 2500.00 2200.00 11,000.00 2000.00 10,000.00 1000.00 848.50 4,242.50 3000.00 15,000.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

500.00 64,000.00 1500.00 1320.00 168,960.00 200.00 25,600.00 250.00 212.13 27,152.00 500.00 64,000.00

500.00 24,500.00 2000.00 1760.00 86,240.00 200.00 9,800.00 250.00 212.13 10,394.12 600.00 29,400.00

400.00 24,000.00 2500.00 2200.00 132,000.00 200.00 12,000.00 400.00 339.40 20,364.00 800.00 48,000.00

600.00 24,000.00 3000.00 2640.00 105,600.00 200.00 8,000.00 600.00 509.10 20,364.00 1000.00 40,000.00
SKJ

150.00 15,000.00 2000.00 1760.00 176,000.00 200.00 20,000.00 300.00 254.55 25,455.00 100.00 10,000.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

200.00 3,000.00 500.00 440.00 6,600.00 500.00 7,500.00 250.00 212.13 3,181.87 500.00 7,500.00

300.00 4,500.00 1500.00 1320.00 19,800.00 500.00 7,500.00 250.00 212.13 3,181.87 18.00 270.00

300.00 4,500.00 500.00 440.00 6,600.00 500.00 7,500.00 500.00 424.25 6,363.75 100.00 1,500.00

300.00 12,000.00 2000.00 1760.00 70,400.00 200.00 8,000.00 200.00 169.70 6,788.00 40.00 1,600.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

5000.00 5,000.00 20000.00 17600.00 17,600.00 20000.00 20,000.00 35000.00 29697.50 29,697.50 10000.00 10,000.00

2000.00 4,000.00 5000.00 4400.00 8,800.00 3000.00 6,000.00 3000.00 2545.50 5,091.00 5000.00 10,000.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

60000.00 180,000.00 5000.00 4400.00 13,200.00 30000.00 90,000.00 250000.00 212125.00 636,375.00 200000.00 600,000.00
771300.00 1376056.00 594600.00 1270671.16 1289470.00

18,425,418.08 17,560,648.65 19,389,272.79 17,019,420.81 20,871,336.54


2,395,304.35 2,282,884.32 2,520,605.46 2,212,524.70 2,713,273.75
20,820,722.43 19,843,532.97 21,909,878.25 19,231,945.51 23,584,610.29
3rd
(5,024,109.93) (5,888,879.36) (4,060,255.22) (6,430,107.20) (2,578,191.47)
(21.425) (25.113) (17.315) (27.421) (10.995)
111
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Division Office, Kavre
Abstract of Cost
Summary sheet
F/Y: 070/71
Phone no: 011-662842

Project : Construction of District Government Lawyer's office Building


Site : Saptari,Rajbiraj

Sn Discription of work Amount Plinth Area Remarks


1 Provisional Sum 329,119.53
2 Civil Work
a office Building #REF!
b Septic tank 167,181.83
c Soak pit (3.0 nos) 81,509.45
d Man hole (8.0 nos) 98,713.65
e water tank 20 cu.m 436,085.44
f land development 2,144,613.32
g guard house 1,462,002.20 office building+
Guard house =
h Retaining wall 573,595.78
7786.92sq.ft @
i Rain water harvesting 32,770.22 Rs. 2602 per sq.ft
j Garage Shed 62,528.19
Sub Total #REF!
3 Sanitary Work
a office Building,guard house 779,169.85
Sub Total 779,169.85
4 Electrical Work
a office Building,guard house 1,261,883.70
Sub Total 1,261,883.70
Total of Provisional sum+Civil
works+Sanitary works+Electrical works #REF!
5 % Contingency #REF!
Sub Total #REF!
13 % Vat #REF!
Total #REF!
for budget purpose
Physical contingency 10% #REF!
Price escalation 10%
#REF!
Net Total
#REF!

Prepared by: Checked by: Recommended By: Approved By:


112

Prepared by: Checked by: Recommended By: Approved By:


Government of Nepal
Ministry of Physical Planning and Works
Department of Urban Development and Building Construction
DIVISION OFFICE DHULIKHEL, KAVRE

Project : Construction of District Government Lawyer's office Building


Site : Saptari,Rajbiraj

BREAKDOWNS OF COSTS FOR LAB TEST

S.No. Description of Work Quantity Unit Rate Amount Remarks


1 Concrete Test
a Cubes or Cylinder Crushing 30.00 Nos. 150.00 4,500.00
2 Brick Test
a Brick Crossing Test 6.00 Nos. 100.00 600.00
b Water Absorbtion Test 6.00 Nos. 100.00 600.00
3 Aggregate Test
a Aggregate Crushing Value Test 2.00 Nos. 489.00 978.00
b Aggregate Impact Value 2.00 Nos. 350.00 700.00
4 Sieve Analysis
a Sieve Analysis 1.00 Nos. 844.00 844.00
b Sieve Analysis 1.00 Nos. 450.00 450.00
5 U.T.M. Tensile Strength Test
a 8mm Ø 3.00 Nos. 1,200.00 3,600.00
b 10mm Ø 3.00 Nos. 1,200.00 3,600.00
c 12mm Ø 3.00 Nos. 1,200.00 3,600.00
d 16mm Ø 3.00 Nos. 1,200.00 3,600.00
e 20mm Ø 3.00 Nos. 1,500.00 4,500.00
6 Cement Test
a Cement Mortar Cube Crushing 3 Nos. 2.00 Nos. 450.00 900.00
b Initial Setting and Final Setting 2.00 Nos. 500.00 1,000.00
Total 29,472.00
15% contractors Overhead 4,420.80
Grand Total 33,892.80
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Division Office, Kavre

CALCULATION OF INSURANCE PREMIUM FOR CONSTRUCTION of District lawyer's office, Ramechap

1) Insurance premium for the work, plant and materials damage for contract work for all risk
including Riot strike Damage, Malicious damage and Terrorism for contract work for 1.25 years
construction period + 1 year Maintenance period
Insurance with value 21,862,479.21 Rs.2.00 per thousand Rs. 43,724.96
Do for terrorism Rs. 1.49 per thousand Rs. 32,575.09
for stamp duty Rs. 5.00
Premium with stamp duty Rs. 76,305.05

2 . Insurance premium for the insurance of owner and Contractor's staff (unnamed ) Rs,
10,00,000.00 per person for 6persons with unlimited number of occurances for two years
Personal accident of 1,000,000.00 Rs. 2.00 per thousand Rs. 24,000.00
Do for terrorism Rs. 1.49 per thousand Rs. 23,840.00
for stamp duty Rs. 5.00
premium with stamp duty Rs. 47,845.00

3 . Insurance premium for construction equipment and machines with value of Rs. 500000.00 for 2
years
Insurance premium of 500,000.00 Rs. 2.00 per thousand Rs. 2,000.00
Do for terrorism Rs. 1.00 per thousand Rs. 1,000.00
for stamp duty Rs. 5.00
Premium with stamp duty Rs. 3,005.00

4. Insurance premium for third party liability personal per person Rs. 300000.00 for 10 persons for 2
years
P.A . Of third party 10 per Rs. 3,000,000.00 Rs. 2.00 per thousand Rs. 12,000.00
Do for terrorism Rs. 1.00 per thousand Rs. 6,000.00
for stamp duty Rs. 5.00
Premium with stamp duty Rs. 18,005.00
Total 145,160.05
15% Contractor's Overhead 21,774.01
Grand Total 166,934.06

Prepared By Checked By Approved By


Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
DIVISION OFFICE KAVRE
DHULIKHEL, NEPAL

Bill of Quantity

Project : Construction of District Government Lawyer's office Building


Site : Saptari,Rajbiraj

A. The rate quoted here under shall be inclusive of :


1. Supplying the materials along with accessories to the site .
2. Fixing and erecting them in position as per general practice, specifications and instructions of site Engineer
3. Test & Maintenance up to the period, specified in the agreement
B. The itemwise rate should be quoted without VAT

Rate excluding VAT Total


Sno Description Quantity Unit Remarks
In Figure In word Amount
I Civil Works
A General works
1 Insurance for the loss of damage to work, plant,equipment materials one lakh sixty six thousand nine
property and personel injury or death to third party all complete. hundred thirty four and paisa six
1.00 P.S 166934.06 only.
2 Lab test reports as per instruction of engineers all complete. Thirty three thousand eight hundred
1.00 P.S 33892.80 ninty two and paisa eighty only.
3 Site clearence work before and after all complete 1.00 L.S
4 Providing and maintaining camp facilities (2rooms including furniture
and furnishing)as directed by site engineer and specification during
the construction period 20.00 Month
5 As built drawing (Architecture,sanitary,electrical) as per instruction by
site engineer 1.00 L.S
6 Supply day work labours for whole construction period as per
instruction all complete 70.00 md

B EARTH WORKS
1 Earthwork in excavation in hard/boulder mix soils in foundation
including 10m hauling distance and 1.5 m. lift all complete. 414.54 cu.m.

Page-115
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
3 Earth filling in 150 mm thick layer, watering, ramming including supply
of filling materials within 10 m distance all complete. 58.15 cu.m.
4 Earth work in excavation by machine in good levelling 2038.00 cu.m.
5 Disposal of excavated waste material including cutting soil and other
materials by trucks within 5 km distance from construction site.
2143.81 cu.m.
C STONE MASONARY WORKS
1 Rubble masonry soling work in foundation . 77.01 cu.m.
2 Rubble masonry in 1:6 C/S mortar in perfect line level finish including,
racking the joints and curing the work for at least 7 days all complete.
127.15 cu.m.
3 Rubble masonry work in inclined level in 1:4 C/S mortar in perfect line
level finish including, racking the joints and curing the work for at
least 7 days all complete. 0.00 cu.m.
3 Dry rubble masonry work in perfect line level finish all complete.
4.85 cu.m.
4 Rubble masonry in 1:4 C/S mortar in perfect line level finish including,
racking the joints and curing the work for at least 7 days all complete.
10.98 cu.m.

D BRICK WORKS
1 Good quality local chimney made Brickwork in 1:4 C/S mortar in
ground floor and abovein perfect line level finishe including wetting
the bricks, racking the joints and curing the work for at least 7 days all
complete. 159.40 cu.m.
2 Flat Brick Soling 1.49 sq.m

E P.C.C. WORKS
1 Plain cement Concrete (PCC) in 1:3:6 ratio for foundations, flooring
and walls with approved quality of cement and sand and crushed
stone aggregate including mixing, laying, curing etc all complete in
approval of site engineer. 17.45 cu.m.
2 Plain cement Concrete (PCC) in 1:2:4 ratio for foundations, flooring
and walls with approved quality of cement and sand and crushed
stone aggregate including mixing, laying, curing etc all complete in
approval of site engineer. 24.05 cu.m.

Page-116
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
3 Plain cement Concrete (PCC) for RCC works (1:2:4) for slab/lintels
with approved quality of cement and sand and crushed stone
aggregate including mixing, laying, curing etc all complete in approval
of site engineer. 14.55 cu.m.
4 Plain cement Concrete (PCC) for RCC works (1:1.5:3) for slab/lintels
with approved quality of cement and sand and crushed stone
aggregate including mixing, laying, curing etc all complete in approval
of site engineer. 218.46 cu.m.
5 Tor steel reinforcement bar of fe 415/500 grade including
straightening, cleaning, cutting, binding & fixing in position with
annealed tying binding wire as per drawing, design & instruction all
complete. 31.69 MT
6 Formwork, shuttering, centering with 19mm thick waterproof ply
board and steel post for all works necessary propping, scaffolding,
staging, supporting inclusive of wedging and cutting holes for
utilization till the support if fully unyielding nett. 1567.95 sq.m.
7 Formwork, shuttering, centering with 19mm thick waterproof ply for
column. 246.87 sq.m.

G METAL WORKS
1 Making and fitting fixing of 12 x 12 mm,solid core squar rod Grill on
the frame of 4.5 x 20 mm. M.S.plate with painting all complete.
134.53 sq.m
2 Supplying and fixing of spiral staircase with 100 mm black pipe post
20mm square pipe railing 32 mm handrel with of staircase 75 cm
including oxide primer coat and necessary fitting all complete
3.13 rm
3 Supplying and fitting 50 mm dia stainless steel staircase railling with
stainless steel balluster of 25mm pipe 26.64 rm
4 Supplying and fitting 38 mm dia stainless steel staircase railling 2
rows with vertical post at 2m c/c 77.78 sq.m
5 Fencing with 62mm X 62mm size mesh made up of 7mm Ø rods
framed on 25X25X4 mm angles and 50mm Ø M.S. blackpipe post in
2m interval including jointting , fixing, erection and primer painting
with all necessary M.S. grills and plates as per drawing and inst
165.00 sq.m
6 supplying and fitting iron compound gate with 50*50mm. Equal iron
angle frame 8.40 sq.m

Page-117
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
7 M.S.black pipe roof truss with I.S. or B.S. section including jointing,
fixing, erection and primer painting with all necessary M.S. bed plates,
shoe angles anchor bolts leas sheeting or cement grouting as per
drawing and instructions, all complete . 849.15 kg
8 0.50mm colour CGI sheet roofing including fixing in proper shape &
size with all necessary rails, screws, bolts & nuts washers, J & L
hocks etc as per drawing & instruction all complete.
71.52 sq.m
9 0.50mm colour GI plain sheet for ridge cover on roofing including
fixing in proper shape & size with all necessary rails, screws, bolts &
nuts washers, J & L hocks etc as per drawing & instruction all
complete. 8.01 sq.m

H FLOORING & FINISHING WORKS


1 Supplying and laying of good quality marble 16mm in cement sand
motar (1:2) ratio with approved colour on floors, skirting and wall s all
complete. 186.83 sq.m.
2 Supplying and laying of glazed or non glazed tiles in cement sand
mortar (1:4) ratio with Boarder approved colour on wall and floor all
complete. 135.84 sq.m.
3 12.5mm thick cement sand plaster in (1:3) ratio on ceiling of good
finish including racking the joint, wetting of surfaces & curing the
work all complete. 458.31 sq.m.
4 12.5mm thick cement sand plaster in (1:4) ratio on wall of good finish
including racking the joint, wetting of surfaces & curing the work all
complete. 1863.83 sq.m.
5 20mm thick cement sand plaster in (1:4) ratio on floor of good finish
including racking the joint, wetting of surfaces & curing the work all
complete. 1563.93 sq.m
6 25mm. Thick cement sand(1:4) tile shape butta 96.34 sq.m.
7 60mm thick inter locking concrete block paving with 50mm.th. Stone
dust all complete 182.28 sq.m.
8 3 mm thick cement sand punning (1:1) on floor, skriting, dado etc,
including mixing laying and rubbing with steel trowel to a hard,
smooth and shining surface and curing all complete. 239.16 sq.m.
9 20mm thick cement sand rainwater protection plaster line in (1:4) ratio
including wetting of surfaces & curing the work all complete.
229.21 Rm

Page-118
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
10 Elastocrete cementitious elastomeric water proofing coating 2
components capacity per kg. 6 sq.ft 2 coat including supply and
applying all complete work 219.72 sq.m.
11 Brick bat filling work 2.33 cu.m
12 50mm thick (1:2:4) IPS flooring with approved quality of O.P. cement &
sand and crushed stone aggregate including mixing, laying, punning,
rubbing in hard surface curing etc all complete. 379.31 sq.m.
13 Providing material & applying pressure grouting on RCC Roof slab,
beam ,shear wall as per instruction 179.07 sq.m
14 Supplying and applying white cement putty on ceiling and wall with
line and level all complete 3264.30 sq.m.
15 Ruled pointing work in (1:2) cement sand mortar on boulder stone
work with good finish including curing as per instruciton all complete.
297.38 sq.m
16 Sand filling including supply of filling materials, watering, ramming
etc. all complete 2.30 cu.m

I WOOD WORKS
1 Well seasoned salwood chaukhats for fixed/openable door/windows
with good finish of approved quality incuding fixing in postion with
necessary M.S. hold fasts as per drawing and instruction all complete.
2.04 cu.m.
2 Making and fitting fixing sal wood Panelled door shutter with 38 mm
thick sal wood frame including all necessary hardware fitting all
complete. 23.09 sq.m.
3 Supplying and fitting readymade carved salwood door shutter for
entrance door including carved chaukhat frame all complete. 2.52 sq.m.
4 Supplying and fitting readymade carved salwood latic window (ankhe
jhyal) including carved chaukhat frame all complete. 1.45 sq.m.
5 Making and fitting fixing Plywood Panel door shutter of 38 x 100 mm
size sal wood frame with 8 mm thick commercial ply on midle and
4mm thick teak ply on one sides including all necessary hardware
fitting all complete. 33.26 sq.m.
6 Making and fitting fixing Plywood Panel door shutter of 38 x 100 mm
size sal wood frame with 6 mm thick waterproof ply on midle and 4mm
thick teak ply on one sides including all necessary hardware fitting all
complete. 11.00 sq.m.

Page-119
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
7 Making and fitting of G.I. Mosquito net shutter with 38mm thick
seasoned salwood frame including hinges, towerbolts, handles,
locking set etc all complete. 8.64 sq.m.
8 6mm thick plywood false ceiling in existing wooden frame. 29.44 sq.m
9 Fitting & fixing suspended design ceiling of water resistance gypsum
board with all necessary hanger, angles, hooks nut bolt all complete.
32.49 sq.m
10 Supplying and laying 100mm long 12mmthick parquate flooring and
skirting in line and level with painting all complete. 123.18 sq.m

J PAINTING WORKS
1 Colouring with two coat distemper paint with one coat primer to give
uniform colouring after rendering the surface all complete. 684.05 sq.m.
2 2 coats of ready made enamel paint of approved colour over 1 coats
of primer Painting over porperly sanded wooden surface all complete
318.57 sq.m.
3 Three coats of chapra polishing in wood surfaces with approved
colour in properly sanded surface including sealing voids with putting
all complete. 110.61 sq.m.
4 2 coats of weather coat (Apex) paint of approved colour with one coat
primer Painting over porperly cleaned surface all complete
1316.86 sq.m.
5 2 coats of ready made enamel paint without primer Painting over
porperly sanded surface all complete 321.85 sq.m.
6 2 coats of plastic emulsion paint of approved colour over 1 coat of
primer painting over properly cleaned surface all complete 606.89 sq.m.
K ALUMINIUM WORK
1 Aluminium sliding windows of section (88*38*1.3mm) with Fly mesh
shutter all complete 134.16 sq.m.
2 Aluminium partition with 5 mm thick glass and 9 mm thick laminated
board of section (64 x38x1.1) 14.90 sq.m
TOTAL OF CIVIL WORKS

II Sanitary Works
1 White glazed earthenware Indian pattern W C 530mm Orissa Pan with
3.0gallons low level flushing cistern with complete accessories
including bracket, flushing pipe,pipe connector etc. all complete set
3.00 Set
2 Urinal 46.5X35.5X26.5cm White glazed with complete set . 1.00 Set

Page-120
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
3 Porcelain clay white glazed indian pattern Comode(Hindustan,
Parryware, Classica or eq.) with 10 lts. low level cistern and seat cover
constallation type. 4.00 Set
4 White glazed oval wash basin 55X40cm with brackets 32mm bottle
trap, 32mm CP waste coupling with CP chain and rubber plug, 15mm
fancy type piller cock and ½"x18" pipe connector etc all complete.
7.00 Set
5 Kitchen sink stainless steel 90 cm long all complete. 3.00 Set
6 C.P. Bibcock 15mm dia heavy type 8.00 nos
7 C.P. 15mm dia Angle valve Ordinary type 25.00 nos
8 15 mm CP water spray all complete. 3.00 nos
9 Chrome plated 15mm dia x450mm long heavy quality towel rod 9.00 nos
10 Chrome plated soap tray 6"x6" with necessary accessories 9.00 nos
11 PVC floor trap 11x7.5 cm all complete. 10.00 nos
12 55X40cm beveled edge looking mirror of high quality, 7.00 nos
13 Supply and fixing of 60 cm CP Glass Shelf 7.00 nos
14 1HP Electric motor Pump monoblock ( crompton) 1.00 nos
15 1000 lit hilltake tank supplying and installing works as per
specification and instruction all complete. 1.00 nos
16 2000 lit capacity PVC water tank HilTake or equivalent 1.00 nos
17 Chrome plate shower rose 7.5 cm dia of standard brand 4.00 nos
18 15mm dia concealed valve ordinary type 1.00 nos
19 Stainless Steel wall Mixture complate 3.00 Rm
20 CP sink mixer all complete. 1.00 nos
21 Porecelene clay toilet paper holder Recessed type with necessary
accessories all complete. 3.00 nos
22 50mm PVC pipe of 6 kg/cm2 and instruction all complete. 30.00 Rm
23 75mm PVC pipe of 6 kg/cm2 and instruction all complete. 50.00 Rm
24 110mm PVC pipe of 6 kg/cm2 and instruction all complete. 130.00 Rm
25 110mm upvc elbow 10.00 nos
26 110mm dia upvc 45 degree bend 8.00 nos
27 50 mm mm dia UPVC plain Tee. 10.00 nos
28 50 mm mm dia UPVC 90 degree bend 11.00 nos
29 75 mm dia UPVC 90 degree bend. 13.00 nos
30 75 mm dia UPVC plain Tee. 14.00 nos
31 75mm dia UPVC vent cowl 1.00 nos
32 110 mm dia UPVC vent cowl. 2.00 nos
33 110 mm dia UPVC 90 degree bend. 16.00 nos
34 110 mm dia UPVC plain Tee. 14.00 nos

Page-121
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
35 16 mm dia multi-layer PAP Composite pipe includes fixing/laying with
necessary fittings all complete. 60.00 Rm
36 20 mm dia multi-layer PAP Composite pipe includes fixing/laying with
necessary fittings all complete. 55.00 Rm
37 25 mm dia multi-layer PAP Composite pipe includes fixing/laying with
necessary fittings all complete. 48.00 Rm
38 4 kg/cm2 (110 mm) HDP pipe all complete. 67.00 Rm
39 20mm dia galvanized Iron (GI) pipe medium class includes
fixing/laying with necessary hardware all complete. 5.00 Rm
40 (G.M.) gate valve 20mm dia full way medium 2.00 nos
41 (G.M.) gate valve 25mm dia full way medium 1.00 nos
42 (G.M.) check valve 20mm dia medium quality 1.00 nos
43 (G.M.) check valve 25mm dia medium quality 1.00 nos
44 300 lit. 3 panel solar heater fixing with electric booster all complete.
1.00 Set
45 5 kg fire extinguiser 4.00 nos
46 Euro guard filter all complete. 3.00 Set
47 Supply fixing and applying readmade steel kitchen chimney all
complete as per instruction of engineer 1.00 set
48 25mm dia Aeroflex Pipe insulation for hot water pipe all complete.
30.00 Rm
49 55*55 mm medium C.I cover 8.00 nos
48 Pressures senser switch for pump auto switch of all complete set 1.00 Set
49 pipe clip with grips,screw and plastic jali all including 26.00 Set
TOTAL OF SANITARY WORKS
III ELECTRICAL WORKS
A. LUMINAIRES ( FIXTURES)
accessories ,screws, gripes, pvc tape,choke,starter,Tube,bulbs,
holder, flexible wire etc all complete.
1 Dome type CFL light 8"black cast milky base decorative Homedec,
Decon or ISI eqvt. etc all complete. 31.00 Set
2 Wall type CFL lamp 13 to 22 watt decorative with glass
Decon,Homedec or eqvt.etc all complete. 28.00 Set
3 1X40watt Tube light box type Wipro /Ge or eqvt. etc all complete.
25.00 Set
4 Mirror light decorative Homedec,Decon or eqvt.etc all complete. 7.00 Set
B FAN / EXHAUST FAN
Accssories:as per sn A +nut ,bolt,hook
clamp, regulator,flexible wire etc all complete.

Page-122
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
5 36'' ceiling fan Almonard/Bajaj or eqvt.etc all complete. 27.00 Set
6 9"exhaust fan Almonard /Bajaj or eqvt.etc all complete. 10.00 Set
C SOCKET,SWITCH ,JUNCTION BOX
accessories:metal box ,screws ,gripes clamp, regulator,flexible wire
etc all complete
7 16/6 Amps combined S/socket flush type CPL,Anchor or eqvt. 60.00 Set
8 1 gang one way switch CPL, Anchor or eqvt.etc all complete. 13.00 Set
9 2gang one way switch CPL,Anchor or eqvt.etc all complete. 11.00 Set
10 3 gang one switch CPL,Anchor or eqvt.etc all complete. 10.00 Set
11 4 gang one way switch CPL,Anchor or eqvt.etc all complete. 9.00 Set
12 5,6 gang one way switch CPL,Anchor or eqvt.etc all complete. 9.00 Set
13 Junction box made of metal with cover size 6"X4" etc. all complete.
66.00 Set
D MAIN SWITCH/DB
Accessories ;screws, gripes, nut bolt,cu bus bar,earth bus bar, neutral
bus bar,fuse, porcelin base , cable shoe ,phase bar,pvc tape etc all
complete.
14 63 Amps DP Main Switch or eqvt. 1.00 Set
15 Distribution board 12 way SPN made of mild steel sheet double cover
lockable Geco or eqvt.flush type etc all complete. 3.00 No
16 Distribution board 8 way SPN made of mild steel sheet double cover
lockable Geco or eqvt.flush type etc all complete. 1.00 No
17 40 Amps DP MCB Siemens Ge,Merlin gerain or eqvt. for main 4.00 No
18 6,16,25 Amps. SP MCB Siemens,Ge,Merlin gerain or eqvt.for light &
power circuit. 60.00 No
E. PANEL BOARD/DB
Accessories: screws, gripes, nut bolt, cu bus bar, earth bus bar,
neutral bus bar, cu strip for connection, porcelin base,cable shoe,
phase bar, PVC tapes etc all complete
19 60/100 pannel board with suitable color, floor mounted double cover
push type switch with size 9"x36"x48" 1.00 set
20 60 amp. MCCB Siemens/Marlin/Gerlin or equi. 1.00 set
21 Amp. Meter with selector switch (0-500) 1.00 no.
22 Volt-meter 0-500v with selector switch 1.00 no.
23 Heavy Duty Indicator for panel board 3.00 no.
24 6-32 DB MCB 5.00 no.
25 6-32 SP MCB 85.00 set
26 32 Amp 415 Volt DP Main Switch 5.00 set
F. POINT WIRING / WIRES/CABLES

Page-123
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
Accessories:HDPE polythene pipe,srews,pvc tape, grips, circular box
etc al complete.
26 2*2.50 sq mm multi strand flexible cu .wire for light & fan point in
1/2"HDPE polythene pipe 128.00 Point
27 2x4.0 +1x1.5sq.mm multi strand flexible cu wire for power point in 3/4"
HDPEpolythene pipe. 49.00 Point
28 6 sq.mm 4 core unarmoured copper cable for main switch to DB
through polythene pipe etc all complete. 60.00 Rm
29 10 sq.mm 4 core armoured copper cable for NEA to panel board etc
all complete. 40.00 Rm
30 8 swg copper wire for earth continuity from panel board to DB through
1/2" polythene pipe etc all complete. 100.00 Rm
G. TELECOM SYSTEM
Accessories : screws, grips, pvc tape,HDPE pipe etc all complete.

31 Telephone socket flush type North-West or eqvt. 15.00 Set


32 Two pair telephone cu.cable in 1/2" HDPE polythene pipe etc all
complete. 15.00 Point
33 Telephone junction box with crone tag double cover push type lock
with etc all complete. 15.00 Set
34 20 pair telephone cu.cable for main in (20mm) HDPE polythene pipe.
40.00 meter
H. EARTHING
accessories :salt, coal ,cu plate ,HDPEpolythene pipe.,etc all
complete.
35 Earthing with cu plate size 65 cmx65cmx3.15mm with G.N.8 copper
wire for earth continuity from panel board to earthing site etc all
complete. 1.00 Set
36 10" Globe type Post top lamp complete set Homedec,DECON or ISI
eqv.. 2.00 Set
E. Air conditioning system
37 Supplying and fixing 2.00 TR capacity wall mounted split type air
conditioning system Daikin,Toshiba,Fujitsu,Stulz or eqv japanese
company as per instruction 3.00 Set
TOTAL OF ELECTRICAL WORKS
Total of civil + Sanitary + Electrical Works+provisional sum

Total amount in words ........................................................................................

Page-124
Rate excluding VAT Total
Sno Description Quantity Unit Remarks
In Figure In word Amount
Name of Contractor : Signature of Contractor :
Phone : Mobile :
Address : Fax :
Date : E-mail :

Page-125
Comparative Chart
#REF!
#REF!
S.N. Description of Work Quantity Unit Estimated Contractor-1 Contractor-2 Contractor-3

Rate Rs. Amount Rs. Rate Rs. Amount Rs. Rate Rs. Amount Rs. Rate Rs. Amount Rs.
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF! #REF!

Rank
Difference #REF! #REF! #REF!
Percentage #REF! #REF! #REF!
g]kfn ;/sf/
ljnsf] qmd ;+Vof M ef}lts of]hgf tyf lgdf{0f dGqfno &]Ssfk§fsf] ;+Vof M d=n]=k
=
&]s]bf/sf] gfd M zx/L ljsf; tyf ejg lgdf{0f ljefu cl#Nnf] e'QmfgL ljnsf] ef}=g+= M kmf=g+
= !^&
cl#Nnf] e'QmfgL ljnsf] qmd ;+Vof M
l8lehg sfof{no, sfe]| sfo{ ;DkGg ug'{ kg]{ ldlt M

sfof{/De cfb]z ldlt M 7]Ssf ;DalGw lan e'QmfgL ef}r/ g+= M


sfo{ ;DkGg ePsf] ldlt M e'QmfgL ldlt M
of]hgfsf] gfd M gfkL lstfj g++ M sf] k[i7 ;+Vof

cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf] sfd


qm=;+= sfo{sf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f hDdf d"No
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

Page-128
g]kfn ;/sf/
ljnsf] qmd ;+Vof M ef}lts of]hgf tyf lgdf{0f dGqfno &]Ssfk§fsf] ;+Vof M d=n]=k
=
&]s]bf/sf] gfd M zx/L ljsf; tyf ejg lgdf{0f ljefu cl#Nnf] e'QmfgL ljnsf] ef}=g+= M kmf=g+
= !^&
cl#Nnf] e'QmfgL ljnsf] qmd ;+Vof M
l8lehg sfof{no, sfe]| sfo{ ;DkGg ug'{ kg]{ ldlt M

sfof{/De cfb]z ldlt M 7]Ssf ;DalGw lan e'QmfgL ef}r/ g+= M


sfo{ ;DkGg ePsf] ldlt M e'QmfgL ldlt M
of]hgfsf] gfd M gfkL lstfj g++ M sf] k[i7 ;+Vof

cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf] sfd


qm=;+= sfo{sf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f hDdf d"No
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

Page-129
g]kfn ;/sf/
ljnsf] qmd ;+Vof M ef}lts of]hgf tyf lgdf{0f dGqfno &]Ssfk§fsf] ;+Vof M d=n]=k
=
&]s]bf/sf] gfd M zx/L ljsf; tyf ejg lgdf{0f ljefu cl#Nnf] e'QmfgL ljnsf] ef}=g+= M kmf=g+
= !^&
cl#Nnf] e'QmfgL ljnsf] qmd ;+Vof M
l8lehg sfof{no, sfe]| sfo{ ;DkGg ug'{ kg]{ ldlt M

sfof{/De cfb]z ldlt M 7]Ssf ;DalGw lan e'QmfgL ef}r/ g+= M


sfo{ ;DkGg ePsf] ldlt M e'QmfgL ldlt M
of]hgfsf] gfd M gfkL lstfj g++ M sf] k[i7 ;+Vof

cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf] sfd


qm=;+= sfo{sf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f hDdf d"No
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Total #REF! - #REF!
VAT 13% #REF! 0.00 #REF!
Grand Total #REF! - #REF!

pko'{Qm adf]lhd 7Ls 5 egL k|dfl0ft ug]{


of] ljn adf]lhd hDdf ?= 7]s]bf/sf] ;xL / 5fk M =======
cl3Nnf] ljnaf6 e'QmfgL ePsf] ?=
s§f ug'{ kg]{ ?= afFls lbg' k
-s_ k]ZsL -v_ dfn;fdfgsf] df]n =========== -u_ d]lzg cf}hf/sf] axfn ===============
-3_ d'No clea{l4 s/ !# % -ª_ w/f}6L M -r_ clu|d cfos/ jfktM
v'b lbg' kg]{ M k]z ug]{ l;=l8=O{= sf] ;xL :jLs[t ug]{sf] ;xL
k]z ug]{ sf] ;xL hfFr ug]{ O{lGhlgo/s] ;xL bhf{ M
bhf{ M bhf{ M
hDdf ?= ================================== cIf/]kL ====================================================

Page-130
g]kfn ;/sf/
ef}lts of]hgf tyf lgdf{0f dGqfno
zx/L ljsf; tyf ejg lgdf{0f ljefu
l8lehg sfof{no, sfe]|
jf:tljs sfo{ ;Dkfbg ljj/0f
1= sfof{nosf] gfd M z=lj=t=e=lg=lj=l*=sf=sf&df)*f}
2= sfdsf] gfd M #REF! #REF!
### ### 7= sfd z'? Uf/]sf] ldlt M
### ### 8= sfd ;DkGg ug'{ kg]{ ldlt M
### ### 9= ;DkGg ePsf] ldlt M
O{li6d]6 adf]lhd v'b ePsf] sfd km/s
qm=;+= sfdsf] ljj/0f s}lkmot
kl/df0f b/ hDdf d"No kl/df0f b/ hDdf d"No kl/df0f b/ hDdf d"No
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!

Page-131
g]kfn ;/sf/
ef}lts of]hgf tyf lgdf{0f dGqfno
zx/L ljsf; tyf ejg lgdf{0f ljefu
l8lehg sfof{no, sfe]|
jf:tljs sfo{ ;Dkfbg ljj/0f
1= sfof{nosf] gfd M z=lj=t=e=lg=lj=l*=sf=sf&df)*f}
2= sfdsf] gfd M #REF! #REF!
### ### 7= sfd z'? Uf/]sf] ldlt M
### ### 8= sfd ;DkGg ug'{ kg]{ ldlt M
### ### 9= ;DkGg ePsf] ldlt M
O{li6d]6 adf]lhd v'b ePsf] sfd km/s
qm=;+= sfdsf] ljj/0f s}lkmot
kl/df0f b/ hDdf d"No kl/df0f b/ hDdf d"No kl/df0f b/ hDdf d"No
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!

Page-132
g]kfn ;/sf/
ef}lts of]hgf tyf lgdf{0f dGqfno
zx/L ljsf; tyf ejg lgdf{0f ljefu
l8lehg sfof{no, sfe]|
jf:tljs sfo{ ;Dkfbg ljj/0f
1= sfof{nosf] gfd M z=lj=t=e=lg=lj=l*=sf=sf&df)*f}
2= sfdsf] gfd M #REF! #REF!
### ### 7= sfd z'? Uf/]sf] ldlt M
### ### 8= sfd ;DkGg ug'{ kg]{ ldlt M
### ### 9= ;DkGg ePsf] ldlt M
O{li6d]6 adf]lhd v'b ePsf] sfd km/s
qm=;+= sfdsf] ljj/0f s}lkmot
kl/df0f b/ hDdf d"No kl/df0f b/ hDdf d"No kl/df0f b/ hDdf d"No
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!

Page-133
g]kfn ;/sf/
ef}lts of]hgf tyf lgdf{0f dGqfno
zx/L ljsf; tyf ejg lgdf{0f ljefu
l8lehg sfof{no, sfe]|
jf:tljs sfo{ ;Dkfbg ljj/0f
1= sfof{nosf] gfd M z=lj=t=e=lg=lj=l*=sf=sf&df)*f}
2= sfdsf] gfd M #REF! #REF!
### ### 7= sfd z'? Uf/]sf] ldlt M
### ### 8= sfd ;DkGg ug'{ kg]{ ldlt M
### ### 9= ;DkGg ePsf] ldlt M
O{li6d]6 adf]lhd v'b ePsf] sfd km/s
qm=;+= sfdsf] ljj/0f s}lkmot
kl/df0f b/ hDdf d"No kl/df0f b/ hDdf d"No kl/df0f b/ hDdf d"No
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
### #REF! #REF! #REF! #REF! - #REF!
Total #REF! #REF! #REF!
VAT 13% #REF! #REF! #REF!
Grand Total #REF! #REF! #REF!

hDdf M–
j9L ePdf -±_ 36L ePdf -—_ lrGx clÍt ug]{ / Oli6d]6 eGbf 36Lj9L ePsf] d'Vo sf/0f M–

l:js[t l8hfOg / :k]lzlkms]zg adf]lhd sfd ePsf] 5 egL k|dfl0ft ug]{ ===========================================
===================== ========== == ====== ===============

sfo{ ;Dkfbg ug]{ ;a–O{lGhlgo/ O{lGhlgo/ >L l;=l8=O{= >L ;'=O{= >L sfof{no k|d'v

Page-134

You might also like