EQUIPMENT INSTALLATION(PANELS,
Stage of Assessment
Activity JUNCTION BOXES, CCR CABINETS AND After Applying Conditions
CONSOLES) (Strike off which is not applicable)
Signature of Construction
Assessed By Assessing Date RA Sheet No.
manager
Likelihood
Likelihood
Severity
Severity
Rating
Rating
Index
Index
Index
Index
Sl.
Risk
Risk
Task Hazards Identified Persons at Risk Controls Responsibility
No.
2.Eye injury due to hazardous 2. Use proper type of ppes while doing the Concerned
rays from welding
Working person 2 2 4 welding work
1 1 1
supervisor
3. Fall of erection material due Working person & person near 3. use proper lifting method and qualified Concerned
to unsafe lifting by 2 2 4 person to do thelifting activity
1 1 1
supervisor
4. Ensure that all electrical connection arain Concerned
CONSOLES)
Reviewed by LEGEND
HSE Manager Severity Index Likelihood Index
Death 5 Certain to Happen 5
Major Injury, Illness resulting in disability (Permanent Disability) 4 Very Likely to Happen 4
Injury Requiring Hospital Treatment, Illness (Temporary Disability) 3 Likely to Happen 3
Approved by
Construction Manager Minor Injury requiring First Aid Only 2 Unlikely to Happen 2
Delay 1 Very Unlikely to Happen 1
RISK ASSESSMENT SHEET
EQUIPMENT INSTALLATION(PANELS,
Stage of Assessment
Activity JUNCTION BOXES, CCR CABINETS AND After Applying Conditions
CONSOLES) (Strike off which is not applicable)
Signature of Construction
Assessed By Assessing Date RA Sheet No.
manager
Likelihood
Likelihood
Severity
Severity
Rating
Rating
Index
Index
Index
Index
Sl.
Risk
Risk
Task Hazards Identified Persons at Risk Controls Responsibility
No.