RISK ASSESSMENT SHEET

EQUIPMENT INSTALLATION(PANELS,
Stage of Assessment
Activity JUNCTION BOXES, CCR CABINETS AND After Applying Conditions
CONSOLES) (Strike off which is not applicable)

Signature of Construction
Assessed By Assessing Date RA Sheet No.
manager

Likelihood

Likelihood
Severity
Severity

Rating

Rating
Index

Index

Index

Index
Sl.

Risk

Risk
Task Hazards Identified Persons at Risk Controls Responsibility
No.

1.Fire hazard to Flammables


1. Area must be kept in clean while hot work Concerned
stored near to the welding area Working person 2 2 4 is performed
1 1 1
supervisor
JUNCTION BOXES, CCR CABINETS AND
EQUIPMENT INSTALLATION(PANELS,

2.Eye injury due to hazardous 2. Use proper type of ppes while doing the Concerned
rays from welding
Working person 2 2 4 welding work
1 1 1
supervisor
3. Fall of erection material due Working person & person near 3. use proper lifting method and qualified Concerned
to unsafe lifting by 2 2 4 person to do thelifting activity
1 1 1
supervisor
4. Ensure that all electrical connection arain Concerned
CONSOLES)

4. Electric Shock Working person 2 2 4 good condition or not.


1 1 1
supervisor
1 5 . Use proper type of ppes while performing Concerned
5. Burn Injury Working person 4 1 4 the hot activity
1 1 1
supervisor
6. Chace of electrocuction Working person & person near 6. Make sure that all erathing should be clear Concerned
hazards by 2 2 4 or not
1 1 1
supervisor
7. Cbable termination and 7. Use proper type of personnel protective Concerned
connection equipment supervisor

8. Inspect the equipment before each use,


8.Electric burns, Explosions,
Working person & person near Assign only qualified workers for such job, Concerned
Nips, cuts and abrasions, Back
by 2 2 4 De energize the system before doing any
1 1 1
supervisor
injury.
alteration, Avoid manual handling.

Reviewed by LEGEND
HSE Manager Severity Index Likelihood Index
Death 5 Certain to Happen 5
Major Injury, Illness resulting in disability (Permanent Disability) 4 Very Likely to Happen 4
Injury Requiring Hospital Treatment, Illness (Temporary Disability) 3 Likely to Happen 3
Approved by
Construction Manager Minor Injury requiring First Aid Only 2 Unlikely to Happen 2
Delay 1 Very Unlikely to Happen 1
RISK ASSESSMENT SHEET
EQUIPMENT INSTALLATION(PANELS,
Stage of Assessment
Activity JUNCTION BOXES, CCR CABINETS AND After Applying Conditions
CONSOLES) (Strike off which is not applicable)

Signature of Construction
Assessed By Assessing Date RA Sheet No.
manager

Likelihood

Likelihood
Severity
Severity

Rating

Rating
Index

Index

Index

Index
Sl.

Risk

Risk
Task Hazards Identified Persons at Risk Controls Responsibility
No.

Risk Rating = Severity Index x Likelyhood Index