NATIONAL POWER TRAINING INSTITUTE,

(Under Ministry of Power, Govt. of India)


NEYVELI – 607 803: TAMIL NADU

Trainees - Udupi Power Corporation Pvt. Limited, karnataka

TEST ON POWER PLANT FAMILIARIZATION


Name of the Student :
(MARKS: 150 X 1 = 150) TIME: 2 Hrs.

Answer all the questions


BOILER

1. The coal with maximum percentage of Carbon in it is


a) Peat
b) Lignite
c) Bituminous
d) Anthracite
2. Grindability index of which coal is more
a) Peat
b) Lignite
c) Bituminous
d) Anthracite
3. Which of the following temperature is higher?
a) Pour Temperature
b) Flash Temperature
c) Fire Temperature
4. Which coal mill is preferred for pulverizing soft coals?
a) Tube ball on drum mill
b) ‘E’ type ball mill
c) Raymond bowl mill
d) Beater / Hammer mill
5. Water is chosen as the working fluid in boilers due its
a) High availability
b) Low viscosity
c) High specific heat
d) All the above
6. The fuel used in HEA igniter is
a. Light diesel oil
b. Propane Gas
c. Butane Gas
d. None of the above
7. In the lignite coal, which one of the following is the highest as per the
Proximate analysis
a. Fixed carbon
b. Oxygen
c. Moisture
d. Ash
8. In mixed flow pumps the pressure is developed by
a. Centrifugal force alone
b. By the lift of the impeller vanes
c. Combination of the both

d. No relation with regard to centrifugal force


9. The nucleate boiling will result in
a) Overheating of tubes
b) Scaling of the tubes
c) Individual bubble formation on the water metal interface
d) All the above
10. In natural circulation boilers the circulation is effected by using the
a) Density difference of hot gas and cold air
b) Density difference of water and steam
c) Pressure difference of water and steam
d) Density difference of water and hot flue gas
11. In the Boiler the heat addition causes only temperature rise in
a) Economizer
b) Super Heater
c) Re Heater
d) All the above
12. The most important function of Boiler Drum is to
a) Store Boiler water
b) Control feed water flow
c) Release excess pressure
d) Separate water and steam
13. Steam separation in high pressure boiler drums is achieved by
a) Heating of steam
b) Gravity forces
c) Centrifugal forces
d) Combination of gravity & centrifugal forces
14. Continuous blow down is meant for
a) Maintaining Drum level
b) Increasing pH value of feed water
c) Maintaining salt concentration within tolerable limits
d) None of the above
15. One of the following is not a mounting on Boiler Drum
a) Gauge glass
b) Air vent
c) Feed header
d) Safety valve
16. In a tower type Boiler (single pass) all the super heater sections are
a) Vertical
b) Horizontal
c) Wall panels
d) Non drainable
17. The opening set pressure of safety valves will be in the decreasing order for
a) Drum, - Superheater, - Reheater
b) Superheater, - Reheater, -Drum
c) Reheater, - Drum, - Superheater
d) Superheater, - Drum, - Reheater
18. Retention time required for complete combustion of coal depends on
a) Fuel size
b) Volatile matter in the coal
c) Fixed carbon in coal
d) All the above
19. The main feature of tangential firing system is
a) Sustained turbulence throughout the furnace
b) Precise control of air fuel ratio at each burner
c) Use of tertiary air
d) All the above
20. For mechanical atomization
a) Steam is required
b) Compressed air is required
c) Oil should be at high pressure
d) All the above
21. In a corner fired Boilers the Secondary air dampers of the wind box
a) Regulate Secondary air flow to furnace
b) Regulate Primary air flow to furnace
c) Adjust distribution of Secondary air to the combustion zone
d) All the above
22. Water is chosen as the working fluid in boilers due its
e) High availability
f)Low viscosity
g) High specific heat
h) All the above
23. In the boiler, the Economizer are generally located
a) In convective zone
b) In radiant zone
c) After air heater
d) None of the above
24. Water wall tubes are generally made of
a) Carbon steel
b) Chromium-molybdenum steel
c) Stainless steel
d) Cast iron
25. Feed water from Economizer is admitted in to the boiler drum through
a) A wire mesh
b) Feed header nozzle
c) Turbo separator
d) Anti vertex spider
26. To prevent silica carry over by steam the water inside the Boiler Drum must be
a) Alkaline
b) Acidic
c) Neutral
d) Any of the above
27. Turbulence (thorough mixing) of fuel and air is more significantly required
a) Before the ignition of fuel
b) At the initial stags of combustion
c) At later stages of combustion
d) At all the above conditions
28. Rifle tubes are used for
a) Economizer
b) Water wall
c) Super heater and re heater
d) All the above
29.A 1000MW coal fired Thermal Power Station if runs on full load approximately need coal per day
a) 100 tonnes
b) 1000 tonnes
c) 10000 tonnes
d) 100000 tonnes
30. For large Boilers only induced draft system is not preferred because
a) I.D. Fan size will be very large
b) Precise air control to furnace is not possible
c) Flame will come out of furnace.
d) All the above
31. In a balanced draught system, the balancing point means the point
a)At which furnace pressure is equal to wind box pressure
b) At which the furnace pressure is equal to FD discharge pressure
c)In the furnace where atmospheric pressure is acting
d) Where balancing discs are provided to prevent vibration in ducting
32. In radial fan ___________________type of blade develops low velocity for a given tip or
Peripheral speed
a)Forward curved
b) Flat
c)Backward curved
d) Both (a) & (c)
33. In an axial impulse fan the blades are
a) Having varying cross section from root to tip
b) Welded to the hub
c) Welded between two circular plates
d) Tiltable during operation
34. In Ljungstrom air heater, the rotor is divided into 12 or 24 segments by
a) Division plates
b) Shell plates
c) Radial plates
d) Connecting plates
35. The most preferred atomization method for LDO is
a. Pressure atomization
b. Steam atomization
c. Compressed air atomization
d. Centrifugal atomization
36. The secondary air dampers provided in the wind box of a corner fired boiler are
Meant for
a. Varying the quantity of air to furnace
b. Varying the distribution of air across the height of furnace
c. Selecting the fuel
d. None of the above
37. Circulation number of assisted circulation boiler is ___________
a. One
b. 12 to 15
c. 7 to 9
d. 2 to 3
38. In steaming economizer ____________ heat is added to feed water
a. Latent heat only
b. Sensible and super heat
c. Sensible heat only
d. Sensible and a portion of latent heat
39. The total relieving capacity of the drum and SH safely valves should be _________
a. Less than 100% of the MCR of boiler
b. Equal to 100% of the MCR of boiler
c. Greater than 100% of the MCR of boiler
d. Either a or c
40. At the bottom hopper of the boiler sealing box arrangement is provided to
_________
a. Reduce escape of radiant heat
b. Prevent air ingress to furnace
c. Prevent escape of flue gas
d. None of the above
41. The best method of controlling reheat steam temperature in a tangential corner fired
Boiler is
a. Excess air control
b. Attemperation
c. Tilting burners
d. Gas recirculation
42. In two pass boiler, the second pass enclosure is made of
a. Water walls
b. Repeater
c. Super heater
d. Both a or c
43. In Ljungsteam air preheater cold end baskets are made of _______ material
a. Carbon steel
b. SS
c. Cast iron
d. Corten steel
44. To prevent the entry of flue gas and air mixture to the bearings of Ljungsteam air
Heater, it is provided with _____________________ seal.
a. By pass seal
b. Radial seal
c. Axial seal
d. Rotor post seal
45. ERV is provided in boiler to __________
a. Venting of air during starting from boiler
b. Drain boiler
c. Take care of the pressure surges in boiler operation
d. None of the above
46. Sloping the _____________ at the top forms gooseneck portion of water wall system
a) Front wall
b) Rear wall
c) Right side wall
d) Left side wall

47. The function of classifier in coal mill is to control


a. Grindability index
b. Calorific value
c. Fineness
d. Mill rejects
48. ------------ separate steam from water steam mixture using centrifugal force
a. Corrugated sheets
b. Wire mesh
c. Baffle plates
d. Cyclone separators
49. To prevent silica carry over by steam the water inside the Boiler Drum must be
a. Alkaline
b. Acidic
c. Neutral
d. Any of the above
50. Water for S.H. attemperation is generally obtained
a) From Boiler Drum
b) After Economizer
c) After H.P. heater but before economizer
d) Before H.P. heater

TURBINE

1. _________________ types of rotors are generally used in reaction turbine


a) Solid drum type rotor
b) Hollow drum type rotor
c) Welded disc type rotor
d) All the above
2. Generally turbine rotors are made up of _______________ material
a) Carbon steel
b) Chromium, Molybdenum, vanadium steel
c) Copper
d) Stainless steel
3. The maximum wetness permitted in the last stage of the turbine is
a) 18%
b) 12%
c) 10%
d) 25%
4. The purpose of atmospheric relief diaphragm in LP cylinder is
a) To safe guard the cylinder from excessive pressure
b) To safe guard the cylinder from excessive negative pressure (vacuum)
c) To prevent the air ingress
d) Any of the above
5. Generally the sizes of the LP turbine blades are larger in size
a) To withstand the increased centrifugal force
b) To accommodate the increased specific volume of the steam
c) To avoid tip leakages
d) None of the above
6. Water for HP-bypass valve is taken from
a) BFP discharge
b) CEP discharge
c) Deareator
d) Condenser
7. The enthalpy drop takes place in ____________in case of impulse steam turbine
a) Moving blades
b) Stationary nozzles
c) Both the moving and fixed blades
d) None of the above
8. The barrel type casing is advantages than double shell casing because
a) It is having constant wall thickness all around the axis of rotation. Hence expansion is uniform
b) The starting and loading of the set is quick compared to the double shell casing
c) It remains in constant shape and leak proof while heating
d) All the above
9. The following statement is not true regarding disc or built up type rotors
a) These are not used in IP turbine in a Reheat machine
b) The discs are fixed on the rotor by shrink fitting
c) This type of rotors are cheaper than other type
d) These are generally used in HP turbines
10. The following statement is not true in case of turning gear
a) Turning gear operation reduces the eccentricity of the rotor
b) it eliminates the bending of the shaft due to uneven cooling and heating
c) It reduces the starting torque
d) It helps for sudden admission of more steam in to the turbine during the startup
11. The purpose of balancing / air line in C.E.P. is
a) To equalize the pressure at both ends and helps for continues venting of vapour
b) To warm up the pump
c) To control the temperature raise in the pump
d) None of the above
12. The enthalpy drop takes place in ____________in case of impulse steam turbine
a) Moving blades
b) Stationary nozzles
c) Both the moving and fixed blades
d) None of the above
13. The thermal efficiency of the steam turbine is
a) Lesser than that of steam engine
b) Higher than that of the steam engine
c) Equal to that of steam engine
d) Not comparable
14. In general the material used for the construction of the turbine rotor is
a) Plain carbon steel
b) White metal
c) Cr molybdenum vanadium steel
d) Titanium alloy
15. In K.W.U turbine the following method is used to control the moisture at the low pressure stages
a) cutting edges are fitted with stellite blades
b) Bauhman stage is introduced
c) Last row stationary blades are made as hollow blades with slot and collecting annulus
d) None of the above

16. The following one is not the fixed point of the 210 MW KWU turbine supports
a) Front bearing pedestal of LP turbine
b) Rear bearing Pedestal of LP turbine
c) Thrust bearing housed in the rear bearing pedestal of HP turbine
d) Front bearing pedestal of HP turbine
17. The purpose of providing a journal bearing to support the turbine rotor is
a) They are having high loading capacity
b) It employs a hydrodynamic lubrication
c) They are having high reliability and absence of wear
d) All the above
18. The main purpose of booster pump in series at main BFP suction is to
a) add more flow or capacity
b) to increase NPSH available at main pump suction.
c) to utilize or conserve the motor free end power
d) to maintain supply of water to boiler drum in case of main pump fails
19. The speed of boiler feed water pump is
1] 5000 rpm
2] 1500 rpm
3] 30 – 85 rev per sec
4]1500 rev per sec
20. The type of 210 MW boiler feed water pump is of
a) multistage double volute casing design
b) cartridge – barrel casing design
c) double suction vertical can design
d) multistage radial piston design
21. The following statement is not true regarding the compounding of turbines
a) The compounding of steam turbine is done to allow greater heat drop without increasing the
speed
b) In pressure compounded turbine, the pressure
c) Pressure compounded turbines are having higher efficiency than velocity compounded turbines
d) Velocity compounded turbine costs lesser than pressure compounded turbine of same capacity
22. In which turbine velocity compounding is utilized?
a. Parson turbine
b. Curtis turbine
c. Rateau Turbine
d. None of the above
23. The following statement is not true regarding barrel type casing
a) It consists of two shells (inner and outer)
b) Inner shell is spilit and carries the guide blades
c) Outer shell is not spilit and have uniform wall thickness
d) None of the above
24. In IP turbine (KWU), the gap between the inner and outer shell is filled with
a) Exhaust steam of the turbine
b) Inlet steam of the turbine
c) PRDS steam
d) Steam is not filled
25. __________________ type of rotors are generally used in high pressure end
a) Built-up type rotor
b) Welded disc type rotor
c) Integral rotor
d) None of the above
26. Generally turbine rotors are made up of _______________ material
a) Carbon steel
b) Chromium, molybdenum, vanadium steel
c) Copper
d) Stainless steel
27. In moving blades of the steam turbine, the following energy transfer takes place
a) Potential energy to kinetic energy
b) Kinetic energy to mechanical energy
c) Thermal energy to mechanical energy
d) None of the above
28. The reason for making the LP turbine as double flow
a) To make the layout easier
b) Steam can be distributed uniformly into the condenser
c) It decrease the size of last stage blades by decreasing the volume of steam
d) To allow for free expansion of the casing
29. The axial force on the turbine rotor will be more for
Reaction turbine
Impulse turbine
Radial flow turbine
Tangential turbine
30. In 210 MW KWU unit the main oil pump is driven by
a) 6.6 KVA 3 phase A.C motor
b) HP turbine though gear coupling
c) Separate steam driven turbine
d) It is directly driven by turbine through rigid coupling
31. The purpose of a injector in the turbine lub oil system is
a) To provide a low pressure oil to bearings
b) To provide the lubricating oil during the turbine tripping
c) To provide the oil supply to bearings incase of failure of DC pump
d) To provide the necessary suction pressure to main oil pump

32. The following one is not true in case of main oil pump
a) Main oil pump is located in the front pedestal of HP turbine
b) It is connected with HP turbine
c) It is wanted over the cover plate of the main oil tank
d) It is the pump which will be in service when the turbine is an load
33. The purpose of a jacking oil steam is
a) To provide necessary lubrication when main oil pump fails
b) To provide necessary lubrication when auxiliary oil pump fails
c) To lift the rotor when the turning gear is in service
34. The function of a governor in a steam turbine is
a) only to regulate the mean speed of the turbine during changes in the loading
b) only to vary the load on the machine as per the requirements of the operator
c) To control the speed of the turbine during speed raising only
d) All the above
35. The following statement is not true regarding by-pass governing
a) It consists of main and by-pass valve
b) By pass valve admits the steam after the first few stages of the turbine
c) Main and by-pass valve each having 50% capacity
d) When the load is more than 80% of the load will be control by by-pass valve alone
36. The following one is not true in case of Nozzle control governing
a) The first stage of the nozzle is divided into number of nozzle groups
b) Each nozzle group is supplied with steam by separate valves
c) Depending upon the load variation the system is throttled in pre-arranged sequence one after
other
d) The steam input is varied by simultaneous operation of control valves.
37. In hydro mechanical governing system _________ is the speed sensing element
a) Halls probe
b) Hydraulic speed transmitter
c) Speed governor
d) Governor impeller
38. In case of hydro mechanical governing system the following component does not take part in the
normal governing process
Intermediate pilot valve
Control valve servo motor
Differentiator
Summation pilot valve
39. In 210 K.W.U Governing system the auxiliary trip oil circuit is connected between the following
components
a) Stop valve servomotor and control valve servo motor
b) Main trip valve and stop valve servo motor
c) Hydraulic protective devices and Main trip valve
d) Startup & and load limiting device and control valve servo motor
40. During the ATT test for over-speed, the fly bolt operation is checked by
a) Reducing the trip oil pressure
b) Actually raising the turbine speed to the overspeed set value
c) Both a & b
d) Increasing the test oil pressure
41. In _____________ the steam is ejected at a pressure higher than atmospheric pressure
a) Condensing turbine
b) Back pressure turbine
c) Pass out turbine
d) Low pressure turbine
42. In cold reheat (CRH) line reversal of steam flow from reheater to HP turbine is prevented by
a) Control valve
b) Stop valve
c) Non return valve
d) Any of the above
43. In a210 MW KWU unit , the rotor of the individual cylinders are connected by
a) Flexible coupling
b) Welding
c) Solid coupling
d) Any of the above
44. The following one is the fixed point of the turbine rotor
a) Front bearing pedestal of HP turbine
b) Front bearing pedestal of LP turbine
c) Rear bearing pedestal of LP turbine
d) Thrust bearing housed in the rear bearing pedestal of HP turbine
45. In 210 MW KWU unit the thrust bearing is kept
a) In between HP and LP turbine
b) In between IP and LP turbine
c) Rear end of LP turbine
d) Front pedestal of HP turbine
46. The leak off steam from the external glands of the turbine cylinder goes to
a) Deaerator
b) LP heaters
c) Condenser
d) Gland steam cooler
47. When by-pass system is required
a) during startup
b) during turbine trip
c) higher steam pressure
d) all the above
48. From the following which one is not true with respect to regenerative feed heating system?
a) It improves cycle efficiency
b) Decreasing pumping power
c) Less cooling water required
d) Bigger condenser required
49. Air lines from HP heater side is connected to
a) Deaerator
b) Condenser
c) Ejector
d) None of the above
50. BFP balancing drum/piston is located at ___________
a) Suction side of the BFP
b) At 3rd stage of BFP
c) Discharge side of the BFP
d) All the above

ELECTRICAL
1. Turbo Generator Rotor is of
a. Salient pole laminated type
b. Non-salient pole laminated type
c. Non-salient pole solid type
d. Salient pole solid type.

2. Manufacturing class of insulation of Modern Turbo Generator is


a. Class C insulation
b. Class B insulation
c. Class A insulation
d. Class F insulation

3. H2 is used in Turbo Generator because


a. It improves efficiency of the Generator
b. It improves cooling
c. It reduces losses
d. All the above.
4. The retaining rings are used in Turbo Generator rotor
a. To protect the rotor winding against the centrifugal force
b. To protect the centering ring of Turbo Generator Rotor
c. To protect the stator winding
d. To protect the rotor end winding against centrifugal force.
5. The rotor winding is made up of from Silver bearing copper because
a. It reduces the contact resistance
b. It reduces the winding resistance
c. It reduces the copper shortening phenomena
d. It is more flexible.
6. Roe bel Transposition of Stator Conductors are done
a. To have an equal voltage on all stator conductors
b. To have an equal voltage at rotor terminals
c. To have an equal current in all the Stator Conductors.
d. None of the above
7. The Turbo Generator Stator winding is of
a. Concentric winding
b. Helical winding
c. Lap winding
d. Wave winding
8. Turbo Generator magnetic system is made up of ____________
a. HRGO silicon steel
b. CRNGO silicon steel
c. Cast steel
d. Mu. Metal
9. BHEL make Turbo Generator of stator water-cooled 210 MW units are
a. THW Type
b. THRI Type
c. THDF Type
d. TLRI Type
10. The Turbo Generator Rotor winding is of
a. Concentric winding
b. Helical winding
c. Lap winding
d. Wave winding
11. The Coolers, in the Stator casing of Turbo Generator are provided for cooling
a. Seal Oil
b. Hydrogen
c. Water
d. Lub. Oil
12. The purpose of providing Babbit metal in the bearing is
a. To cool the lub. Oil
b. To cool the seal oil
c. To offer a support to bearings.
d. To offer a friction less surface at the bearings.
13. Seal Oil system is used in Turbo Generator
a. To cool the bearings
b. To prevent escape of water from Gas coolers
c. To prevent escape of water from Stator water cooling system.
d. To prevent H2 escape from Generator.
14. Seal Oil System must be used for all
a. Air cooled Turbo Generator
b. H2 cooled Turbo Generator
c. Stator Water Cooled Turbo Generator
d. None of the above.
15. The Short Circuit Ratio of a Typical 210 MW Turbo Generator is
a. 0.48
b. 1.0
c. 0.8
d. 0.3
16. Field Discharge Resister (FDR) in excitation system is to
a. Protect stator winding insulation
b. Protect rotor winding insulation
c. Protect exciter winding insulation
d. All the above
17. Hydrogen is used as Cooling medium in Turbo Generator because
a. it is having low density
b. it is having high density
c. it is having low conductivity
d. None of the above.
18. No. of poles in Modern Turbo Generator of medium capacity are
a. 4 poles
b. 2 poles
c. 6 poles
d. 8 poles
19. Normally, stator rated voltage of modern Turbo Generator (typical 210 MW) is
a. 10.5 Kv
b. 21 Kv
c. 15.75 Kv
d. 18.4 Kv
20. Air gap of the Motor/Generator is nothing but the
a. gap between stator and shaft
b. gap between shaft and bearing
c. gap between stator and rotor
d. None of the above
21. The efficiency of Electro static precipitator
a. Increases with increased thickness of dust deposit
b. Decreases with increased thickness of dust deposit
c. It independent of thickness of dust deposit
d. None of the above
22. The emitting electrodes of ESP are
a. Spiral wound stainless steel wires of diameter 1.6mm
b. Steel plates of 1.6mm
c. Spiral wound stainless steel wires of diameter 2.5mm
d. Cured sheets
23. The collecting electrodes of ESP are
a. Spiral wound stainless steel wires of diameter 1.6mm
b. Steel plates of 1.6mm
c. Spiral wound stainless steel wires of diameter 2.5mm
d. Cured sheets
24. The working principle of AC Motor is based on
a. Mutual Induction
b. Faraday’s Laws of Electro Magnetic Induction
c. Self Induction
d. Lenz’s Law
25. In motor to find out the direction of the motion of the rotor, _________________ rule is used
a. Fleming left hand
b. Fleming right hand
c. Either a or b
d. None of the above
26. Separators are provided in between +ve and –ve plates of battery
a. to avoid buckling of plates
b. to avoid excessive shedding of plates
c. to avoid excessive discharging
d. to avoid short circuit of plates
27. Hydrometer is used to measure
a. the amount of water content present in the cell
b. the internal cell resistance
c. specific gravity of the electrolyte
d. none of the above
28. The type of storage battery used in Power Station is
a. nickel-cadmium type
b. nickel-iron type
c. lead acid type
d. lithium battery
29. The specific gravity of Electrolyte, when the battery is fully charged is
a. 1.2
b. 1.16
c. 1.35
d. 1.85
30. The main purpose of Trickle charger used in D.C System is
a. to supply trickle charge to battery
b. to supply normal DC load in Power Station
c. for both (a) & (b) above
31. AVR functions as
a) open loop control
b) closed loop control with voltage feedback
c) closed loop control with current feedback
32. The controller used in AVR is
a) PID controller
b) PI controller
c) PD controller
33. Limiters in conjunction with AVR ensure
a) constant generator voltage
b) voltage feedback to AVR
c) optimum utilization of the machine
34. The Rotor current limiter helps to prevent
a) variation in rotor current
b) thermal overloading of the rotor
c) the speed variation of the rotor
35. The comparator in AVR compares
a) voltage set reference and generator feedback current
b) current set reference and generator voltage feedback
c) voltage set reference and generator voltage feedback
36. Excitation system feeds the DC voltage to the
a) rotor winding
b) stator winding
c) both stator and rotor windings

37. The Capability diagram helps to know about the


a) capacity of the machine
b) operating limits of the machine
c) functioning of the machine
38. For Synchronization, the terminal voltage of the incoming Alternator must be
a) Equal to the Bus- bar voltage
b) greater than the Bus- bar voltage
c) Lesser than the Bus- bar voltage
39. The De-energization system helps to de-energize the
a) field energy
b) generator voltage
c) filed flashing voltage
40. In Static excitation system, the Thyristor Bridge converts
a) AC voltage into DC voltage
b) DC voltage into AC voltage
c) DC voltage into DC voltage
41. The efficiency of Electro static precipitator
Increases with increased thickness of dust deposit
Decreases with increased thickness of dust deposit
It independent of thickness of dust deposit
None of the above
42. The emitting electrodes of ESP are
a) Spiral wound stainless steel wires of diameter 1.6mm
b) Steel plates of 1.6mm
c) Spiral wound stainless steel wires of diameter 2.5mm
d) Cured sheets
43. Back corona problems are in ESP due to
Air leakage in to the hoppers
High electrical resistivity of fly ash
High excess air operation
All the above
44. A circuit breaker is
A transient effect neutralizing device
A power factor-correcting device
A current interrupting device
A waveform correcting device
45. For opening the isolator during load condition the sequence of operation to be done is

a) Isolator is to be opened first and then the circuit breaker


b) Circuit breaker is to be opened first and then the isolator
c) Both to be opened simultaneously
d) None of the above
46. The contact resistance of CB under closed condition will be of the order of
a) Kilo ohms
b) Ohms
c) Micro ohms
d) Mega ohms
47. SF6 gas has an excellent heat transfer property because of its
Higher molecular weight
Higher dielectric strength
Electro negative gas
All the above
48. Activated alumina is present in the SF6 circuit breaker to
Increase the dielectric strength of SF6.
To reduce the moisture content of SF6
To filter out the fluorides present inside the circuit breaker.
None of the above.
49. The purpose of sputter shield is
a) To prevent the vacuum from moisture
b) To condense the metal vapor released from contact surface during arcing.
c) To prevent the vacuum contamination.
d) None of the above.

50. The circuit breaker rating relevant to transient stability is


a) rated voltage
b) rated operating time
c) rated breaking current
d) None of the above