INDEX OF DRAWINGS

SHEET NO. DESCRIPTION

1 GENERAL NOTES AND DESIGN CRITERIA


GENERAL NOTES DESIGN DATA
2 MULTI-COLUMN BENT - DETAILS
3
UNIT WEIGHT OF BACKFILL MATERIAL = 120 lb/ft. 3 MULTI-COLUMN BENT - COLUMN DETAILS
1. ALL REINFORCEMENT STEEL BARS SHOWN MEET THE REQUIREMENTS OF
ASTM A 615, A 706, OR A 996. 4 MULTI-COLUMN BENT - COLUMN SECTIONS
3
UNIT WEIGHT OF CONCRETE = 150 lb/ft.
5 MULTI-COLUMN BENT - WALL PIER DETAILS
2. MATERIALS AND WORKMANSHIP ARE TO BE IN ACCORDANCE WITH PUBLICATION 408.
EQUIVALENT FLUID EARTH PRESSURE = 35 psf/ft OF DEPTH 6 HAMMERHEAD - DETAILS
3. PIER DIMENSIONS ARE DETERMINED BY DESIGN. 7 HAMMERHEAD - COLUMN DETAILS AND SECTIONS
FOR FOOTINGS USE A MINIMUM DEPTH INCREMENT OF 3"
8 SOLID SHAFT - DETAILS
4. PROVIDE THE FOLLOWING MINIMUM CONCRETE COVER FOR REINFORCEMENT:
MINIMUM FOOTING THICKNESS: 2'-0" FOR SPREAD FOOTINGS
4" - CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 9 SINGLE COLUMN - DETAILS
2'-6" FOR FOOTINGS ON PILES
3" - CONCRETE EXPOSED TO EARTH
10 SINGLE COLUMN - COLUMN DETAILS AND SECTIONS
2" - CONCRETE EXPOSED TO WEATHER
SOLID PIERS SHALL HAVE A MINIMUM THICKNESS OF 2'-0" AND MAY BE WIDENED AT 11 SINGLE DRILLED SHAFT - DETAILS
1•" - TO CROSS TIES IN COLUMNS
THE TOP TO ACCOMMODATE THE BRIDGE SEAT WHEN REQUIRED.
3" - SIDE COVER TO STIRRUPS IN PIER CAPS TO PROVIDE CONSTRUCTION
SINGLE DRILLED SHAFT - SHAFT/COLUMN DETAILS
TOLERANCE AND LONG TERM SERVICEABILITY 12
FOR ROUND, SQUARE AND RECTANGULAR COLUMNS USE A 3'-0" MIN. COLUMN DIA./WIDTH. AND SECTIONS
USE INCREMENTS OF 6" MINIMUM TO INCREASE COLUMN WIDTHS/DIA.
5. USE CLASS A CEMENT CONCRETE IN PIERS, FOOTINGS AND DRILLED SHAFTS. 13 TYPICAL FOOTING DETAILS

SHRINKAGE KEYS MUST NOT BE USED IN PIER CAPS TO ELIMINATE PARTIAL OR TOTAL SHRINKAGE 14 TYPICAL CAP DETAILS
6. USE CLASS C CEMENT CONCRETE BELOW BOTTOM OF FOOTINGS, IF SPECIFIED.
STRESSES. 15 REHABILITATION AND JACKING DETAILS
7. EPOXY COAT MAIN REINFORCEMENT BARS (J-BARS) PROTRUDING FROM PIER FOOTINGS INTO
FOR COLUMNS OR PIER BENTS LOCATED IN THE SLOPED PORTION OF AN EMBANKMENT, INCREASE
COLUMNS OR STEM AND CAP STEEL BELOW OPEN JOINTS.
THE EARTH PRESSURE AGAINST THE BACK OF THE FOOTING AND COLUMN 100% TO INCLUDE THE
EFFECT OF THE ADJACENT EMBANKMENT.
8. FOR ADDITIONAL EPOXY COATED REINFORCEMENT BAR REQUIREMENTS, SEE DESIGN MANUAL,
PART 4, CONCRETE STRUCTURES, SECTION D.5.4.3.6P.
PIERS LOCATED IN THE EMBANKMENT MUST BE INVESTIGATED FOR STABILITY NOT CONSIDERING
SUPERSTRUCTURE LOADS.
9. KEY FOR CONSTRUCTION JOINT MAY BE FORMED INTO THE COLUMN OR INTO THE FOOTING.

FOR STEEL BRIDGES WITH MULTIPLE FIXED PIERS AND CONTINUOUS DECK DESIGN,
10. SEE BC-736M FOR STANDARD SPLICE AND DEVELOPMENT LENGTHS.
PROVIDE A TEMPERATURE/DISPLACEMENT TABLE FOR PLACEMENT AT OTHER THAN 70°F.

11. PROVIDE ƒ" V-NOTCH IN COLUMNS OF PIERS AT FINISH GROUND LINE FOR
PIERS NEAR WATER.

12. FOR FOOTINGS FOUNDED ON BEDROCK A MINIMUM OF 1 FT. SOIL COVER IS PREFERRED
BUT NOT REQUIRED. SOIL COVER MAY BE ANY DEPTH TO AVOID UNNECESSARY EXCAVATION. CONSTRUCTABILITY CONSIDERATIONS
13. FOR CHECKING CRACK CONTROL, THE SIDE CLEARANCE SHALL BE 2". A 3" COVER IS INDICATED TO ALLOW PLACEMENT OF THE PIER CAP REINFORCEMENT CAGE:
TO PROVIDE CONSTRUCTION TOLERANCE AND LONG TERM SERVICEABILITY. - PROVIDE SPLICES IN COLUMN TIES WHICH EXTEND INTO THE PIER CAP.
- DO NOT EXTEND SPIRALS INTO THE PIER CAP. PROVIDE SPLICED TIES.
14. APPLY AN EPOXY RESIN COATING TO ENTIRE PIER COLUMN/WALL THAT ARE WITHIN SPLASH
ZONE (14 FT. OF ROADWAY EDGE), TO PROTECT AGAINST SALT SPRAY. FOR VERTICAL COLUMN REINFORCEMENT STABILITY, EXTEND VERTICAL COLUMN STEEL
(J-BARS) TO BOTTOM MAT OF FOOTING REINFORCEMENT STEEL.

COLUMN
- FOR STEPPED COLUMN, PROVIDE 6" MINIMUM / 2'-0" MAXIMUM WIDTH VARIANCE.
CONSIDER USING COLUMN SEGMENT LENGTHS WITH 1'-0" INCREMENTS FOR ALL BUT
TOP COLUMN SEGMENT. SEE ELEVATION ON SHEET 9, FOR GRAPHICAL REPRESENTATION.
- FOR ROUND COLUMNS, RECOMMENDED MAXIMUM COLUMN DIA. IS 8'-0".

BC-735M WALL CONSTR. & EXP. JOINT DETAILS

BC-736M REINFORCEMENT BAR FABRICATION DETAILS

BC-751M BRIDGE DRAINAGE

BC-755M BEARINGS

BC-788M TYPICAL WATERPROOFING AND EXPANSION DETAILS COMMONWEALTH OF PENNSYLVANIA


BD-613M HIGH LOAD MULTI-ROTATIONAL POT BEARINGS
DEPARTMENT OF TRANSPORTATION
BUREAU OF PROJECT DELIVERY
BD-621M REINFORCED CONCRETE ABUTMENTS

REQUIREMENTS FOR TENDONS, DOWELS, SHEAR BLOCK,


BD-651M STANDARD
DIAPHRAGMS, SKEW LIMITATIONS AND BACKWALLS

BD-653M TYPICAL FRAMING PLANS AND DETAILS REINFORCED CONCRETE PIERS

BD-656M TYPICAL LONGITUDINAL SECTIONS

BD-658M
SHEAR BLOCK DETAILS AT PIER - P/S CONCRETE I-BEAM GENERAL NOTES AND DESIGN CRITERIA
AND BOX BEAM BRIDGES

BD-664M CONTINUITY FOR LIVE LOAD DETAILS - I-BEAM BRIDGES

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


1 OF
15
CONTINUITY FOR LIVE LOAD DETAILS - BOX BEAM
BD-665M
BRIDGES

REFERENCE DRAWINGS CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M
L
STIRRUP SPACING STIRRUP SPACING
@ 24" MAX. @ 24" MAX.
OVER COLUMN OVER COLUMN

D
1 1 1
6"
5 5 STIRRUP SPACING STIRRUP SPACING STIRRUP SPACING

ROUND OR SQUARE COLUMNS (TYP.)


1'-0" COLUMNS MAY BE STEPPED OR TAPERED
4
MIN. COVER FOR SHEAR BLOCK
DETAILS, SEE BD-658M TOP SPLICE (BETWEEN COLUMNS)
(IF REQUIRED)
C
L GIRDER TOP
9
FLEXURAL 8
3'-0"
INDIVIDUAL OR B A REINF.
11
MINIMUM CONTINUOUS SPREAD
LEVEL (SEE TYP. CAP
OR PILE FOOTING
DETAILS ON SHEET 14 FOR

TYPE A SLOPED OR STEPPED CAP)

L
0.75 D
SEE DETAIL A
ON SHEET 14

D
#5 @ 12" BOT. SPLICE
FOR COLUMN TIES
MAX. SPA. B A
BOT. EXTENDING INTO CAP
6 5 5
6"
6 FLEXURAL SEE COLUMN DETAILS
ROUND OR SQUARE COLUMNS (TYP.)
REINF. ON SHEET 3
COLUMNS MAY BE STEPPED OR TAPERED 10

1'-0"
MIN. COVER

- DENOTES RECOMMENDED VALUE

CAP ELEVATION
3'-0"
INDIVIDUAL OR
11 NOTES:
MINIMUM CONTINUOUS SPREAD
OR PILE FOOTING
1 STIRRUPS TO BE SPACED AT A MIN. OF 9" CLEAR
2" CLR. TO FACILITATE CONCRETE PLACEMENT, EXCEPT LOCALIZED
2
TYPE B TOP & BOT.
REGIONS (HIGH SHEAR STRESS ZONES) WHERE A SMALLER
SPACING WILL NOT INTERFERE WITH VIBRATION OR
TOP REINF. CONCRETE PLACEMENT. MAX. SPACING IS 12".

0"
L 2 PROVIDE AT LEAST ONE SPACE AT A MIN. OF 9" CLEAR TO
3" CLR. FACILITATE CONCRETE PLACEMENT. FOR CAPS GREATER THAN

8
EA. SIDE 5'-0" WIDE PROVIDE TWO 9" CLEAR SPACES.
#4 STIRRUPS PROVIDE 6" MIN. AT ALL OTHER SPACES. REINF. SPACING
WILL NEED TO BE ADJUSTED TO CLEAR DOWELS OR ANCHOR BOLTS
MIN.
INCLUDING SLEEVES.

ROUND OR SQUARE COLUMNS (TYP.) 3 PROVIDE #5 @ 12" MIN. OR IF EFFECTIVE DEPTH

3
6 5 5 COLUMNS MAY BE STEPPED OR TAPERED "de" EXCEEDS 3'-0", PROVIDE LONGITUDINAL SKIN
REINFORCEMENT PER AASHTO 5.7.3.4.

INDEPENDENT WALL PIER PORTION (TO ALLOW GREATER 4 ALTERNATE SPLICE LOCATIONS OF ADJACENT BARS.
FLEXIBILITY IN SHORTER PIERS, WHERE THERMAL
1'-0" OR SHRINKAGE FORCES BECOME EXCESSIVE.) 5 TYPICAL RANGE OF COLUMN SPACING, S IS 12'TO 20'.
MIN. COVER 10
6 WHEN POSSIBLE, ENDS OF PIER CAPS SHALL EXTEND S/3 TO
BOT. REINF. S/2 TO BALANCE POSITIVE AND NEGATIVE MOMENTS IN THE CAP.

0"
3" MIN.
7 FOR CONSTRUCTABILITY, PROVIDE STIRRUP SPLICE OVER COLUMNS
6" MAX. AND CANTILEVER PORTIONS OF CAP.
3'-0" CONTINUOUS SPREAD
11
MINIMUM OR PILE FOOTING
8 MULTI-LAYERS
PLACE REINFORCING BARS DIRECTLY BELOW REINFORCING BARS
SECTION A-A IN UPPER LAYER(S)
TYPE C CLEAR SPACING MUST BE 1•" MINIMUM
(DOUBLE STIRRUPS WITH TWO
LAYERS OF TOP REINFORCEMENT) 9 DIMENSION BASED ON THE FOLLOWING PARAMETERS: BEAM SIZE,
BEARING SIZE, ANCHOR BOLT LOCATION/EDGE DISTANCES AND SKEW.
L

10 COORDINATE BOTTOM FLEXURAL CAP REINFORCEMENT WITH VERTICAL


COLUMN REINFORCEMENT TO AVOID INTERFERENCE.

11 BOTTOM OF FOOTING ELEVATION DETERMINED BY SOIL CONDITIONS,


2" CLR. FROST, SCOUR, PAVEMENT DEPTH, ROADWAY DRAINAGE OR ANY
2
ROUND OR SQUARE COLUMNS (TYP.) TOP & BOT. OTHER REQUIREMENTS AS DETERMINED BY THE ENGINEER.
6 5 5 COLUMNS MAY BE STEPPED OR TAPERED
TOP REINF.
1'-0"

0"
MIN. WALL PIER PORTION
3" CLR.

8
DESIGN FLOOD
ELEVATION EA. SIDE
1'-0"
#4 STIRRUPS
MIN. COVER
MIN.

3
3'-0"
11
CONTINUOUS SPREAD
OR PILE FOOTING
COMMONWEALTH OF PENNSYLVANIA
MINIMUM
PROVIDE V-NOTCH AT GROUND DEPARTMENT OF TRANSPORTATION
LINE (PIERS NEAR WATER) BUREAU OF PROJECT DELIVERY
10
TYPE D
BOT. REINF.

0"
3" MIN.
STANDARD
6" MAX.
RECOMMENDED MULTI-COLUMN BENT
CONFIGURATIONS REINFORCED CONCRETE PIERS

GRADE
RAILROAD WITHIN SECTION B-B MULTI-COLUMN BENT
PIER TYPE RIVER 25 FT.
SEPARATION (DOUBLE U-SHAPED STIRRUPS WITH TWO
OF CL TRACK
LAYERS OF TOP REINFORCEMENT) DETAILS
A X
B X
C X X
RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET
2 OF
15
D X X X

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


CAP CAP
CAP

1
TIES @ 6" 1
1
MAX. SPACING TIES @ 6"
MAX. SPACING

4
4
B B B B

DIAMETERS

DIAMETERS
Ld (20 BAR

TIE SPA.
TIE SPA.

SPIRAL WITH

TIGHT PITCH
DIAMETERS

1.25 Ld

(20 BAR

1.25 Ld

(20 BAR
TIE SPA.

6" MAX.

SPACING
3" MAX.

TIES @

MIN.)

MIN.)
3" MAX.
5

5
MIN.)
C C D D

6" MAX.




A A

TIES @ 12" MAX. SPA.

TIES @ 12" MAX. SPA.


A A

#4 SPIRAL WITH

12" MAX. PITCH


6
3

2
3
NOTE:

A A FOR SECTIONS A-A, B-B, C-C


& D-D, SEE SHEET NO. 4.
TIE SPA.

TIE SPA.

SPIRAL WITH
TIGHT PITCH
3" MAX.

TIE SPA.
6" MAX.

SPACING
TIES @
6" MAX.

3" MAX.
5

5
D D
FOOTING


C C


4

4
TIES @ 6"
TIES @ 6"
FOOTING
MAX. SPACING
MAX. SPACING FOOTING

ROUND, SQUARE OR ROUND, SQUARE OR


ROUND COLUMN (ALTERNATE)
RECTANGULAR COLUMN RECTANGULAR COLUMN
(SITE CLASS E, F OR RESPONSE
(RESPONSE ACCELERATION (SITE CLASS E, F OR RESPONSE
ACCELERATION COEFFICIENT, D1
S ,
COEFFICIENT, S
D1 , ACCELERATION COEFFICIENT, D1
S ,
GREATER THAN OR EQUAL TO 0.10 )
LESS THAN 0.10 ) GREATER THAN OR EQUAL TO 0.10 )

SPLICE
NOTES:
COLUMN

20'-0"
1 COORDINATE VERTICAL COLUMN REINFORCEMENT WITH BOTTOM REINFORCEMENT

MIN.
COLUMN
FLEXURAL CAP REINFORCEMENT TO AVOID INTERFERENCE. (TYP.)

14'-0"
2 SPLICE CRITERIA: (SEE PERMITTED SPLICE LOCATION DETAILS) EDGE OF
(IN SPLASH ZONE)
ROADWAY
THE SPLICE LENGTH MUST NOT BE LESS THAN CLASS B SPLICE COLUMN
PER BC-736M.
SPLICE

14'-0"
EDGE OF
STAGGER CLASS B SPLICES SUCH THAT NO MORE THAN 50% OF THE

4'-0"
(NOT IN SPLASH

MIN.
ROADWAY
REINFORCING BARS ARE SPLICED AT ONE LOCATION. ZONE)
GROUND
USE A 6" MAXIMUM TIE SPACING ALONG THE LENGTH OF
THE SPLICE.
LINE
COMMONWEALTH OF PENNSYLVANIA

SPLICE
IF THE ABOVE SPLICE CRITERIA CANNOT BE MET, FULL-MECHANICAL
DEPARTMENT OF TRANSPORTATION
GROUND
CONNECTION SPLICES CAN BE USED PROVIDED NOT MORE THAN BUREAU OF PROJECT DELIVERY
LINE
ALTERNATE REINFORCING BARS IN EACH LAYER ARE SPLICED AT A
SECTION, AND THE DISTANCE BETWEEN SPLICES OF ADJACENT
REINFORCING BARS IS GREATER THAN 24" MEASURED
ALONG THE LONGITUDINAL AXIS OF THE COLUMN.
FOOTING FOOTING
STANDARD
3 FOR BUNDLED #10 BARS OR LARGER, VERTICAL TIE SPACING OR
PITCH OF SPIRAL MUST NOT EXCEED 6". REINFORCED CONCRETE PIERS
4 COLUMN CONNECTION
GREATER OF: • MAX. COL. DIMENSION OR 15"
MULTI-COLUMN BENT
5 PLASTIC HINGE ZONE COLUMN DETAILS
GREATER OF: MAX. COLUMN DIMENSION, 1/6 CLR. HEIGHT OF COLUMN OR 18" PERMITTED SPLICE LOCATION PERMITTED SPLICE LOCATION

6 SPIRAL REINFORCEMENT #4 @ 12" MAXIMUM PITCH, BUT NOT IN NON-SPLASH ZONE IN SPLASH ZONE
LESS THAN THE SIZE AND SPACING SHOWN ON THE DRAWINGS, MAY BE
RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET
3 OF
15
SUBSTITUTED AT NO ADDITIONAL COST TO THE DEPARTMENT.

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


3'-0" MIN. 3'-0" 3'-0" 3'-0"
MIN. MIN. MIN.
#5 MIN.
135° HOOK (TYP.)
EACH CORNER

(COLUMN ONLY)

E
IC

IC
3" CLR.

.
#5 MIN. 1

.
#5 MIN. 1 #5 MIN. 1 #5 MIN. 1

SPL

SPL
MIN

MIN
3'-0"
3'-0"

MIN.
MIN.
ER

ER
"

"
1'-6

1'-6
AG G

AG G
ST

ST
#4 MIN. R.
CL
3" CLR.
3"

.
R
L
C
#4 MIN.
#4 MIN. #4 SPIRAL MIN.

"
SPACE VERT. @ 12"
3
48" MAX. BETWEEN 8" MAX.
RESTRAINED VERTICAL #4 MIN. (COLUMN ONLY) CENTER TO CENTER
BARS

2
SECTION D-D
ROUND COLUMN SQUARE COLUMN SQUARE COLUMN
(PLASTIC HINGE ZONE)
(DESIGNED AS ROUND)

2
SECTION A-A
2 2
SPIRAL LENGTH = ( D)+P (H/P)+(3)( D)
3
3
(DOES NOT INCLUDE ADDITIONAL
1'-2" MAX. 1'-2" MAX.
4 4
LENGTH FOR HOOKED ENDS)
TIE SPACING TIE SPACING
5
5 D = DIAMETER

H = HEIGHT OF SPIRAL PIECE

P = PITCH (DISTANCE BETWEEN TURNS)


E

E
IC

IC
3 = 1• TURNS TOP & BOTTOM
.

.
#5 MIN. 1 #5 MIN. 1 #5 MIN. 1 #5 MIN. 1
SPL

SPL
MIN

MIN
SPIRAL SPLICES:

THE TOTAL SPIRAL LENGTH CAN BE DIVIDED


ER

ER
"

"
INTO SEPARATE PIECES. EACH PIECE MUST
1'-6

1'-6
AG G

AG G
BE PROVIDED WITH 1• EXTRA TURNS AND A
ST

ST
135 DEGREE HOOK AT EACH END. EACH HOOK

MUST ENGAGE A VERTICAL REINFORCING BAR.

THE MAXIMUM DISTANCE BETWEEN THE SPIRAL

PIECES IS LIMITED TO THE PITCH OF THE


#4 MIN. (TYP.) #4 MIN. (TYP.) SPIRAL.
#4 MIN. (TYP.) #4 MIN. (TYP.)

PITCH
1• EXTRA TURNS
SPACING = PITCH MAXIMUM
ROUND COLUMN SQUARE COLUMN SQUARE COLUMN SQUARE COLUMN
(ALTERNATE TIE (DESIGNED AS ROUND) #4 SPIRAL MIN.
6" MAX. CLEAR ARRANGEMENT)
2
SPACING WHEN
SECTION B-B OR APPROVED MECHANICAL CONNECTORS.
ALTERNATE BARS
ARE TIED (TYP.) SPIRAL ANCHORAGE:

1• EXTRA TURNS
1'-2" MAX. 1'-2" MAX.
4 4
TIE SPACING TIE SPACING
5 5
#5 MIN. 1 #5 MIN.

EACH CORNER

(COLUMN ONLY)
E

E
#5 MIN. 1 #5 MIN.
IC

IC
1
.

.
MIN
SPL

SPL

MIN
#5 MIN. 1
1'-6"
ER

ER

"
1'-6
AG G

AG G
ST

ST
#4 MIN.
(COLUMN ONLY)
6" MAX. CLEAR
SPACING WHEN
ALTERNATE BARS
8" MAX. #4 MIN. (TYP.) ARE TIED (TYP.) #4 MIN. (TYP.)
#4 MIN. (TYP.) #4 MIN. (TYP.)
CENTER TO CENTER

COMMONWEALTH OF PENNSYLVANIA
ROUND COLUMN SQUARE COLUMN SQUARE COLUMN SQUARE COLUMN DEPARTMENT OF TRANSPORTATION
(ALTERNATE TIE (DESIGNED AS ROUND)
BUREAU OF PROJECT DELIVERY
ARRANGEMENT)

2
SECTION C-C STANDARD
NOTES:
(PLASTIC HINGE ZONE)
1 COORDINATE VERTICAL COLUMN REINFORCEMENT WITH BOTTOM
FLEXURAL CAP REINFORCEMENT TO AVOID INTERFERENCE.
REINFORCED CONCRETE PIERS
2 FOR LOCATION OF SECTIONS A-A, B-B, C-C & D-D, SEE COLUMN DETAILS MULTI-COLUMN BENT
SHEET NO. 3.

3 CONTRACTOR MAY SUBSTITUTE SPLICED TIES AT NO ADDITIONAL COST TO COLUMN SECTIONS


THE DEPARTMENT.

4 ALL HOOKS ON TIES MUST ENGAGE VERTICAL COLUMN REINFORCING STEEL.


ALTERNATE 90° & 135° HOOKS ON CROSS TIES BOTH VERTICALLY AND HORIZONTALLY.
RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET
4 OF
15

5 WHERE NON-CONTINUOUS TIES ARE USED, THEY SHALL BE LAP SPLICED WITH A
CLASS A SPLICE AND HAVE A 180 DEGREE HOOK WITH AN EXTENSION OF SIX BAR DIAMETERS.
CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M
TIES @ 12"
MAX. SPA.
3
C
L COLUMN
C C FOR REINFORCEMENT
L COLUMN L COLUMN
NOT SHOWN, SEE SHEET 3
FOR REINFORCEMENT FOR REINFORCEMENT
NOT SHOWN, SEE SHEET 3 SQUARE COLUMN ROUND COLUMN
NOT SHOWN, SEE SHEET 3

TIES @ 12"
MAX. SPA.
• TIE SPA.
TOP OF

6" MAX.
WALL PIER

TIE SPA.

TIE SPA.
TIES @ 6"
3

SPACING
3" MAX.

6" MAX.
MAX.
TOP OF TOP OF

5
WALL PIER WALL PIER

#5 MIN. (TYP.)

#5 @ 12
4
E E
A A B B

TIES @ 12"
TIES @ 6"

MAX. SPA.
MAX. SPACING

3
COLUMN COLUMN
FOOTING
REINFORCEMENT REINFORCEMENT

TIES @ 12"
MAX. SPA.
(FULLY DEVELOPED (FULLY DEVELOPED
C IN WALL OR C C IN WALL OR C
1
FOOTING) FOOTING)

3
TIE SPA.

6" MAX.

• TIE SPA.

TIES @ 6"

SPACING
3" MAX.

MAX.
WALL
REINFORCEMENT WALL

5
2
D REINFORCEMENT D

COLUMN WITH

INDEPENDANT WALL PIER

4
(SEISMIC DETAILING REQUIRED
TIES @ 6"
MAX. SPACING FOR COLUMN SECTION ONLY)

C
L COLUMN
FOOTING FOOTING
COLUMN WITH COLUMN WITH C
L PIER &
FOR COLUMN
C
L COLUMN
REINFORCEMENT
INTEGRAL WALL PIER INTEGRAL WALL PIER SEE SHEET 3

(RESPONSE ACCELERATION

3" CLR.
(SITE CLASS E, F OR RESPONSE

(TYP.)
CAULK - SIDES
& TOP (TYP.)
COEFFICIENT, S
D1 , ACCELERATION COEFFICIENT, D1
S , #5 MIN. (TYP.)

LESS THAN 0.10 ) GREATER THAN OR EQUAL TO 0.10 )

1'-6"
MIN.
6 48" MAX. BETWEEN 6 1'-2" MAX.
RESTRAINED VERTICAL TIE SPACING (COLUMN COLUMN
BARS COLUMN
SECTION ONLY) REINFORCEMENT
REINFORCEMENT
(FULLY DEVELOPED
(FULLY DEVELOPED
COLUMN ABOVE COLUMN ABOVE IN WALL OR
IN WALL OR
3" CLR. (TYP.) (TYP.) (TYP.) FOOTING) (TYP.)
FOOTING) (TYP.)
1" CLOSED CELL
FRONT FACE OF WALL PIER
NEOPRENE SPONGE
10" TO BE FLUSH WITH FACE OF
(TYP.) COLUMN (PROTECTED SIDE
OF COLUMN)
3'-0" MIN.

C
L PIER C
L PIER
SQUARE COLUMN ROUND COLUMN
"Y"

SECTION E-E
#4 MIN. #4 MIN.

3" CLR. (TYP.)


C
L COLUMN WALL REINFORCEMENT C
L COLUMN
#4 MIN. (TYP.) #4 MIN. (TYP.)
#5 MIN. (TYP.) WALL REINFORCEMENT
#5 MIN. (TYP.)

SECTION A-A SECTION B-B


COMMONWEALTH OF PENNSYLVANIA
NOTES: DEPARTMENT OF TRANSPORTATION
1 SECTION C-C IS SIMILAR TO SECTION A-A ON SOLID SHAFT DETAILS,
BUREAU OF PROJECT DELIVERY
SHEET 8.

2 SECTION D-D IS SIMILAR TO SECTION C-C ON SOLID SHAFT DETAILS,


SHEET 8.
STANDARD
3 FOR BUNDLED #10 BARS OR LARGER, VERTICAL TIE SPACING
MUST NOT EXCEED 6".
REINFORCED CONCRETE PIERS
4 COLUMN CONNECTION MULTI-COLUMN BENT
GREATER OF: • MAX. COL. DIMENSION (• MAX. "Y" DIMENSION FOR
WALL SECTION) OR 15"
WALL PIER DETAILS
5 PLASTIC HINGE ZONE
GREATER OF: MAX. COLUMN DIMENSION (MAX. "Y" DIMENSION FOR WALL
SECTION), 1/6 CLR. HEIGHT OF COLUMN OR 18"

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


5 OF
15
6 ALL HOOKS ON TIES MUST ENGAGE VERTICAL COLUMN REINFORCING STEEL.
ALTERNATE 90° & 135° HOOKS ON CROSS TIES BOTH HORIZONTALLY AND VERTICALLY.

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


(TYP.)
1 EXTEND DESIGN CANTILEVER SHEAR 1 EXTEND DESIGN CANTILEVER SHEAR

0.5 D
REINFORCEMENT 2'-0" MINIMUM REINFORCEMENT 2'-0" MINIMUM
L
OVER COLUMN OVER COLUMN

1 1
STIRRUP SPACING
6" 6"
STIRRUP SPACING @ 24" MAX. STIRRUP SPACING

D
6 TOP
FOR SHEAR BLOCK FLEXURAL
DETAILS, SEE BD-658M REINF.
A

LEVEL (SEE TYP. CAP

.3 L .4 L .3 L DETAILS ON SHEET 14 FOR

SLOPED OR STEPPED CAP)

1'-0" MIN.
COVER

3
3'-0" SPREAD OR PILE
8
MINIMUM FOOTING

PROVIDE V-NOTCH AT GROUND


FOR COLUMN TIES
TYPE A LINE (PIERS NEAR WATER)
EXTENDING INTO CAP

SEE COLUMN DETAILS


SEE DETAIL A
L & SECTIONS
ON SHEET 14
#5 @ 12"
4 MAX. SPA.
#5 @ 12"
MAX. SPA. 3" (TYP.)
BOT.
A REINF. 7
2'-6" SPLICE UNCOATED BARS 2'-6" SPLICE UNCOATED BARS
3'-0" SPLICE EPOXY COATED BARS 3'-0" SPLICE EPOXY COATED BARS

- DENOTES RECOMMENDED VALUE

.15 L .2 L .3 L .2 L .15 L CAP ELEVATION

1'-0" MIN.
COVER SYMM. ABOUT C
L
NOTES:

BUNDLED BARS BUNDLED BARS


1 STIRRUPS TO BE SPACED AT A MIN. OF 9" CLEAR TO
(HORIZ.) (VERT.) FACILITATE CONCRETE PLACEMENT, EXCEPT LOCALIZED
2" CLR. REGIONS (HIGH SHEAR STRESS ZONES) WHERE A SMALLER
2
3'-0" SPACING WILL NOT INTERFERE WITH VIBRATION OR
CONTINUOUS SPREAD
8 CONCRETE PLACEMENT. MAX. SPACING IS 12".
MINIMUM OR PILE FOOTING

5
TOP FLEXURAL
TYPE B 2 PROVIDE AT LEAST ONE SPACE AT A MIN. OF 9" CLEAR TO
REINF.

0"
6
FACILITATE CONCRETE PLACEMENT. FOR CAPS GREATER THAN
5'-0" WIDE PROVIDE TWO 9" CLEAR SPACES.
PROVIDE 6" MIN. AT ALL OTHER SPACES. REINFORCEMENT
SPACING WILL NEED TO BE ADJUSTED TO CLEAR DOWELS OR
#4 ANCHOR BOLTS INCLUDING SLEEVES.
L STIRRUPS
MIN. 3 PROVIDE #5 @ 12" MIN. OR IF EFFECTIVE DEPTH
"de" EXCEEDS 3'-0", PROVIDE LONGITUDINAL SKIN
4 REINFORCEMENT PER AASHTO 5.7.3.4..
3" CLR. 3" CLR.
4 FLUSH EXP. JT. - FOR DECKS WITH LONGITUDINAL EXPANSION
JOINT.

5 MULTI-LAYERS
PLACE REINFORCING BARS DIRECTLY BELOW REINFORCING BARS
IN UPPER LAYER(S)

3
CLEAR SPACING MUST BE 1•" MINIMUM

6 EXTEND ALL TOP FLEXURAL REINFORCEMENT THE ENTIRE LENGTH


OF CAP.
1'-0"
MIN. 7 COORDINATE BOTTOM CAP REINFORCEMENT WITH VERTICAL COLUMN
WALL PIER PORTION
REINFORCEMENT TO AVOID INTERFERENCE.
DESIGN FLOOD
ELEVATION 8 BOTTOM OF FOOTING ELEVATION DETERMINED BY SOIL CONDITIONS,
FROST, SCOUR, PAVEMENT DEPTH, ROADWAY DRAINAGE OR ANY
OTHER REQUIREMENTS AS DETERMINED BY THE ENGINEER.

1'-0" MIN.
COVER

0"
3'-0" CONTINUOUS SPREAD
8 3" MIN. BOT. REINF.
MINIMUM
TYPE C
OR PILE FOOTING
6" MAX. COMMONWEALTH OF PENNSYLVANIA
PROVIDE V-NOTCH AT GROUND
LINE (PIERS NEAR WATER)
#5 @ 12"
2" CLR.
DEPARTMENT OF TRANSPORTATION
MAX. SPA.
BUREAU OF PROJECT DELIVERY

SECTION A-A STANDARD

RECOMMENDED HAMMERHEAD PIER REINFORCED CONCRETE PIERS


CONFIGURATIONS
HAMMERHEAD
RAILROAD WITHIN
GRADE
PIER TYPE
SEPARATION
RIVER 25 FT. DETAILS
OF CL TRACK

A X X X
B X
RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET
6 OF
15
C X X X

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


CAP CAP TIES REQUIRED WHEN DISTANCE
6 7 48" MAX. BETWEEN BETWEEN LONGITUDINALLY
RESTRAINED VERTICAL SUPPORTED BARS EXCEED 48" 7
BARS

1 1

3" CLR. #5 MIN. 1

3'-0"
MIN.
"Y"
Ld (20 BAR
Ld (20 BAR

DIAMETERS
DIAMETERS
TIE SPA.

TIE SPA.

MIN.)
MIN.)
6" MAX.

6" MAX.
#4 MIN.
#4 MIN.
(TYP.)
(TYP.)

A A


MAX. SPACING
18" LAP #4 MIN.

TIES @ 12" MAX. SPA.

TIES @ 12"
MIN. (TYP.) (TYP.)

3
SECTION A-A
3

2
A A 6" MAX. CLEAR
SPACING WHEN
ALTERNATE BARS 6
14" MAX.
ARE TIED (TYP.)
TIE
SPACING
TIE SPA.

#5 MIN.
6" MAX.

3" CLR. 1

TIES @ 6"

TIE SPA.

"Y"
SPACING

3" MAX.
MAX.
5
C C

FOOTING
#4 MIN.
#4 MIN.


(TYP.)
(TYP.)

4
TIES @ 6" FOOTING 18" LAP #4 MIN.
MAX. SPACING MIN. (TYP.) (TYP.)

SECTION C-C
(PLASTIC HINGE ZONE)

ELEVATION ELEVATION

(RESPONSE ACCELERATION (SITE CLASS E, F OR RESPONSE

COEFFICIENT, S
D1 , ACCELERATION COEFFICIENT, D1
S ,

LESS THAN 0.10 ) GREATER THAN OR EQUAL TO 0.10 )


#5 MIN. 1

18" LAP 1 #5 MIN. 18" LAP


MIN. (TYP.) NOTES:
MIN. (TYP.)

1 COORDINATE VERTICAL COLUMN REINFORCEMENT WITH BOTTOM


CAP REINFORCEMENT TO AVOID INTERFERENCE.

2 FOR SPLICE CRITERIA, SEE SHEET 3, NOTE 2.

3 FOR BUNDLED #10 BARS OR LARGER, VERTICAL TIE SPACING


MUST NOT EXCEED 6".

4 COLUMN CONNECTION
GREATER OF: • MAX. "Y" DIMENSION OR 15"

5 PLASTIC HINGE ZONE


GREATER OF: MAX. "Y" DIMENSION, 1/6 CLR. HEIGHT OF COLUMN
OR 18"

6 ALL HOOKS ON TIES MUST ENGAGE VERTICAL COLUMN REINFORCING STEEL.


ALTERNATE 90° & 135° HOOKS ON CROSS TIES BOTH VERTICALLY AND HORIZONTALLY.

#4 MIN. #4 MIN.
7 WHERE NON-CONTINUOUS TIES ARE USED, THEY SHALL BE LAP SPLICED WITH A
(TYP.) (TYP.) CLASS A SPLICE AND HAVE A 180 DEGREE HOOK WITH AN EXTENSION OF SIX BAR DIAMETERS.

ROADWAY, STREAMS STREAMS


COMMONWEALTH OF PENNSYLVANIA
OR RIVERS OR RIVERS DEPARTMENT OF TRANSPORTATION
BUREAU OF PROJECT DELIVERY

OPTIONAL END TREATMENTS STANDARD

REINFORCED CONCRETE PIERS

HAMMERHEAD
COLUMN DETAILS AND SECTIONS

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


7 OF
15

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


W/CAP W/O CAP W/CAP W/O CAP C
L PIER

B B
2" CLR.

TIE SPA.

TIE SPA.
6" MAX.

6" MAX.
CAP
CAP

#5 @ 12
3" CLR.
MIN. (TYP.)


2'-6" PLAIN
3" CLR. 3'-0" EPOXY
6" 6" MIN. SPLICE
B B #4 @ 12
(TYP.) (TYP.)
STIRRUPS MIN.

MAX. SPACING
A A

TIES @ 12" MAX. SPA.

TIES @ 12"
2" CLR.
3" MIN.

6" MAX. KEYED CONSTR. JT.

2
A A SECTION B-B
2

TIES REQUIRED WHEN DISTANCE


BETWEEN LONGITUDINALLY
48" MAX. BETWEEN

1
SUPPORTED BARS EXCEED 48" 6
RESTRAINED VERTICAL
BARS 5 6

SPA.
1'-2"
3" CLR.

MAX.
#5 MIN.
TIE SPA.
6" MAX.

2'-0"
MIN.
"Y"
TIES @ 6"

TIE SPA.
SPACING
MAX.

3" MAX.
4
#4 MIN.
C C (TYP.)

FOOTING
#4 MIN.


(TYP.)

3
#4 MIN.
(TYP.)
TIES @ 6" FOOTING
MAX. SPACING 18" LAP
MIN. (TYP.) SECTION A-A

1'-2" 5

MAX. TIE
ELEVATION ELEVATION
SPACING

(RESPONSE ACCELERATION (SITE CLASS E, F OR RESPONSE

COEFFICIENT, S
D1 , ACCELERATION COEFFICIENT, D1
S ,

SPA.
1'-2"
LESS THAN 0.10 ) GREATER THAN OR EQUAL TO 0.10 ) #5 MIN.

MAX.
#5 MIN. #5 MIN.
3" CLR.

"Y"
NOTES:

18" LAP 18" LAP


1 FOR SPLICE CRITERIA, SEE SHEET 3, NOTE 2.
MIN. (TYP.) MIN. (TYP.)
#4 MIN.
2 FOR BUNDLED #10 BARS OR LARGER, VERTICAL TIE SPACING
(TYP.)
MUST NOT EXCEED 6".
#4 MIN.
3 COLUMN CONNECTION (TYP.)
GREATER OF: • MAX. "Y" DIMENSION OR 15"

4 PLASTIC HINGE ZONE 6" MAX. CLEAR


GREATER OF: MAX. "Y" DIMENSION, 1/6 CLR. HEIGHT OF COLUMN SPACING WHEN
OR 18" #4 MIN. (TYP.) ALTERNATE BARS
ARE TIED (TYP.)
5 ALL HOOKS ON TIES MUST ENGAGE VERTICAL COLUMN REINFORCING STEEL.
18" LAP
ALTERNATE 90° & 135° HOOKS ON CROSS TIES BOTH VERTICALLY AND HORIZONTALLY.
MIN. (TYP.)
SECTION C-C
6 WHERE NON-CONTINUOUS TIES ARE USED, THEY SHALL BE LAP SPLICED WITH A
CLASS A SPLICE AND HAVE A 180 DEGREE HOOK WITH AN EXTENSION OF (PLASTIC HINGE ZONE)
SIX BAR DIAMETERS.

#4 MIN. #4 MIN.

(TYP.) (TYP.)

COMMONWEALTH OF PENNSYLVANIA
ROADWAY, STREAMS STREAMS
DEPARTMENT OF TRANSPORTATION
OR RIVERS OR RIVERS BUREAU OF PROJECT DELIVERY

OPTIONAL END TREATMENTS STANDARD

REINFORCED CONCRETE PIERS

SOLID SHAFT (WALL)


RECOMMENDED SOLID SHAFT
CONFIGURATION DETAILS
RAILROAD WITHIN
GRADE
RIVER 25 FT.
SEPARATION
OF CL TRACK APR.29, 2016 APR.29, 2016 SHEET
8 OF
15
RECOMMENDED RECOMMENDED
X X X

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY


BD-629M
(TYP.)
0.5 D
L

1 STIRRUP SPACING 1
6" 6"
STIRRUP SPACING @ 24" MAX. STIRRUP SPACING

D
TOP
FOR SHEAR BLOCK
FLEXURAL
DETAILS, SEE BD-658M
REINF.
A

LEVEL (SEE TYP. CAP

ROUND OR DETAILS ON SHEET 14 FOR


SQUARE COLUMN SLOPED OR STEPPED CAP)

4
3" MIN.

H
1'-0" MAX.
(TYP.)

3
1'-0" MIN.
COVER

SEE DETAIL A
6 #5 @ 12" #5 @ 12"
6
ON SHEET 14 MAX. SPA. MAX. SPA.

3'-0" SPREAD OR PILE


7
MINIMUM FOOTING 3" (TYP.) FOR COLUMN TIES
PROVIDE V-NOTCH AT GROUND
A EXTENDING INTO CAP
LINE (PIERS NEAR WATER)
COLUMN BARS SEE COLUMN DETAILS
ELEVATION AND SECTIONS
AND TIES
CONSIDER USING 1'-0" INCREMENTS.
2'-6" SPLICE UNCOATED BARS
3'-0" SPLICE EPOXY COATED BARS
SYMM. ABOUT C
L
RECOMMENDED SINGLE COLUMN BUNDLED BARS BUNDLED BARS - DENOTES RECOMMENDED VALUE

CONFIGURATION (HORIZ.) (VERT.)


CAP ELEVATION
NOTES:
2 2" CLR.
RAILROAD WITHIN
GRADE 1 STIRRUPS TO BE SPACED AT A MIN. OF 9" CLEAR
RIVER 25 FT.
SEPARATION TOP REINF. TO FACILITATE CONCRETE PLACEMENT, EXCEPT LOCALIZED
OF CL TRACK REGIONS (HIGH SHEAR STRESS ZONES) WHERE A SMALLER

0"
SPACING WILL NOT INTERFERE WITH VIBRATION OR
X X X
CONCRETE PLACEMENT. MAX. SPACING IS 12".

5
2 PROVIDE AT LEAST ONE SPACE AT A MIN. OF 9" CLEAR TO
#4 STIRRUPS FACILITATE CONCRETE PLACEMENT. FOR CAPS GREATER THAN
MIN. 5'-0" WIDE PROVIDE TWO 9" CLEAR SPACES.
PROVIDE 6" MIN. AT ALL OTHER SPACES. REINF. SPACING
WILL NEED TO BE ADJUSTED TO CLEAR DOWELS OR ANCHOR BOLTS
INCLUDING SLEEVES.
3" CLR. 3" CLR.

3 PROVIDE #5 @ 12" MIN. OR IF EFFECTIVE DEPTH


"de" EXCEEDS 3'-0" PROVIDE LONGITUDINAL SKIN
REINFORCEMENT PER AASHTO 5.7.3.4..

4 GUIDELINES FOR COLUMN STEPS:


H < 20 FT. : NO STEP

3
H > 20 FT. AND H < 40 FT. : 1 STEP
H > 40 FT. : 2 OR MORE STEPS

STEP CONSIDERATIONS:
MATERIAL SAVING VS. CONSTRUCTION COST
REDUCE COLUMN STIFFNESS TO MINIMIZE THERMAL AND/OR
SEISMIC FORCES
LOCATION DETERMINED BY ANALYSIS

5 MULTI-LAYERS
PLACE REINFORCING BARS DIRECTLY BELOW REINFORCING BARS IN
UPPER LAYER(S)
CLEAR SPACING MUST BE 1•" MINIMUM.

6 COORDINATE BOTTOM FLEXURAL CAP REINFORCEMENT WITH VERTICAL

0"
COLUMN REINFORCEMENT TO AVOID INTERFERENCE.

7 BOTTOM OF FOOTING ELEVATION DETERMINED BY SOIL CONDITIONS,


FROST, SCOUR, ROADWAY PAVEMENT DEPTH, ROADWAY DRAINAGE OR ANY
OTHER REQUIREMENTS AS DETERMINED BY THE ENGINEER.
3" MIN.
2" CLR.
6" MAX.

KEYED CONSTRUCTION JOINT


#5 @ 12"
MAX. SPA.

SECTION A-A
COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF TRANSPORTATION
BUREAU OF PROJECT DELIVERY

STANDARD

REINFORCED CONCRETE PIERS

SINGLE COLUMN
DETAILS

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


9 OF
15

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


135° HOOK

CAP CAP

E
A G G ER S P LIC
#5 MIN. 1

.
1 1

1'-6" MIN
ST

.
R
L
C
"
3
#4 MIN.

Ld (20 BAR
Ld (20 BAR

DIAMETERS
DIAMETERS

TIE SPA.
TIE SPA.
SECTION A-A

6" MAX.
6" MAX.
- DENOTES RECOMMENDED VALUE

MIN.
MIN.

TIES @ 12" MAX. SPACING


NOTES:
#5 MIN.


• 1 COORDINATE VERTICAL COLUMN REINFORCEMENT WITH BOTTOM
CAP REINFORCEMENT TO AVOID INTERFERENCE.

E
IC
2 FOR SPLICE CRITERIA, SEE SHEET 3, NOTE 2.

.
3

SPL
MIN
A A A A 3 FOR BUNDLED #10 REINFORCING BARS OR LARGER, VERTICAL
TIE SPACING MUST NOT EXCEED 6".

A G G ER
"
1'-6
4 COLUMN CONNECTION
GREATER OF: • MAX. COL. DIMENSION OR 15"

ST
3" MIN. 5 PLASTIC HINGE ZONE
3" MIN.

TIE SPA.
GREATER OF: MAX. COL. DIMENSION, 1/6 CLR. HEIGHT OF COLUMN
1'-0" MAX. 1'-0" MAX.
TIES @ 12" MAX. SPA.

OR 18"
#4 MIN.
(TYP.)

6" MAX.
(TYP.)

.
R
L
C
#5 BAR #5 BAR

"
3
8" MAX.


3

12 12
CENTER TO CENTER
3 (TYP.) 3 (TYP.)
CLASS C

CLASS C
SPLICE

SPLICE
SECTION C-C
TIE SPA.

(PLASTIC HINGE ZONE)


6" MAX.

0" TO 6" 0" TO 6"


(IF GREATER THAN (IF GREATER THAN
6" INNER RING 6" INNER RING
OF REINFORCEMENT OF REINFORCEMENT
MUST BE TIED) MUST BE TIED)

OPTIONAL OPTIONAL

TIES @ 6" MAX. SPACING


CONSTRUCTION CONSTRUCTION
JOINT JOINT

C C

5
TIE SPA.

TIE SPA.
6" MAX.

3" MAX.

FOOTING FOOTING


4

TIES @ 6"
MAX. SPACING

COMMONWEALTH OF PENNSYLVANIA
COLUMN COLUMN DEPARTMENT OF TRANSPORTATION
BUREAU OF PROJECT DELIVERY
(RESPONSE ACCELERATION (SITE CLASS E, F OR RESPONSE

COEFFICIENT, S
D1 , ACCELERATION COEFFICIENT, D1
S ,
STANDARD
LESS THAN 0.10 ) GREATER THAN OR EQUAL TO 0.10 )
REINFORCED CONCRETE PIERS

SINGLE COLUMN
COLUMN DETAILS AND SECTIONS

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


10 OF
15

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


PIER CAP

PIER CAP PIER CAP

CAP CAP

GRADE BEAM GRADE BEAM


COLUMNS COLUMNS COLUMN
GROUND/ GROUND/ GROUND/
MUD LINE MUD LINE MUD LINE

DRILLED
SHAFTS DRILLED DRILLED
SHAFTS SHAFTS

COLUMN COLUMN MULTI-DRILLED SHAFT CONFIGURATIONS


(DETAILS NOT SHOWN)

KEYED KEYED
CONSTR. JT. CONSTR. JT.

GROUND/ GROUND/
MUD LINE MUD LINE

6" (TYP.) 6" (TYP.)

1'-0"
MIN.
1'-0"
MIN.

NOTES:

1 DRILLED SHAFTS NOT FORMED OR SOCKETED INTO ROCK ARE


GENERALLY NOT PERMITTED BY THE DEPT., AND IF USED,
MUST BE APPROVED BY THE CHIEF BRIDGE ENGINEER.

2 USE OF BELLED TIP REQUIRES THE PRIOR APPROVAL OF THE


CHIEF BRIDGE ENGINEER.

DRILLED SHAFT DRILLED SHAFT


INCREASE IN INCREASE IN
INCREMENTS INCREMENTS
OF 6" OF 6"

3" MIN. DRILLED

TOP OF TOP OF SHAFT


BEDROCK BEDROCK

ROCK SOCKET
DEPTH OF

6"
30° (MAX.)
DIAMETER OF
ROCK SOCKET

COMMONWEALTH OF PENNSYLVANIA
3 x DIAMETER OF
DEPARTMENT OF TRANSPORTATION
DRILLED SHAFT
BUREAU OF PROJECT DELIVERY
(MAX.)
DRILLED SHAFT
BELLED TIP
STANDARD
(WITH ROCK SOCKET)
REINFORCED CONCRETE PIERS
2
DRILLED SHAFT
SINGLE DRILLED SHAFT
1
DETAILS

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


11 OF
15

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


.
COLUMN

R
L
C
ABOVE

"
135° HOOK

4
1 CAP 1 CAP

E
IC

.
#5 MIN. 1

MIN
ER SPL

(TYP.)

SPLICE
Ld (20 BAR

MIN.
Ld (20 BAR

DIAMETERS
DIAMETERS

MIN.)
MIN.)

"
1' 6

P.)
AG G

GER

"
(TY
ST

-6
AG
1'
#5 MIN.

ST
R
L
C
"
TIE SPA.

3
TIE SPA.
#4 MIN. #4 MIN.

6" MAX.

6" MAX.
SECTION A-A SECTION B-B


A A

TIES @ 12" MAX. SPA.


A A

.
R
L
C
"
TIES @ 12" MAX. SPA.

4
CE
N.
LI
3

MI
SP

P.)
#5 MIN.

STA GG ER
1'-6"
3

(TY
2
TIE SPA.
6" MAX.

TIE SPA.

3" MAX.
GROUND/MUD LINE GROUND/MUD LINE


MAX. SPACING
#4 MIN.

TIES @ 6"
SECTION C-C
CLASS C

CLASS C
SPLICE

SPLICE
(SECTION D-D SIMILAR )

TIES @ 6" MAX. SPACING


4
TIES @ 12" MAX. SPA.

NOTES:
B B B B
1 COORDINATE VERTICAL COLUMN REINFORCEMENT WITH BOTTOM CAP
REINFORCEMENT.
STEEL CASING STEEL CASING
OPTIONAL AS REQUIRED OPTIONAL AS REQUIRED 2 FOR SPLICE CRITERIA, SEE SHEET 3, NOTE 2.
CONSTRUCTION CONSTRUCTION
JOINT JOINT 3 FOR BUNDLED #10 REINFORCING BARS OR LARGER, VERTICAL TIE
C C C C SPACING MUST NOT EXCEED 6".
THEORETICAL POINT THEORETICAL POINT

OF MOMENT FIXITY OF MOMENT FIXITY 4 PLASTIC HINGE ZONE


GROUND/MUD LINE ELEVATION - THEORETICAL POINT OF MOMENT
FIXITY ELEVATION + THE GREATER OF MAXIMUM COLUMN DIMENSION

5
CLASS C

OR 1'-6".

CLASS C
SPLICE

SPLICE
5 PLASTIC HINGE ZONE
TIES @ 12" MAX. SPA.

APPROXIMATE APPROXIMATE 3 X MAXIMUM COLUMN DIMENSION


TOP OF BEDROCK TOP OF BEDROCK
MAX. SPACING

TIES @ 12" MAX. SPA.


TIES @ 6"

TIES @ 12"
MAX. SPA.

D D D D

COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF TRANSPORTATION
DRILLED SHAFT DRILLED SHAFT BUREAU OF PROJECT DELIVERY

(RESPONSE ACCELERATION (SITE CLASS E, F OR RESPONSE


STANDARD
COEFFICIENT, S
D1 , ACCELERATION COEFFICIENT, D1
S ,
LESS THAN 0.10 ) GREATER THAN OR EQUAL TO 0.10 ) REINFORCED CONCRETE PIERS

SINGLE DRILLED SHAFT


SHAFT/COLUMN DETAILS AND SECTIONS

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


12 OF
15

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


EMBEDMENT
1'-0"
3" CLR.
3" CLR. 3" CLR.

2'-0" MIN. 1
1

D
2'-6" MIN. 1'-0" MIN.
2 4 STEEL OR
5'-0" MAX.
3 CONCRETE
1 PILES 2

4" CLR.

1'-0"
4" 4"
4" CLR.
4" CLR.
NOTE:
OTHER DETAILS SIMILAR
TO SPREAD FOOTING
SINGLE COLUMN STEEL OR
2
CONCRETE 0.625 D ; ROUND UP TO ROUND UP TO NEXT
SPREAD FOOTING PILES NEXT 3" INCREMENT 3" INCREMENT

4" 4"
1'-6" 1'-6"

3'-0" MIN.
1'-6" 1'-6"
15'-0" MAX.
SPREAD FOOTING PILE FOOTING
(BOTH DIRECTIONS)

SINGLE COLUMN
STEP DETAILS
PILE FOOTING

NOTES:

1 TIE TOP AND BOTTOM MATS OF REINFORCING STEEL WITH #4


3" CLR. TIE BARS AT A MAXIMUM SPACING OF 4'-0" IN BOTH
DIRECTIONS. PROVIDE TIE BARS WITH 90° HOOK AT ONE END AND
135° HOOK AT THE OTHER END. ALTERNATE 90° AND 135° HOOK
AT TOP IN ALTERNATING TIES.

2'-0" 2 FOR PILE ANCHORAGE DETAILS, SEE BD-621M.


1
MIN.
3 FOR REINFORCEMENT HOOK REQUIREMENTS ON PILE SUPPORTED
FOOTINGS, SEE DM-4, SECTION 5.11.1.2.1.

4 SLOPE OF FOOTING STEP SHOWN IS FOR FOOTINGS ON ROCK OR


4" CLR.
4" PILES. USE 1:1 SLOPE FOR FOOTINGS ON SOIL.

4"

MULTI-COLUMN BENT HAMMERHEAD & WALL

CONTINUOUS SPREAD FOOTING

3
3" CLR.

1
2'-6"
MIN.

4" CLR. COMMONWEALTH OF PENNSYLVANIA


1'-0"

DEPARTMENT OF TRANSPORTATION
STEEL OR BUREAU OF PROJECT DELIVERY
2
CONCRETE
PILES

4" 4"
STANDARD

1'-6"
3'-0" MIN. 3'-0" MIN.
1'-6"
REINFORCED CONCRETE PIERS
15'-0" MAX. 15'-0" MAX.
(BOTH DIRECTIONS) (BOTH DIRECTIONS) TYPICAL FOOTING

MULTI-COLUMN BENT HAMMERHEAD & WALL DETAILS

CONTINUOUS PILE FOOTING


RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET
13 OF
15

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M


U-SHAPED #5 @ 12" MAX. SPA.
1'-0" MIN. (VERT. LEGS NOT SHOWN)
A
L

AM
(TYP.)
STEPS OVER 4"

BE
6"
MUST BE REINFORCED

(TYP.)
4"

L
C
0.5 D
SEE CONCRETE

AM
PEDESTAL DETAILS ANCHOR BOLT (TYP.)

BE
(THIS SHEET) FOR DETAILS SEE

L
C
BC-755M OR BD-613M
A
TOP DESIGN
END OF REINF.

B B PIER CAP
OPTIONAL * L-SHAPED

D
C
L BRGS.
BOT. OF CAP
#5 @ 12"
MAX. SPA.
END OF NOTE:
LEVEL
PIER CAP
B B REINFORCEMENT SHOWN IS TYPICAL FOR EACH STEP.
SPACE TO CLEAR DOWELS OR ANCHOR BOLTS.

ELEVATION

(TYP.)
U-SHAPED #5 @ 12"

6"
MAX. SPA. PLACE TO

ELEVATION CLEAR ANCHOR BOLTS


TOP DESIGN REINF. *REINFORCING BARS
MAY BE CONSIDERED
1'-0" MIN. FOR SERVICEABILITY
SLOPED CAP WITH PEDESTALS
1'-0" MIN.
NEOPRENE BEARING PAD * L-SHAPED #5 @ 12" REQUIREMENTS.
WITHOUT ANCHOR BOLTS
MAX. SPA.

- DENOTES RECOMMENDED VALUE


PLAN - 4 ANCHOR BOLTS PLAN - 2 ANCHOR BOLTS
OR NEOPRENE PAD
L
U-SHAPED #5 @ 12" MAX. SPA. U-SHAPED #5 @ 12"
PLACE TO CLEAR ANCHOR BOLTS
MAX. SPA.

(TYP.)
SEE STEPPED

0.5 D

0"
CAP DETAILS
(THIS SHEET) PEDESTALS OVER 4"
2" CLR.
MUST BE REINFORCED STIRRUPS

TOP OF PIER CAP. MAKE LEVEL UNLESS


PEDESTAL HEIGHT EXCEEDS 18".
OPTIONAL
D

THAN, SLANT THE TOP FROM ONE END


BOT. OF CAP TO THE OTHER.
SECTION A-A

LEVEL STEPPED CAP DETAILS


#4 TIE WHEN PEDESTAL
HEIGHT EXCEEDS 8". PLACE AT
• PEDSETAL HEIGHT OR 9" SPA.
SHEAR BLOCK, C
L PIER CAP
30db MINIMUM IF REQUIRED

SLOPE TOP OF CAP


SECTION B-B PROVIDE 1" DIA. BETWEEN PEDESTALS
ELEVATION PVC PIPE AT LOW END OF 25 25
FOR DRAINAGE FROM
1 1
STEPPED CAP EACH BAY FOR DRAINAGE DECK JOINTS.

CONCRETE PEDESTAL DETAILS 3" CLR.

C
L SINGLE C
L BUNDLED DESIGN db BARS
DESIGN BAR. (S + DESIGN BAR DIVIDED BY 2 )

S CLEARANCE BETWEEN BARS:


TOP ROW DESIGN REINF. 2ND ROW DESIGN REINF.
9" FOR AT LEAST 1 SPACE.
(90° HOOK) IF REQ'D. (180° HOOK)
FOR CAPS GREATER THAN
5'-0" PROVIDE TWO 9" SPA. AS REQUIRED
SPACES. 6" PREFERABLE
FOR OTHER SPACES. (TYP.)
ARCHITECTURAL
PROVIDE A CLEARANCE CIRCLE CONCENTRIC U-SHAPED BARS 3" CLR.
TREATMENT (TYP.)
WITH, & 2" LARGER THAN THE ANCHOR #5 @ 12"
BOLT, IF REQUIRED.
0"
2" CLR. TYP. FOR TOP
3"
C
L ANCHOR BOLT AND BOTTOM OF PIER CAP
C
L PIER CAP

ARCHITECTURAL TREATMENT
3" CLR.
AND TOP OF CAP AT DECK JOINT
RADIUS
C
L SECOND ROW OF DESIGN BARS,
ELEVATION - SINGLE AND
IF NEEDED. A SECOND ROW CAN
MINIMIZE CAP WIDTH. HORIZONTALLY BUNDLED BARS
STIRRUP db

TOP ROW DESIGN REINF. 2ND ROW DESIGN REINF.


2 BAR BUNDLES (1-90° 2 BAR BUNDLES (1-90°
& 1-180° HOOK) & 1-180° HOOK)

3" CLR. SPA. AS REQUIRED

COMMONWEALTH OF PENNSYLVANIA
STIRRUP db
DIMENSION "S"
U-SHAPED BARS
DEPARTMENT OF TRANSPORTATION
(3"+db+RADIUS) BUREAU OF PROJECT DELIVERY
#5 @ 12"
#4 #5 #6 #7 #8

5" 5•" 6" 6•" 7"


3" (TYP.)
STANDARD

COORDINATE VERTICAL COLUMN REINFORCEMENT


REINFORCED CONCRETE PIERS
3" CLR.
3" MIN. WITH BOTTOM CAP REINFORCEMENT TO AVOID

6" MAX.
INTERFERENCE. TYPICAL CAP
ELEVATION - VERTICALLY BUNDLED BARS DETAILS
C
L COLUMN

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


14 OF
15
PIER CAP SECTION DETAIL A
NOTE: STIRRUPS AND SIDE REINF. NOT SHOWN.
CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M
3" CLR.
(TYP.)
C
L COLUMN
EXISTING
1
CONCRETE
COLUMN
DRILL HOLE INTO EXIST.
COLUMN, FILL WITH AN STEEL SHELL SHOTCRETE
EXISTING EXISTING
COVER
APPROVED EPOXY CONCRETE 1 CONCRETE 1
ADHESIVE (TYP.) 2 5 COLUMN COLUMN

3" MIN.
6" MIN.
NEW REINFORCED C THREADED REINFORCING
L PIER &
CONCRETE (TYP.) C
L COL. BAR #4 MIN.

CHIP CONCRETE
FOR TURNBUCKLE TURNBUCKLE DETAIL
#5 MIN.
3
(TYP.)
1'-0" MIN.
EMBEDMENT BOLTED
EPOXY DEPTH (TYP.) CONNECTIONS
BONDING
FILL SPACE BETWEEN #4 MINIMUM HOOPS
COMPOUND
#5 @ 12" SHELL AND COLUMN TENSIONED WITH SPECIAL
DOWELS MIN. (TYP.) WITH GROUT TURNBUCKLE
#4 MIN. ALTERNATE SPACING 2 4
3 SPLICE
(TYP.)
(TYP.)

6" (TYP.) 6" (TYP.)

12" MIN.
DOWEL SPA.

CROSS SECTION CROSS SECTION CROSS SECTION

C
L PIER 3" MIN.

BOLTED
EXISTING CAP CONNECTIONS

1'-0"
SHOTCRETE

ƒ " DIA. BOLTS


(TYP.) 3" CLR. TOP OF COVER
EXISTING

@ 8" MIN.
(TYP.)
COLUMN
SPACING TO MEET MINIMUM TEMPERATURE
REINFORCEMENT REQUIREMENT OR MIN.

CEMENT CONCRETE
SPECIAL TURNBUCKLE REQUIRED BY DESIGN, WHICHEVER IS GREATER.
DRILL HOLE INTO EXIST.
(TYP.) SEE DETAIL
COLUMN, FILL WITH AN
#4 MIN.

CLASS A
#5 MIN. @ 12"

APPROVED EPOXY
MAX. SPACING

ADHESIVE (TYP.) 2 5

REHABILITATION NOTES:
#5 MIN.
3
(TYP.) 1 WHERE NEW CONCRETE CONTACTS EXISTING CONCRETE, SANDBLAST
AND THOROUGHLY CLEAN EXISTING CONCRETE SURFACE TO PARTIALLY
2

EXPOSE AGGREGATE ‚" MIN. AND APPLY EPOXY BONDING COMPOUND.


EXIST. COL. EXIST. COL. EXIST. COL.
6" MIN. 6" MIN.
2 THE CONTRACTOR IS RESPONSIBLE FOR LOCATING THE EXISTING BARS
PRIOR TO DRILLING DOWEL HOLES. ADJUST SPACING AS REQUIRED.
ELEVATION ELEVATION ELEVATION
3 CONTRACTOR IS RESPONSIBLE FOR FINAL REINFORCEMENT BAR LENGTHS.

TYPE 1 TYPE 2 TYPE 3 4 DOWEL BAR TO ENGAGE NEW VERTICAL COLUMN REINFORCEMENT.

5 DRILL HOLES OF PROPER DIAMETER AND DEPTH IN ACCORDANCE WITH


COLUMN REHABILITATION DETAILS MANUFACTURER'S SPECIFICATIONS.

JACKING NOTES:
9" MIN. C
TOP DESIGN REINF. L BEAM/GIRDER
C
L 2" DIA. PVC
TOP DESIGN REINF. 1 JACKING LOAD TO CONSIST OF SUPERSTRUCTURE DEAD LOAD ONLY
PIPE (NUMBER AND
LOCATION AS REQUIRED 9" MIN.
TOP OF PIER CAP
2 SPACE 2" PVC PIPE TO CLEAR ANCHOR BOLTS AND PIER CAP
TO ATTACH JACK SUPPORT
TOP OF PIER CAP PEDESTAL IF REQUIRED REINFORCEMENT.
BRACKETS TO FACE OF CAP)
C TOP OF PIER CAP

JACKING SHELF
0"
0"

LEVEL UNDER EACH HEIGHT AS AS REQUIRED


BEAM/GIRDER REQUIRED

STIRRUPS 1'-0" MIN.


STIRRUPS
(TYP.)

2" DIA.
PVC PIPE
(TYP.)
COMMONWEALTH OF PENNSYLVANIA
DEPARTMENT OF TRANSPORTATION
FACE OF BUREAU OF PROJECT DELIVERY
PIER CAP

SCREW
C STANDARD
IN CAP NOTE: TYPICAL AT EACH BEAM/GIRDER.
REINFORCMENT NOT SHOWN.

CAP SECTION CAP SECTION SECTION C-C REINFORCED CONCRETE PIERS


WITH JACKING SHELF WITH PREFORMED HOLES
REHABILITATION AND JACKING
DETAILS
FUTURE SUPERSTRUCTURE JACKING DETAILS

RECOMMENDED APR.29, 2016 RECOMMENDED APR.29, 2016 SHEET


15 OF
15

CHIEF BRIDGE ENGINEER DIRECTOR, BUR. OF PROJECT DELIVERY BD-629M