PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE


DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person

1. Preliminary works.  Removal All personnel 12  Avoid to use soft ground.  Site Supervisor
construction  Provide escort vehicle for lorry and  HSSE Personnel
debris along mobile crane.  Project Engineer
exaction area  Follow TMP or designated road
 Bad weather. access instruction

 Wear approved reflective vest and  Site Supervisor


2. Survey Works – Setting  Struck by 16 other PPE i.e safety helmet, safety  HSSE Personnel
Out Works moving shoe etc..  Project Engineer
vehicles i.e car,  Walking facing incoming traffic
lorry truck flow/inside barricade area.
and etc  Practice buddy system. (min of 2
persons)
All personnel
 Provide shelter/shade/cover.
 Exposed to 12  Drink more water
heat. .
 Wear dust mask.
 Ground watering.
 Exposed to 12
dust  Stop work during bad weather.
 Provide proper and safe rest area
 Bad weather 16 with lightning arrestor
 Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
3. Mobilization of plant and  Competent machinery  HSSE Personnel
machineries to site  Machinery operator/driver.  Project Engineer
stuck at  Good physical condition of vehicle,
muddy access 16 plant, equipment, machinery.
road  Machinery with valid insurance
coverage
All personnel.
 Crane  4 wheel vehicle to guide during
overturned the mobilization plant
.
 Bad weather
 Competent machinery
Major operator/driver.  Site Supervisor
4 Delivery of work  Poor access to body injury 12  Good physical condition of vehicle,  HSSE Personnel
materials to site the designated All personnel plant, equipment, machinery.  Project Engineer
working area  Machinery with valid insurance
coverage.
 4 wheel vehicle to guide during
the mobilization plant.

 Ensure Safe Working Load is


followed
 Using lifting gears correctly and  Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
5 Lifting materials by crane,  Struck by 12 must be inspected and approved  HSSE Personnel
excavator and backhoe falling/lifting/ All personnel.  Personnel kept clear distance  Project Engineer
moving objects during crane operation  Crane Operator
 Crane overturn  Barricade lifting area and put up
 Bad weather signage “LIFTING IN PROGRESS”
 Do not working/passing below
suspended load
 Competent riggers

 Ensure Safe Working Load is


followed
 Using lifting gears correctly and
Installation of pipes/RCP  Struck by  Site Supervisor
must be inspected and approved
6 culvert/lifting materials falling/lifting/ 12  HSSE Personnel
 Personnel kept clear distance
by excavator. moving objects  Project Engineer
during lifting operation
 Excavator  Excavator Operator
All personnel  Barricade lifting area and put up
collapse due to signage “LIFTING IN PROGRESS”
uneven surface  Do not working/passing below
 Bad weather suspended load
 Accelerate gently to minimize load
swing when travelling with a
suspended load.
 Installation of safety barrier
surrounding excavation area.
 Fall of person  Put up safety/warning signage
Excavation works. into  Site Supervisor
 Excavation shall be consider as
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
7 excavation/pit 12 restricted work area.  HSSE Personnel
area All personnel  Project Engineer
 Ensure safe degree slope
cutting/platform
 Failure of  Deep excavation for > 1.2m depth
excavate slope shall provide temporary work i.e
 Bad weather strutting, timbering and etc.
16  Safe distance from machinery to
excavated area.
 Usage of tagline to receive
material.
 Excavated materials to be placed
minimum of 2m from the edge of
excavated trench.
 Machinery shall be sit on top of
steel plate when perform works at
weak ground condition.
 To properly level the ground
before machinery start excavation
works.

 Wear dust mask.


 Ground watering.
 Prior to start work activity, walk-
 Exposed to down to identify potential hazard
Laying of bedding dust. that could result in slip and trip.  Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
8 materials.  Cut or 12  HSSE Personnel
abrasion, All personnel  Project Engineer
fingers caught
in between.
 Bad weather  Proper housekeeping at working
area and pathway.
 To use proper hand protection.
 Exposed to  Use dust mask if necessary.  Site Supervisor
Formwork Erection dust.  Task to be carried out by trained  HSSE Personnel
9  Hazard by 12 personnel.
 Project Engineer
using sharp  Prior to start work activity, walk-
and handling All personnel down to identify potential hazard
tools. that could result in slip and trip.
 Hit by falling  Brief personal to the hazard prior
objects due to to start activity
mishandling
/slip/trip.
 Cut or
abrasion,
fingers caught
in between
 Proper housekeeping at working
area and pathway.
 To use proper hand protection.
 Skin disease -  Use dust mask if necessary.
Concreting Thrust Block. Exposure to  Site Supervisor
 Task to be carried out by trained
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
10 mortar . 12 personnel.  HSSE Personnel
 Noise and All personnel  Concrete bucket shall have nozzle  Project Engineer
vibration to reduce splash or concrete
hazard when chemical to concreter.
using vibration  Stand by clean water and washing
poker. facilities.
 Body contact
with concrete
chemical
 Exposure to
cement dust /
silica (from
sand)
 Bad weather

 Ensure Safe Working Load is


followed
 Using lifting gears correctly and
 Struck by must be inspected and approved
Installation of HDPE falling/lifting/  Personnel kept clear distance  Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
11 pipe/RCP culvert by moving objects 12 during lifting operation  HSSE Personnel
excavator.  Bad weather All personnel  Berricade lifting area and put up  Project Engineer
signage “LIFTING IN PROGRESS”  Excavator Operator
 Do not working/passing below
suspended load.
 Usage of tagline to receive
material.
 Check on site condition before
start work.
 Accelerate gently to minimize load
swing when travelling with a
suspended load.

 Ensure adequate working


clearance space.
 Installation of safety barrier
 Movement of surrounding excavation area.
Backlifting & Compacting machinery /  Put up safety / warning signage.  Site Supervisor
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
12 Works. contact with 12  Excavation shall be consider as  HSSE Personnel
machinery. All personnel restricted work area.  Project Engineer
 Fall of person  Machineries Operator
into pit /
excavation
area.
 Bad weather.  Proper housekeeping at working
area and pathway.
 To use proper hand protection.
 Hazard in  Use dust mask if necessary.
Rebar Fabrication  Site Supervisor
handling sharp  Task to be carried out by trained
13 12  HSSE Personnel
materials. personnel.
 Project Engineer
 Hit by falling All personnel  Prior to start work activity, walk-
object due to down to identify potential hazard
mishandling / that could result in slip and trip..
slip/ trip.  Brief personal to the hazard prior
 Cut or to start activity.
abrasion,
fingers caught
in between.
 Bad weather
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS

Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary

No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person

Prepared By; Reviewed by: Approved by:


Name : Mohd Suhaimi Bin Che Yaacob. Name: Name:
Position : Site Safety Supervisor Position : HSE Officer / HSE Manager Position: Construction Manager/Project Manager
Signature: Signature: Signature:

Date: Date: Date:

Reviewed by :

OWNER/PMC HSE :

OWNER /PMC CONSTRUCTION :