Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
1. Preliminary works. Removal All personnel 12 Avoid to use soft ground. Site Supervisor
construction Provide escort vehicle for lorry and HSSE Personnel
debris along mobile crane. Project Engineer
exaction area Follow TMP or designated road
Bad weather. access instruction
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
3. Mobilization of plant and Competent machinery HSSE Personnel
machineries to site Machinery operator/driver. Project Engineer
stuck at Good physical condition of vehicle,
muddy access 16 plant, equipment, machinery.
road Machinery with valid insurance
coverage
All personnel.
Crane 4 wheel vehicle to guide during
overturned the mobilization plant
.
Bad weather
Competent machinery
Major operator/driver. Site Supervisor
4 Delivery of work Poor access to body injury 12 Good physical condition of vehicle, HSSE Personnel
materials to site the designated All personnel plant, equipment, machinery. Project Engineer
working area Machinery with valid insurance
coverage.
4 wheel vehicle to guide during
the mobilization plant.
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
5 Lifting materials by crane, Struck by 12 must be inspected and approved HSSE Personnel
excavator and backhoe falling/lifting/ All personnel. Personnel kept clear distance Project Engineer
moving objects during crane operation Crane Operator
Crane overturn Barricade lifting area and put up
Bad weather signage “LIFTING IN PROGRESS”
Do not working/passing below
suspended load
Competent riggers
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
7 excavation/pit 12 restricted work area. HSSE Personnel
area All personnel Project Engineer
Ensure safe degree slope
cutting/platform
Failure of Deep excavation for > 1.2m depth
excavate slope shall provide temporary work i.e
Bad weather strutting, timbering and etc.
16 Safe distance from machinery to
excavated area.
Usage of tagline to receive
material.
Excavated materials to be placed
minimum of 2m from the edge of
excavated trench.
Machinery shall be sit on top of
steel plate when perform works at
weak ground condition.
To properly level the ground
before machinery start excavation
works.
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
8 materials. Cut or 12 HSSE Personnel
abrasion, All personnel Project Engineer
fingers caught
in between.
Bad weather Proper housekeeping at working
area and pathway.
To use proper hand protection.
Exposed to Use dust mask if necessary. Site Supervisor
Formwork Erection dust. Task to be carried out by trained HSSE Personnel
9 Hazard by 12 personnel.
Project Engineer
using sharp Prior to start work activity, walk-
and handling All personnel down to identify potential hazard
tools. that could result in slip and trip.
Hit by falling Brief personal to the hazard prior
objects due to to start activity
mishandling
/slip/trip.
Cut or
abrasion,
fingers caught
in between
Proper housekeeping at working
area and pathway.
To use proper hand protection.
Skin disease - Use dust mask if necessary.
Concreting Thrust Block. Exposure to Site Supervisor
Task to be carried out by trained
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
10 mortar . 12 personnel. HSSE Personnel
Noise and All personnel Concrete bucket shall have nozzle Project Engineer
vibration to reduce splash or concrete
hazard when chemical to concreter.
using vibration Stand by clean water and washing
poker. facilities.
Body contact
with concrete
chemical
Exposure to
cement dust /
silica (from
sand)
Bad weather
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
11 pipe/RCP culvert by moving objects 12 during lifting operation HSSE Personnel
excavator. Bad weather All personnel Berricade lifting area and put up Project Engineer
signage “LIFTING IN PROGRESS” Excavator Operator
Do not working/passing below
suspended load.
Usage of tagline to receive
material.
Check on site condition before
start work.
Accelerate gently to minimize load
swing when travelling with a
suspended load.
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
12 Works. contact with 12 Excavation shall be consider as HSSE Personnel
machinery. All personnel restricted work area. Project Engineer
Fall of person Machineries Operator
into pit /
excavation
area.
Bad weather. Proper housekeeping at working
area and pathway.
To use proper hand protection.
Hazard in Use dust mask if necessary.
Rebar Fabrication Site Supervisor
handling sharp Task to be carried out by trained
13 12 HSSE Personnel
materials. personnel.
Project Engineer
Hit by falling All personnel Prior to start work activity, walk-
object due to down to identify potential hazard
mishandling / that could result in slip and trip..
slip/ trip. Brief personal to the hazard prior
Cut or to start activity.
abrasion,
fingers caught
in between.
Bad weather
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID
JOB SAFETY ANALYSIS FOR EXCAVATION AND LAYING SEWER PIPE
DOC. REF. NO: JSA-
JOB SAFETY ANALYSIS
Supervisor Name: Mohd Faliq B. Shaari Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: Common Facilities Area 3.Evaluate the Risk and Decide If Existing Controls
Task: Excavation and Laying Sewer Pipe Date: 04 June 2015 are Adequate
JSA No: 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
Reviewed by :
OWNER/PMC HSE :