You are on page 1of 6
Cl: ROGER BULLIVANT — METHOD STATEMENT Contract No: ‘contract Name: Doct: POLS SHH Reson bag of 6 Becunet DRIVEN PRECAST CONCRETE PILING 1.0 Purpose and Scope 44 This method statement defies the Company Standard Implementation procedure fr tho constuction of Driven Provast oncrota Pies with the standard spp ont 2.0 Health and Safety Controls 2.1. Seo all eovant Risk Assossmeats 30 Enviconm conols 5.1. The skips, water bowser and licensed caries wil be provided by the Main Conrator, unless lhe sated in tn contract. 52 Operation should only take place within specified working hous 33 Goneral waste shall be daposited into designatod skips. 34 Hazardous waste, such as al contaminated materials, wd ol spi sole. shal be disposed of bya icensed carr. 35 Allvehcles shall not be nn unnecessay. Engines shal be med of ‘shen not nse, 3.5 Funl/ol pis shal be prevented, Drip trays and emergency ol spit kis ‘shal be used i catch and clean the spl lets. Ol spl ks comtaln Enlour coded bags to conan any Used sll equipment These shall bo ‘Isposed of by a lensed carior 40° Process 41 Palo to Commencing Construction 4.1 The Ste Foreman shal ensure that al be safety requirements forthe pling operator are in place and e accordance wn he Company Heath and Safety. 4412 The preparation fo pling opratives shal be in acordance with GENAWID 1085 - Gonere Setup and Pinning, Prepared bys Name 3B Psion Date GEN rocoto race Bb ROGER BULLIVANT METHOD STATEMENT ‘Contract No: ‘Contract Name: uc Mo: POLPMS 1301 Revlon L age 2 of 8 Qos ORIVEN PRECAST CONCRETE PILING 42 etna eoceaure 42:4 The pag ig shal be precisa located atthe poston where the ple tobe riven, normally sot out by others. The Rebar Safety Cap should bo romoved fom he ssting Out pi by hand 25 fate as possible ahead ofthe rg geting tothe pin but before ‘hong is actualy postoned above the pa 422 The pling rig mast sal bo adjusted to he verical postion hacked mt to places at 80" fo each oer. 42.3 The tt pe section shal be presented horizontal tothe ping rigby afork ruck na poston as cose 90” as possible with the drecton of movement tothe hammer Defoe being attached tothe wincn by means ofa sing 424 Before hoisting the pile an excusion zowe shal apply of 1 moter freaterthan the pla secon from thar fool o prevent impact from lotesl movement. The socondmar shall retreat fo 2 fist of I mole bind the ple toe ine with the cvecon ofthe pt section. 4425. Usiog he ple host rope the ple shall sia into a near vetcl poston and the pile oad Ioeated into th ping helmet ‘The foreman wil ensure the steady unhndesed progress ofthe hoist ough careful observation and canto. Dung the host the seconaman may enter tho exclusion zone bul must be at Teast 1 mata avay rom the pile to in te droction of ho it tnt ths pia section is tthe pant of ertoing the holm. AU Ws Sago th socandman may assist in masoeuvring the ple ection ino the helmet Shodd any persons enter the exclusion one, he secondman be closer than described above othe pile belly to calide wih any obstucten the foreman wi Immedataly stop the auxiary nos 426 The les lowered, and he pls manly guided ito the rg foatpate, whieh acs 2s a guide during fe stl penetration ‘movement ofthe pie during driving. Teprovent a rapping acciont should tho ple kick backwards during his procedure, 8 lar area ofa ast 2 metres in frotof he rg must be dear Sf obsructons including plant equipmest and stores. Where tose than 2 metres e svaiabl,exta care must be taken To fenaure the Ple does not ik out whan reposioning, GEN rocote evo trosc8 ROGER BULL ANT] | METHOD STATEMENT ‘Contract No: Contract Name: oecmen DRIVEN PRECAST CONCRETE PILING 42.7 Theil shall be checked for vericalty on achieving @ pnetravln of © m postiena aajustmans sha be mage Foauied 42.8 Allpllos shall be civen toa predetermired set andr length as inatucted onthe brting set. 42.9, To revent damage tothe pi, care must be laken fo ensure the hammer blow is always axial ote pl, and the ple ‘Merete stuck square tothe ple ai 42.10 Tho hoist rope is removed rom the pile, and the ple deving ce cotinued ever atthe same locaton bythe axon of fither ple sections, dependant upon te length andor st pected forthe pl, or at 2 now locate, 442.11 When tracking the ping rig toa now pile location, tho Site Foroman, assisted by Ne Second Man sto physical chock ‘and ovate the rsks and dose whether existing precautions {are adequate or whether moce should be done. Where the i. ‘movements by radiaremote conta the operators to be ‘usted at such a gstance from the mashne fo enable const 380" visiifyfawaronoss. The Socond Wan iste assist in ‘acteuing tho sate movement othe 9 and guaranteeing Segregation of pedstrans and other te. Addons 9 cose ‘motoring of he pling mat and ts egy isto be mantaned ‘whist the rig moves te tho nox plo poston. 43 Jointing 42.1. The conerate fas and the ste! spigotand socket of he to piles which ae tobe joined shall be clean and douitus fee 4.32 The socket shal be ha fled with he pre-med proprietary for ein gout Wet Sunmer gana appropiate 0 se 43.3. Avng gaskets to be placed on top et the lower segment 424 Tho auspended ple secon shal be slomy lowered pig frst Into the socket ofthe lower pe section; tne operatives should onsure their hands are sufisontl above tho Jan faces to top Sny hand injures. The ple dmvng cya ro-started in ‘ceotdance wih socton 3 unt eter th pe set andor length ave been achieved, or after ple son needs to ba ‘ded GENSFoses ev Hc a ROGER BULLIVANT | © METHOD STATEMENT gamer DRIVEN PRECAST CONCRETE PILING 44 Theos 444.1 In simple terms the final set is 2 measure of physical Performance compared witha calculated requement, whore ‘be dopth of ple penetration is measured ver a given number ‘of bons (10 bys nan force (hammer weight» distance froppes} 44.2 Tho requted sels and anticipated pie dsign lengths shal be given othe Ste Foreman in wing oto the commencement Ot ping construction. 44.3. Set measurement on ates achieved by following the stops ‘+The competent machine oparatr isto mark tho Pein an aceassble pant Lethe Pao, vamo, cage, by \ahatever means, rom a tim surface, such 8 he ig foot ‘+The competent machine operatr to retire tothe maximum dstance posible fo safely 4+ Undertake the designsted number of blows (sual 1), ft agian hammer drop elht, 1+ Cease Operation ‘+ Tho compotent machine oporataris ortum tothe Po postion physically measure the depth ponetation + Ropeat the operation unt! desir Sts achieved. Make Pile entry on Ping Log Sheet 444 Where ne pile sets achieved at pile ngth which vais by ‘ore than fan fom the antipeted ple cesign Teng he Pilg Foreman shall roti the Operations Supervisor, record the ‘event on ho pling records and swat ineruction regarding the ‘Scceptablty ofthe pleas ven. The Operations Supereot ‘halteat such events 2 Ste Design Changes n actordance with GEN-WD O44 45° ThePileRe-stiko, 45.1 Arotaking of pile sot undertaken a long a possible after the ples eoastrcton, and atleast 2h afer, to enstie thatthe a ROGER BULLIVANT | METHOD STATEMENT contact Nos Contract Name: Doc No: PGLPMS 1301 Revision Page 5 of 6 Document Te DRIVEN PRECAST CONCRETE PILING dynamic resistance of the ple has not dacreased over a parod ‘an overnight re-stike is not acceptable an contracts of onger -Amininum of 5 t0thes per day wl be carted out, On larger ‘contracts 3 iim o 5% ofthe tt umber pes wl bo Unless the pias ae founded on Rack (icuding chalk), or Denso Gravel o-stkos il be taken over 10 Biws, on randomiy slecod ples urioss otherwisa specified. The ro- ‘tke set shal be equator oss thane sel at end of civ. ‘Only where the pus are founded on Ron (including chalk). or Dense Gravel can the numberof blows 28 reauced to @ rim of Inthe event that a ple estke produces a sel which i greater (Sisekee than the ple set at end of drive the Piing Foreman shall notfy the Operations Supervisor, racotd the event onthe pling records and swat intucton from the Operations ‘Supervisor. The Operations Supervisor shall eat such events 25 Ste Design Changes in accordance wth GEN-AVID O40" Pile Testing 46 462 Dn As wel as rational methods of tasting, we fofer dynamite testing of piles using the Pip Driving Aaiyser ‘operates by persone who are exparerced in ple testing This vidal used and accopted technique oes an ezapamical and ‘anid method of pao testing to sats an statuary or spac reguirements. Static Load Tast- Where testing is inctod inthe Bil of {Gees we have only alowed for estng verte pos Wiorting piles tobe tested shauld be solace car of ‘obstnctns suficenty ear inthe contact fo enable testing to te cari’ out and completed during thecourse ofthe main ping wor, No work by any porson shall be card et on or adjacent tothe pics until such tes as tho Ping Protection Cereal forthe Sub-Gontracl works has boon issued by Roger Bulvant ime GEN rOcH8 Re ro808 METHOD STATEMENT 4b “ROGER BULLIVANT Contact no Contract Name: Doc No: PGLPMS 1301 Revision Page 6 of 6 Coe DRIVEN PRECAST CONCRETE PILING 47 Visa inspection 4.71 Whee the ig st eave site without an as bt survey ofthe pile positions the Rig Operator must canduct a visual chock Song tho Ine of iloe and call tha Area Ofc appears that & pile may rogue checking. 48.1. The Company shal retain copies of al pling records. 482 Where possible the Site Foreman shal bina signa from the Chet oc his representative onthe record sheets ae an ‘greement to tha accuracy ofthe ecard data 48.3. Penctraion records are ta be taken ofthe fist pile on every contrac Subsequent, 3 ofthe lot numbor of contract piles ‘i be recorded inthe Same manoer, wah a minim of 3, proferaty 5 4.84 Inadsion shoud any variation in tho ength occur futher records are to be takon ae appropiate, GEN rosete evo trae

You might also like