FLOW FOR CONSTRUCTION WORKS

REQUEST For Authorization to


Commence

Approved Construction Time


SCHEDULE (Detailed Part)

Approved Construction/ Shop


DRAWINGs (A3 Size)

Mutual Re-SETTING OUT Survey Elevation


Elevation& &Dimension,
Dimension,Line Grade: Form
Line& &Grade : Form
(Indicated Works) design,
design,Profile
ProfilePegs,
Pegs,Stability
Stability& &Safety
Safety(MC-0
(MC-0& &100)
100)

Earth Works: :Clearing


EarthWorks Clearing&&Grubbing,
Grubbing,Stripping,
Stripping, CALCULATION SHEETS for
Excavation,
Excavation,Embankment,
Embankment,Backfill
Backfill Detailed Items
Concrete Structures: :Form,
ConcreteStructures Form,Re-bar
Re-barsteel/
steel/bending
bending
table,
table,Volume,
Volume,Accessories/Embeded,
Accessories/Embeded,M/E M/Epart
part
neccessity
neccessity
Stone Masonry: :Volume,
StoneMasonry Volume,Plastering,
Plastering,Pointing,
Pointing, Mutual
Accessories FIELD CHECK LIST MutualCheck/
Check/Field
FieldInspection
Inspection(by(byForms
Formssheet)
sheet): :
Accessories Schedule,
Schedule,Preparation/
Preparation/Pre
PrePlacement,
Placement,Lab
LabTest
Test
Result,
Result,Form,
Form,Re
ReBar
BarSteel,
Steel,Readiness
ReadinessofofMaterial,
Material,
Equipment,
Equipment, Man Power, InsituAccess,
Man Power, Insitu Access,Weather
Weather

Quality Direction: :team


QualityDirection teamwork workcoordination,
coordination,proper
proper FIELD SUPERVISE
manner
mannersteps
steps&&action,
action,mix mixproportion,
proportion,volume
volume&&
density,
density,sequence
sequenceofofliftlift&&joint,
joint,field
fieldtest,
test,finishing
finishing

MONITORING and Final Measurement : :Curing,


FinalMeasurement Curing,form
formremoval,
removal,
EVALUATION repairing
repairing(if(ifany),
any),re-setting
re-settingout
outsurvey,
survey,lab
labtest
testresult,
result,
evaluation, as-built dwg & progress
evaluation, as-built dwg & progress