9.00% S/. 11.10 9.00% S/. 11.37 9.00% S/. 11.04 9.00% S/. 8.55 9.00%
1.10% S/. 1.36 1.10% S/. 1.39 1.10% S/. 1.35 1.10% S/. 1.04 1.10%
1.24% S/. 1.53 1.24% S/. 1.57 1.24% S/. 1.52 1.24% S/. 1.18 1.24%
1.00% S/. 1.23 1.00% S/. 1.26 1.00% S/. 1.23 1.00% S/. 0.95 1.00%
S/. 0.20 S/. 0.20 S/. 0.20 S/. 0.20
S/. 0.25 S/. 0.25 S/. 0.25 S/. 0.25
S/. 15.66 S/. 16.04 S/. 15.59 S/. 12.17
S/. 208.91 S/. 212.36 S/. 208.22 S/. 166.34
S/. 26.11 S/. 26.55 S/. 26.03 S/. 20.79
Peón
S/. 44.90
S/. 13.47
S/. -
S/. 6.74
S/. 7.74
S/. 1.68
S/. 11.91
S/. 5.08
S/. 13.39
S/. 9.00
S/. 3.14
S/. 8.98
S/. 1.50
S/. 11.23
S/. 138.75
S/. 7.63
S/. 0.93
S/. 1.05
S/. 0.85
S/. 0.20
S/. 0.25
S/. 10.91
S/. 149.66
S/. 18.71
Bonificaiones Permanentes Bonificaciones Por Condiciones
Categoria por
BUC BAE Movilidad Por altura Contacto
JB con Agua
operario
S/. 61.40 S/. 19.65 S/. 7.20 S/. 4.30 S/. 12.28
operador de equipo
liviano S/. 61.40 S/. 19.65 S/. 4.91 S/. 7.20 S/. 4.30 S/. 12.28
operador de equipo
pesado S/. 61.40 S/. 19.65 S/. 6.14 S/. 7.20 S/. 4.30 S/. 12.28
operador
metalmecánico S/. 61.40 S/. 19.65 S/. 9.21 S/. 7.20 S/. 4.30 S/. 12.28
topografo S/. 61.40 S/. 19.65 S/. 5.53 S/. 7.20 S/. 4.30 S/. 12.28
oficial S/. 50.30 S/. 15.09 S/. - S/. 7.20 S/. 3.52 S/. 10.06
peon S/. 44.90 S/. 13.47 S/. - S/. 7.20 S/. 3.14 S/. 8.98
Bonificaciones Por Condiciones de trabajo
Por laborar Por trabajos Por trabajo
Por altitud bajo cota en alta total por dia
cero tempratura nocturno
S/. 2.00 S/. 1.50 S/. 3.50 S/. 15.35 S/. 121.68
S/. 2.00 S/. 1.50 S/. 3.50 S/. 15.35 S/. 126.59
S/. 2.00 S/. 1.50 S/. 3.50 S/. 15.35 S/. 127.82
S/. 2.00 S/. 1.50 S/. 3.50 S/. 15.35 S/. 130.89
S/. 2.00 S/. 1.50 S/. 3.50 S/. 15.35 S/. 127.20
S/. 2.00 S/. 1.50 S/. 3.50 S/. 12.58 S/. 100.25
S/. 2.00 S/. 1.50 S/. 3.50 S/. 11.23 S/. 90.42
Semana Festividades Fechas Domingo Feriado No laborado
1 San pedro jue 29/06/17 1.0000 1.0625 2.0625
2 Fiestas patrias vie 28/07, Sab 29/07 1.0000 2.1250 3.1250
3 Santa rosa Mier 30/08/17 1.0000 1.0625 2.0625
4 Grau Dom 08/10/17 1.0000 0 1.0000
5 Construccion Civil Mier 25/10/17 1.0000 1.0625 2.0625
6 Todos los santos Mier 01/11/17 1.0000 1.0625 2.0625
7 Virgen María Vier 08/12/17 1.0000 1.0625 2.0625
8 Navidad Lun 25/12/17 1.0000 1.0625 2.0625
9 Año Nuevo Lun 01/01/17 1.0000 1.0625 2.0625
10 Semana Santa Jue y Vie 1.0000 1.0625 2.0625
11 Día del Trabajo Mar 01/05/18 1.0000 1.0625 2.0625
Dec-52 Semanas normales 41.0000 41.0000
Total dias laborados 52.0000 11.6875 63.6875
11.3125
Dias Laborados
301.6875 0.21110421
3.75
Dias no laborados
63.3125 0.2098612