You are on page 1of 24

GRILLE

GRILLEDE
DESUIVI
SUIVIANPQP
ANPQPDIM - DIM2.1
version ANPQP
DIM - FOLLOW-UP GRID
DIM ANPQP 2.1 FOLLOW-UP GRID

Moteur(s) - Engine(s): Moteur 33333 Transmission / Transmission: BV 33333333 Véhicule/Vehicle : Véhicule 333 Site(s) d'utilisation /Assembly plant: DOUAI SANDOUVILLE CLEON XXX 333

Ref pièce - Part N°: Ref 8200 000 000 XXX33333333""" Désignation Pièce - Part Name : Pièce XXXXX YYYYY 3333

Nom Fournisseur - Supplier Name: Fournisseur tartanpion 3333 Site Fournisseur - Supplier Plant: Roumania Code Fnr Supplier Code:
D Niv A
a eau Q
RAPPEL DES DATES CLES - KEY MILESTONES EXIGENCES PARTICULIERES APPLICABLES - APPLICABLE SPECIAL FEATURES
t Ris P
e JALONS PROJET (JPOM) que JALONS PIECE (ANPQP) REVUES ANPQP P
Oui / Yes Non / No
PROJECT MILESTONES PART MILESTONES ANPQP REVIEWS 8
9
1
0
Affectation Initialisation
EXIGENCES DE PROPRETE - CLEANLINESS REQUIREMENTS
Sourcing confirmation Initialization

Lancement outillage
Revue 1 - Review 1 EXIGENCES SURETE DE FONCTIONNEMENT - OPERATING DEPENDABILITY FUNCTION
Tooling release

EXIGENCE SECURITE - SAFETY REQUIREMENT

Agrément IOD
EXIGENCE REGLEMENTATION - REGULATORY REQUIREMENT
IOD approval

EXIGENCES METHODOLOGIQUES - TOOLS REQUIREMENTS : - P-FTA

Agrément EI
- AFT - TFA
EI approval

AUDIT DE PRE-PRODUCTION PAR RENAULT - PRE-PRODUCTION AUDIT BY RENAULT

A.F.F RISQUE D'UTILISATION DE SUBSTANCES LISTE N/G/O - FORBIDDEN SUBSTANCE USE RISK

EXIGENCE TRACABILITE UNITAIRE - INDIVIDUAL TRACABILITY REQUIREMENT


ANALYSE DE RISQUES POE - POE RISK ANALYSIS (RPIFIMO1I20060001)
CORRESPONDANTS - CONTACTS
Risque Produit / Process - Product / Process risk Faible - Low NOYAU DUR - CORE TEAM
Fonction - Job Nom - Name tel - phone e-mail:
Risque Site Fournisseur - Supplier Plant Risk Moyen - Medium Pilote GFE Pilot
CA - Buyer
COMMENTAIRE / JUSTIFICATION DE LA COTATION - COMMENT / COTATION EXPLANATION: SQF - SQA
Fournisseur Supplier
Animateur POE
SPP

CORRESPONDANTS METIERS - OTHER CONTACTS


Logistique
NIVEAU DE RISQUE ANPQP - ANPQP RISK LEVEL
Logistics
Méthodes
Process Engineering
Concepteur
RISQUE INITIAL - INITIAL RISK
Design engineer
Moyen - Medium Expert métier
Technical Expert
EVOLUTION - EVOLUTION
Date - Date Evolution - Evolution
Participant : Date of revue : 12/18/2008 Version ANPQP : V2.1
M. Bat Vehicle : Véhicule 333
0 Engine : Moteur 33333
0 Transmission BV 33333333
0 Renault/Nissan: Plant DOUAI SANDOUVILLE CLEON XXX 333
0 Part : Pièce XXXXX YYYYY 3333
0 Reference PIE : Ref 8200 000 000 XXX33333333"""
0 Supplier : Fournisseur tartanpion 3333
0 Production plant : Roumania

CHECK LIST ATTENDUS ANPQP


ANPQP expectings check list According to the 2.1 ANPQP version
Agreement of documents rules :
1: Document completed by supplier and submitted to R/N for signature. 2: Document completed by supplier and submitted to R/N. 3: Document completed by supplier, submitted to R/N only by request. (x) Document completed by sup

Document reçu ? VALIDATION DES DOCUMENTS


Attendu Type of Document
Document received ? Document validation
PHASE 1 - Format

CR RAPP
référence
Dossier
(Imposed / Agreement Document reçu ? Who
Qui fait / Who did Result of validation
Proposed / rule: 1,2,3 Document received ? Validate
Free)

RFQ remis au fournisseur (Dossier consulation) RFQ 1 Purchasing Supplier


RFQ with Quality commitment

Engagement qualité (Fiche F1) X X


Imposed
1 Purchasing Supplier
Quality commitment F1 Sheet

Qual: ANPQP or
3.2
Plan de deploiement des objectif Qualité et fiabilité ?
Libre
2/2/2 Supplier SPP (high risk)
Quality & Reliability target Study Plan Free
Fiab: GFE

Convention IAO DIM (Echange données numériques) 1 GFE Supplier


Data exchange Convention(CAD/CAI) (DIM)

5.2
Shema d'implantation (Flux) X (X)
Libre
3/3/3 Supplier ANPQP
Plant synoptic ((Floor plan layout) Free

certification ISO NA Supplier ANPQP


ISO Certification

Document reçu ? VALIDATION DES DOCUMENTS


Attendu Type of Document
Document received ? Document validation
PHASE 2 - Format
CR RAPP
référence
Dossier

(Imposed / Agreement Document reçu ? Who


Qui fait / Who did Result of validation
Proposed / rule: 1,2,3 Document received ? Validate
Free)

3.1
Correspondant Fournisseur X X Proposed 2/2/2 Supplier Purchasing
Supplier contact list

2.1
CSCC X X Imposed 3/2/2 Supplier Purchasing
Component Supply chain Chart

10.1
DCL définition conditionnement et Validation X X Imposed 2/2/2 Purchasing Supplier
Packaging definition and approval

Special characteristics and key features define (For


4.1 X Proposed 3/2/2 GFE Supplier
the drawing)

11.4
IMDS (International system) IMDS system 1/1/1 Supplier GFE
Declaration table of substances

4.4
Plan validé et Spécification BE (BR) X X PIE 1/1/1 Supplier GFE
Drawing approved

3.4
GRP (Liste des risques Projet) Libre
3/3/3 Supplier ANPQP
Open issue list Free

3.4
Plan Qualité Libre
3/3/3 Supplier
SPP High Risk /
Quality plan Free NA if not

Imposed ANPQP or SPP


4.1 HCPP Study Excel tool
2/2/2 Supplier
if high level risk

4.1
Engagement faisabilité Imposed 2/2/2 Supplier
ANPQP or SPP
Supplyer Feasibility commitment if high level risk

3.3
Signature planning Fournisseur Proposed 3/2/2 Supplier GFE
Supplier Master schedule approval

Elaboration du plan de validation rsa GFE GFE


Test and validation plan (DVPR)

3.3
Plan et rapport de mise en production Imposed 3/2/2 Supplier
ANPQP or SPP
Supplier production preparation monitoring and status report for high level risk

4.3
CR Revue de developpement interne FRN Free 3/3/3 Supplier
ANPQP or SPP
Supplier Internal Design review record for high level risk

10.1
Agrément EDI (Lance le processus EDI si nouv site) X Imposed (1/1/1) Supplier DSIR
Supplier EDI agreement

Synthèse AMDEC Produit (Selon responsabilité dev) ANPQP or SPP


4.2 Free (3/3/3) Supplier
Product DFMEA Summary for high level risk

3.3
Description des Capacités de production Proposed 2/2/2 Supplier Purchasing
Production capacity plan

TOP RO NA NA Purchasing Supplier


Renault tooling order (tool launching)

Document reçu ? VALIDATION DES DOCUMENTS


Attendu Type of Document
Document received ? Document validation
PHASE 3 - Format
CR RAPP
référence
Dossier

(Imposed / Agreement Document reçu ? Who


Qui fait / Who did Result of validation
Proposed / rule: 1,2,3 Document received ? Validate
Free)

ANPQP Report : Page 2 / 24


6.1
Définition des attendus IOD (qtt, lieu, CR etc..) Free 2/2/2 GFE Supplier
IOD expectings plan (quantity, contrôle report etc..)

5.2
Plan de surveillance X X Proposed 2/2/2 Supplier
ANPQP or SPP
Quality monitoring plan(Control plan) for high level risk

5.2
Synoptique de fabrication X X libre 2/2/2 Supplier ANPQP
Process flow chart

6.1
Représentativité IOD imposed 1/1/1 Supplier GFE
Part status report IOD

6.1
Rapport de contrôle IOD Proposed 2/2/2 Supplier
GFE + ANPQP
IOD inspection report or SPP HRsk

Agrement composants de rang n (PSW et AFF) X X libre Supplier


ANPQP or SPP
Supplier list + approval of component level n for high level risk

Synthèse AMDEC PROCESS ANPQP or SPP


5.1 Free 3/3/2 Supplier
Process DFMEA Summary for high level risk

RENAULT
Préconisation Fournisseur X X libre 2/2/2 Supplier Process Design
Supplier recommendations engineer

5.3
CMC capabilité moyen de contrôle (Spécifiques) X X Proposed 3/1/1 Supplier
SPP High Risk /
Gauge specification and approval sheet NA if not

5.4
Plan d'étude de Capabilités Free 3/2/2 Supplier
ANPQP or SPP
Capabilities study plan for high level risk

6.1
Résultat essais fournisseur X X Prposed (2/2/2) Supplier GFE
Suplier test plan and report

Résultat analyse DIMAT (En Phase 3) X X


Prposed
(2/2/2) Supplier DIMAT / GFE
DAM: Result of DIMAT agreement on Phase 3 (IOD) DAM

Résultat validation Renault (Prononcé de validation) X X rsa GFE GFE


Renault alidation ressult

Document reçu ? VALIDATION DES DOCUMENTS


Attendu Type of Document
Document received ? Document validation
PHASE 4 - Format
CR RAPP
référence
Dossier

(Imposed / Agreement Document reçu ? Who


Qui fait / Who did Result of validation
Proposed / rule: 1,2,3 Document received ? Validate
Free)

Définition des attendus EI (qtt, lieu, CR etc..) GFE / Process


6.1 Free 2/2/2 Supplier
EI expectings plan (quantity, contrôle report etc..) design engineer

Représentativité des EI imposed 1/1/1 Supplier GFE


Part Status report EI

Rapport de contrôle EI X X Proposed 2/2/2 Supplier


GFE + ANPQP
EI inspection report or SPP HRsk

5.4
Capabilités résultats X X
Free
2/2/2 Supplier
ANPQP or SPP
Capabilities study result or A2M for high level risk

Capabilité Poids pièce sur brut Free (3/3/3) Supplier Purchasing

Résultat analyse DIMAT (En Phase 4) Prposed


X X (2/2/2) Supplier DIMAT / GFE
DAM: Result of DIMAT agreement on Phase 4 (EI) DAM

SPP HiRsk /
5.2
MQA (X) imposed (2/2/2) Supplier ANPQP MedRsk
QA Matrix / NA

5.2
Fiches instruction au poste Free 3/3/3 Supplier
ANPQP or SPP
Work instructions for high level risk

SPP participate /
5.5
CR Audit Process X X Free 3/3/3 Supplier ANPQP check
Result process audit result

10.1
Certification engagement EDI (Valide flux log.) X X imposed 1/1/1 Supplier DSIR
EDI submission warrant

4.4
Spécification BE-BE X Internal rsa GFE GFE
Renault specification

CR RAPP documenté X Imposed 1/1/1 ?


All main GFE following
Product / process development monitoring report menbers RAPP

Montabilité / Usinabilité X X RSA RSA rsa


Assembly test or machining test report

SQF Quality
7.1
PSW X X imposed 1/1/1 Supplier manufacturing
Part submission warrant R/N

3.3
CEC (Certificat engagement capacitaire) X X imposed 1/1/1 Purchasing Supplier
Capacity Submission Warrant

CR Audit Preproduction (X) (X) imposed 3/3/3 Purchasing Purchasing


Result of pre-production audit

SQF Quality
7.1 AFF X X imposed 1/1/1 Supplier manufacturing
R/N

Plan activité monté en cadence + plan actions SPP all Rsk /


5.6 Ramp-up activity + countermeasure and documentation X X Free (3/2/2) Supplier ANPQP info->
associated SQF

9,1 Design, Process, Facility modification request by supplie (and


9,2
imposed (1/1/1) Supplier GFE
8D associated)

Check list ANPQP - V1.0 - 16dec2008 : according to V2.1

ANPQP Report : Page 3 / 24


ANPQP MEETING REPORT 1/2 (According to ANPQP V2.1)
Participant : Date of revue : 12/18/2008 Version ANPQP : V2.1
M. Bat Vehicle : Véhicule 333
Engine : Moteur 33333
Transmission BV 33333333
Renault/Nissan: Plant DOUAI SANDOUVILLE CLEON XXX 333
Part : Pièce XXXXX YYYYY 3333
Reference PIE : Ref 8200 000 000 XXX33333333"""
Supplier : Fournisseur tartanpion 3333
Production plant : Roumania

LIBELLE WHO WHEN DONE Remarks


DESIGN / DRAWING :
O Plan spécifié
O Note RO

SCHEDULE :
V Transmettre un planning détaillé
V Livraison des IOD = Wxxx
V Livraison de EI = Wxxx

PURCHASING / COMMERCIAL :
V Signature fiche F1 ( engagement qualite = Nbre de ppm )
O
O

LOGISTIC : DCL et SUPPLY CHAIN


V
O

VALIDATION / TEST :
O

QUANTITY IOD :
V

CONTROL EXPECTED ON IOD / EI PARTS :


O
O
O
ACTION PLAN ANPQP ITEM
O
O
O
O

QUALITY INFORMATION
<>

O QUALITY FAILURE AND ACTION PLAN


O

ANPQP Report : Page 4 / 24


CONSTITUTION DU DAQ
Quality assurance plan - check list According to the 2.1 ANPQP version

Document reçu ? VALIDATION DES DOCUMENTS


Type of Document
Document received ? Document validation
PHASE 1 - Format
(Imposed / Agreement Document reçu ? Who
Qui fait / Who did Result of validation
Proposed / rule: 1,2,3 Document received ? Validate
Free)

1 Engagement qualité Fiche F1


Quality commitment F1 Sheet

joint
2 Correspondant Fournisseur
Supplier contact list
ANPQP
format

3 GRP Libre
Open issue list Free

4 Planning Fournisseur
Supplier timing plan
Libre
Free

5 Shema d'implantation Libre


Plant synoptic Free

Plan de deploiement des objectif Qualité et


6 fiabilité Libre
Free
Developement quality planning

7 certification ISO NA
ISO Certification

Document reçu ? VALIDATION DES DOCUMENTS


Type of Document
Document received ? Document validation
PHASE 2 - Format
(Imposed / Agreement Document reçu ? Who
Qui fait / Who did Result of validation
Proposed / rule: 1,2,3 Document received ? Validate
Free)

Plan validé
Drawing approved

RO
Tooling approval

Contrat de faisabilité
Feasibility commitment

HCPP

CSCC

Signature planning Fournisseur


Supplier planning approval

Elaboration du plan de validation / essais/ etc,…


Test plan (DVPR)

Document reçu ? VALIDATION DES DOCUMENTS


Type of Document
Document received ? Document validation
PHASE 3 - Format
(Imposed / Agreement Document reçu ? Who
Qui fait / Who did Result of validation
Proposed / rule: 1,2,3 Document received ? Validate
Free)

Rapport de contrôle IOD Support


IOD inspection report

Liste des Fournisseurs et Synthèse des


agrement des composants de rang n libre
Supplier list + approval of component level n

Capacité de production joint


Production capacity

Plan de mise en production joint


Safe launch plan

Rapport de mise en production joint


Safe launch report

Plan de surveillance exemple


Quality monitoring plan joint

ANPQP Report : Page 5 / 24


DCL DCL

Synthèse AMDEC libre


DFMEA Summary

Préconisation Fournisseur libre


Product usage specification

Synoptique libre
Plant synoptic

CMC moyen de contrôle exemple


Inspection tooling review joint

Représentativité IOD joint


Part status report IOD

Etat d'avancement des dossiers transmis à la


DIMAT libre
Progress on document submission to DIMAT

Certification engagement EDI joint


EDI certification commitment

Document reçu ? VALIDATION DES DOCUMENTS


Type of Document
Document received ? Document validation
PHASE 4 - Format
(Imposed / Agreement Document reçu ? Who
Qui fait / Who did Result of validation
Proposed / rule: 1,2,3 Document received ? Validate
Free)

Rapport de contrôle EI Support


EI inspection report

Capabilités logiciel
Capabilities

Représentativité des EI joint


Part Status report EI

PSW joint

15 CEC joint

16 CR Audit joint

17 AFF joint

18 Poids pièce sur brut N/A

19 Rapport DIMAT sur brut et autre Technologie N/A

20 Shema associé au plan de surveillance N/A

21

22 Shema associé au plan de surveillance N/A

23

24

ANPQP Report : Page 6 / 24


Français
Phase 1 Phase 2
Anglais

Date & ROV validation

Date & ROV validation


ROV & date validation

ROV & date validation


Date & ROV réception

Date & ROV réception


ROV & date reception

ROV & date reception


Phase 1 objective: to analyse the customer requirements in order to plan and
Phase 2 objective: Ensure that the supplier's Product and process Design meets the
define a product development programme, which achieves the necessary quality,
Full Activités Validation
Who does what?
Applicable? cost, and delivery targets required to support Renault/ Nissan's project.
Quality, Cost and Delivery requirements of renault/Nissan

Activities responsible Required ?

ible / Low Expected results Support and requirement Expected results Support and requirement

en / Medium Low Medium Higt Low Medium Higt

ort / Hight
POE Consultant (K°%Quality Situation and
plan Pxx objectives) Renault data:
Buyer SQA (km0- ppm Quality situation ) RFQ with Quality
1.1 Pré-étude Produit- GFE commitment
Process (confirm supplier's Quality commitment)
1.1 Product &Process
concept Study Renault data:
RFQ with Reliability
GFE/GFS Pilot GFE Pilot (Confirm supplier's technical file)
commitment and
technical file

SPP ( Identify the list of the risks process Product/process concept Free document Free document Free document
GFE/GFS Pilot
on risk part) file 2 2 2

Imposed document Imposed document Imposed document


Buyer Buyer CSCC
3 2 2

Agreement between tier n 1


supplier, imposed tier n Free document Free document Free document
Buyer Buyer
suppliers and Renault if 3 3 3
modification made (DIM)
High P/P risk Parts:
Implementation of QA follow-
SPP (confirm QA follow-up between tier n Free document Free document Free document
Buyer up for tier n suppliers in case
2.1 Management des and tier n-1 ) 3 3 3
of modification
fournisseurs de rang n Others parts: Buyer
2.1 Sub-Supplier
Identification of the risks
Management High/Medium P/P risk Part :
linked to each tier n supplier
SPP ( confirm the actions plans on the Free document Free document Free document
GFE/GFS Pilot and related Action plan
risks) Others 3 3 3
included in the list of project
parts: Buyer
risks

Buyer Buyer

High P/P risk Parts:


SPP (confirm the robustness P/P for tier n)
GFE/GFS Pilot
Others parts:
POE Consultant

3.1 Identification de
Supplier's contact directory
l'équipe projet Imposed document Imposed document Imposed document
Buyer Buyer for Head office and Project
3.1 Identification of 2 2 2
team
project team

Renault data:
GFE (confirm supplier's Quality (AER) (AER) (AER)
Buyer Quality file and quality
commitment with SQA informations) 0686-93-289 0686-93-289 0686-93-289
targets in RFQ

Renaul data: (AER) (AER) (AER)


GFE/GFS Pilot GFE (confirm supplier's technical file)
RFQ reliability target 0686-93-289 0686-93-289 0686-93-289
High P/P risk Parts: SPP
3.2 Management de la
GFE (do the synthesis ) Definition of the Product Free document Free document Free document Product Quality Targets Study Free document Free document Free document
Qualité et de la Fiabilité Buyer
Others parts: Quality Targets Study 2 2 2 Plan updated (if necessary) (2) (2) (2)
du Produit
PPOE Consultant
3.2 Product Quality and
Reliability Management Finalization of reliability study
plan to fulfill the reliability
Definition of the Product Proposed in Proposed in Proposed in
commitments:
reliability targets study in standard standard standard Free document Free document Free document
GFE/GFS Pilot GFE (confirm supplier's technical file) Conception/design choice,
accordance with the 01- 01-33-212 01-33-212 01-33-212 (2) (2) (2)
tests, specific calculations for
33-212 norm/standard 2 2 2
example. Updated with action
plan of the D-FMEA

Renault data:
GFE/GFS Pilot GFE/GFS Pilot Project schedule and key
dates updated
Renault data: controlling
requirements and specific
GFE/GFS Pilot GFE/GFS Pilot requests for prototype, IOD
and EI parts including part
quantity

Renault data:
Product and process
GFE/GFS Pilot GFE/GFS Pilot
representativness for IOD et
EI parts

Co-signature of the Supplier Free document Free document Free document


GFE/GFS Pilot GFE/GFS Pilot
3.3 Planning projet et Master schedule 1 1 1
Suivi de la mise en place
de la production
3.3 Project planning
3.3 Planning projet et
Suivi de la mise en place
de la production
3.3 Project planning High P/P risk Parts: ANPQP-Supplier ANPQP-Supplier ANPQP-Supplier
and Production SPP (Confirm the schedule Production Production Production
Preparation monitoring Industrialization targets of
consistency for the requirements of Preparation Preparation Preparation
supplier / Production
Buyer representativeness, the consideration in Monitoring Plan/ Monitoring Plan / Monitoring Plan/
Preparation Monitoring Status
the MQA of the risks 1 and 2 for IOD, 3 for Status report Status report Status report
Report.
EI, 4 for AFF) Imposed document Imposed document Imposed document
Others parts: POE Consultant 3 2 2

Proposed Proposed Proposed


Production capacities
Buyer Buyer document document document
description
2 2 2

Renault data:
(AER) (AER) (AER)
Buyer Buyer RFQ documentation
0686-93-289 0686-93-289 0686-93-289
§ 6 Economic File
Price/Tooling Variation
Tracking sent and updated by (AER) (AER) (AER)
Suivi économique (DIM) Buyer Buyer
the supplier and confirmed by 53860-02-05 53860-02-05 53860-02-05
Economical follow-up the buyer
IDO cotation (Investissement
Devis Outillage) sent by the (AER) (AER) (AER)
Buyer Buyer
supplier and accepted by the 53860-01-94 53860-01-94 53860-01-94
buyer

Capitalization of lessons Proposed Proposed Proposed


GFE/GFS Pilot POE Consultant: Audit supplier's GRP learned inside the project risk document document document
3.4 Management des follow-up (GRP) 3 3 3
Risques et Problèmes
3.4 Project High P/P risk Parts:
risk and concern SPP (Confirm the consideration of the
Management quality risks of UM, UCM, dealer network) Free document Free document Free document
GFE/GFS Pilot Quality plan draft
3 3 3
Others parts: no activity

Renault data: Renault data:


Buyer RFQ with Quality and RFQ finalization with Quality
Buyer
(economical) Reliability commitment and Reliability commitment
and technical file and technical file
Spécification produit Renault data: Renault data:
Renault GFE/GFS Pilot GFE (Submits to the project decision in RFQ with Quality and RFQ finalization with Quality
Engineering Renault (Technical) case of technical-economical conflict) Reliability commitment and Reliability commitment
Product specification and technical file and technical file
Co-signature of the data
exchange Imposed document Imposed document Imposed document
GFE/GFS Pilot GFE/GFS Pilot
Convention(CAD/CAI) 1 1 1
(DIM)

High/medium P/P risk Parts:


SPP :(Validate the technical
content of the HCPP done by the supplier
HCPP HCPP HCPP
with the help of the "Métier" esxpert
GFE/GFS Pilot HCPP study realisation Imposed document Imposed document Imposed document
support if necessary) .
2 2 2
Others parts: POE Consultant ( to make
sure that the HCPP are realized on the
hierarchical characteristics )

4.1 Identification et High/medium P/P risk Parts:


ANPQP - ANPQP - ANPQP -
déploiement des SPP : (Validate the technical
Supplier's Supplier's Supplier's
caractéristiques content of the feasability commitment done
Supplier Feasability feasability feasability feasability
spéciales et des points GFE/GFS Pilot by supplier with the help of the "Métier" if
Commitment document commitment commitment commitment
clés necessary)
Imposed document Imposed document Imposed document
4.1 Identification and Others parts: POE Consultant ( to make
3 3 3
deployment of special sure that the document is realized)
characteristics and key
features

High P/P risk Parts: SPP


to make sure of the CSR indentification and
the consistency with the hierarchical CSR caracteristics known
Proposed Proposed Proposed
characteristics in the documentation. and used on adequate
GFE/GFS Pilot document document document
Other parts: POE Consultant (to make sure documents (product
3 3 3
of the CSRidentification and the plan,control plan…)
consistency with the hierarchical
characteristics in the documentation)
High/medium P/P risk Parts:
4.2 Analyse des
SPP : Validates the technical
Défaillances potentielles
content of the AMDEC (FMEA) done by the Realization of the D-FMEA
et de leurs effets en
supplier with the help of the "Métier" expert according to standard 01-33- Free document Free document Free document
conception GFE/GFS Pilot
support if necessary) 200 or equivalent study with 3 3 3
4.2 Analysis of Design
Others parts: POE Consultant ( to make Renault agreement
potential faillures and
sure that there's an action plan for all RPI>
effects
acceptation level

4.3 Revue de conception


Produit/Process interne Parts with product Higt/Medium risk
du fournisseur (Innovation,…) GFE/GFS pilot Free document Free document Free document
GFE/GFS Pilot Supplier design review record
4.3 Supplier's internal Others parts: POE 3 3 3
Product and Process Consultant
Design review

Drawing and technical file


realization including the Imposed document Imposed document Imposed document
GFE/GFS Pilot GFE/GFS Pilot
4.4 Spécification produit/ product identification and 1 1 1
Etudes et réalisation du marking
Plan
4.4 Engineering Product Realization of the supplier's
specification / Drawing recommendations regarding
Study and completion RENAULT Process Design engineer for the the product use in Renault Free document Free document Free document
GFE/GFS Pilot
line where the POE is used - Confirms (assembly definition, rework, 2 2 2
wrehousing,.After Sale...)

5. D

5.1 Analyse des High P/P risk Parts:


Défaillances potentielles SPP :checks the relevance of actions
et de leurs effets du plan for risky operations
processus industriel GFE/GFS Pilot Others parts: POE Consultant ( to make
5.1 Analysis of Process sure that treatment of
potential faillures and actions plan exist for the RPI> acceptation
effects level)

Renault data:
GFE/GFS Pilot GFE/GFS Pilot BE-DIP agreement for
process requirements
High P/P risk Parts: SPP
If necessary, realization of a Proposed Proposed Proposed
Verify the relevance of the result
GFE/GFS Pilot prototype control plan for document document document
Others parts: POE
prototype parts (2) (2) (2)
Consultant
makes sure of the realization of the activity
High-Medium P/P risk Parts:
SPP
5.2 Conception du GFE/GFS Pilot Checks the set up of POKA YOKE
Processus industriel
5.2 Manufactoring Others parts: no activities
Process design
If necessary realisation of
Free document Free document Free document
GFE/GFS Pilot POE Consultant: Verify the update process flow chart for
(2) (2) (2)
prototype parts
Initialization of the process Free document Free document Free document
GFE/GFS Pilot POE Consultant: Verify the update
settlement. 3 3 3

High P/P risk Parts:


SPP checks the relevance of work
GFE/GFS Pilot
instructions for risky operations
Others parts: POE Consultant

5.3 Management des


High P/P risk Parts:
outillages, moyens de
SPP checks the relevance of Proposed Proposed Proposed
contrôle et de production
GFE/GFS Pilot agreements for risky operations Gauge specification document document document
5.3
Others 3 2 2
Tooling, Gauges and
parts: no activities
facility management

High P/P risk Parts:


SPP checks the relevance of
previsional capability studies for risky Initialization of the capability Free document Free document Free document
GFE/GFS Pilot
operations study plan 3 2 2
Others parts:POE Consultant
makes sure of progress
5.4 Etude et amélioration
de la capabilité process
5.4 Process capability
study and improvement High P/P risk Parts:
SPP checks the relevance of realized
capability ( law, sample...) for risky
GFE/GFS Pilot
operations
Others parts:POE Consultant
makes sure of progress
High P/P risk Parts :
5.5 Confirmation de la SPP takes part in the audit realized by
pleine cadence the supplier and/or Renault
GFE/GFS Pilot
5.5 Confirmation of Others parts: POE Consultant
Full Volume Condition makes sure that the supplier's audit is
conform

High/medium (all risks) P/P risk Parts :


5.6 Activités pendant la SPP checks the
montée en cadence actions plan for the ramp- up (inc. Control
GFE/GFS Pilot
5.6 Activities during plan) POE
ramp up Consultant organize the transmission to
SQA

Renault data:
Feedback on tests results,
GFE/GFS Pilot GFE/GFS Pilot
calculations,simulations
carried out by Renault.

Definition of the validation


plan: Assembly and
functioning tests defined,
Propesed Propesed Propesed
performance defined and
GFE/GFS Pilot GFE/GFS Pilot document document document
reliability defined. Agreement
2 2 2
on job sharing for product
validation and associated
schedule.

Result of the calculations and


Propesed Propesed Propesed
simulation carried out by the
6.1 Vérification de la GFE/GFS Pilot GFE/GFS Pilot document document document
supplier.
conception / Validation 2 2 2
Tests/trials results
du Produit
6.1 Design
verification / Product
validation
High P/P risk Parts:
SPP confirm the validation of files by the
GFE (deviations are signed by the GFE) Proposed Proposed Proposed
GFE/GFS Pilot Others Inspection report document document document
parts: POE Consultant, with the GFE (2) (2) (2)
assistance, analyses files for each audit
(deviations are signed by the GFE)

High P/P risk Parts:


SPP confirms the validation Part Status Part Status Part Status
Finalization of Prototype
files by the GFE Report Report Report
GFE/GFS Pilot representativity commitment,
Others parts: POE Consultant Imposed document Imposed document Imposed document
visa
analysrs files for each audit (deviations are (1) (1) (1)
signed by the GFE)

8.

POE Consultant: Quality Project subjects to


8.1 Management du PSW
8D 8D 8D
produit non conforme GFE/SQF SQA: Quality subjects after PSW Non conforming product
Imposed document Imposed document Imposed document
8.1 Non conforming Logistic Logistic for Logistic management
(2) (2) (2)
product management subjects

Under the GFE/GFS management


9.1 Management des
Modifications produit
Parts with High risk P/P:
SPP checks on the site the
9.1 Design Change
modification of process
Management
Others parts: POE
Consultant
Update the file

9.2 Management des


Modifications de process Under the GFE/GFS management
ou deTransfert de
Fabrication Parts with High risk P/P: SPP checks
on the site the modification of process
9.2 Process Facility Site Others
Change Management parts: POE Consultant
Update the file
Renault data: Conditionning,
labelling and 'traçabilité'
Buyer Buyer
agreement for proto parts
delivery

Parts with high risk: SPP


10.1 Logistique et Makes sur that the risks linked to Logistics Renault data: Logistic data update for serial DCL Sheet DCL Sheet DCL Sheet
(AER) (AER) (AER)
Emballage Buyer are lifted. RFQ documentation , spare or CKD parts, if Imposed document Imposed document Imposed document
0686-93-289 0686-93-289 0686-93-289
10.1 Logistic & All parts: Logistic Methods (DIP for UM § 5 and Production file necessary. 2 2 2
Packaging Parts), DPSI and iDVU for UCM parts)

Imposed document Imposed document Imposed document


DSIR All parts: Validation by DSIR Supplier EDI agreement
(1) (1) (1)

DSIR All parts: Validation by DSIR

Renault Decision:
High P/P risk Parts:
Buyer Development Pilot
Fin de phase 1: SPP identifies process risks
supplier Intention letter
affectation du
fournisseur
End of Phase 1: High P/P risk Parts: Co-signature of
Allocation of supplier Buyer SPP identifies and makes sure that the Quality-reliability F1 Sheet F1 Sheet F1 Sheet
process risks are taken in account. commitment

Renault data:
GFE/GFS Pilot GFE/GFS Pilot
BE note for RO

Renault decision:
Fin de phase 2: Buyer Buyer
"Tooling Purchase Order"
lancement des outillages
End of phase 2 : Launch
of equipment/toolings

Supplier feasability
Imposed document Imposed document Imposed document
Buyer Buyer commitment for tooling
3 3 3
release

Fin de phase 3: mise en


place du process
High P/P risk Parts:
End of phase 3 : GFE/GFS Pilot
SPP gives an opinion to the GFE
Installation of the
process

GFE/GFS Pilot GFE/GFS Pilot after RAPP

SQA SQA

Fin de phase 4: agrément


des pièces de série et
AFF
End of phase 4: Approval Buyer Buyer
for the parts of series
and AFF

GFE/GFS Pilot GFE/GFS Pilot after RAPP

SQA SQA

AVANCEMENT ANPQP PAR PHASE : avis de synthèse - ANPQP PROGRESS STATUS BY PHASE: contact opinion
AVIS Animateur POE et Supplier Process Pilot ( risques forts) vers le GFE/GFS - POE Consultant and
Supplier Process
SYNTHESE & AVISPilot (High risk)vers
DU GFE/GFS opinion to GFE/GFS Pilot
le Projet
SYNTHESIS AND GFE OPINION to the Project team
Phase où le livrable doit être soumis,
Données d'entrée si demandé Phase when the
Renault Renault input Phase où le livrable doit être soumis Phase when the document wil be submitted upon
data document wil be submitted request
Phase 3 Phase 4 Phase 5

Date & ROV validation

Date & ROV validation


Date & ROV validation
ROV & date validation

ROV & date validation


ROV & date validation
Date & ROV réception

Date & ROV réception

Date & ROV réception


ROV & date reception

ROV & date reception

ROV & date reception


Purpose of Phase 4: Complete the product & process development and confirm the Purpose of Phase 5: Manage Ramp-up activities and the manufactoring process.
Purpose of Phase 3: Complete the development of the production tooling and confirm
manufacturing process ability to meet the Quality, Cost and Delivery targets at full Continuously monitor performance to improve customer satisfaction during mass
that the off-tool parts fully comply with the engineeringproduct specification
volume condition production. Commentaires

Expected results Support and requirement Expected results Support and requirement Expected results Support and requirement

Low Medium Higt Low Medium Higt Low Medium Higt

2. Management des Fournisseurs de rang n 2. Sub/Suppliers Management

Free document Free document Free document Free document Free document Free document
If necessary CSCC update If necessary CSCC update
3 (2) (2) 3 (2) (2)

Agreement between tier n 1 Agreement between tier n 1


supplier, imposed tier n Free document Free document Free document supplier, imposed tier n Free document Free document Free document
suppliers and Renault if 3 3 3 suppliers and Renault if 3 3 3
modification made (DIM) modification made (DIM)

Implementation of QA follow- Implementation of QA follow-


Free document Free document Free document Free document Free document Free document
up for tier n suppliers in case up for tier n suppliers in case
3 3 3 3 3 3
of modification of modification

In case of modification, In case of modification,


identification of the risks Free document Free document Free document identification of the risks Free document Free document Free document
linked to each tier n supplier 3 3 3 linked to each tier n supplier 3 3 3
and related Action plan and related Action plan

Tier n suppliers capacity Free document Free document Free document


commitment. 3 3 3

Tier n suppliers' agreed PSW Free document Free document Free document
(or equivalent) 3 3 3

3. Management de Projet 3. Project Management

Supplier's contact directory Imposed document Imposed document Imposed document Plant Supplier's contact Imposed document Imposed document Imposed document If necessary, Plant Supplier's Imposed document Imposed document Imposed document
update (2) (2) (2) directory (2) (2) (2) contact directory update (2) (2) (2)

Quality target study plan Free document Free document Free document Quality target study plan Free document Free document Free document
update. (2) (2) (2) updated. (2) (2) (2)

Free document Free document Free document Free document Free document Free document
Reliability study plan update Reliability study plan update
(2) (2) (2) (2) (2) (2)

Renault data: Renault data:


Project schedule and key Project schedule and key
dates updated dates updated

Renault data: controlling Renault data: controlling


requirements and specific requirements and specific
requests for IOD and EI parts requests for EI parts including
including part quantity part quantity

Renault data:
Product and process
representativness for IOD et
EI parts

Supplier' master schedule Supplier' master schedule


Free document Free document Free document Free document Free document Free document
update if modification and update if modification and
(1) (1) (1) (1) (1) (1)
new co-signature new co-signature
ANPQP-Supplier ANPQP-Supplier ANPQP-Supplier ANPQP-Supplier ANPQP-Supplier ANPQP-Supplier
Production Production Production Production Production Production
Preparation Preparation Preparation Preparation Preparation Preparation
If modificated Industrialization
Monitoring Plan/ Monitoring Plan / Monitoring Plan/ Monitoring Plan/ Monitoring Plan / Monitoring Plan/
targets of supplier
Status report Status report Status report Status report Status report Status report
Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document
3 2 2 3 2 2

Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed


Production capacities Production capacities Production capacities
document document document document document document document document document
description if modification description if necessary description if necessary
(2) (2) (2) (2) (2) (2) (2) (2) (2)

Agreement on I.O.D product Agreement on EI product (AER) 53860-00- (AER) 53860-00- (AER) 53860-00-
delivery proposal. delivery proposal. 27F01V03 27F01V03 27F01V03

I.O.D products order made by EI products order made by


(SAGA) CPI (SAGA) CPI (SAGA) CPI (SAGA) CPI (SAGA) CPI (SAGA) CPI
the buyer for the supplier. the buyer for the supplier.

Capitalization of lessons Proposed Proposed Proposed Capitalization of lessons Proposed Proposed Proposed Capitalization of lessons Proposed Proposed Proposed
learned inside the project risk document document document learned inside the project risk document document document learned inside the project risk document document document
follow-up (GRP) 3 3 3 follow-up (GRP) 3 3 3 follow-up (GRP) 3 3 3

Free document Free document Free document Free document Free document Free document Free document Free document Free document
Quality plan update Quality plan follow-up Quality plan follow-up
3 3 3 3 3 3 3 3 3

4. Développement Produit 4. Product Development

Renault data:
RFQ technical file update, if
necessary

Renault data:
RFQ technical file update, if
necessary

HCPP study realisation Imposed document Imposed document Imposed document HCPP study realisation Imposed document Imposed document Imposed document HCPP study realisation Imposed document Imposed document Imposed document
update if necessary (2) (2) (2) update if necessary (2) (2) (2) update if necessary (2) (2) (2)

ANPQP - ANPQP - ANPQP - ANPQP - ANPQP - ANPQP -


Supplier Feasability Supplier's Supplier's Supplier's Supplier Feasability Supplier's Supplier's Supplier's
Commitment document if feasability feasability feasability Commitment document if feasability feasability feasability
engineering product commitment commitment commitment engineering product commitment commitment commitment
specification evolution Imposed document Imposed document Imposed document specification evolution Imposed document Imposed document Imposed document
3 3 3 3 3 3

CSR caracteristics known CSR caracteristics known CSR caracteristics known


Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed
and used on adequate and used on adequate and used on adequate
document document document document document document document document document
documents (product documents (product documents (product
3 3 3 3 3 3 3 3 3
plan,control plan…) plan,control plan…) plan,control plan…)
Free document Free document Free document
D-FMEA update if necessary
3 3 2

Free document Free document Free document Free document Free document Free document Free document Free document Free document
Supplier design review record Supplier design review record Supplier design review record
3 3 3 3 3 3 3 3 3

If necessary Drawing and Imposed document Imposed document Imposed document If necessary Drawing and Imposed document Imposed document Imposed document If necessary Drawing and Imposed document Imposed document Imposed document
technical file update (1) (1) (1) technical file updating. (1) (1) (1) technical file updating. (1) (1) (1)

Update of the supplier's Update of the supplier's Update of the supplier's


recommendations regarding recommendations regarding recommendations regarding
the product use in Renault Free document Free document Free document the product use in Renault Free document Free document Free document the product use in Renault Free document Free document Free document
(assembly definition, rework, 2 2 2 (assembly definition, rework, 2 2 2 (assembly definition, rework, (2) (2) (2)
wrehousing,.After Sale..) wrehousing,After Sale...) wrehousing,After Sale...)

5. Développement du Processus industriel 5. Manufacturing Process Development

P-FMEA or equivalent study Free document Free document Free document If necessary, P-FMEA or Free document Free document Free document If necessary, P-FMEA or Free document Free document Free document
finalization 3 3 2 equivalent study update 3 3 (2) equivalent study update 3 3 (2)

Renault data:
BE-DIP agreement for
process requirements

Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed


Implementation of the serial Serial control plan update if
document document document Visa of the serial control plan. document document document document document document
control plan. necessary
3 2 2 1 1 1 (1) (1) (1)

Imposed document Imposed document Imposed document "QA Matrix" update, if Imposed document Imposed document Imposed document
"QA Matrix" Realisation
(2) (2) (2) necessary (2) (2) (2)

Finalization of pre-serial Free document Free document Free document Optimization of serial process Free document Free document Free document If necessary, Optimization of Free document Free document Free document
process flow chart. 3 2 2 flow chart. 2 2 2 process flow chart. 2 2 2

Finalization of the process Free document Free document Free document


settlement. 3 3 3

Implementation of working Free document Free document Free document If necessary, Implementation Free document Free document Free document
station instructions 3 3 3 of working station instructions 3 3 3

Proposed Proposed Proposed Proposed Proposed Proposed


Visa gauge approval. document document document If necessary, gauge update document document document
3 1 1 (1) (1) 3

Finalization of the capability


study plan: target and Free document Free document Free document If necessary, the capability Free document Free document Free document If necessary, the capability Free document Free document Free document
calculation methods 3 (2) (2) study plan update 3 (2) (2) study plan update 3 (2) (2)
definitions.

First capability results on IOD Free document Free document Free document Capability results on serial Free document Free document Free document Capability results on serial Free document Free document Free document
parts. 3 3 3 parts and control plan update. 2 2 2 parts. 2 2 2
Free document Free document Free document Supplier's self-Process audit, Free document Free document Free document
Supplier's self-Process audit
3 3 3 if necessary 3 3 3

Free document Free document Free document Full volume production Free document Free document Free document
Activity plan during ramp-up
3 2 2 confirmation (2) (2) (2)

6. Confirmation Produit 6. Product confirmation


Renault data: Renault data:
Feedback on tests results, Feedback on tests results,
calculations,simulations calculations,simulations
carried out by Renault. carried out by Renault.

Definition of the validation Definition of the validation Definition of the validation


plan: Assembly and plan: Assembly and plan: Assembly and
Free document Free document Free document Free document Free document Free document Libre Libre Libre
functioning tests defined, functioning tests defined, functioning tests defined,
(2) (2) (2) (2) (2) (2) (2) (2) (2)
performance defined and performance defined and performance defined and
reliability defined. reliability defined. reliability defined.

Proposed Proposed Proposed Proposed Proposed Proposed


Tests/trials results update if If necessary, Tests/trials If necessary, Tests/trials Proposé Proposé Proposé
document document document document document document
necessary results update. results update. (2) (2) (2)
2 2 2 (2) (2) (2)

Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed


Inspection report, if
Inspection report document document document Inspection report document document document document document document
necessary
2 2 2 2 2 2 (2) (2) (2)

Finalization of Off-tool Part Status Report Part Status Report Part Status Report Part Status Report Part Status Report Part Status Report Part Status Report Part Status Report Part Status Report
Finalization of EI Part status Part status report visa, if
representativity commitment, Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document
report, visa necessary.
visa 1 1 1 1 1 1 (1) (1) (1)

8. Management du produit non-conforme 8. Non conforming product management

8D 8D 8D 8D 8D 8D 8D 8D 8D
Non conforming product Non conforming product Non conforming product
Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document
management management management
(2) (2) (2) (2) (2) (2) (2) (2) (2)

9. Management des Modifications 9.Change Management

ANPQP - Product ANPQP - Product ANPQP - Product ANPQP - Product ANPQP - Product ANPQP - Product ANPQP - Product ANPQP - Product ANPQP - Product
change request change request change request change request change request change request change request change request change request
Product evolutions follow-up. Product evolutions follow-up. Product evolutions follow-up.
Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document
(1) (1) (1) (1) (1) (1) (1) (1) (1)

ANPQP - ANPQP - ANPQP - ANPQP - ANPQP - ANPQP -


Process/Facility Process/Facility Process/Facility Process/Facility Process/Facility Process/Facility
Production plant transfer site transfer site transfer site transfer Production plant transfers site transfer site transfer site transfer
follow-up. Change Request Change Request Change Request follow-up. Change Request Change Request Change Request
Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document
(1) (1) (1) (1) (1) (1)
10. Logistique et Emballage 10. Logistic & Packaging
Renault data: Conditionning, Renault dta:Conditionning, Renault data:
labelling and 'traçabilité' labelling and 'traçabilité' Definition of previsional ramp-
agreement for IOD parts agreement for EI parts up and full production
delivery delivery volumes

Logistic data update for serial DCL Sheet DCL Sheet DCL Sheet Appoval on logistic data for DCL Sheet DCL Sheet DCL Sheet Appoval on logistic data for DCL Sheet DCL Sheet DCL Sheet
, spare or CKD parts, if Imposed document Imposed document Imposed document serial, spare or CKD parts, if Imposed document Imposed document Imposed document serial, spare or CKD parts, if Imposed document Imposed document Imposed document
necessary. (2) (2) (2) necessary. (2) (2) (2) necessary. (2) (2) (2)

Supplier EDI Submission


Imposed document Imposed document Imposed document
warrant
(1) (1) (1)

AUTRES RISQUES IDENTIFIES - SPECIFICITES PROJET ou SITE


OTHER IDENTIFIED RISKS - PROJECT OR PRODUCTION SITE SPECIFICITIES

DECISIONS

Renault decision: IOD GFE/GFS CRAPP GFE/GFS CRAPP GFE/GFS CRAPP


approval IOD IOD IOD

Renault decision:
Renault decision:
agreement for PSW
agreement for PSW
presentation after P/P
presentation after P/P
status review, if
status review
modification

PSW PSW PSW PSW PSW PSW


PSW presentation by PSW presentation by
Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document
supplier supplier
1 1 1 (1) (1) (1)

ANPQP - capacity ANPQP - capacity ANPQP - capacity Signature of capacity ANPQP - capacity ANPQP - capacity ANPQP - capacity
Signature of capacity
submission submission submission submission warrant by the submission submission submission
submission warrant by the
warrant warrant warrant supplier- document pre- warrant warrant warrant
supplier- document pre-
Imposed document Imposed document Imposed document filled by Renault, if Imposed document Imposed document Imposed document
filled by Renault
1 1 1 necessary (1) (1) (1)

Renault decision: AFF


Renault decision: AFF
confirmation, si
confirmation
modification

AFF AFF AFF AFF AFF AFF


AFF presentation by AFF presentation by
Imposed document Imposed document Imposed document Imposed document Imposed document Imposed document
supplier supplier
1 1 1 (1) (1) (1)
Commentaires Responsable
Date Etat State
Coments Responsible
ANPQP TEAM
Vehicle : Véhicule 333
Engine : Moteur 33333
Transmission BV 33333333
Renault/Nissan: Plant DOUAI SANDOUVILLE CLEON XXX 333
Part : Pièce XXXXX YYYYY 3333
Reference PIE : Ref 8200 000 000 XXX33333333"""
Supplier : Fournisseur tartanpion 3333
Production plant : Roumania

Sce//Fournisseur Nom Prénom téléphone fixe Fax Tél portable E-Mail API
Qualité
Achats

Etudes
Etudes
Metier forge

Fournisseur
Fournisseur
Fournisseur

Flus logistique centrale


Flus logistique centrale
Flus logistique centrale

Dacia plant
Dacia plant
Dacia plant

Qualité Proto
Logistic
Process ASS Pitesti

Initialisation
Next meeting

Edité le 04/16/2018
Front page

1 K16 Tools requirement


2 E23 Product/process risk & Plant risk ? Initial risk?

Expectings checklist
1 PIE
2

ANPQP
1 12 CSCC - imposed document. But stated as free doc in phases 3&4
2 19 Supplier contact directory -
Phase 3&4, Plant supplier contact directory ( Contact directory updated with Plant contact persons not engg
So, Phase 3 submission level to be 2 not (2)
3 24 Comment states " update RFQ if necessary" in phases 2,3&4
4 29 Production capacity plan
Proposed document - Why not imposed?
5 32 SAGA ?
6 36,37 RFQ technical file updated in phase 2& 3?
can be combined in one line
7 38 looks like EDI aggrement?
not Eng, product spec & drgs. Submission
8 39 Metier ?
HCPP - Imposed document - Renault no standard doc. Use nissan QFD ?
9 40 Supplier feasibility commitment not reviewed/updated in phase3 .why?
10 41 CSR char. Included in Quality docs.
Submission - proposed document level 3 submission in phases 2,3,4&5 .Std number given
Follow as per nissan std : submission level (2) in phase 2 & level 2 in Phases 3&4
To include spl. Characteristics also.
11 47 PFMEA - free document
May be as nissan practice - 'AIAG approved format"
12 49 Control plan
Proposed document - Why not imposed? Stated if necessary in phase2 why?
13 50 MQA
only for high PXP risk parts. Why
14 54 Gauge specification
Phase 4 - no activity listed & Phase 5 submission level changed
proposed document
15 56 Process capability study results
Acceptable limit : Nissan or Renault ?
16 58 Ramp up activity plan ok
Concern & c/measure not stated. Only full volume condition ensured
to be used for capitalization
17 61 Supplier test plan and report
Comment states " supplier finalises his design" in all phases. Imposed doc.
18 64 Part status report
Doc submission level 1 - why ?
19 66 8D
Imposed doc. Renault Or nissan ?
Nissan ok
20 69 Process/facility site change request
Activity starts at phase 4. As per ANPQP phase 5. Allowed or not?
21 72 Logistics and packaging data sheet
AER, Doc submission level (2) in phases 1~4, As per ANPQP 2.
22 73,74 EDI aggreement - not compulsory?
sons not engg.)