Monthly Progress Report-Apr 16

Note: To Achieve the targets we need access road along the line location to location.

1) Executive Summary

a)Progress during this reporting period

i)Route alignment
ii)Detailed survey
iii) Soil Investigations
iV) Foundations
v)Tower Erection
b)Overall progress

Sl no. Subject Unit Planned Actual progress Up to Last Cumulative Weighting Weighted progress
progress (Apr-16) Month Progress
(April-16) progress
[%] [%] [%] [%]
1 Route alignment Km 0 0 224.8 224.8 1.25% 1.2%
2 Detailed survey Km 0 0 224.8 224.8 1.25% 1.2%
3 Soil Investigations Nos 0 0 604 604 2.00% 1.9%
4 Foundations Nos 70 30 147 177 12.00% 3.4%
5 Tower Erection Nos 60 30 45 75 9.00% 1.1%
Total

2)Contract description

a)Project title : 220kV D/C Nkenda-Hoima OHTL


b)Contract number : UETCL/Wrks/2013/00009
c)Contractor name : KEC INTERNATIONAL LIMITED.
d)Consultant name : FICHTNER
e)Contract Agreement : 16th April 2015
f)Contract price
i)Supply(in USD) : 37,291,834.66
ii)Erection(in UGX) : 31,930,828,150.00
g)Invoiced amount
i)Mobalization Advance-Supply(in : 7,266,332.52
ii)Mobalization Advance : 5,412,004,771.00
Erection(in UGX)
h)Variation Order : Nil
i)Date of Commencement : 19th May 2015
j)Original Completion Date : 19th Nov 2016
k)Guarantee period : 12 months from the date of completion
l)Percentage of Period expended : Nil
g)Total weighted progress-Achived : 66.181%
h)Total weighted progress-Targeted: 73.629%

3)Progress of works, activities during reporting period inclusive of photographs

Sl no Description of item Unit Total Qty Up to last month This month Cumulative % Remarks
progress (Mar-16) Progress progress
(Apr 16) ( upto Apr
16)
1 Route alignment Km 226 224.8 224.8 99 Balance Due to Sub-
2 Detailed survey Km 226 224.8 224.8 99 station co-ordinates
layout for Fort Portal
not received till date.

3 Soil Investigations Nos 631 604 604 95.72 Balance locations 9 in


ROW & 10 in Forest
4 Foundations Nos 631 147 30 177 28.05 ROW- 86 Nos & Affected
Section:30/0 to 39/0-
52.57 in Kms for
Stringing
5 Tower Erection Nos 631 45 30 75 11.89 ROW-30/27,21/44,21/49

Page 1 of 11
Monthly Progress Report-Apr 16
4)Coordination between Lots

5)Time schedule, milestones, outage schedule


[Separate for each plant]
No. Description Scheduled date Actual date Remarks

[to be frozen]
1 Project commencement
Date of Kickoff meeting 7-May-15 7-May-15
Date of site handover 7-May-15 19-May-15 Site handed over
verbally on 19th May-
15 but detailed
survey report was
given in August and
Oct Still substation
Contract commencement 7-May-15 19-May-15
2 FINALIZATION /
APPROVAL OF VENDORS
TOWERS 22-May-15 26-May-15
CONDUCTOR 22-May-15 22-May-15
OPGW and JOINT BOXES 22-May-15 22-May-15
INSULATORS 22-May-15 22-May-15
INSULATOR FITTINGS 22-May-15 16-Jun-15
OPGW FITTINGS 22-May-15 18-Jun-15
EARTHING MATERIAL 22-May-15 29-Jun-15
CONDUCTOR ACCESSORIES 22-May-15 16-Jun-15

MISCLLANEOUS 22-May-15 29-Jun-15


3 ENGINEERING
TECHNICAL SUBMISSIONS
SUBMISSION OF TECH DETAILS FOR
TOWERS 1-Jun-15 26-May-15
CONDUCTOR 1-Jun-15 22-May-15
OPGW and JOINT BOXES 1-Jun-15 22-May-15

INSULATORS 1-Jun-15 22-May-15


INSULATOR FITTINGS 1-Jun-15 16-Jun-15
OPGW FITTINGS 1-Jun-15 18-Jun-15
EARTHING MATERIAL 1-Jun-15 3-Aug-15
CONDUCTOR 1-Jun-15 16-Jun-15
ACCESSORIES
MISCLLANEOUS 1-Jun-15 16-Jun-15
SAG TENSION
CALCULATIONS
Suspension & Tension 21-May-15 26-May-15
Tower
TOWER DESIGNS
SUBMISSION
DA - NORMAL 6-Jun-15 26-May-15
SUSPENSION
DB/ST - LIGHT ANGLE 18-Jun-15 17-Aug-15
DC-MEDIUM ANGLE 7-Aug-15 9-Sep-15
DD-HEAVY ANGLE 11-Sep-15 4-Dec-15
STUB, CLEAT,TEMPLATE
DESIGN SUBMISSION
DA - NORMAL 6-Jun-15 24-Jul-15
SUSPENSION
DB/ST - LIGHT ANGLE 18-Jun-15 27-Oct-15
DC-MEDIUM ANGLE 7-Aug-15 25-Nov-15
DD-HEAVY ANGLE 11-Sep-15 15-Dec-15
FOUNDATION DESIGN
SUBMISSION
DA - NORMAL 2-Jul-15 30-Jul-15
SUSPENSION
DB/ST - LIGHT ANGLE 14-Jul-15 8-Dec-15
DC-MEDIUM ANGLE 2-Sep-15 1-Jan-16
DD-HEAVY ANGLE 7-Oct-15 1-Jan-16

Page 2 of 11
Monthly Progress Report-Apr 16
TOWER STRUCTURAL
DRAWINGS
DA - NORMAL 20-Jun-15 26-Aug-15
SUSPENSION
DB/ST - LIGHT ANGLE 2-Jul-15 12-Oct-15
DC-MEDIUM ANGLE 6-Aug-15 18-Dec-15
DD-HEAVY ANGLE 14-Sep-15 13-Jan-16
4 APPROVALS OF
TECHNICAL SUBMISSIONS

APPROVAL OF TECH
DETAILS FOR
TOWERS 9-Jun-15 24-Aug-15
CONDUCTOR 9-Jun-15 26-Jun-15
OPGW and JOINT 9-Jun-15 19-Aug-15
BOXES
INSULATORS 9-Jun-15 29-Jun-15
INSULATOR FITTINGS 9-Jun-15 13-Jul-15
OPGW FITTINGS 9-Jun-15 29-Jun-15
EARTHING MATERIAL 9-Jun-15 29-Jun-15
CONDUCTOR 9-Jun-15 13-Jul-15
ACCESSORIES
MISCLLANEOUS 29-May-15 29-Jun-15
SAG TENSION
CALCULATIONS
APPROVAL
Suspension & Tension 29-May-15 26-Aug-15
Tower
TOWER DESIGNS
APPROVAL
DA - NORMAL 12-Jun-15 26-Aug-15
SUSPENSION
DB /ST- LIGHT ANGLE 24-Jun-15 8-Oct-15

DC - MEDIUM ANGLE 23-Jul-15 19-Nov-15


DD-HEAVY ANGLE 31-Aug-15 14-Dec-15
STUB, CLEAT,TEMPLATE
DESIGN APPROVAL
DA - NORMAL 15-Jun-15 2-Sep-15
SUSPENSION
DB/ST - LIGHT ANGLE 26-Jun-15 4-Nov-15
DC - MEDIUM ANGLE 15-Aug-15 2-Dec-15
DD-HEAVY ANGLE 19-Sep-15 22-Dec-15
FOUNDATION DESIGN
APPROVAL
DA - NORMAL 10-Jul-15 30-Sep-15
SUSPENSION
DB - LIGHT ANGLE 22-Jul-15 24-Dec-15
DC - MEDIUM ANGLE 10-Sep-15 7-Jan-16
DD-HEAVY ANGLE 15-Oct-15 8-Jan-16
TOWER STRUCTURAL
DRAWINGS
DA - NORMAL 29-Jun-15 7-Sep-15
SUSPENSION
DB /ST- LIGHT ANGLE 10-Jul-15 20-Oct-15
DC - MEDIUM ANGLE 8-Aug-15 5-Feb-16
DD-HEAVY ANGLE 16-Sep-15 8-Feb-16
Tower Testing
DA - NORMAL 7-Jul-15 14-Sep-15
SUSPENSION
DB /ST- LIGHT ANGLE 3-Aug-15 9-Nov-15
DC - MEDIUM ANGLE 28-Aug-15 26-Feb-16
DD-HEAVY ANGLE 6-Oct-15 28-Feb-16

Page 3 of 11
Monthly Progress Report-Apr 16
5 PROCUREMENT
PLACEMENT OF ORDER
CONDUCTOR 25-Jun-15 23-Jun-15
OPGW and JOINT BOXES 25-Jun-15 24-Jun-15

INSULATORS 25-Jun-15 24-Jun-15


INSULATOR FITTINGS 25-Jun-15 24-Jun-15
OPGW FITTINGS 25-Jun-15 24-Jun-15
EARTHING MATERIAL 25-Jun-15 24-Jun-15
CONDUCTOR 25-Jun-15 24-Jun-15
ACCESSORIES
MISCLLANEOUS 15-Jun-15 24-Jun-15
Supply
Type testing
Conductor 3-Nov-15 2-Feb-16
Insulator & Fittings 3-Nov-15 30-Jan-16
OPGW 26-Nov-15 21-Mar-16
6 MANUFACTURING
STUB, CLEAT,TEMPLATE
MANUFACTURING
DA - NORMAL 15-Sep-15 12-Sep-15
SUSPENSION
DB/ST - LIGHT ANGLE 12-Sep-15 9-Nov-15
DC - MEDIUM ANGLE 24-Sep-15 26-Feb-16
DD-HEAVY ANGLE 21-Oct-15 28-Feb-16
TOWER MANUFACTURING

DA - NORMAL 20-Oct-15 20-Oct-15


SUSPENSION
DB/ST - LIGHT ANGLE 26-Oct-15 9-Nov-15
DC - MEDIUM ANGLE 12-Nov-15 26-Feb-16
DD-HEAVY ANGLE 24-Nov-15 28-Feb-16
Conductor-Lot1 2-Oct-15 3-Nov-15
OPGW & Joint Boxes-Lot1 26-Oct-15 21-Mar-16
INSULATORS- LOT-1 21-Sep-15 30-Jan-16
INSULATOR FITTINGS -LOT- 21-Sep-15 30-Jan-16
1
OPGW FITTINGS-LOT-1 21-Sep-15 21-Mar-16
EARTHING MATERIAL-LOT- 24-Jul-15 12-Sep-15
1
CONDUCTOR ACCESSORIES 21-Sep-15 30-Jan-16

MISCLLANEOUS 7-Aug-15 21-Mar-16


7 Inspection and Shipment
STUB, CLEAT
DA - NORMAL 18-Nov-15 5-Oct-15
SUSPENSION(lot 1 &2)
DB/ST - LIGHT ANGLE(lot 4-Nov-15 9-Nov-15
1 &2)
DC - MEDIUM ANGLE(lot 1 21-Nov-15 15-Mar-16
& 2)
DD-HEAVY ANGLE 25-Nov-15 17-Mar-16
Tower Inspection &
Shipment
DA - NORMAL 31-Oct-15 24-Oct-15
SUSPENSION
DB/ST - LIGHT ANGLE 27-Nov-15 9-Nov-15
DC - MEDIUM ANGLE 23-Dec-15 15-Mar-16
DD-HEAVY ANGLE 1-Jan-16 17-Mar-16
Conductor-Lot1 12-Nov-15 3-Nov-15
OPGW and JOINT BOXES 18-Nov-15 21-Mar-16
INSULATORS- LOT-1 22-Oct-15 23-Feb-16
INSULATOR FITTINGS -LOT- 14-Oct-15 23-Feb-16
1
OPGW FITTINGS-LOT-1 14-Oct-15 21-Mar-16
EARTHING MATERIAL-LOT- 17-Aug-15 5-Oct-15
1
CONDUCTOR ACCESSORIES 14-Oct-15 23-Feb-16

MISCLLANEOUS 29-Sep-15 21-Mar-16


Receipt of Materials at
Site

Page 4 of 11
Monthly Progress Report-Apr 16
STUB, CLEAT
DA - NORMAL 27-Jan-16 5-Oct-15
SUSPENSION
DB/ST - LIGHT ANGLE 19-Jan-16 9-Nov-15
DC - MEDIUM ANGLE 29-Feb-16
DD-HEAVY ANGLE 9-Mar-16
Tower material
DA - NORMAL 19-Feb-16 24-Oct-15
SUSPENSION
DB/ST - LIGHT ANGLE 11-Mar-16 9-Nov-15
DC - MEDIUM ANGLE 19-Mar-16
DD-HEAVY ANGLE 4-Apr-16
Conductor-Lot1 8-Mar-16 15-Mar-16
OPGW and JOINT BOXES 14-Mar-16
INSULATORS- LOT-1 27-Feb-16
INSULATOR FITTINGS -LOT- 19-Feb-16
1
OPGW FITTINGS-LOT-1 19-Feb-16
EARTHING MATERIAL-LOT- 30-Nov-15 15-Nov-15
1
CONDUCTOR ACCESSORIES 8-Feb-16

MISCLLANEOUS 26-Jan-16
Equipments and tools
Foundation 5-Aug-15 15-Aug-15
equipments(JCB,Tractors,Car
mix.Tools etc.)
Erection Tools 21-Sep-15 15-Oct-15
Stringing Tools 30-Nov-15 23-Apr-16
8 Construction Activities
Mobilisation
Office & Store 24-Jul-15 1-Jul-15
Survey team (Sub 25-May-15 28-May-15
contractor /Departmental
)
Soil Investigation 4-Jul-15 28-Jul-15
Access road & ROW 14-Aug-15
Route Alignment & Detail 5-Jul-15 28-May-15
Survey
Foundation 22-Aug-15 17-Sep-15
Team(Subcontractor/Depa
rtmental)
Erection 8-Oct-15 15-Jan-16
Team(Subcontractor/Depa
rtmental)
Stringing 17-Dec-15
Team(Subcontractor/Depa
rtmental)

Page 5 of 11
Monthly Progress Report-Apr 16
Survey
Route Alignment & Detail 20-Aug-15 10-Sep-15
Survey
Submission of profile for 29-Oct-15 29-Oct-15
Approval
Approval of profile 6-Nov-15 11-Jan-16
Soil Investigation
SI of Angle points 21-Nov-15 25-Aug-15
DCPT of all locations 11-Feb-16 5-Apr-16

6)Two month activity forecast


[Separate for each plant]
May-2016 plan
No. Description Qty Date Remark
1 Route Alignment & Detail
Survey(in Kms)
Soil Investigation
2 SPT (in Nos)
3 DCPT
4 Foundation of Tower incl 70
Earthing
5 Tower Erection 70
June-2016 plan
No. Description Qty Date Remark
1 Route Alignment & Detail
Survey(in Kms)
Soil Investigation
2 SPT (in Nos)
3 DCPT
4 Foundation of Tower incl 70
Earthing
5 Tower Erection 70
7 )Difficulties / recommendations
[Separate for each plant]
No. Description Recommendati
on

8)Annexes

(a)Disbursement schedule, cash-flow chart


Sl no Invoice No. DETAILS Date of Invoiced amount Amount Date OF Remarks
invoice received Payment
received
1 X-N602(15-16)SUP & Mobalization 30.04.15 7,266,332.52 7,266,332.52 22.06.15
ERE/ADV/USD/01 Advance-
Supply(USD)
2 X-N602(15-16)SUP & Mobalization 30.04.15 5,412,004,771 5,412,004,771 06.06.15
ERE/ADV/UGX/01 Advance-
Erection(UGX)

3 KEC/N Erection-1(USD) 31.08.15 155,675 108,180 04.11.15


602/CONST/USD/07-
Invoice-1
4 KEC/N Erection-1(UGX) 31.08.15 1,218,081,703 846,463,556 04.11.15
602/CONST/UGX/07-
Invoice-1
5 X-TL-N602(15-16) 118 BUB Supply-1(USD) 08.10.15 22,806 13,683 12.01.16
dated 07/09/2015
6 X-TL-N602(15-16) 22 TT Design(USD)-1 08.10.15 44,324 26,294 12.01.16
dated 25/09/2015
7 X-TL-N602(15-16) 138 BUB Supply-2(USD) 08.10.15 174338.26 104,603 12.01.16
dated 05/10/2015
8 KEC/N Erection-2(USD) 22.10.15 42980 32,043 24.12.15 &
602/CONST/USD/02 dated 01.05.16
30.09.15
9 KEC/N Erection-2(UGX) 22.10.15 336055453 250,617,626 22.12.15 &
602/CONST/UGX/02 dated 01.05.16
30.09.15

Page 6 of 11
Monthly Progress Report-Apr 16
10 X-TL-N602(15-16) 168 BUB Supply-3(USD) 04.11.15 703762.63 422,258 17.12.15
dated 26/10/2015
11 X-TL-N602(15-16) 169 BUB Supply-4(USD) 04.11.15 676838.4 406,103 17.12.15
dated 26/10/2015
12 X-TL-N602(15-16) 172 BUB Supply-5(USD) 04.11.15 672908.34 403,745 17.12.15
dated 27/10/2015
13 X-TL-N602(15-16) 173 BUB Supply-6(USD) 04.11.15 618980.22 371,388 17.12.15
dated 27/10/2015
14 X-TL-N602(15-16) 174 BUB Supply-7(USD) 04.11.15 238260.42 142,956 17.12.15
dated 27/10/2015
15 KEC/N Erection-3(USD) 09.11.15 42255 33,700 04.03.16 &
602/CONST/USD/03 dated 01.05.16
31.10.15
16 KEC/N Erection-3(UGX) 09.11.15 330430076 330,430,076
11.02.16 &
602/CONST/UGX/03 dated
01.05.16
31.10.15
17 KEC/TL/N602/15-16/183 Supply-8(USD) 07.01.16 26,473.38 15,884
25.02.16
BUB dated 05.11.15
18 KEC/TL/N602/15-16/198 Supply-9(USD) 07.01.16 529,467.60 317,681
25.02.16
BUB dated 25.11.15
19 KEC/TL/N602/15-16/199 Supply-10(USD) 07.01.16 516,025.01 309,615
25.02.16
BUB dated 02.12.15
20 KEC/TL/N602/15-16/200 Supply-11(USD) 07.01.16 498,170.80 298,902
25.02.16
BUB dated 02.12.15
21 KEC/TL/N602/15-16/201 Supply-12(USD) 07.01.16 602078.33 361,247
25.02.16
BUB dated 02.12.15
22 KEC/TL/N602/15-16/104A Supply-13(USD) 07.01.16 2126273.27 1,275,764
BOAPAR dated 25.11.15 25.02.16

23 KEC/TL/N602/15-16/128 Supply-14(USD) 07.01.16 93131.11 55,879


25.02.16
BO APAR dated 26.11.15
24 KEC/TL/N602/15-16/104 Supply-15(USD) 07.01.16 116214.3 69,728
25.02.16
BO APAR dated 10.12.15
26 KEC/TL/N602/15-16/206 Supply-16(USD) 07.01.16 459813.02 275,888
25.02.16
BUB dated 09.12.15
27 KEC/TL/N602/15-16/207 Supply-17(USD) 07.01.16 683188.2 409,913
25.02.16
BUB dated 09.12.15
28 X-TL-N602(15-16) 42 TT Design(USD)-2 07.01.16 76222.71 45,217
25.02.16
dated 10/11/2015
29 KEC/TL/N602/15-16/150 A Supply-18(USD) 27.01.16 1594811.79 956,887
BO APAR dated 11/01/16 16.03.16

30 KEC/TL/N602/15-16/150 B Supply-19(USD) 27.01.16 265844.12 159,506


BO APAR dated 11/01/16 16.03.16

Page 7 of 11
Monthly Progress Report-Apr 16
31 KEC/TL/N602/15-16/150 C Supply-20(USD) 27.01.16 398024.82 238,815
BO APAR dated 13/01/16 16.03.16

32 KEC/TL/N602/15-16/150 D Supply-21(USD) 27.01.16 132891.53 79,735


BO APAR dated 13/01/16 16.03.16

33 KEC/TL/N602/15-16/150 E Supply-22(USD) 27.01.16 796477.01 477,886


BO APAR dated 19/01/16 16.03.16

34 KEC/TL/N602/15-16/151 Supply-23(USD) 27.01.16 97992.63 58,796


16.03.16
BO APAR dated 19/01/16
35 KEC/TL/N602/15-16/235 Supply-24(USD) 27.01.16 192310.58 115,386
16.03.16
JBL dated 22/01/16
36 KEC/TL/N602/15-16/236 Supply-25(USD) 27.01.16 353175.23 211,905
16.03.16
JBL dated 22/01/16
37 KEC/TL/N602/15-16/237 Supply-26(USD) 27.01.16 350832.44 210,499
16.03.16
JBL dated 22/01/16
38 KEC/TL/N602/15-16/149 Supply-27(USD) 27.01.16 2869947.78 1,721,969
BO APAR dated 05/01/16 16.03.16

39 KEC/N602/CONST/UGX/04 Erection-4(UGX) 07.12.15 884996944 659,997,720 04.03.16 &


dated 30/11/15 01.05.16
40 KEC/N602/CONST/USD/04 Erection-4(USD) 07.12.15 113134 84,371 04.03.16 &
dated 30/11/15 01.05.16
41 KEC/N602/CONST/UGX/05 Erection-5(UGX) 14.01.16 562739619 333,828,588 04.03.16
Payment for
dated 31/12/15 VAT portion still
42 KEC/N602/CONST/USD/05 Erection-5(USD) 14.01.16 71884 42,643 04.03.16 not received.
dated 31/12/15
43 KEC/TL/N602/15-16/168 A Supply-28(USD) 29.02.16 1809405.91
BO APAR dated 19/02/16

44 KEC/TL/N602/15-16/168 B Supply-29(USD) 29.02.16 1995248.22


BO APAR dated 19/02/16

45 KEC/TL/N602/15-16/170 Supply-30(USD) 29.02.16 523433.42


BO MOSDO dated
19/02/16
46 KEC/N- Design(USD)-3 29.02.16 671663.08
602/DESGIN/USD/03
dated 29/02/2016
47 KEC/N602/CONST/UGX/06 Erection-6(UGX) 15.02.16 274185733 PAYMENT
dated 31/01/16 NOT
48 KEC/N602/CONST/USD/06 Erection-6(USD) 15.02.16 35051 RECEIVED.
dated 31/01/16
49 KEC/N602/CONST/UGX/07 Erection-7(UGX) 15.03.16 448260092
dated 29/02/16
50 KEC/N602/CONST/USD/07 Erection-7(USD) 15.03.16 57301
dated 29/02/16
51 KEC/N- Design(USD)-4 16.03.16 179639.66
602/DESGIN/USD/04
dated 15/03/2016
52 KEC/N602/CONST/UGX/08 Erection-8(UGX) 14.04.16 984568702
dated 30/03/16
53 KEC/N602/CONST/USD/08 Erection-8(USD) 14.04.16 125940
dated 30/03/16

Page 8 of 11
Monthly Progress Report-Apr 16
(b)Time schedule(s) (master schedule, current schedule) : 18 months
(c) Outage schedule(s) : Nil
(d)Progress tables
[Sample form only, shown figures are only for example]

Sl no Description of item Unit Total Qty Up to last month This month Cumulative %
progress (Mar-16) Progress progress
(Apr 16) ( upto Apr
16)
1 Route alignment Km 226 224.81 224.81 99.47
2 Detailed survey Km 226 224.81 224.81 99.47
3 Soil Investigations Nos 631 604 604 95.72
4 Foundations Nos 631 147 30 177 28.05
5 Tower Erection Nos 631 45 30 75 11.89
(e)Progress S-curves (separate for each plant); A sample form is attached, however, details are to be defined/agreed during kick-off meeting.

S – Cur e is prepared on the basis of follo ing Assigned Weightage Distribution:

Sl no S Curve weightage
1 Project commencement 1
2 Finalazation / Approval Of 1
Vendors
3 Design & Engineering 10
4 Tower Testing 2
5 Procurement placement 2
of order
6 Manufacturing & Supply 20
7 Material deleviry & 25.5
Receipt at site
8 Construction Activities 38.5
8.1 Mobilisation 1
8.2 Store yard & Site office 1
8.3 Survey 2.5
8.4 Soil Investigation 2
8.5 Foundation&Earthing 12
8.6 Tower Erection 9
8.7 Stringing 9
9 Final Inspection & 2
Commissioning
100

(f) Actions follow-up


· List of finished actions : GTP of Conductor,Insulators,Earth Wire,Sag tention Calculations,Conductor Accessories,Earth wire Accessories,OPGW
with fittings,DA tower design,DA stub and Cleat,DA Foundation design,DA Str drawings,DB Stub,DB tower design,DB Str
drawings,DC tower Design,DD tower Design,DB,DC,DD foundation drawings, were Approved.Route Alignment & Plan &
Profile approved.P-DA & P-DB mono Pole design and GTP of mono pole Approved

· List of actions under progress : Stringing Methodology is under progress.


(g) Drawing list

Page 9 of 11
Monthly Progress Report-Apr 16
(h)FAT list (scheduled/performed)
Sl no Description of item Unit Qty Date of FAT
Completed
1 Stubs-DA Sets 25 12.09.15
2 Earthing materials Sets 50 12.09.15
3 Stubs-DA Sets 252 12.09.15
4 DA tower Test 12.09.15
5 Earthing materials Sets 262 12.09.15
6 Towers-DA+0-88,DA+3- Nos 217 09.10.15
56,DA+6-23,DA+9-27 and
DA+12-23
7 AAAC 240 sq mm Kms 511.84 03.11.15
Conductor
8 ACS OHEW Kms 121.676 03.11.15
9 Stubs-DA Nos 238 07.11.15
10 Earthing materials Sets 179 07.11.15
11 DA towers Nos 238 09.11.15
12 DB-Tower Test 07.11.15
13 DB/ST Stubs Sets 65 15.12.15
14 DB/ST Towers Sets 62 15.12.15
15 AAAC 240 sq mm Kms 1389.14 21.12.15
Conductor
16 ACS OHEW Kms 115.19 21.12.15
17 AAAC 240 sq mm Kms 873 02.02.16
Conductor
18 Composite Insulators Nos 4210 04.02.16
19 Insulators Fittings -3937, 30.01.16
Conductor Fittings-47408,
OHEW Hardware and
fittings
20 DC-Tower Test 19.02.16
21 DD-Tower Test 03.03.16
22 DA-Tower Nos 50
23 DA-Stubs Nos 49
15.03.16
24 DB-Tower Nos 12
25 DB-Stub Nos 9
26 DC-Tower Nos 15
16.03.16
27 DC-Stub Nos 15
28 DD-Tower Nos 9
29 DD-Stub Nos 9
30 Earthing materials Nos 67 17.03.16
31 All leg Extentions & Spare
towers
32 OPGW Cable & OPGW
23.03.16
Accessories

(i) Correspondence logs


· from Contractor to EMPLOYER/Consultant
· from EMPLOYER/Consultant to Contractor
(j) List of variations, claim notices
(k)Records as per General Conditions of Contract,
(l) Photo report
(m) Other Annexes for the relevant reporting period, if any
Note:1) 456 sets Stubs-DA & 536 sets Earthing sets and 455-DA towers,65-DB/ST Stubs,62-DB/ST towers and 2774 Km Conductor
and 237 Km Earth wire,Composite Insulators -90 kN-6291 Nos & 160kN-2240 Nos reached at stores.

Page 10 of 11
Monthly Progress Report-Apr 16
Stringing tools Received at Store yard

Received
Sr.No Items Description Unit
Qty
16 mm Pilot Wire-
1 Pcs 40
Connectors
2 Three Sheave rollers Pcs 154
3 Ground rollers Pcs 6
4 Pilot Stand Pcs 2
5 Hydraulic Drum Stand set 12
Automatic Clamp for
6 Pcs 30
Conductor
Bolted Clamps for
7 Pcs 30
Conductor
8 Earth wire roller Pcs 40
9 Trifor Pcs 6
Head board for AAAC
10 Pcs 4
conductor
Head board for OPGW
11 Pcs 2
conductor
12 Aluminum Ladders Pcs 12
13 Spacers trolley Pcs 12

Page 11 of 11