MATERIALES
CONCEPTO UNIDAD CANTIDAD COSTO
Cemento 0.358 + 3% TON 0.369 $1,420.00
Arena 0.497 + 7% M3 0.532 $267.00
Grava 0.601 + 7% M3 0.643 $252.00
Agua 0.202 + 25% M3 0.258 $50.00
0.000
0.000
0.000
0.000
TOTAL DE MATERIALES
MANO DE OBRA
CONCEPTO UNIDAD CANTIDAD COSTO
operarios JOR 2.400 $16.80
oficial 1.600 $14.17
ayudantes 8.400 $12.72
0.000
0.000
0.000
0.000
0.000
TOTAL DE MANO DE OBRA
HERRAMIENTA Y EQUIPO
CONCEPTO UNIDAD CANTIDAD COSTO
mezcladora de concreto tambor 18HP 11p3 M3 1.000 $24.78
palas 4.000 $100.00
baldes 5.000 $20.00
manguera 60.000 $240.00
TOTAL DE HERRAMIENTA Y EQUIPO
UNIDAD
M3
IMPORTE
$523.98
$142.04
$162.04
$12.90
$0.00
$0.00
$0.00
$0.00
$840.96
IMPORTE
$40.32
$22.67
$106.85
$0.00
$0.00
$0.00
$0.00
$0.00
$169.84
IMPORTE
$24.78
$400.00
$100.00
###
###
###