Report for Outage Approval by OCC meeting

Element Total Remark


Sr.No Request by Owner Element Name Mode Reason Outage Request Status
Type Hours By OCC
From From To To
Date Time Date Time
POWER GRID POWER GRID
CORPORATION CORPORATION KURUKSHETRA-CHAMPA POLE- For OCT & OLT of Pole-3 at Kurukshetra end, 2018- 2018-
1 HVDC DAILY 09:00 17:30 32 -- PENDING
OF INDIA OF INDIA 1(PGNRDCL800004)/800 shutdown of both Poles are required for two days. 05-07 05-08
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION KUREKSHETRA -CHAMPA POLE - For OCT & OLT of Pole-3 at Kurukshetra end, 2018- 2018-
2 HVDC DAILY 09:00 17:30 32 -- PENDING
OF INDIA OF INDIA II(PGLIHVL800001)/800 shutdown of both Poles are required for two days. 05-07 05-08
LIMITED LIMITED
POWER GRID POWER GRID
For OCT & OLT of Pole-3 at Champa end, shutdown
CORPORATION CORPORATION KURUKSHETRA-CHAMPA POLE- 2018- 2018-
3 HVDC DAILY of both Poles are required on continuous two 09:00 17:30 32 -- PENDING
OF INDIA OF INDIA 1(PGNRDCL800004)/800 05-09 05-10
days.
LIMITED LIMITED
POWER GRID POWER GRID
For OCT & OLT of Pole-3 at Champa end, shutdown
CORPORATION CORPORATION KUREKSHETRA -CHAMPA POLE - 2018- 2018-
4 HVDC DAILY of both Poles are required on continuous two 09:00 17:30 32 -- PENDING
OF INDIA OF INDIA II(PGLIHVL800001)/800 05-09 05-10
days.
LIMITED LIMITED
Uttar Pradesh
Power On daily basis for testing of auto reclosing relay &
SLDC Uttar ANPARA-C (765KV)(LAPLUP)- 2018- 2018-
5 Transmission LINE DAILY timing test of existing breakers related to line at 08:00 18:00 34 -- PENDING
Pradesh UNNAO (765KV)(UPPTCL) 05-03 05-04
Corporation Unnao end
Limited
POWER GRID POWER GRID
VARANASI (765KV)
CORPORATION CORPORATION FOR ATTENDING THE STRENGTHENING WORK OF 2018- 2018-
6 LINE (POWERGRID)-FATEHPUR-PG DAILY 08:00 18:00 274 -- PENDING
OF INDIA OF INDIA SUSPENSION TOWERS , at Allahabad 05-04 05-15
(765 KV)(POWERGRID)
LIMITED LIMITED
Uttar Pradesh
Power On daily basis for remaining work & commissioning
SLDC Uttar ICT03 UNNAO (765KV)(UPPTCL) 2018- 2018-
7 Transmission ICT DAILY of CSD Relay on both sides (H.V. & L.V.) in panel of 08:00 18:00 34 -- PENDING
Pradesh (ICT7650020)/1000 05-07 05-08
Corporation 1000 MVA ICT-III (along with 765 KV Bus-I).
Limited
Uttar Pradesh
Power
SLDC Uttar For remaining work in Bay No.-7 & Bay No.-11 2018- 2018-
8 Transmission BUS Bus-I(Unnao)(ABS765005) DAILY 08:00 18:00 10 -- PENDING
Pradesh (extension work 1000 MVA ICT-III & Mainpuri Line) 05-07 05-07
Corporation
Limited
Uttar Pradesh
Power REACTOR
SLDC Uttar For CSD commissioning covering of PRDs and 2018- 2018-
9 Transmission REACTOR FATEHBAD_AGRA(765KV) DAILY 08:00 18:00 82 -- PENDING
Pradesh spare bus reactor commissioning. No supply loss 05-15 05-18
Corporation (PGBR765002)/330.00
Limited
RAJASTHAN
SLDC RAJYA VIDYUT MORAK (220KV)(RRVPN)-BAROD 2018- 2018-
10 LINE DAILY PREVENTIVE MAINTENANCE WORK at Kota end 09:30 16:00 6 -- PENDING
Rajasthan PRASARAN (220KV)(RRVPN) 05-10 05-10
NIGAM LIMITED
RIHAND NTPC (400KV)(NTPC)-
Erection & Commissioning of 3 no. 400 KV CTs in 2018- 2018-
11 NTPC Limited NTPC Limited LINE ALLAHABAD (400KV) CONTINUOUS 08:30 18:30 34 -- PENDING
Bay no. 19 for new IBT-3 05-01 05-02
(POWERGRID) I
400kv Singrauli Allahabad Line-1 Shutdown from
09/05/2018 to 10/05/2018 on continuous Basis
SINGRAULI NTPC (400KV)(NTPC)- along with 400KV generator # 2 to be shifted to
2018- 2018-
12 NTPC Limited NTPC Limited LINE ALLAHABAD (400KV) CONTINUOUS Transfer Bus-1. This is required in view of old CVT 08:30 18:00 33 -- PENDING
05-09 05-10
(POWERGRID) I (more than 20Years) replacement practice of NTPC
Ltd. Both bay & Bay#2 shutdown is required as
BUS CVT placed in between both these bay 2.
POWER GRID POWER GRID
FATEHPUR-PG (765 KV) To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION 2018- 2018-
13 LINE (POWERGRID)-SASARAM-ER DAILY Missing Jumper Bolts, Spacer Damper,cottor Pin 08:00 18:00 274 -- PENDING
OF INDIA OF INDIA 05-18 05-29
(765KV)(POWERGRID) etc)
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 MOGA( 765KV)
CORPORATION CORPORATION 2018- 2018-
14 ICT (POWERGRID) DAILY For AMP Works. 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA 05-01 05-01
(PGICT7650021)/1500
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION REACTOR I(S) MOGA( 765KV) 2018- 2018-
15 REACTOR DAILY For AMP Works. 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA (PGBR7650025)/240.00 05-03 05-03
LIMITED LIMITED
POWER GRID POWER GRID
ICT 02 MOGA( 765KV)
CORPORATION CORPORATION 2018- 2018-
16 ICT (POWERGRID) DAILY For AMP Works. 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA 04-02 04-02
(PGICT7650026)/1500
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION REACTOR II MOGA( 765KV) 2018- 2018-
17 REACTOR DAILY For AMP Works. 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA (PGBR7650026)/240.00 04-04 04-04
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION MEERUT (765KV)(POWERGRID)- 2018- 2018-
18 LINE DAILY Commissioning of Priority Auto-Reclose circuit. 10:00 17:00 7 -- PENDING
OF INDIA OF INDIA MOGA( 765KV)(POWERGRID) 04-16 04-16
LIMITED LIMITED
POWER GRID POWER GRID
MOGA( 765KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
19 LINE BHIWANI-PG (765 KV) DAILY Commissioning of Priority Auto-Reclose circuit. 10:00 17:00 7 -- PENDING
OF INDIA OF INDIA 04-14 04-14
(POWERGRID)
LIMITED LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT KOTA(220KV)(RRVPN)-BAROD 2018- 2018-
20 LINE DAILY QUARTERLY MAINTENANCE WORK 08:00 18:00 10 -- PENDING
Rajasthan PRASARAN (220KV)(RRVPN) 05-17 05-17
NIGAM LIMITED
RAJASTHAN
PHAGI (765KV)(RRVPN)-
SLDC RAJYA VIDYUT For the replacement of defective CVT (Y-Phase) 2018- 2018-
21 LINE GWALIOR-WR (765KV) DAILY 08:30 19:00 10 -- PENDING
Rajasthan PRASARAN due to oil leakage. 05-09 05-09
(POWERGRID) 1
NIGAM LIMITED
RAJASTHAN
PHAGI (765KV)(RRVPN)-
SLDC RAJYA VIDYUT For the replacement of B-Phase defective CVT as 2018- 2018-
22 LINE GWALIOR-WR (765KV) DAILY 09:00 19:00 10 -- PENDING
Rajasthan PRASARAN the oil leakage has been observed. 05-16 05-16
(POWERGRID) 2
NIGAM LIMITED
RAJASTHAN RANAPRATAP SAGAR- RPS
SLDC RAJYA VIDYUT (132KV)(RRVUNL)-GANDHI For replacement of damaged earth wire having 2018- 2018-
23 LINE DAILY 08:00 18:00 106 -- PENDING
Rajasthan PRASARAN SAGAR MPSEB-WR (132KV) total 14.00Kms in the line 05-07 05-11
NIGAM LIMITED (POWERGRID) 1 +MP
RAJASTHAN RANAPRATAP SAGAR- RPS
SLDC RAJYA VIDYUT (132KV)(RRVUNL)-GANDHI For replacement of damaged earth wire having 2018- 2018-
24 LINE DAILY 08:00 18:00 106 -- PENDING
Rajasthan PRASARAN SAGAR MPSEB-WR (132KV) total 14.00Kms in the line 05-07 05-11
NIGAM LIMITED (POWERGRID) 2 +MP
Uttar Pradesh
Power
SLDC Uttar GREATER NOIDA(765 KV) 2018- 2018-
25 Transmission LINE DAILY Tower Strengthening, Tree cutting 05:00 11:00 126 -- PENDING
Pradesh (UPPTCL)-HAPUR(UPPTCL) 05-14 05-19
Corporation
Limited
Uttar Pradesh
Power GREATER NOIDA(765 KV)
SLDC Uttar 2018- 2018-
26 Transmission LINE (UPPTCL)-MAINPURI-UP (765KV) DAILY Tower Strengthening, Tree cutting 05:00 11:00 126 -- PENDING
Pradesh 05-07 05-12
Corporation (UPPTCL)
Limited
RAJASTHAN
SLDC RAJYA VIDYUT ICT01 ANTA(765KV)(RRVPN) 2018- 2018-
27 ICT DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN (ICT765004)/1500 05-09 05-09
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT ICT02 ANTA(765KV)(RRVPN) 2018- 2018-
28 ICT DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN (ICT765005)/1500 05-10 05-10
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT ICT03 ANTA(765KV)(RRVPN) 2018- 2018-
29 ICT DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN (ICT765006)/1500 05-15 05-15
NIGAM LIMITED
Uttar Pradesh
Power
SLDC Uttar 765 kV bus reactor Hapur 2018- 2018-
30 Transmission REACTOR DAILY Aircell commissioning 08:00 19:00 11 -- PENDING
Pradesh (UPPTCL)(BR7650013)/80.00 05-07 05-07
Corporation
Limited
2018- 2018-
31 NTPC Limited NTPC Limited BUS BUS-3(ABS220007) CONTINUOUS ISOLATORS SERVICING & TIGHNESS CHECKING. 08:30 18:30 34 -- PENDING
05-01 05-02
2018- 2018-
32 NTPC Limited NTPC Limited BUS BUS-4(ABS220008) CONTINUOUS ISOLATORS SERVICING & TIGHNESS CHECKING. 08:30 18:00 33 -- PENDING
05-03 05-04
RAJASTHAN
SLDC RAJYA VIDYUT Reactor Bank 1 ANTA(765KV) 2018- 2018-
33 REACTOR DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN (LR765007)/240.00 05-23 05-23
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT Reactor Bank 2 ANTA(765KV) 2018- 2018-
34 REACTOR DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN (LR765008)/240.00 05-24 05-24
NIGAM LIMITED
KANPUR (400KV)(POWERGRID)- 2018- 2018-
35 NTPC Limited NTPC Limited LINE CONTINUOUS BAY EQUIPMENT MAINTENANCE & TESTING. 08:30 18:00 57 -- PENDING
AURAIYA GPS (400KV)(NTPC) I 05-01 05-03
KANPUR (400KV)(POWERGRID)- 2018- 2018-
36 NTPC Limited NTPC Limited LINE CONTINUOUS BAY EQUIPMENT MAINTENANCE & TESTING. 08:30 18:00 57 -- PENDING
AURAIYA GPS (400KV)(NTPC) II 05-07 05-09
KOTESHWAR- KOTESHWAR- Koteshwar(GENCO00100)- 2018- 2018-
37 GENCO CONTINUOUS Annual Maintenance Of Unit # 4 10:00 18:30 704 -- PENDING
THDC THDC U4/100 05-01 05-30
TANDA (220KV)(NTPC)-BASTI 2018- 2018-
38 NTPC Limited NTPC Limited LINE DAILY RELAY TESTING. 08:30 18:30 34 -- PENDING
(220KV)(UPPTCL) 05-14 05-15
Uttar Pradesh
Power
SLDC Uttar ICT01 FATEHBAD_AGRA(765KV) For commissioning of RTCC for tap change control 2018- 2018-
39 Transmission ICT CONTINUOUS 08:00 18:00 82 -- PENDING
Pradesh (UPPTCL)(ICT765007)/1500 and covering of PRDs. No supply loss 05-07 05-10
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar ICT02 FATEHBAD_AGRA(765KV) For commissioning of RTCC for tap change control 2018- 2018-
40 Transmission ICT CONTINUOUS 08:00 18:00 82 -- PENDING
Pradesh (UPPTCL)(ICT765008)/1500 and covering of PRDs. No supply loss 05-11 05-14
Corporation
Limited
RAJASTHAN
705-52 T , Tie CB of ICT-II &
SLDC RAJYA VIDYUT 2018- 2018-
41 BAY 765KV PHAGI-2 LINE AT 765KV DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN 05-17 05-17
GSS ANTA(BAY1090)
NIGAM LIMITED
RAJASTHAN
702-52T tie CB for ICT-2 & 1. Measurement of Tan-delta & IR of CTs.
SLDC RAJYA VIDYUT 2018- 2018-
42 BAY PHAGI-BHIWANI-1 LINE AT 765KV DAILY 2.Mainenance of CB & CTs. 3. Tightening of clamps 09:30 19:00 33 -- PENDING
Rajasthan PRASARAN 05-03 05-04
PHAGI(BAY1089) & connectors.
NIGAM LIMITED
RAJASTHAN
706-52T tie CB for 765kV ANTA- 1. Measurement of Tan-delta & IR of CTs.
SLDC RAJYA VIDYUT 2018- 2018-
43 BAY 1 & GWALIOR-1 LINES AT 765KV DAILY 2.Mainenance of CB & CTs. 3. Tightening of clamps 09:00 19:00 34 -- PENDING
Rajasthan PRASARAN 05-21 05-22
PHAGI(BAY1088) & connectors.
NIGAM LIMITED
RAJASTHAN
701-52A CB for 765kV PHAGI- 1. Measurement of Tan-delta & IR of CTs.
SLDC RAJYA VIDYUT 2018- 2018-
44 BAY BHIWANI-2 LINE 765KV DAILY 2.Mainenance of CB & CTs. 3. Tightening of clamps 09:00 19:00 34 -- PENDING
Rajasthan PRASARAN 05-24 05-25
PHAGI(BAY1091) & connectors.
NIGAM LIMITED
RAJASTHAN
705-52A CB for 3*80MVAR BUS 1. Measurement of Tan-delta & IR of CTs.
SLDC RAJYA VIDYUT 2018- 2018-
45 BAY REACTOR AT 765KV GSS DAILY 2.Mainenance of CB & CTs. 3. Tightening of clamps 09:30 19:00 33 -- PENDING
Rajasthan PRASARAN 05-29 05-30
PHAGI(BAY1092) & connectors.
NIGAM LIMITED
Uttar Pradesh
LUCKNOW-Kursi Road (400KV)
Power
SLDC Uttar PG(POWERGRID)-LUCKNOW 2018- 2018-
46 Transmission LINE DAILY Checking & Tightening of Jumpers and Clamps 09:00 17:00 8 -- PENDING
Pradesh (Sarojini Nagar) 400- 05-12 05-12
Corporation
UP(UPPTCL)
Limited
Uttar Pradesh
Power LUCKNOW (Sarojini Nagar) 400-
SLDC Uttar 2018- 2018-
47 Transmission LINE UP(UPPTCL)-UNNAO (400KV) DAILY Checking & Tightening of Jumpers and Clamps 09:00 17:00 8 -- PENDING
Pradesh 05-13 05-13
Corporation (UPPTCL)
Limited
Power
BAREILY-PG (400KV)
Transmission
SLDC Uttar (POWERGRID)-LUCKNOW 2018- 2018-
48 Corporation of LINE DAILY FOR YEARLY ROUTINE TESTING (MOST URGENT). 09:00 16:00 7 -- PENDING
Pradesh (Sarojini Nagar) 400- 05-11 05-11
Uttarkhand
UP(UPPTCL)
Limited
POWER GRID POWER GRID
AGRA-PG (765KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
49 LINE FATEHPUR-PG (765 KV) DAILY To attend the shut down nature defects 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-01 05-02
(POWERGRID) I
LIMITED LIMITED
POWER GRID POWER GRID
AGRA-PG (765KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
50 LINE FATEHPUR-PG (765 KV) DAILY To attend the shut down nature defects 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA 05-03 05-05
(POWERGRID) II
LIMITED LIMITED
POWER GRID POWER GRID
AGRA-PG (765KV)(POWERGRID)- To attend the shut down nature defects and
CORPORATION CORPORATION 2018- 2018-
51 LINE GWALIOR-WR (765KV) DAILY insulator replacement on balance towers with 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA 05-07 05-09
(POWERGRID) I polymer
LIMITED LIMITED
POWER GRID POWER GRID
AGRA-PG (765KV)(POWERGRID)- To attend the shut down nature defects and
CORPORATION CORPORATION 2018- 2018-
52 LINE GWALIOR-WR (765KV) DAILY insulator replacement on balance towers with 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA 05-10 05-12
(POWERGRID) II polymer
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION AGRA-PG (765KV)(POWERGRID)- 2018- 2018-
53 LINE DAILY To attend the shut down nature defects 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA JHATIKALA(765 KV)(POWERGRID) 05-21 05-23
LIMITED LIMITED
POWER GRID POWER GRID FOR ATTENDING THE STRENGTHENING WORK OF
AGRA-PG (765KV)(POWERGRID)-
CORPORATION CORPORATION SUSPENSION TOWERS. To attend the shut down 2018- 2018-
54 LINE ALIGARH-PG (765KV) DAILY 08:00 18:00 130 -- PENDING
OF INDIA OF INDIA nature defects (Fixing of Missing Jumper Bolts, 05-08 05-13
(POWERGRID) S/C
LIMITED LIMITED Spacer Damper,cottor Pin etc)
POWER GRID POWER GRID FOR ATTENDING THE STRENGTHENING WORK OF
ALIGARH-PG (765KV)
CORPORATION CORPORATION SUSPENSION TOWERS. To attend the shut down 2018- 2018-
55 LINE (POWERGRID)-GREATER DAILY 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA nature defects (Fixing of Missing Jumper Bolts, 05-03 05-05
NOIDA(765 KV)(UPPTCL) S/C
LIMITED LIMITED Spacer Damper,cottor Pin etc)
POWER GRID POWER GRID
To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION GAYA-ER (765KV)(POWERGRID)- 2018- 2018-
56 LINE DAILY Missing Jumper Bolts, Spacer Damper,cottor Pin 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA BALIA (765KV)(POWERGRID) 05-06 05-06
etc)
LIMITED LIMITED
POWER GRID POWER GRID FOR ATTENDING THE STRENGTHENING WORK OF
GAYA-ER (765KV)(POWERGRID)-
CORPORATION CORPORATION SUSPENSION TOWERS. To attend the shut down 2018- 2018-
57 LINE VARANASI (765KV)(POWERGRID) DAILY 08:00 18:00 130 -- PENDING
OF INDIA OF INDIA nature defects (Fixing of Missing Jumper Bolts, 05-01 05-06
1
LIMITED LIMITED Spacer Damper,cottor Pin etc)
POWER GRID POWER GRID
VARANASI (765KV) To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION 2018- 2018-
58 LINE (POWERGRID)-BALIA (765KV) DAILY Missing Jumper Bolts, Spacer Damper,cottor Pin 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-07 05-08
(POWERGRID) etc)
LIMITED LIMITED
To attend the shut down nature defects (Fixing of
POWER GRID POWER GRID
LUCKNOW(765 KV)- Missing Jumper Bolts, Spacer Damper,cottor
CORPORATION CORPORATION 2018- 2018-
59 LINE PG(POWERGRID)-BAREILY-PG DAILY Pin,Broken Insulator Replacement etc) and 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA 05-08 05-10
(765 KV)(POWERGRID) switching of Spare phase as B-Phase to attend the
LIMITED LIMITED
Leakage from MOG in Line Reactor at Bareilly also.
POWER GRID POWER GRID
LUCKNOW(765 KV)- To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION 2018- 2018-
60 LINE PG(POWERGRID)-BALIA (765KV) DAILY Missing Jumper Bolts, Spacer Damper,cottor 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA 05-24 05-26
(POWERGRID) Pin,Broken Insulator Replacement etc)
LIMITED LIMITED
POWER GRID POWER GRID
VARANASI (765KV) To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION 2018- 2018-
61 LINE (POWERGRID)-KANPUR GIS DAILY Missing Jumper Bolts, Spacer Damper,cottor 08:00 18:00 106 -- PENDING
OF INDIA OF INDIA 05-20 05-24
(765KV)(POWERGRID) I Pin,Broken Insulator Replacement etc)
LIMITED LIMITED
POWER GRID POWER GRID
KANPUR GIS (765KV) To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION 2018- 2018-
62 LINE (POWERGRID)-ALIGARH-PG DAILY Missing Jumper Bolts, Spacer Damper,cottor 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-11 05-12
(765KV)(POWERGRID) S/C Pin,Broken Insulator Replacement etc)
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 LUCKNOW(765 KV)-
CORPORATION CORPORATION 2018- 2018-
63 ICT PG(POWERGRID) DAILY For AMP Work 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA 05-15 05-15
(PGICT7650012)/1500
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 LUCKNOW(765 KV)-
CORPORATION CORPORATION 2018- 2018-
64 ICT PG(POWERGRID) DAILY For AMP Work 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA 05-14 05-14
(PGICT7650011)/1500
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION REACTOR BAREILY-PG (765 KV) 2018- 2018-
65 REACTOR DAILY AMP of 240MVAR Bus Reactor 09:30 18:30 9 -- PENDING
OF INDIA OF INDIA (PGBR765006)/240.00 05-08 05-08
LIMITED LIMITED
POWER GRID POWER GRID
Switching of Spare phase as B ph to attend the
CORPORATION CORPORATION REACTOR BAREILY-PG (765 KV) 2018- 2018-
66 REACTOR DAILY leakage from MOG (During the switching the S/D of 10:00 11:00 1 -- PENDING
OF INDIA OF INDIA (PGLR765001)/240.00 05-10 05-10
765KV S/C Bareilly Lucknow line is required)
LIMITED LIMITED
POWER GRID POWER GRID
702 Bay ( Tie bay of 765 KV
CORPORATION CORPORATION 2018- 2018-
67 BAY Fatehpur Varanasi Line), at DAILY AMP and Tightening work 09:30 18:00 8 -- PENDING
OF INDIA OF INDIA 05-09 05-09
Fatehpur(702 BAY)
LIMITED LIMITED
POWER GRID POWER GRID
704 Bay ( Tie bay of 765 KV
CORPORATION CORPORATION 2018- 2018-
68 BAY Fatehpur Sasaram Line), at DAILY AMP and Tightening work 09:30 18:00 8 -- PENDING
OF INDIA OF INDIA 05-11 05-11
Fatehpur(704 BAY)
LIMITED LIMITED
POWER GRID POWER GRID
710 Bay ( Main bay of 765 KV
CORPORATION CORPORATION 2018- 2018-
69 BAY Fatehpur Agra-2 Line), at DAILY AMP and Tightening work 09:30 18:00 8 -- PENDING
OF INDIA OF INDIA 05-15 05-15
Fatehpur(710 BAY)
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 704 Main Bay (VNS-II Main Bay), 2018- 2018-
70 BAY DAILY AMP Work 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA at Kanpur (GIS)(704 MAIN BAY) 05-08 05-08
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 705 Tie Bay (VNS-II- ICT-II Tie) , 2018- 2018-
71 BAY DAILY AMP Work 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA at Kanpur (GIS)(705 TIE BAY) 05-09 05-09
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 706 Main Bay (ICT-II Main bay) , 2018- 2018-
72 BAY DAILY AMP work 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA at Kanpur (GIS)(706 MAIN BAY) 05-15 05-15
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 707 Main Bay (ICT-I Main bay) , 2018- 2018-
73 BAY DAILY AMP Work 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA at Kanpur (GIS)(707 MAIN BAY) 05-16 05-16
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 703 Bay, (ICT-1 Main Bay), at 2018- 2018-
74 BAY DAILY AMP Work 09:00 18:00 33 -- PENDING
OF INDIA OF INDIA Lucknow(703 BAY) 05-16 05-17
LIMITED LIMITED
POWER GRID POWER GRID
JALLANDHAR-PG (400KV)
CORPORATION CORPORATION For rectification of B-Phase CB HMV Drive at GIS 2018- 2018-
75 LINE (POWERGRID)-CHAMBA POOL CONTINUOUS 09:00 18:00 57 -- PENDING
OF INDIA OF INDIA Chamba. 05-03 05-05
(400KV)(POWERGRID) 1
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400KV BUS- I at For Extension of GIS Bus-Bar for ICT-III under 2018- 2018-
76 BUS CONTINUOUS 09:00 17:00 128 -- PENDING
OF INDIA OF INDIA Hamirpur(PGABS400008) construction. (Rescheduled from 144 OCC.) 05-02 05-07
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400KV BUS- II at For Extension of GIS Bus-Bar for ICT-III under 2018- 2018-
77 BUS CONTINUOUS 09:00 17:00 128 -- PENDING
OF INDIA OF INDIA Hamirpur(PGABS400009) construction. (Rescheduled from 144 OCC.) 05-08 05-13
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 220KV BUS- I at For Extension of GIS Bus-Bar for ICT-III under 2018- 2018-
78 BUS CONTINUOUS 09:00 17:00 128 -- PENDING
OF INDIA OF INDIA Hamirpur(PGABS220004) construction. (Rescheduled from 144 OCC.) 05-14 05-19
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 220KV BUS- II at For Extension of GIS Bus-Bar for ICT-III under 2018- 2018-
79 BUS CONTINUOUS 09:00 17:00 128 -- PENDING
OF INDIA OF INDIA Hamirpur(PGABS220005) construction. (Rescheduled from 144 OCC.) 05-20 05-25
LIMITED LIMITED
For Extension of GIS Bus-Bar for ICT-III under
POWER GRID POWER GRID construction. ICT-II shutdown is required as it is
ICT02 HAMIRPUR-PG (400KV)
CORPORATION CORPORATION adjacent to the upcoming Bus section & gas 2018- 2018-
80 ICT (POWERGRID) CONTINUOUS 09:00 17:00 128 -- PENDING
OF INDIA OF INDIA pressure is to be reduced to 03. Bar. So it could 05-02 05-07
(PGICT40000135)/315
LIMITED LIMITED not be charged till Bus-I is out. (Rescheduled from
144 OCC.)
For Extension of GIS Bus-Bar for ICT-III under
POWER GRID POWER GRID construction. ICT-II shutdown is required as it is
ICT02 HAMIRPUR-PG (400KV)
CORPORATION CORPORATION adjacent to the upcoming Bus section & gas 2018- 2018-
81 ICT (POWERGRID) CONTINUOUS 09:00 17:00 128 -- PENDING
OF INDIA OF INDIA pressure is to be reduced to 03. Bar. So it could 05-08 05-13
(PGICT40000135)/315
LIMITED LIMITED not be charged till Bus-II is out. (Rescheduled from
144 OCC.)
POWER GRID POWER GRID
AMRITSAR (400KV)
CORPORATION CORPORATION Auto-Reclosure Non Auto mode for OPGW work. 2018- 2018-
82 LINE (POWERGRID)-ParbatiPooling- DAILY 09:00 17:00 728 -- PENDING
OF INDIA OF INDIA (Non- Shutdown activity). 05-01 05-31
BANALA (400KV)(POWERGRID) I
LIMITED LIMITED
POWER GRID POWER GRID
HAMIRPUR-PG (400KV)
CORPORATION CORPORATION Auto-Reclosure Non Auto mode for OPGW work. 2018- 2018-
83 LINE (POWERGRID)-ParbatiPooling- DAILY 09:00 17:00 728 -- PENDING
OF INDIA OF INDIA (Non- Shutdown activity). 05-01 05-31
BANALA (400KV)(POWERGRID)
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 KAITHAL (400KV)
CORPORATION CORPORATION Replacement of 220 KV Side R & Y Phase LA's due 2018- 2018-
84 ICT (POWERGRID) DAILY 09:00 16:00 7 -- PENDING
OF INDIA OF INDIA to THRC violation. 05-02 05-02
(PGICT4000090)/315
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 KAITHAL (400KV)
CORPORATION CORPORATION 2018- 2018-
85 ICT (POWERGRID) DAILY For AMP Works. 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA 04-16 04-16
(PGICT4000091)/315
LIMITED LIMITED
POWER GRID POWER GRID
KAITHAL (400KV)(POWERGRID)-
CORPORATION CORPORATION Replacement of Y Phase LA of Line due to THRC 2018- 2018-
86 LINE BAGHPAT (400KV)(POWERGRID) DAILY 10:00 14:00 4 -- PENDING
OF INDIA OF INDIA violation. 04-03 04-03
II
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 LUDHIANA (400KV)
CORPORATION CORPORATION Replacement of 220KV Y-Phase Bushing of ICT-1 2018- 2018-
87 ICT (POWERGRID) CONTINUOUS 09:00 18:00 129 -- PENDING
OF INDIA OF INDIA due to Tan Delta Violation. 05-02 05-07
(PGICT40000109)/315
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400KV Bus-I at For Replacement of T Connectors related to Bus 2018- 2018-
88 BUS DAILY 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA Patiala(PGABS4000060) Reactor. 05-15 05-15
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400kV Bus-II at 2018- 2018-
89 BUS DAILY For AMP Works/to Attend Hotspots. 09:30 17:00 7 -- PENDING
OF INDIA OF INDIA Wagoora(PGABS400007) 05-16 05-16
LIMITED LIMITED
POWER GRID POWER GRID For diversion of Existing T. No. 66 to new pile
CORPORATION CORPORATION HIRANAGAR(220KV)(JKPDD)- foundation tower because existing foundation got 2018- 2018-
90 LINE CONTINUOUS 09:00 17:30 200 -- PENDING
OF INDIA OF INDIA SARNA (220KV)(PSTCL) damaged due to change in path of river flow. 05-02 05-10
LIMITED LIMITED (Rescheduled from 144 OCC.)
Uttar Pradesh
"1.Stringing of balance earth wire/tree cutting
Power
SLDC Uttar UNNAO (400KV)(UPPTCL)- 2.General maintenance of feeder, FSC-I and 2018- 2018-
91 Transmission LINE DAILY 09:00 18:00 81 -- PENDING
Pradesh BAREILY-UP (400KV)(UPPTCL) I maintence of 50 MVAR Line Reactor at 400 KV S/S 05-23 05-26
Corporation
Unnao at first circuit."
Limited
Uttar Pradesh
Power
SLDC Uttar OBRA (400KV)(UPPTCL)- Replacement of disc insulator by Polymer insulator 2018- 2018-
92 Transmission LINE DAILY 08:00 18:00 34 -- PENDING
Pradesh SULTANPUR (400KV)(UPPTCL) and other maintenance work. 05-16 05-17
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar SULTANPUR (400KV)(UPPTCL)- 2018- 2018-
93 Transmission LINE DAILY Maintenance works & tree cutting. 08:00 18:00 10 -- PENDING
Pradesh AZAMGARH (400KV)(UPPTCL) 05-18 05-18
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar MAU (400KV)(UPPTCL)- Servicing & overhauling of pantograph isolator, 2018- 2018-
94 Transmission LINE DAILY 08:00 18:00 10 -- PENDING
Pradesh AZAMGARH (400KV)(UPPTCL) replacement of contact blades at Mau end. 05-11 05-11
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar AZAMGARH (400KV)(UPPTCL)- For Erection of new line Reactor at 400 KV 2018- 2018-
95 Transmission LINE DAILY 08:00 18:00 106 -- PENDING
Pradesh SARNATH (400KV)(UPPTCL) Azamgarh end 05-20 05-24
Corporation
Limited
Uttar Pradesh Connecting the 33 KV Tertiary bushing terminals by
Power 4" IPS AI Pipe along with 33 KV Surge Capacitor ,
SLDC Uttar ICT02 UNNAO (400KV)(UPPTCL) 2018- 2018-
96 Transmission ICT DAILY 33 KV CT Lightening Arrestor and 33 KV CT to 08:00 18:00 10 -- PENDING
Pradesh (ICT40000193)/315 05-02 05-02
Corporation charge the 31.5 MVAR Tertiary reactor of
Limited 400/220/33 KV 315 MVA ICT-III at 400 KV S/S Unnao
Uttar Pradesh
Major Overhauling of Main Circuit Breaker of 400 KV
Power
SLDC Uttar AGRA-UP (400KV)(UPPTCL)- Agra Feeder at 400 KV S/S Unnao bay Main Circuit 2018- 2018-
97 Transmission LINE CONTINUOUS 08:00 18:00 154 -- PENDING
Pradesh UNNAO (400KV)(UPPTCL) Breaker (during shutdown the line will remain 05-07 05-13
Corporation
charged through 400 KV TBC ) Unnao
Limited
DELHI
ICT01 BAMNAULI(DTL) TO CHECK THE BUCHHOLZ RELAY AND ITS 2018- 2018-
98 SLDC Delhi TRANSCO ICT DAILY 07:00 12:00 5 -- PENDING
(ICT4000028)/315 ASSOCIATED CKTS. 05-02 05-02
LIMITED
Uttar Pradesh
Power ICT02 LUCKNOW (Sarojini Nagar)
SLDC Uttar FOR ROUTINE TESTING AND BAY MAINTAINANCE 2018- 2018-
99 Transmission ICT 400-UP(UPPTCL) DAILY 09:00 16:00 7 -- PENDING
Pradesh WORK. 05-07 05-07
Corporation (ICT40000170)/315
Limited
DELHI DADRI-THERMAL (400KV)(NTPC)-
2018- 2018-
100 SLDC Delhi TRANSCO LINE LONI-HARSHVIHAR (400KV)(DTL) DAILY TAN DELTA TESTING. 08:00 11:00 3 -- PENDING
05-03 05-03
LIMITED 1
DELHI DADRI-THERMAL (400KV)(NTPC)-
2018- 2018-
101 SLDC Delhi TRANSCO LINE LONI-HARSHVIHAR (400KV)(DTL) DAILY TAN DELTA TESTING. 13:30 16:00 2 -- PENDING
05-03 05-03
LIMITED 2
Uttar Pradesh
Power
SLDC Uttar PANKI (400KV)(UPPTCL)-ALIGARH For tightening of jumper & other maintenance 2018- 2018-
102 Transmission LINE DAILY 08:00 18:00 106 -- PENDING
Pradesh (400KV)(UPPTCL) work. No supply loss 05-11 05-15
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar ALIGARH (400KV)(UPPTCL)- To replace Disc Insulator by polymer string of 2018- 2018-
103 Transmission LINE DAILY 08:00 16:00 104 -- PENDING
Pradesh MURADNAGAR (400KV)(UPPTCL) Tension tower. 05-07 05-11
Corporation
Limited
Uttar Pradesh
Power GREATER NOIDA (400KV)
SLDC Uttar 2018- 2018-
104 Transmission LINE (UPPTCL)-SIKANDRABAD (400KV) DAILY Tower Strengthening, Tree cutting 05:00 11:00 30 -- PENDING
Pradesh 05-28 05-29
Corporation (UPPTCL) 1
Limited
Uttar Pradesh
Power GREATER NOIDA (400KV)
SLDC Uttar 2018- 2018-
105 Transmission LINE (UPPTCL)-SIKANDRABAD (400KV) DAILY Tower Strengthening, Tree cutting 05:00 11:00 126 -- PENDING
Pradesh 05-07 05-12
Corporation (UPPTCL) 2
Limited
Haryana
SLDC Vidyut ICT02 DAULTABAD (400KV) 2018- 2018-
106 ICT DAILY For Annual mtc. 08:30 16:00 7 -- PENDING
Haryana Prasaran (HVPNL)(ICT400005)/315 05-02 05-02
Nigam LTD
Uttar Pradesh
Power
SLDC Uttar ICT01 SIKANDRABAD (400KV) 2018- 2018-
107 Transmission ICT DAILY Annual Maintenance 09:00 18:00 9 -- PENDING
Pradesh (UPPTCL)(ICT40000188)/500 05-03 05-03
Corporation
Limited
Haryana
SLDC Vidyut ICT03 KIRORI (400KV)(HVPNL) 2018- 2018-
108 ICT DAILY For annual mtc. 10:00 16:00 6 -- PENDING
Haryana Prasaran (ICT400003)/315 05-07 05-07
Nigam LTD
Haryana
FATEHABAD PG (400KV)
SLDC Vidyut For M&P testing of CVT of B ph installed on line bay 2018- 2018-
109 LINE (POWERGRID)-KHEDAR (400KV) DAILY 11:00 14:00 3 -- PENDING
Haryana Prasaran at F/Bad Mathana. 05-09 05-09
(HPGCL)
Nigam LTD
Haryana
FATEHABAD PG (400KV)
SLDC Vidyut 2018- 2018-
110 LINE (POWERGRID)-NUHIANWALI DAILY Gen mtc and tree trimming. 09:00 17:00 8 -- PENDING
Haryana Prasaran 05-11 05-11
(400KV)(HVPNL)
Nigam LTD
Haryana
SLDC Vidyut KHEDAR (400KV)(HPGCL)- 2018- 2018-
111 LINE DAILY Gen mtc and tree trimming 09:00 17:00 8 -- PENDING
Haryana Prasaran NUHIANWALI (400KV)(HVPNL) 1 05-15 05-15
Nigam LTD
Uttar Pradesh
Power
SLDC Uttar ICT02 SIKANDRABAD (400KV) 2018- 2018-
112 Transmission ICT DAILY Annual Maintenance 09:00 18:00 9 -- PENDING
Pradesh (UPPTCL)(ICT40000189)/500 05-08 05-08
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar REACTOR SIKANDRABAD (400KV) 2018- 2018-
113 Transmission REACTOR DAILY Annual Maintenance 09:00 18:00 9 -- PENDING
Pradesh (BR4000039)/125.00 05-15 05-15
Corporation
Limited
POWER GRID POWER GRID
VARANASI (765KV) To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION 2018- 2018-
114 LINE (POWERGRID)-KANPUR GIS DAILY Missing Jumper Bolts, Spacer Damper,cottor 08:00 18:00 106 -- PENDING
OF INDIA OF INDIA 05-20 05-24
(765KV)(POWERGRID) II Pin,Broken Insulator Replacement etc)
LIMITED LIMITED
Haryana
SLDC Vidyut Tie Bay 408 at Dhanonda for Gen mtc. of bay equipments & alignment of bus 2018- 2018-
115 BAY DAILY 09:00 15:00 6 -- PENDING
Haryana Prasaran Dhanonda-CLP line(408) isolators. 05-02 05-02
Nigam LTD
Uttar Pradesh
Power SINGRAULI NTPC (400KV)(NTPC)-
SLDC Uttar 2018- 2018-
116 Transmission LINE LUCKNOW (Sarojini Nagar) 400- DAILY FOR YEARLY ROUTINE TESTING 09:00 16:00 7 -- PENDING
Pradesh 05-09 05-09
Corporation UP(UPPTCL)
Limited
Uttar Pradesh
Power
SLDC Uttar ICT01 BAREILY-UP (400KV) 2018- 2018-
117 Transmission ICT CONTINUOUS For Replacement of TarantulLa Jack Bus. 07:00 18:00 59 -- PENDING
Pradesh (UPPTCL)(ICT40000162)/315 05-14 05-16
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar ICT02 BAREILY-UP (400KV) 2018- 2018-
118 Transmission ICT CONTINUOUS For Replacement of Tarantulla Jack Bus. 07:00 18:00 59 -- PENDING
Pradesh (UPPTCL)(ICT40000163)/315 05-16 05-18
Corporation
Limited
Uttar Pradesh
Power Servicing & overhauling of pantograph isolator,
SLDC Uttar BALIA(400KV)(POWERGRID)-MAU 2018- 2018-
119 Transmission LINE CONTINUOUS replacement of contact blades and relay testing at 08:00 18:00 10 -- PENDING
Pradesh (400KV)(UPPTCL) I 05-09 05-09
Corporation Mau.
Limited
Uttar Pradesh
Power Servicing & overhauling of pantograph isolator,
SLDC Uttar BALIA(400KV)(POWERGRID)-MAU 2018- 2018-
120 Transmission LINE CONTINUOUS replacement of contact blades and relay testing at 08:00 18:00 10 -- PENDING
Pradesh (400KV)(UPPTCL) II 05-10 05-10
Corporation Mau.
Limited
ANTA GPS( GT)(GENCO001)- 2018- 2018-
121 NTPC Limited NTPC Limited GENCO CONTINUOUS Minor Inspection (8000 EOH) 00:00 23:59 143 -- PENDING
U1/88.71 05-05 05-10
AURAIYA GPS (GT)(GENCO005)- 2018- 2018-
122 NTPC Limited NTPC Limited GENCO DAILY Boiler License renewal 00:00 23:59 23 -- PENDING
U1/111.19 05-09 05-09
Faridabad GPS (GT) 2018- 2018-
123 NTPC Limited NTPC Limited GENCO CONTINUOUS Minor inspection 00:00 23:59 119 -- PENDING
(GENCO0021)-U1/137.75 05-15 05-19
BHAKRA BEAS BHAKRA BEAS
BHIWANI BBMB (220KV)(BBMB)- Erection on new towers for railway crossing in 2018- 2018-
124 MANAGEMENT MANAGEMENT LINE DAILY 08:00 17:00 201 -- PENDING
HISSAR BBMB (220KV)(BBMB) 1 between span no.2-3 & half yearly maintenance 05-23 05-31
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS Erection of new towers for railway line (RVNL)
BHIWANI BBMB (220KV)(BBMB)- 2018- 2018-
125 MANAGEMENT MANAGEMENT LINE DAILY crossing in between span no.2-3 & half yearly 08:00 17:00 201 -- PENDING
HISSAR BBMB (220KV)(BBMB) 2 05-23 05-31
BOARD BOARD maintenance.
BHAKRA BEAS BHAKRA BEAS
PANIPAT BBMB (220KV)(BBMB)- Erection of new towers for railway line (RVNL) 2018- 2018-
126 MANAGEMENT MANAGEMENT LINE CONTINUOUS 08:00 17:00 249 -- PENDING
CHARKHI DADRI (220KV)(BBMB) crossing in between span no. 327-328. 05-05 05-15
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS BALLABGARH BBMB (220KV) 1 No. Isolator & 1 No. CT to be replaced at
2018- 2018-
127 MANAGEMENT MANAGEMENT LINE (BBMB)-SAMAYPUR (220KV) CONTINUOUS Samaypur substation . 1 No. CT to be replaced at 08:00 17:00 57 -- PENDING
05-02 05-04
BOARD BOARD (BBMB) 2 Ballabgarh substation.
BHAKRA BEAS BHAKRA BEAS BALLABGARH BBMB (220KV)
2018- 2018-
128 MANAGEMENT MANAGEMENT LINE (BBMB)-BADARPUR (220KV) DAILY Half Yearly Maintenance 08:00 17:00 9 -- PENDING
05-21 05-21
BOARD BOARD (NTPC) 1
BHAKRA BEAS BHAKRA BEAS JAGADHRI (220KV)(BBMB)-
For replacement of conventional disc insulator with 2018- 2018-
129 MANAGEMENT MANAGEMENT LINE KURUKSHETRA BBMB (220KV) DAILY 08:00 17:00 9 -- PENDING
Antifog disc insulator 05-02 05-02
BOARD BOARD (BBMB)
BHAKRA BEAS BHAKRA BEAS Due to 4 laning of NH-73, the height of conductor
GANGUWAL (220KV)(BBMB)- 2018- 2018-
130 MANAGEMENT MANAGEMENT LINE CONTINUOUS is to be raised by erecting new tower by NHAI. 08:00 17:00 105 -- PENDING
JAGADHRI (220KV)(BBMB) 05-25 05-29
BOARD BOARD (under self execution scheme)
DELHI
DEEPALPUR (400KV)(KT JHAJJAR)- REPLACE DAMAGED DROPPER JUMPER 'R' PHASE OF 2018- 2018-
131 SLDC Delhi TRANSCO LINE DAILY 06:00 10:00 4 -- PENDING
BAWANA-DTL (400KV)(DTL) LINE ISOLATOR AND TAN DELTA TESTING. 05-02 05-02
LIMITED
BHAKRA BEAS BHAKRA BEAS BHIWANI-PG (400KV)
2018- 2018-
132 MANAGEMENT MANAGEMENT LINE (POWERGRID)-BHIWANI BBMB DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
05-17 05-17
BOARD BOARD (400KV)(BBMB)
DELHI ALONGWITH 400KV DEEPALPUR CKT. FOR REPLACING
400KV BUS-1 AT BAWANA-DTL 2018- 2018-
133 SLDC Delhi TRANSCO BUS DAILY DAMAGED DROPPER JUMPER 'R' PHASE OF LINE 06:00 10:00 4 -- PENDING
(400KV)(ABS4000018) 05-02 05-02
LIMITED ISOLATOR AND TAN DELTA TESTING.
BHAKRA BEAS BHAKRA BEAS BHIWANI-PG (400KV)
2018- 2018-
134 MANAGEMENT MANAGEMENT LINE (POWERGRID)-HISSAR-PG DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
05-15 05-15
BOARD BOARD (400KV)(POWERGRID) II
Haryana
SLDC Vidyut 400kv BUS-1 For Erection 400 kV Bays equipments at 400 kV 2018- 2018-
135 BUS DAILY 09:00 18:00 9 -- PENDING
Haryana Prasaran Kirori(ABS4000097) Kirori for 400 kv Kirori-jind line. 05-01 05-01
Nigam LTD
BHAKRA BEAS BHAKRA BEAS DADRI-THERMAL (400KV)(NTPC)-
2018- 2018-
136 MANAGEMENT MANAGEMENT LINE PANIPAT-PG (400KV) DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
05-21 05-21
BOARD BOARD (POWERGRID) I
Haryana
SLDC Vidyut 400kv BUS-2 For Erection 400 kV Bays equipments at 400 kV 2018- 2018-
137 BUS DAILY 09:00 18:00 9 -- PENDING
Haryana Prasaran KIRORI(ABS4000098) Kirori for 400 kv Kirori-jind line. 05-02 05-02
Nigam LTD
DELHI
MEHRAULI (220KV)(DTL)- 2018- 2018-
138 SLDC Delhi TRANSCO LINE DAILY TREE TRIMMING. 05:00 09:00 28 -- PENDING
BADARPUR (220KV)(NTPC) 1 05-04 05-05
LIMITED
DELHI
MEHRAULI (220KV)(DTL)- 2018- 2018-
139 SLDC Delhi TRANSCO LINE DAILY TREE TRIMMING. 05:00 09:00 4 -- PENDING
BADARPUR (220KV)(NTPC) 2 05-03 05-03
LIMITED
DELHI
MEHRAULI (220KV)(DTL)- 2018- 2018-
140 SLDC Delhi TRANSCO LINE DAILY TREE TRIMMING. 05:00 09:00 4 -- PENDING
BADARPUR (220KV)(NTPC) 2 05-06 05-06
LIMITED
BHAKRA BEAS BHAKRA BEAS HISSAR-PG (220KV)
2018- 2018-
141 MANAGEMENT MANAGEMENT LINE (POWERGRID)-HISSAR IA (220KV) DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
05-10 05-10
BOARD BOARD (HVPNL)
BHAKRA BEAS BHAKRA BEAS HISSAR-PG (220KV)
2018- 2018-
142 MANAGEMENT MANAGEMENT LINE (POWERGRID)-HISSAR IA (220KV) DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
05-11 05-11
BOARD BOARD (HVPNL) 2
BHAKRA BEAS BHAKRA BEAS
HISSAR BBMB (220KV)(BBMB)- 2018- 2018-
143 MANAGEMENT MANAGEMENT LINE DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
CHIRAWA (220KV)(RRVPN) 05-14 05-14
BOARD BOARD
DELHI
OKHLA (220KV)(DTL)-BADARPUR 2018- 2018-
144 SLDC Delhi TRANSCO LINE DAILY DEAD END REPLACEMENT AT TOWER NO 25. 05:00 10:00 5 -- PENDING
(220KV)(NTPC) 1 05-12 05-12
LIMITED
Haryana
SLDC Vidyut ICT03 DHANONDA (400KV) For gen mtc of bay equipment and alignment of 2018- 2018-
145 ICT DAILY 09:00 16:00 7 -- PENDING
Haryana Prasaran (HVPNL)(ICT4000010)/315 isolator. 05-15 05-15
Nigam LTD
Uttar Pradesh
Power
SLDC Uttar ANPARA-B (400KV)(UPRVUNL)- 2018- 2018-
146 Transmission LINE CONTINUOUS Diversion work for Obra C 08:00 18:00 226 -- PENDING
Pradesh OBRA (400KV)(UPPTCL) 05-01 05-10
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar ANPARA-B (400KV)(UPRVUNL)- For replacement of disc insulator by polymer & 2018- 2018-
147 Transmission LINE DAILY 08:00 18:00 178 -- PENDING
Pradesh SARNATH (400KV)(UPPTCL) 2 replacement of Earthwire. 05-11 05-18
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar ANPARA-B (400KV)(UPRVUNL)- For DFCC works & replacement of damaged 2018- 2018-
148 Transmission LINE CONTINUOUS 08:00 18:00 154 -- PENDING
Pradesh SARNATH (400KV)(UPPTCL) 1 conductor 05-25 05-31
Corporation
Limited
Uttar Pradesh
"1. For replacement of disc insulator by polymer &
Power
SLDC Uttar ANPARA-B (400KV)(UPRVUNL)- replacement of Earthwire. 2. Servicing & 2018- 2018-
149 Transmission LINE DAILY 08:00 18:00 154 -- PENDING
Pradesh MAU (400KV)(UPPTCL) overhauling of pantograph isolator, replacement 05-18 05-24
Corporation
of contact blades. "
Limited
BHAKRA BEAS BHAKRA BEAS CHARKHI DADRI (220KV)(BBMB)-
2018- 2018-
150 MANAGEMENT MANAGEMENT LINE MAHINDERGARH HVPNL (220KV) DAILY Half Yearly Maintenance 08:00 17:00 9 -- PENDING
05-11 05-11
BOARD BOARD (HVPNL) 2
RAJASTHAN
SLDC RAJYA VIDYUT ANTA(400KV)(RRVPN)-KALISINDH 2018- 2018-
151 LINE DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN (400KV)(RRVPN) 2 05-03 05-03
NIGAM LIMITED
BHAKRA BEAS BHAKRA BEAS JALLANDHAR-PG (220KV)
2018- 2018-
152 MANAGEMENT MANAGEMENT LINE (POWERGRID)-DASUYA (220KV) DAILY Half yearly mtc. of the substation equipment 08:00 17:00 9 -- PENDING
05-17 05-17
BOARD BOARD (PSTCL) I
BHAKRA BEAS BHAKRA BEAS JALLANDHAR BBMB (220KV)
2018- 2018-
153 MANAGEMENT MANAGEMENT LINE (BBMB)-JAMSHER (220KV) DAILY Half yearly mtc. of the substation equipment 08:00 17:00 9 -- PENDING
05-22 05-22
BOARD BOARD (PSTCL) 1
Uttar Pradesh
Power TANDA (220KV)(NTPC)-
SLDC Uttar For Replacement of Insulators with polymer 2018- 2018-
154 Transmission LINE GORAKHPUR (BARAUHA)-UP DAILY 08:00 18:00 226 -- PENDING
Pradesh Insulators. 05-11 05-20
Corporation (220KV)(UPPTCL)
Limited
BHAKRA BEAS BHAKRA BEAS JALLANDHAR BBMB (220KV)
2018- 2018-
155 MANAGEMENT MANAGEMENT LINE (BBMB)-JAMSHER (220KV) DAILY Half yearly mtc. of the substation equipment 08:00 17:00 9 -- PENDING
05-23 05-23
BOARD BOARD (PSTCL) 2
BHAKRA BEAS BHAKRA BEAS
BAIRASUIL (220KV)(NHPC)-PONG Yearly mtc of 220KV SF-6 Breaker A-1 controlling 2018- 2018-
156 MANAGEMENT MANAGEMENT LINE DAILY 08:00 17:00 9 -- PENDING
(220KV)(BBMB) Ckt & its allied equipments at Pong. 05-04 05-04
BOARD BOARD
RAJASTHAN
SLDC RAJYA VIDYUT ANTA(400KV)(RRVPN)-CHHABRA 2018- 2018-
157 LINE DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN (400KV)(RRVPN) 1 05-08 05-08
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT ANTA(400KV)(RRVPN)-KAWAI 2018- 2018-
158 LINE DAILY Replacement of 02 nos CVT at Line 09:00 18:30 9 -- PENDING
Rajasthan PRASARAN (400KV)(RRVPN) 2 05-08 05-08
NIGAM LIMITED
BHAKRA BEAS BHAKRA BEAS JASSURE(HIMACHAL PRADESH
Yearly mtc of 220KV SF-6 Breaker A-2 controlling 2018- 2018-
159 MANAGEMENT MANAGEMENT LINE STATE ELECTRICITY BOARD DAILY 08:00 17:00 9 -- PENDING
Ckt & its allied equipments at Pong. 05-05 05-05
BOARD BOARD LIMITED)-PONG (220KV)(BBMB) 2
RAJASTHAN
SLDC RAJYA VIDYUT ANTA(400KV)(RRVPN)-KAWAI 2018- 2018-
160 LINE DAILY Replacement of 01 no CVT at Line 09:00 18:30 9 -- PENDING
Rajasthan PRASARAN (400KV)(RRVPN) 1 05-10 05-10
NIGAM LIMITED
BHAKRA BEAS BHAKRA BEAS PONG (220KV)(BBMB)-
Yearly mtc of 220KV SF-6 Breaker A-10 controlling 2018- 2018-
161 MANAGEMENT MANAGEMENT LINE JALLANDHAR BBMB (220KV) DAILY 08:00 17:00 9 -- PENDING
Ckt & its allied equipments at Pong. 05-10 05-10
BOARD BOARD (BBMB) I
RAJASTHAN
SLDC RAJYA VIDYUT CHHABRA (400KV)(RRVPN)- 2018- 2018-
162 LINE DAILY Replacement of 01 no CVT at Line 09:00 18:30 9 -- PENDING
Rajasthan PRASARAN KAWAI SCTPS (400KV)(ADANIRJ) 05-11 05-11
NIGAM LIMITED
BHAKRA BEAS BHAKRA BEAS PONG (220KV)(BBMB)-
Yearly mtc of 220KV SF-6 Breaker A-11 controlling 2018- 2018-
163 MANAGEMENT MANAGEMENT LINE JALLANDHAR BBMB (220KV) DAILY 08:00 17:00 9 -- PENDING
Ckt & its allied equipments at Pong. 05-11 05-11
BOARD BOARD (BBMB) II
RAJASTHAN
SLDC RAJYA VIDYUT HISSAR BBMB (220KV)(BBMB)- 2018- 2018-
164 LINE DAILY Half yearly maintenace work of bay and line 08:00 19:00 35 -- PENDING
Rajasthan PRASARAN CHIRAWA (220KV)(RRVPN) 05-11 05-12
NIGAM LIMITED
BHAKRA BEAS BHAKRA BEAS
PONG (220KV)(BBMB)-DASUYA Yearly mtc of 220KV SF-6 Breaker A-14 controlling 2018- 2018-
165 MANAGEMENT MANAGEMENT LINE DAILY 08:00 17:00 9 -- PENDING
(220KV)(PSTCL) 1 Ckt & its allied equipments at Pong. 05-15 05-15
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
DEHAR (220KV)(BBMB)- Half yearly mtc. of the substation equipment 2018- 2018-
166 MANAGEMENT MANAGEMENT LINE DAILY 08:00 17:00 33 -- PENDING
GANGUWAL (220KV)(BBMB) 2 related with Ckt. at Slapper end. 05-08 05-09
BOARD BOARD
RAJASTHAN
SLDC RAJYA VIDYUT BARMER (400KV)(RRVPN)- 2018- 2018-
167 LINE DAILY Quarterly Maintenance 10:00 18:00 8 -- PENDING
Rajasthan PRASARAN RAJWEST (400KV)(RRVPN) 05-10 05-10
NIGAM LIMITED
BHAKRA BEAS BHAKRA BEAS
PONG (220KV)(BBMB)-DASUYA Yearly mtc of 220KV SF-6 Breaker A-15 controlling 2018- 2018-
168 MANAGEMENT MANAGEMENT LINE DAILY 08:00 17:00 9 -- PENDING
(220KV)(PSTCL) 2 Ckt & its allied equipments at Pong. 05-16 05-16
BOARD BOARD
RAJASTHAN
AKAL JAISALMER (400KV)
SLDC RAJYA VIDYUT Erection of Gentry Beam (G2 Type) in Dia-4 by M/s 2018- 2018-
169 LINE (RRVPN)-BARMER (400KV) CONTINUOUS 06:00 18:00 36 -- PENDING
Rajasthan PRASARAN GE T&D India Limited AT BARMER 05-21 05-22
(RRVPN)
NIGAM LIMITED
BHAKRA BEAS BHAKRA BEAS
DEHAR (220KV)(BBMB)- Half yearly mtc. of the substation equipment 2018- 2018-
170 MANAGEMENT MANAGEMENT LINE DAILY 08:00 17:00 33 -- PENDING
GANGUWAL (220KV)(BBMB) 1 related with Ckt. at Slapper end. 05-15 05-16
BOARD BOARD
RAJASTHAN
AKAL JAISALMER (400KV)
SLDC RAJYA VIDYUT Erection of Gentry Beam (G1 Type) in Dia-4 by M/s 2018- 2018-
171 LINE (RRVPN)-BARMER (400KV) CONTINUOUS 06:00 18:00 36 -- PENDING
Rajasthan PRASARAN GE T&D India Limited AT BARMER 05-25 05-26
(RRVPN)
NIGAM LIMITED
RAJASTHAN
AKAL JAISALMER (400KV)
SLDC RAJYA VIDYUT Erection of Gentry Beam (G1 Type) in Dia-4 by M/s 2018- 2018-
172 LINE (RRVPN)-BARMER (400KV) CONTINUOUS 06:00 18:00 36 -- PENDING
Rajasthan PRASARAN GE T&D India Limited AT BARMER 05-29 05-30
(RRVPN)
NIGAM LIMITED
DEHAR (220KV)(BBMB)-KANGOO
BHAKRA BEAS BHAKRA BEAS
(220KV)(HIMACHAL PRADESH Half yearly mtc. of the substation equipment 2018- 2018-
173 MANAGEMENT MANAGEMENT LINE DAILY 08:00 17:00 33 -- PENDING
STATE ELECTRICITY BOARD related with Ckt. at Slapper end. 05-21 05-22
BOARD BOARD
LIMITED)
RAJASTHAN
SLDC RAJYA VIDYUT BASSI (220KV)(POWERGRID)- 2018- 2018-
174 LINE DAILY Quarterly maintenance 09:30 15:30 6 -- PENDING
Rajasthan PRASARAN DAUSA (220KV)(POWERGRID) 1 05-22 05-22
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT BASSI (220KV)(POWERGRID)- 2018- 2018-
175 LINE DAILY Quarterly maintenance 09:30 15:30 6 -- PENDING
Rajasthan PRASARAN DAUSA (220KV)(POWERGRID) 2 05-23 05-23
NIGAM LIMITED
RAJASTHAN
SAWAI MADHOPUR (220KV)
SLDC RAJYA VIDYUT 2018- 2018-
176 LINE (RRVPN)-DAUSA (220KV) DAILY Quarterly maintenance 09:30 15:30 6 -- PENDING
Rajasthan PRASARAN 05-24 05-24
(POWERGRID) I( PG
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT LALSOT (220KV)(RRVPN)-DAUSA 2018- 2018-
177 LINE DAILY Quarterly maintenance 09:30 15:30 6 -- PENDING
Rajasthan PRASARAN (220KV)(POWERGRID) PG 05-25 05-25
NIGAM LIMITED
RAJASTHAN
for maintenance & tree cutting of the 220 kV Agra-
SLDC RAJYA VIDYUT BHARATPUR (220KV)(RRVPN)- 2018- 2018-
178 LINE DAILY Bharatpur Inerstate line & Bay work at 220 kV GSS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN SIKANDRA (220KV)(UPPTCL) 05-11 05-11
RVPN, Bharapur
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT BIKANER (400KV)(RRVPN)- 2018- 2018-
179 LINE DAILY Routine Bay Maintenance work 07:00 10:00 3 -- PENDING
Rajasthan PRASARAN BHADLA (400KV)(RRVPN) 1 05-10 05-10
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT BIKANER (400KV)(RRVPN)- 2018- 2018-
180 LINE DAILY Routine Bay Maintenance work 07:00 10:00 3 -- PENDING
Rajasthan PRASARAN BHADLA (400KV)(RRVPN) 2 05-11 05-11
NIGAM LIMITED
PUNJAB STATE
TALWANDI SABOO TPS (400KV)
TRANSMISSION General Maintenenace jumper tightening and tree 2018- 2018-
181 SLDC Punjab LINE (PSPCL)-MUKTSAR (400KV) DAILY 09:00 17:00 8 -- PENDING
CORPORATION cutting 05-01 05-01
(PSTCL) 1
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT BIKANER (400KV)(RRVPN)- 2018- 2018-
182 LINE DAILY Routine Bay Maintenance work 10:00 17:00 7 -- PENDING
Rajasthan PRASARAN MERTA (400KV)(RRVPN) 05-17 05-17
NIGAM LIMITED
PUNJAB STATE
TRANSMISSION KANGRA (132KV)(PSPCL)- Disc cleaning & jumper tightemimg and other mtc. 2018- 2018-
183 SLDC Punjab LINE DAILY 10:00 16:00 6 -- PENDING
CORPORATION SHANAN (132KV)(PSPCL) to be done 05-03 05-03
LIMITED
For annual maintenance Remark:- 1. Power
evacuation will be through 400kV CTPP-Bhilwara,
RAJASTHAN
400kV CTPP-Hindaun Line , 220kV CTPP-Jhalawar
SLDC RAJYA VIDYUT CHHABRA (400KV)(RRVPN)- 2018- 2018-
184 LINE CONTINUOUS line and 220 kV CTPP-Kawai line. 2. Due to 08:00 18:00 34 -- PENDING
Rajasthan PRASARAN KAWAI SCTPS (400KV)(ADANIRJ) 05-21 05-22
proximity of cooling towers the insulators gets
NIGAM LIMITED
scaled, therefore descaling is must and it requires
minimum 2 days.
BHAKRA BEAS BHAKRA BEAS
ICT PANIPAT BBMB (400KV) 2018- 2018-
185 MANAGEMENT MANAGEMENT ICT DAILY Half Yearly Maintenance 08:00 17:00 9 -- PENDING
(BBMB)(ICT4000047)/450 05-02 05-02
BOARD BOARD
PUNJAB STATE
TRANSMISSION RAJPURA TPS (400KV)(NPLPB)- Tigheting of nut bolts of jumper, dampers, 2018- 2018-
186 SLDC Punjab LINE DAILY 09:00 17:00 8 -- PENDING
CORPORATION RAJPURA (400KV)(PSTCL) 1 suspension clamps and cleaning of disc insulators 05-03 05-03
LIMITED
For annual maintenance, checking of auto
reclosing scheme and Descaling of insulators
RAJASTHAN Remark:-1. Power evacuation will be through
SLDC RAJYA VIDYUT BHILWARA (400KV)(RRVPN)- 400kV CTPP-Adani, 400kV CTPP-Hindon Line , 2018- 2018-
187 LINE CONTINUOUS 08:00 18:00 34 -- PENDING
Rajasthan PRASARAN CHHABRA (400KV)(RRVPN) 220kV CTPP-Jhalawar line and 220 kV CTPP-Kawai 05-04 05-05
NIGAM LIMITED line. 2. Due to proximity of cooling towers the
insulators gets scaled, therefore descaling is must
and it requires minimum 2 days.
BHAKRA BEAS BHAKRA BEAS ICT02 PANIPAT-PG (400KV)
2018- 2018-
188 MANAGEMENT MANAGEMENT ICT (POWERGRID) DAILY Half Yearly Maintenance 08:00 17:00 9 -- PENDING
05-03 05-03
BOARD BOARD (PGICT40000103)/450
For incorporating auto reclosing and annual
maintenance at CTPP end. Remarks:- 1. Power
RAJASTHAN evacuation will be through 400kV CTPP-Adani,
SLDC RAJYA VIDYUT HINDAUN (400KV)(RRVPN)- 400kV CTPP-Bhilwara Line , 220kV CTPP-Jhalawar 2018- 2018-
189 LINE CONTINUOUS 08:00 18:00 34 -- PENDING
Rajasthan PRASARAN CHHABRA (400KV)(RRVPN) line and 220 kV CTPP-Kawai line. 2. Due to 05-01 05-02
NIGAM LIMITED proximity of cooling towers the insulators gets
scaled, therefore descaling is must and it requires
minimum 2 days.
RAJASTHAN
SLDC RAJYA VIDYUT JODHPUR (400KV)(RRVPN)-AKAL Quaterly Maintenance of BOTH ENDS OF BAYS AND 2018- 2018-
190 LINE DAILY 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN JAISALMER (400KV)(RRVPN) LINE 05-17 05-17
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT MERTA (400KV)(RRVPN)- 2018- 2018-
191 LINE DAILY IInd Quarterly maintenance work OF BAYS AND LINE 10:00 18:00 8 -- PENDING
Rajasthan PRASARAN JODHPUR (400KV)(RRVPN) II 05-10 05-10
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT KANKROLI (400KV)(POWERGRID)- 2018- 2018-
192 LINE DAILY IInd Quarterly maintenance work OF BAYS AND LINE 10:00 18:00 8 -- PENDING
Rajasthan PRASARAN JODHPUR (400KV)(RRVPN) 05-24 05-24
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT MERTA (400KV)(RRVPN)- IInd Quarterly maintenance work OF BAYS AND LINE 2018- 2018-
193 LINE DAILY 10:00 18:00 8 -- PENDING
Rajasthan PRASARAN JODHPUR (400KV)(RRVPN) I at jodhpur 05-31 05-31
NIGAM LIMITED
RAJASTHAN
RAPS B (220KV)(NPCIL)-
SLDC RAJYA VIDYUT 2018- 2018-
194 LINE SAKATPURA-KOTA (220KV) DAILY QUARTERLY MAINTENANCE WORK 08:00 18:00 10 -- PENDING
Rajasthan PRASARAN 05-10 05-10
(RRVPN)
NIGAM LIMITED
PUNJAB STATE
MAKHU (400KV)(PSTCL)-
TRANSMISSION Tightening/checking of jumpers and cleaning of 2018- 2018-
195 SLDC Punjab LINE AMRITSAR (400KV)(POWERGRID) DAILY 09:30 18:30 9 -- PENDING
CORPORATION disc insulators in polluted area 05-03 05-03
I
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT CHARKHI DADRI (220KV)(BBMB)- REPLACEMENT OF DISC INSULATORS WITH 2018- 2018-
196 LINE CONTINUOUS 09:00 17:00 344 -- PENDING
Rajasthan PRASARAN KHETRI (220KV)(RRVPN) 1 COMPOSITE DISC INSULATORS 05-02 05-16
NIGAM LIMITED
PUNJAB STATE
MAKHU (400KV)(PSTCL)-
TRANSMISSION Tightening/checking of jumpers and cleaning of 2018- 2018-
197 SLDC Punjab LINE AMRITSAR (400KV)(POWERGRID) DAILY 10:00 17:00 7 -- PENDING
CORPORATION disc insulators in polluted area 05-04 05-04
II
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT CHARKHI DADRI (220KV)(BBMB)- REPLACEMENT OF DISC INSULATORS WITH 2018- 2018-
198 LINE CONTINUOUS 09:00 17:00 344 -- PENDING
Rajasthan PRASARAN KHETRI (220KV)(RRVPN) 2 COMPOSITE DISC INSULATORS 05-17 05-31
NIGAM LIMITED
PUNJAB STATE
TRANSMISSION RAJPURA (400KV)(PSTCL)-DHURI 2018- 2018-
199 SLDC Punjab LINE DAILY Line jumper/ Nut Bolt tightening 09:00 17:00 32 -- PENDING
CORPORATION (400KV)(PSTCL) 1 05-07 05-08
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT MERTA (400KV)(RRVPN)- 2018- 2018-
200 LINE DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN HEERAPURA (400KV)(RRVPN) 05-03 05-03
NIGAM LIMITED
PUNJAB STATE
TALWANDI SABOO TPS (400KV)
TRANSMISSION 2018- 2018-
201 SLDC Punjab LINE (PSPCL)-NAKODAR (400KV) DAILY General Maintenance 09:00 17:00 8 -- PENDING
CORPORATION 05-07 05-07
(PSTCL)
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT KOTA (400KV)(POWERGRID)- 2018- 2018-
202 LINE DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN MERTA (400KV)(RRVPN) I 05-04 05-04
NIGAM LIMITED
PUNJAB STATE
TRANSMISSION RAJPURA TPS (400KV)(NPLPB)- Tightening of nut bolts of jumpers, dampers , 2018- 2018-
203 SLDC Punjab LINE DAILY 09:00 17:00 8 -- PENDING
CORPORATION RAJPURA (400KV)(PSTCL) 2 suspension clamps and cleaning of Disc insulators 05-09 05-09
LIMITED
RAJASTHAN
SHREE CEMENTS (400KV)(SH.
SLDC RAJYA VIDYUT 2018- 2018-
204 LINE CEMENTS)-MERTA (400KV) DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN 05-07 05-07
(RRVPN)
NIGAM LIMITED
PUNJAB STATE
NALLAGARH (220KV) Tightening of nut bolts of jumpers, dampers ,
TRANSMISSION 2018- 2018-
205 SLDC Punjab LINE (POWERGRID)-MOHALI (220KV) DAILY suspension clamps and cleaning of Disc insulators 10:00 17:00 7 -- PENDING
CORPORATION 05-09 05-09
(PSTCL) 1 of Tower No 40 to 50
LIMITED
PUNJAB STATE
TRANSMISSION RAJPURA TPS (400KV)(NPLPB)- Tightening of nut bolts of jumpers, dampers , 2018- 2018-
206 SLDC Punjab LINE DAILY 10:00 17:00 7 -- PENDING
CORPORATION NAKODAR (400KV)(PSTCL) 1 suspension clamps and cleaning of Disc insulators 05-10 05-10
LIMITED
PUNJAB STATE
TRANSMISSION KANGRA (132KV)(PSPCL)- Disc cleaning & Jumper tightening and other mtc. 2018- 2018-
207 SLDC Punjab LINE DAILY 10:00 16:00 6 -- PENDING
CORPORATION SHANAN (132KV)(PSPCL) to be done 05-10 05-10
LIMITED
PUNJAB STATE
TRANSMISSION MUKTSAR (400KV)(PSTCL)- tightening/checking of jumpers and cleaning of 2018- 2018-
208 SLDC Punjab LINE DAILY 10:00 17:00 7 -- PENDING
CORPORATION MAKHU (400KV)(PSTCL) 1 disc insulators in polluted area 05-10 05-10
LIMITED
PUNJAB STATE
TRANSMISSION MUKTSAR (400KV)(PSTCL)- tightening/checking of jumpers and cleaning of 2018- 2018-
209 SLDC Punjab LINE DAILY 10:00 17:00 7 -- PENDING
CORPORATION MAKHU (400KV)(PSTCL) 2 disc insulators in polluted area 05-11 05-11
LIMITED
PUNJAB STATE
TRANSMISSION RAJPURA (400KV)(PSTCL)-DHURI 2018- 2018-
210 SLDC Punjab LINE DAILY Line jumper/ Nut Bolt tightening 10:00 16:00 30 -- PENDING
CORPORATION (400KV)(PSTCL) 2 05-14 05-15
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT ICT03 AKAL JAISALMER (400KV) 2018- 2018-
211 ICT DAILY QUARTERLY MAINTANANCE 09:00 16:00 7 -- PENDING
Rajasthan PRASARAN (RRVPN)(ICT4000071)/315 05-15 05-15
NIGAM LIMITED
PUNJAB STATE
TRANSMISSION RAJPURA TPS (400KV)(NPLPB)- Tightening of nut bolts of jumpers, dampers , 2018- 2018-
212 SLDC Punjab LINE DAILY 09:00 17:00 8 -- PENDING
CORPORATION NAKODAR (400KV)(PSTCL) 2 suspension clamps and cleaning of Disc insulators 05-16 05-16
LIMITED
PUNJAB STATE
TALWANDI SABOO TPS (400KV)
TRANSMISSION General maintenance, Jumper tightening and Tree 2018- 2018-
213 SLDC Punjab LINE (PSPCL)-MUKTSAR (400KV) DAILY 09:00 17:00 8 -- PENDING
CORPORATION Cutting 05-16 05-16
(PSTCL) 2
LIMITED
PUNJAB STATE
TRANSMISSION MOGA (400KV)(POWERGRID)- General maintenance, Jumper tightening and Tree 2018- 2018-
214 SLDC Punjab LINE DAILY 10:00 16:00 6 -- PENDING
CORPORATION NAKODAR (400KV)(PSTCL) Cutting 05-17 05-17
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT ICT01 BHILWARA (400KV) Quarterly Maintenane of 400KV ICT-I Bay , 315MVA 2018- 2018-
215 ICT DAILY 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN (RRVPN)(ICT40000207)/315 TR-I and associated Equipments 05-23 05-23
NIGAM LIMITED
PUNJAB STATE HAMIRPUR HSEB (132KV)
TRANSMISSION (HIMACHAL PRADESH STATE Tightening of Jumpers of Deadend Towers, Disc 2018- 2018-
216 SLDC Punjab LINE DAILY 09:00 17:00 8 -- PENDING
CORPORATION ELECTRICITY BOARD LIMITED)- Cleaning & Tree Cutting 05-16 05-16
LIMITED CHOHAL (132KV)(PSTCL)
RAJASTHAN
SLDC RAJYA VIDYUT ICT02 BHILWARA (400KV) Quarterly Maintenane of 400KV ICT-2 Bay , 315MVA 2018- 2018-
217 ICT DAILY 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN (RRVPN)(ICT4000064)/315 TR-II and associated Equipments 05-24 05-24
NIGAM LIMITED
PUNJAB STATE
TRANSMISSION KANGRA (132KV)(PSPCL)- Disc cleaning & Jumper tightening and other mtc. 2018- 2018-
218 SLDC Punjab LINE DAILY 10:00 16:00 6 -- PENDING
CORPORATION PATHANKOT (132KV)(PSTCL) to be done 05-17 05-17
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT SHUNT REACTOR-I BIKANER 2018- 2018-
219 REACTOR DAILY Routine Bay Maintenance 10:00 17:00 7 -- PENDING
Rajasthan PRASARAN (400KV)(BR4000012)/50.00 05-18 05-18
NIGAM LIMITED
PUNJAB STATE
TALWANDI SABOO TPS (400KV)
TRANSMISSION 2018- 2018-
220 SLDC Punjab LINE (PSPCL)-NAKODAR (400KV) DAILY General Maintenance 10:00 16:00 6 -- PENDING
CORPORATION 05-24 05-24
(PSTCL)
LIMITED
PUNJAB STATE
TALWANDI SABOO TPS (400KV)
TRANSMISSION 2018- 2018-
221 SLDC Punjab LINE (PSPCL)-DHURI (400KV)(PSTCL) DAILY Line jumper/nut bolt tightening 09:00 17:00 32 -- PENDING
CORPORATION 05-21 05-22
1
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT Shunt Reactor (line reactor for 2018- 2018-
222 REACTOR DAILY Routine Maintenance 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN Akal Bay)(LR400009)/50.00 05-17 05-17
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 50MVAR 2018- 2018-
223 REACTOR DAILY Routine Bay Maintenance 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN REACTOR(LR4000029)/50.00 05-17 05-17
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT REACTOR AKAL JAISALMER 2018- 2018-
224 REACTOR DAILY Routine Maintenance 09:00 16:00 7 -- PENDING
Rajasthan PRASARAN (400KV)(BR4000015)/50.00 05-19 05-19
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT Shunt Reactor RATANGARH 2018- 2018-
225 REACTOR DAILY REPLACEMENT OF LBB RELAY 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN (400KV)(BR4000016)/50.00 05-03 05-03
NIGAM LIMITED
RAJASTHAN
QUARTERLY MAINTANANCE Remark:- AS THE
SLDC RAJYA VIDYUT 400KV BUS-I AKAL JAISALMER 2018- 2018-
226 BUS DAILY MAINTENANCE INCLUDES 40 ISOLATORS SO 2 DAYS 09:00 16:00 31 -- PENDING
Rajasthan PRASARAN (400KV)(ABS4000025) 05-22 05-23
ARE REQUIRED
NIGAM LIMITED
RAJASTHAN
404-52-D CB OF ANTA-
SLDC RAJYA VIDYUT 2018- 2018-
227 BAY KALISINDH-I AT 765KV DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN 05-16 05-16
ANTA(BAY1017)
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400KV 752A CB OF 400KV KOTA 2018- 2018-
228 BAY DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN LINE AT 400KV MERTA(BAY1021) 05-22 05-22
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400KV 752B CB OF 400KV KOTA 2018- 2018-
229 BAY DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN LINE AT 400KV MERTA(BAY1022) 05-23 05-23
NIGAM LIMITED
RAJASTHAN
400KV 852A CB OF 400KV SCL
SLDC RAJYA VIDYUT 2018- 2018-
230 BAY BEAWAR LINE AT 400KV DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN 05-24 05-24
MERTA(BAY1023)
NIGAM LIMITED
RAJASTHAN
400KV 852B CB OF 400KV SCL
SLDC RAJYA VIDYUT 2018- 2018-
231 BAY BEAWAR LINE AT 400KV DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN 05-25 05-25
MERTA(BAY1024)
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT spare bay for 400kV Anta-Kawai 2018- 2018-
232 BAY DAILY Half yearly maintenace work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN at 765kV GSS ANTA(BAY1093) 05-22 05-22
NIGAM LIMITED
RAJASTHAN
552B CB of 400kV Ratangarh
SLDC RAJYA VIDYUT 2018- 2018-
233 BAY line at 400kV GSS DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN 05-08 05-08
MERTA(BAY1095)
NIGAM LIMITED
RAJASTHAN
552T tie CB for 400KV
SLDC RAJYA VIDYUT 2018- 2018-
234 BAY Ratangarh line at 400KV GSS DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN 05-09 05-09
MERTA(BAY1096)
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 552A CB for 315MVA ILT-II at 2018- 2018-
235 BAY DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN 400KV GSS MERTA(BAY1097) 05-10 05-10
NIGAM LIMITED
RAJASTHAN
652B CB for 400KV HEERAPURA
SLDC RAJYA VIDYUT 2018- 2018-
236 BAY LINE AT 400KV GSS DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN 05-15 05-15
MERTA(BAY1098)
NIGAM LIMITED
RAJASTHAN
652T tie CB for 400kV
SLDC RAJYA VIDYUT 2018- 2018-
237 BAY HEERAPURA LINE AT 400KV GSS DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN 05-16 05-16
MERTA(BAY1099)
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 652A CB for 125MVAR Reactor-I 2018- 2018-
238 BAY DAILY Ist QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS 09:00 17:00 8 -- PENDING
Rajasthan PRASARAN at 400KV GSS MERTA(BAY1100) 05-17 05-17
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400KV MAIN BUS 2018- 2018-
239 BUS DAILY II QUARTERLY MAINT.WORK 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN A(ABS4000099) 05-17 05-17
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 2018- 2018-
240 BUS MAIN BUS-B(ABS40000100) DAILY IInd Quarterly maintenance work 09:00 18:00 9 -- PENDING
Rajasthan PRASARAN 05-22 05-22
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400KV MAIN BUS- Erection of Gentry Beam (G1 Type) in Dia-4 by M/s 2018- 2018-
241 BUS CONTINUOUS 06:00 18:00 36 -- PENDING
Rajasthan PRASARAN I(ABS40000101) GE T&D India Limited 05-25 05-26
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400KV MAIN BUS- Erection of Gentry Beam (G2 Type) in Dia-4 by M/s 2018- 2018-
242 BUS CONTINUOUS 06:00 18:00 84 -- PENDING
Rajasthan PRASARAN II(ABS40000102) GE T&D India Limited, 05-15 05-18
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400KV MAIN BUS- 2018- 2018-
243 BUS DAILY Routine Bay Maintenance work 07:00 10:00 3 -- PENDING
Rajasthan PRASARAN I(ABS40000103) 05-10 05-10
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400KV MAIN BUS- 2018- 2018-
244 BUS DAILY Routine Bay Maintenance work 10:00 17:00 7 -- PENDING
Rajasthan PRASARAN II(ABS40000104) 05-24 05-24
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400KV MAIN BUS- 2018- 2018-
245 BUS DAILY IInd Quarterly maintenance work 10:00 18:00 8 -- PENDING
Rajasthan PRASARAN A(ABS40000105) 05-31 05-31
NIGAM LIMITED
RAJASTHAN
4352T , tie CB FOR 400KV AKAL-
SLDC RAJYA VIDYUT Erection of Gentry Beam (G2 Type) in Dia-4 by M/s 2018- 2018-
246 BAY BARMER LINE AT 400KV GSS CONTINUOUS 06:00 18:00 84 -- PENDING
Rajasthan PRASARAN GE T&D India Limited, 05-15 05-18
BARMER(BAY1094)
NIGAM LIMITED
POWER GRID POWER GRID
BALIA(400KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
247 LINE SOHAWAL (400KV)(POWERGRID) DAILY AMP work of Isolator, CVT, WT, LA and Relay Testing 09:30 17:30 8 -- PENDING
OF INDIA OF INDIA 05-08 05-08
I
LIMITED LIMITED
POWER GRID POWER GRID
BALIA(400KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
248 LINE SOHAWAL (400KV)(POWERGRID) DAILY AMP work of Isolator, CVT, WT, LA and Relay Testing 09:30 17:30 8 -- PENDING
OF INDIA OF INDIA 05-09 05-09
2
LIMITED LIMITED
"Retrofitting of existing 400kV Lines and
Integration of SCADA with HVDC Control Room: It
POWER GRID POWER GRID
AGRA-PG (400KV)(POWERGRID)- will be total new commissioning as all control &
CORPORATION CORPORATION 2018- 2018-
249 LINE JAIPUR South (400KV) CONTINUOUS Power cables are need to be laid and changed a. 08:00 18:00 130 -- PENDING
OF INDIA OF INDIA 05-04 05-09
(POWERGRID) I Laying of new cables b. Termination of cables c.
LIMITED LIMITED
Green lining d. C&P testing and greenlining e.
Commissioning & Charging
"Retrofitting of existing 400kV Lines and
Integration of SCADA with HVDC Control Room: It
POWER GRID POWER GRID
AGRA-PG (400KV)(POWERGRID)- will be total new commissioning as all control &
CORPORATION CORPORATION 2018- 2018-
250 LINE JAIPUR South (400KV) CONTINUOUS Power cables are need to be laid and changed a. 08:00 18:00 130 -- PENDING
OF INDIA OF INDIA 05-15 05-20
(POWERGRID) II Laying of new cables b. Termination of cables c.
LIMITED LIMITED
Green lining d. C&P testing and greenlining e.
Commissioning & Charging
"Retrofitting of existing 400kV Lines and
Integration of SCADA with HVDC Control Room: It
POWER GRID POWER GRID
AGRA-PG (400KV)(POWERGRID)- will be total new commissioning as all control &
CORPORATION CORPORATION 2018- 2018-
251 LINE BHIWADI-PG (400KV) CONTINUOUS Power cables are need to be laid and changed a. 08:00 18:00 106 -- PENDING
OF INDIA OF INDIA 05-10 05-14
(POWERGRID) I Laying of new cables b. Termination of cables c.
LIMITED LIMITED
Green lining d. C&P testing and greenlining e.
Commissioning & Charging
"Retrofitting of existing 400kV Lines and
Integration of SCADA with HVDC Control Room: It
POWER GRID POWER GRID
AGRA-PG (400KV)(POWERGRID)- will be total new commissioning as all control &
CORPORATION CORPORATION 2018- 2018-
252 LINE BHIWADI-PG (400KV) CONTINUOUS Power cables are need to be laid and changed a. 08:00 18:00 130 -- PENDING
OF INDIA OF INDIA 05-21 05-26
(POWERGRID) II Laying of new cables b. Termination of cables c.
LIMITED LIMITED
Green lining d. C&P testing and greenlining e.
Commissioning & Charging
POWER GRID POWER GRID
KANPUR (400KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
253 LINE KANPUR GIS (765KV) DAILY AMP of Line Equipments and Main bay 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA 05-02 05-02
(POWERGRID) I
LIMITED LIMITED
POWER GRID POWER GRID
ALLAHABAD-PHULPUR (220KV) REPLACEMENT OF CONDUCTOR FROM POWERGRID
CORPORATION CORPORATION 2018- 2018-
254 LINE (POWERGRID)-REWA ROAD DAILY S/S GANTRY TO TOWER NO. -01 and UPPTCL S/S 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-01 05-02
(220KV)(UPPTCL) 1 GANTRY TO TOWER NO.-1
LIMITED LIMITED
POWER GRID POWER GRID
ALLAHABAD-PHULPUR (220KV) REPLACEMENT OF CONDUCTOR FROM POWERGRID
CORPORATION CORPORATION 2018- 2018-
255 LINE (POWERGRID)-REWA ROAD DAILY S/S GANTRY TO TOWER NO. -01 and UPPTCL S/S 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-03 05-04
(220KV)(UPPTCL) 2 GANTRY TO TOWER NO.-19
LIMITED LIMITED
POWER GRID POWER GRID
SITARGANJ (220KV) To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION 2018- 2018-
256 LINE (POWERGRID)-BAREILY-CB GANJ DAILY Missing Jumper Bolts, Spacer Damper,cottor 09:00 18:00 33 -- PENDING
OF INDIA OF INDIA 05-08 05-09
(220KV)(UPPTCL) Pin,Broken Insulator Replacement etc)
LIMITED LIMITED
POWER GRID POWER GRID
TANAKPUR (220KV)(NHPC)- To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION 2018- 2018-
257 LINE BAREILY-CB GANJ (220KV) DAILY Missing Jumper Bolts, Spacer Damper,cottor 09:00 18:00 33 -- PENDING
OF INDIA OF INDIA 05-10 05-11
(UPPTCL) Pin,Broken Insulator Replacement etc)
LIMITED LIMITED
BHAKRA BEAS BHAKRA BEAS
ICT BHIWANI BBMB (400KV) 2018- 2018-
258 MANAGEMENT MANAGEMENT ICT DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
(BBMB)(ICT4000048)/500 05-09 05-09
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
REACTOR I PANIPAT BBMB 2018- 2018-
259 MANAGEMENT MANAGEMENT REACTOR DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
(400KV)(BR400007)/80.00 05-10 05-10
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
220 KV Bus-1 at 2018- 2018-
260 MANAGEMENT MANAGEMENT BUS DAILY Half yearly maintenance. 08:00 17:00 9 -- PENDING
Panipat(ABS220002) 05-24 05-24
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
220 KV Bus-2 at 2018- 2018-
261 MANAGEMENT MANAGEMENT BUS DAILY Half yearly maintenance of LHS of Bus. 08:00 17:00 9 -- PENDING
Panipat(ABS220003) 05-22 05-22
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
220 KV Bus-2 at 2018- 2018-
262 MANAGEMENT MANAGEMENT BUS DAILY Half yearly maintenance of RHS of Bus. 08:00 17:00 9 -- PENDING
Panipat(ABS220003) 05-25 05-25
BOARD BOARD
POWER GRID POWER GRID
SHAMSAHABAD ROAD (220KV)
CORPORATION CORPORATION 2018- 2018-
263 LINE (UPPTCL)-AGRA-PG (400KV) DAILY AMP works of Line bay at POWERGRID end, 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA 05-07 05-07
(POWERGRID)
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION FIROZABAD (220KV)(UPPTCL)- 2018- 2018-
264 LINE DAILY AMP works of Line bay at POWERGRID end, 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA AGRA-PG (220KV)(POWERGRID) 05-16 05-16
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION SINGRAULI NTPC (400KV)(NTPC)- For replacment of Disc Insulaotrs with Polymer 2018- 2018-
265 LINE DAILY 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA ANPARA-B (400KV)(UPRVUNL) insulator. 05-02 05-04
LIMITED LIMITED
BHAKRA BEAS BHAKRA BEAS
220 KV Bus- I at Half yearly maintenance of bus coupler bay and 2018- 2018-
266 MANAGEMENT MANAGEMENT BUS DAILY 08:00 17:00 9 -- PENDING
Hisar(ABS2200013) Bus-I. 05-15 05-15
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
220 KV Bus- II at Half yearly maintenance of Bus coupler bay and 2018- 2018-
267 MANAGEMENT MANAGEMENT BUS DAILY 08:00 17:00 9 -- PENDING
Hissar(ABS2200014) Bus-II at Hisar 05-17 05-17
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
BARNALA (220KV)(BBMB)-LEHRA Urgently required for Automation of s/stn. & half 2018- 2018-
268 MANAGEMENT MANAGEMENT LINE CONTINUOUS 08:00 17:00 225 -- PENDING
MOHABAT (200KV)(PSTCL) yearly maintenance of s/stn. equipment/Lines. 04-22 05-01
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
BARNALA (220KV)(BBMB)- Urgently required for Automation of S/Stn. & half 2018- 2018-
269 MANAGEMENT MANAGEMENT LINE CONTINUOUS 08:00 17:00 225 -- PENDING
SANGRUR (220KV)(BBMB) yearly maintenance of equipment/ Lines 05-12 05-21
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS BALLABGARH BBMB (220KV) To replace 1 no. Line isolator ,1 no. PT ,2 Nos. CT
2018- 2018-
270 MANAGEMENT MANAGEMENT LINE (BBMB)-SAMAYPUR (220KV) CONTINUOUS and carry out half yearly maintenance at 220 kV 08:00 20:00 60 -- PENDING
04-09 04-11
BOARD BOARD (BBMB) 1 Samaypur substation.
BHAKRA BEAS BHAKRA BEAS to replace 1 No. Blue phase CT and to carry out
220 KV Bus- I at 2018- 2018-
271 MANAGEMENT MANAGEMENT BUS CONTINUOUS half yearly maintenance at 220 kV Ballabhgarh sub 08:00 20:00 60 -- PENDING
Samaypur(ABS2200015) 04-09 04-11
BOARD BOARD station.
BHAKRA BEAS BHAKRA BEAS
220 KV Bus- II at 2018- 2018-
272 MANAGEMENT MANAGEMENT BUS DAILY half yearly maintenance of substation equipment. 08:00 17:00 9 -- PENDING
Barnala(ABS2200010) 05-04 05-04
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
220 KV Bus- I at half yearly maintenance of bus coupler -I and bus-I 2018- 2018-
273 MANAGEMENT MANAGEMENT BUS DAILY 08:00 17:00 33 -- PENDING
Jamalpur(ABS2200011) and other substation equipments. 05-07 05-08
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
220 KV Bus- II at half yearly mtc. of bus -II and bus coupler-II 2018- 2018-
274 MANAGEMENT MANAGEMENT BUS DAILY 08:00 17:00 33 -- PENDING
Jamalpur(ABS2200012) /sectionalizer and substation equipment. 05-09 05-10
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS BALLABGARH BBMB (220KV)
2018- 2018-
275 MANAGEMENT MANAGEMENT LINE (BBMB)-SAMAYPUR (220KV) DAILY To replace 2 no. CTs at Samaypur. 08:00 17:00 9 -- PENDING
04-23 04-23
BOARD BOARD (BBMB) 3
BHAKRA BEAS BHAKRA BEAS BALLABGARH BBMB (220KV)
2018- 2018-
276 MANAGEMENT MANAGEMENT LINE (BBMB)-BADARPUR (220KV) DAILY for replacement of 1 no. P.T. at Ballabhgarh. 08:00 17:00 9 -- PENDING
04-09 04-09
BOARD BOARD (NTPC) 2
Uttar Pradesh
Power
SLDC Uttar 400 kV main bus 1 2018- 2018-
277 Transmission BUS DAILY For Maintenance of Bus. 07:00 18:00 11 -- PENDING
Pradesh Bareilly(ABS40000107) 05-21 05-21
Corporation
Limited
POWER GRID POWER GRID
BHIWANI-PG (765 KV)
CORPORATION CORPORATION 2018- 2018-
278 LINE (POWERGRID)-PHAGI (765KV) DAILY AMP work 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA 05-09 05-09
(RRVPN) 1
LIMITED LIMITED
POWER GRID POWER GRID
PHAGI (765KV)(RRVPN)-
CORPORATION CORPORATION 2018- 2018-
279 LINE GWALIOR-WR (765KV) DAILY AMP Work 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-03 05-04
(POWERGRID) 1
LIMITED LIMITED
POWER GRID POWER GRID
PHAGI (765KV)(RRVPN)-
CORPORATION CORPORATION 2018- 2018-
280 LINE GWALIOR-WR (765KV) DAILY AMP work 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-05 05-06
(POWERGRID) 2
LIMITED LIMITED
Uttar Pradesh
Power
SLDC Uttar 400 kV Bus Reactor 2018- 2018-
281 Transmission REACTOR DAILY For Routine Maintenance and Tan Delta Testing 07:00 18:00 11 -- PENDING
Pradesh Bareilly(BR4000056)/80.00 05-22 05-22
Corporation
Limited
POWER GRID POWER GRID
JHATIKALA(765 KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
282 LINE BHIWANI-PG (765 KV) DAILY A' type delta tower strenghtening work 08:00 18:00 154 -- PENDING
OF INDIA OF INDIA 05-07 05-13
(POWERGRID)
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION AGRA-PG (765KV)(POWERGRID)- 2018- 2018-
283 LINE DAILY A' type delta tower strenghtening work 08:00 18:00 154 -- PENDING
OF INDIA OF INDIA JHATIKALA(765 KV)(POWERGRID) 05-01 05-07
LIMITED LIMITED
For removal of sheet piles under CW duct R&M
Singrauli STPS(GENCO0047)- 2018- 2018-
284 NTPC Limited NTPC Limited GENCO CONTINUOUS works (site located under 400 KV lines from 00:30 23:30 143 -- PENDING
U1/200 04-26 05-01
Unit#1)
For removal of sheet piles under CW duct R&M
Singrauli STPS(GENCO0050)- 2018- 2018-
285 NTPC Limited NTPC Limited GENCO CONTINUOUS works (site located under 400 KV lines from 00:30 23:30 95 -- PENDING
U4/200 05-05 05-08
Unit#4)
Uttar Pradesh
Power
SLDC Uttar Servicing & overhauling of pantograph isolator, 2018- 2018-
286 Transmission ICT ICT III(ICT40000221)/200 DAILY 08:00 18:00 10 -- PENDING
Pradesh replacement of contact blades. 05-14 05-14
Corporation
Limited
Uttar Pradesh
Power 400 kV Main bus 2 at
SLDC Uttar For erection work of 400KV Pantograph isolator for 2018- 2018-
287 Transmission BUS Gorakhpur (UPPTCL) CONTINUOUS 09:00 18:00 129 -- PENDING
Pradesh reactor bay 05-20 05-25
Corporation (ABS40000108)
Limited
Rihand TPS(GENCO0041)- 2018- 2018-
288 NTPC Limited NTPC Limited GENCO CONTINUOUS Unit Overhauling (Boiler+APH Seal Leakages) 00:30 23:30 599 -- PENDING
U1/500 05-07 05-31
Uttar Pradesh
Power 315 MVA Transformer at
SLDC Uttar For attending the oil leakage from OLTC, pump & 2018- 2018-
289 Transmission ICT Gorakhpur (UPPTCL) CONTINUOUS 09:00 17:00 32 -- PENDING
Pradesh changing the defective WTi / OTi 05-28 05-29
Corporation (ICT40000222)/315 MVA
Limited
POWER GRID POWER GRID
CORPORATION CORPORATION BUS I CHITTORGARH(765KV) For Alumiinium Tube Connection of 704 & 707 Bay 2018- 2018-
290 BUS DAILY 10:00 18:00 32 -- PENDING
OF INDIA OF INDIA (PGABS765001) Bus side Isolator to CB of banaskanta Bay. 05-02 05-03
LIMITED LIMITED
Maintenance work of Line 1- Complete tightening
Uttar Pradesh of section tower jumpers 2- Replacement of
Power Jumpers. 3- Checking of OPGW wire. 4- Realignment
SLDC Uttar MAINPURI-UP (765KV)(UPPTCL)- 2018- 2018-
291 Transmission LINE DAILY of vibration damper CC ring, spacer. 5- Insulator 08:00 18:00 82 -- PENDING
Pradesh PARICHA (400KV)(UPRVUNL) 05-14 05-17
Corporation checking, cleaning and replacement of defective
Limited disc. 6- Cutting, looping chopping of tree below
the corridor.
Uttar Pradesh
Power
SLDC Uttar BANDA (400KV)(UPPTCL)-REWA Tightening of jumper on section Tower. Chopping 2018- 2018-
292 Transmission LINE DAILY 08:00 18:00 34 -- PENDING
Pradesh ROAD (400KV)(UPPTCL) of tree in proximity of conductor. 05-10 05-11
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar BANDA (400KV)(UPPTCL)-REWA 2018- 2018-
293 Transmission LINE DAILY For Jumpering of 220KV Bus Extension. 08:00 18:00 34 -- PENDING
Pradesh ROAD (400KV)(UPPTCL) 2 05-12 05-13
Corporation
Limited
POWER GRID POWER GRID
BHIWANI-PG (400KV)
CORPORATION CORPORATION For Rectification of Defects observed during Aerial 2018- 2018-
294 LINE (POWERGRID)-JIND (400KV) DAILY 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA patrolling and Misc line mtc. Works 05-25 05-26
(POWERGRID) I
LIMITED LIMITED
POWER GRID POWER GRID
BHIWANI-PG (400KV)
CORPORATION CORPORATION For Rectification of Defects observed during Aerial 2018- 2018-
295 LINE (POWERGRID)-JIND (400KV) DAILY 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA patrolling and Misc line mtc. Works 05-28 05-29
(POWERGRID) II
LIMITED LIMITED
POWER GRID POWER GRID
BHIWADI-PG (400KV)
CORPORATION CORPORATION 2018- 2018-
296 LINE (POWERGRID)-HISSAR-PG DAILY AMP work 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA 05-12 05-12
(400KV)(POWERGRID) I
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION BASSI (400KV)(POWERGRID)- 2018- 2018-
297 LINE DAILY To attend Shut down defects & AMP work 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA SIKAR (400KV)(POWERGRID) I 05-01 05-02
LIMITED LIMITED
Uttar Pradesh
Power
SLDC Uttar ICT01 PANKI (400KV)(UPPTCL) Replacement of gasket and centrifusing of 2018- 2018-
298 Transmission ICT CONTINUOUS 08:00 17:00 585 -- PENDING
Pradesh (ICT40000135)/240 transformer oil etc. No supply loss 05-07 05-31
Corporation
Limited
POWER GRID POWER GRID
CORPORATION CORPORATION BASSI (400KV)(POWERGRID)- 2018- 2018-
299 LINE DAILY To attend Shut down defects & AMP work 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA SIKAR (400KV)(POWERGRID) II 05-03 05-04
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION SIKAR (400KV)(POWERGRID)- 2018- 2018-
300 LINE DAILY To attend Shut down defects & AMP 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA RATANGARH (400KV)(RRVPN) 2 05-07 05-08
LIMITED LIMITED
POWER GRID POWER GRID
NEEMRANA (400KV)
CORPORATION CORPORATION 2018- 2018-
301 LINE (POWERGRID)-SIKAR (400KV) DAILY Insulator replacement works. 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-10 05-11
(POWERGRID) II
LIMITED LIMITED
POWER GRID POWER GRID
KANPUR (400KV)(POWERGRID)-
CORPORATION CORPORATION Line Diversion work under NHAI .s/d will be avail dt 2018- 2018-
302 LINE BALLABGARH-PG (400KV) CONTINUOUS 08:00 18:00 202 -- PENDING
OF INDIA OF INDIA 20.4.18 to 29.4.18 05-01 05-09
(POWERGRID) I
LIMITED LIMITED
POWER GRID POWER GRID
BALLABGARH-PG (400KV)
CORPORATION CORPORATION Line Diversion work under DFCC.S/D will be avail 2018- 2018-
303 LINE (POWERGRID)-MAHARANIBAGH CONTINUOUS 08:00 18:00 490 -- PENDING
OF INDIA OF INDIA from 21.4.18 to 10.5.18 05-10 05-30
(400KV)(POWERGRID)
LIMITED LIMITED
POWER GRID POWER GRID
NAWADA (400KV)(HVPNL)-
CORPORATION CORPORATION Line Diversion work under DFCC.S/D will be avail 2018- 2018-
304 LINE GREATER NOIDA (400KV) CONTINUOUS 08:00 18:00 202 -- PENDING
OF INDIA OF INDIA from 21.4.18 to 10.5.18 05-01 05-09
(UPPTCL)
LIMITED LIMITED
POWER GRID POWER GRID
Line Diversion work due to tower falling in the
CORPORATION CORPORATION FARIDABAD GPS(NTPC)- 2018- 2018-
305 LINE CONTINUOUS middle of road (HUDA).S/d will be avail from 08:30 18:30 202 -- PENDING
OF INDIA OF INDIA PALLA(HVPNL) I 05-01 05-09
20.4.18.to 29 .4.18
LIMITED LIMITED
POWER GRID POWER GRID
Line Diversion work due to tower falling in the
CORPORATION CORPORATION FARIDABAD GPS(NTPC)- 2018- 2018-
306 LINE CONTINUOUS middle of road (HUDA).S/d will be avail from 08:30 18:30 202 -- PENDING
OF INDIA OF INDIA PALLA(HVPNL) II 05-01 05-09
20.4.18.to 29 .4.18
LIMITED LIMITED
POWER GRID POWER GRID
ROORKEE (400KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
307 LINE SAHARANPUR (400KV) DAILY For AMP 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA 05-07 05-07
(POWERGRID) 1
LIMITED LIMITED
POWER GRID POWER GRID
BAGHPAT (400KV)(POWERGRID)-
CORPORATION CORPORATION 2018- 2018-
308 LINE SAHARANPUR (400KV) DAILY For AMP 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA 05-09 05-09
(POWERGRID)
LIMITED LIMITED
POWER GRID POWER GRID
SAHARANPUR-UP (220KV)
CORPORATION CORPORATION 2018- 2018-
309 LINE (UPPTCL)-SAHARANPUR-PG DAILY For AMP 11:00 19:30 8 -- PENDING
OF INDIA OF INDIA 05-14 05-14
(220KV)(POWERGRID)
LIMITED LIMITED
POWER GRID POWER GRID
NANAUTA (220KV)(UPPTCL)-
CORPORATION CORPORATION 2018- 2018-
310 LINE SAHARANPUR-PG (220KV) DAILY For AMP 12:00 20:30 8 -- PENDING
OF INDIA OF INDIA 05-16 05-16
(POWERGRID)
LIMITED LIMITED
POWER GRID POWER GRID
BHIWADI-PG (400KV)
CORPORATION CORPORATION Disconnector switch 403-89A modification & 2018- 2018-
311 LINE (POWERGRID)-GURGAON CONTINUOUS 09:00 18:00 57 -- PENDING
OF INDIA OF INDIA associated bay 203 will be also in outage 05-03 05-05
(400KV)(POWERGRID)
LIMITED LIMITED
POWER GRID POWER GRID
BALLABGARH-PG (400KV)
CORPORATION CORPORATION Disconnector switch 402-89A modification & 2018- 2018-
312 LINE (POWERGRID)-GURGAON CONTINUOUS 09:00 18:00 129 -- PENDING
OF INDIA OF INDIA associated bay 402 will be also in outage 05-10 05-15
(400KV)(POWERGRID)
LIMITED LIMITED
Uttar Pradesh
Power
SLDC Uttar 400 kV Bus - A PANKI (400KV) For replacement of A- Bus Pentograph Isolator of 2018- 2018-
313 Transmission BUS CONTINUOUS 08:00 17:00 105 -- PENDING
Pradesh (ABS4000027) ICT-I. No supply loss 05-08 05-12
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar ICT02 AGRA-UP (400KV) For routine maintenance and testing. No supply 2018- 2018-
314 Transmission ICT DAILY 09:00 18:00 9 -- PENDING
Pradesh (UPPTCL)(ICT40000209)/500 loss 05-10 05-10
Corporation
Limited
Uttar Pradesh
Power AGRA-UP (400KV)(UPPTCL)-
SLDC Uttar For attending PLCC link healthiness and wave trap 2018- 2018-
315 Transmission LINE FATEHBAD _AGRA(400KV) DAILY 08:00 18:00 34 -- PENDING
Pradesh damaged net. No supply loss 05-21 05-22
Corporation (UPPTCL)
Limited
Uttar Pradesh
Power
SLDC Uttar AGRA-PG (400KV)(POWERGRID)- For routine maintenance and testing. No supply 2018- 2018-
316 Transmission LINE DAILY 09:00 18:00 9 -- PENDING
Pradesh AGRA-UP (400KV)(UPPTCL) loss 05-12 05-12
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar For replacement of 400 KV B- Bus Pentoraph 2018- 2018-
317 Transmission BUS BUS B-PANKI(ABS4000055) CONTINUOUS 08:00 17:00 105 -- PENDING
Pradesh Isolator of ICT-I. No supply loss 05-14 05-18
Corporation
Limited
Uttar Pradesh
Power 400 kV Bus Reactor at 765 kV
SLDC Uttar O-rings needs to be changed for attending oil 2018- 2018-
318 Transmission REACTOR Fatehabad (UPPTCL) CONTINUOUS 08:00 18:00 34 -- PENDING
Pradesh leakages. No supply loss 05-19 05-20
Corporation (BR4000057)/80.00
Limited
Uttar Pradesh
Power
SLDC Uttar ICT01 MURADNAGAR (400KV) 2018- 2018-
319 Transmission ICT CONTINUOUS Replacement of 400KV side Isolator 08:00 15:00 79 -- PENDING
Pradesh (UPPTCL)(ICT40000172)/315 05-02 05-05
Corporation
Limited
Uttar Pradesh
Power ROORKEE (400KV)(POWERGRID)-
SLDC Uttar 2018- 2018-
320 Transmission LINE MUZZAFARNAGAR-UP (400KV) DAILY For routine testing & preventive maintenance 10:00 18:00 8 -- PENDING
Pradesh 05-03 05-03
Corporation (UPPTCL)
Limited
Uttar Pradesh
Power MUZZAFARNAGAR-UP (400KV)
SLDC Uttar 2018- 2018-
321 Transmission LINE (UPPTCL)-MUZZAFARNAGAR PG DAILY For routine testing & preventive maintenance 10:00 18:00 8 -- PENDING
Pradesh 05-04 05-04
Corporation (400KV)(POWERGRID)
Limited
Uttar Pradesh
Power
SLDC Uttar ICT01 GREATER NOIDA (400KV) For general maintenance of T/F and for attending 2018- 2018-
322 Transmission ICT DAILY 08:00 17:00 9 -- PENDING
Pradesh (UPPTCL)(ICT40000140)/315 Bus A Isolator problem alongwith 400KV Bus A. 05-06 05-06
Corporation
Limited
Uttar Pradesh
Power
SLDC Uttar ICT02 GREATER NOIDA (400KV) For general maintenance of T/F and for attending 2018- 2018-
323 Transmission ICT DAILY 08:00 17:00 9 -- PENDING
Pradesh (UPPTCL)(ICT40000141)/315 Bus B Isolator problem alongwith 400KV Bus B . 05-13 05-13
Corporation
Limited
Uttar Pradesh
Power NARA (220KV)(UPPTCL)-
SLDC Uttar For tree cutting, repairing of conductor, inspection 2018- 2018-
324 Transmission LINE ROORKEE PTCUL (220KV) DAILY 09:00 18:00 33 -- PENDING
Pradesh of insulators & other maintenance work. 05-10 05-11
Corporation (PTCUL) +UPPT
Limited
Uttar Pradesh
Power KHODRI (220KV)(PTCUL)-
SLDC Uttar For lopping, Chopping of trees in line corridor and 2018- 2018-
325 Transmission LINE SAHARANPUR-UP (220KV) DAILY 08:00 18:00 34 -- PENDING
Pradesh maintenance work of bay 05-14 05-15
Corporation (UPPTCL) 2 +UP
Limited
Uttar Pradesh
Power NAWADA (400KV)(HVPNL)-
SLDC Uttar 2018- 2018-
326 Transmission LINE GREATER NOIDA (400KV) DAILY For general maintenance of bay. 08:00 17:00 9 -- PENDING
Pradesh 05-27 05-27
Corporation (UPPTCL)
Limited
Uttar Pradesh
Power
SLDC Uttar ICT03 SULTANPUR (400KV) For Routine Testing and M&R Work along with 2018- 2018-
327 Transmission ICT DAILY 08:00 18:00 10 -- PENDING
Pradesh (UPPTCL)(ICT40000212)/315 220KV 'A' Bus 05-21 05-21
Corporation
Limited
Maintenance work of Line 1- Complete tightening
Uttar Pradesh of section tower jumpers 2- Replacement of
Power Jumpers. 3- Checking of OPGW wire. 4- Realignment
SLDC Uttar MAINPURI-UP (765KV)(UPPTCL)- 2018- 2018-
328 Transmission LINE DAILY of vibration damper CC ring, spacer. 5- Insulator 08:00 18:00 82 -- PENDING
Pradesh ORAI (400KV)(UPPTCL) 05-18 05-21
Corporation checking, cleaning and replacement of defective
Limited disc. 6- Cutting, looping chopping of tree below
the corridor.
POWER GRID POWER GRID
HISSAR-PG (220KV)
CORPORATION CORPORATION Pre-Monsoon maintenance and defect removal of 2018- 2018-
329 LINE (POWERGRID)-HISSAR IA (220KV) DAILY 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA line. 04-28 04-28
(HVPNL)
LIMITED LIMITED
POWER GRID POWER GRID
HISSAR-PG (220KV)
CORPORATION CORPORATION Pre-Monsoon maintenance and defect removal of 2018- 2018-
330 LINE (POWERGRID)-HISSAR IA (220KV) DAILY 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA line. 04-27 04-27
(HVPNL) 2
LIMITED LIMITED
POWER GRID POWER GRID
765KV PHAGI-1 M/BAY 716
CORPORATION CORPORATION 2018- 2018-
331 BAY BHIWANI(765KV PHAGI-1 M/BAY CONTINUOUS For Attending SF6 Gas leakage in R Phase CB 10:00 18:00 32 -- PENDING
OF INDIA OF INDIA 05-15 05-16
716 BHIWANI)
LIMITED LIMITED
POWER GRID POWER GRID
765KV BHIWANI M/BAY 712
CORPORATION CORPORATION 2018- 2018-
332 BAY MEERUT(765KV BHIWANI M/BAY DAILY AMP WORK 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-01 05-02
712 MEERUT)
LIMITED LIMITED
POWER GRID POWER GRID
765KV AGRA T/BAY 714
CORPORATION CORPORATION 2018- 2018-
333 BAY MEERUT(765KV AGRA T/BAY 714 DAILY AMP Works 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-08 05-09
MEERUT)
LIMITED LIMITED
POWER GRID POWER GRID
765KV AGRA M/BAY 715
CORPORATION CORPORATION 2018- 2018-
334 BAY MEERUT(765KV AGRA M/BAY DAILY AMP Works 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-15 05-16
715 MEERUT)
LIMITED LIMITED
POWER GRID POWER GRID
765KV ICT-I T/BAY 705 Construction work of Banaskanta Bay REMARKS-For
CORPORATION CORPORATION 2018- 2018-
335 BAY CHITOTGARH(765KV ICT-I T/BAY DAILY Alumiinium Tube Connection of 705 & 704 Bay Tie 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA 05-07 05-09
705 CHITOTGARH) Bay & Main Bay of Banaskanta # 2 Bay
LIMITED LIMITED
POWER GRID POWER GRID
765KV ICT-II T/BAY 708 Construction work of Banaskanta Bay. REMARKS-
CORPORATION CORPORATION 2018- 2018-
336 BAY CHITOTGARH(765KV ICT-II T/BAY DAILY For Alumiinium Tube Connection of 708 & 707 Bay 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA 05-07 05-09
708 CHITOTGARH) Tie Bay & Main Bay of Banaskanta # 1 Bay
LIMITED LIMITED
765KV AJMER -I & 240MVAR
POWER GRID POWER GRID
L/R(SW) BAY 713 CSD RELAY COMMISSIONING of Line Reactor CB,LR
CORPORATION CORPORATION 2018- 2018-
337 BAY CHITORGARH(765KV AJMER -I & DAILY will be out of service during CSD relay 10:00 14:00 4 -- PENDING
OF INDIA OF INDIA 05-10 05-10
240MVAR L/R(SW) BAY 713 commissioning & Line remain service with main CB
LIMITED LIMITED
CHITORGARH)
POWER GRID POWER GRID
765KV AJMER -I T/ BAY 714
CORPORATION CORPORATION CSD RELAY COMMISSIONING of Tie CB, Line remain 2018- 2018-
338 BAY CHITORGARH(765KV AJMER -I T/ DAILY 10:00 14:00 4 -- PENDING
OF INDIA OF INDIA service with main CB 05-10 05-10
BAY 714 CHITORGARH)
LIMITED LIMITED
765KV AJMER -II & 240MVAR
POWER GRID POWER GRID
L/R(SW) BAY 710 CSD RELAY COMMISSIONING of Line Reactor CB,LR
CORPORATION CORPORATION 2018- 2018-
339 BAY CHITORGARH(765KV AJMER -II & DAILY will be out of service during CSD relay 10:00 14:00 4 -- PENDING
OF INDIA OF INDIA 05-04 05-04
240MVAR L/R(SW) BAY 710 commissioning & Line remain service with main CB
LIMITED LIMITED
CHITORGARH)
POWER GRID POWER GRID
765KV ICT-I M/BAY 706 CSD RELAY COMMISSIONING of ICT # 1 main CB,ICT
CORPORATION CORPORATION 2018- 2018-
340 BAY CHITOTGARH(765KV ICT-I M/BAY DAILY # 1 will be out of service during CSD relay 10:00 14:00 4 -- PENDING
OF INDIA OF INDIA 05-14 05-14
706 CHITOTGARH) commissioning.
LIMITED LIMITED
POWER GRID POWER GRID
765KV ICT-II M/BAY 709 CSD RELAY COMMISSIONING of ICT # 2 main CB,ICT
CORPORATION CORPORATION 2018- 2018-
341 BAY CHITORGARH(765KV ICT-II M/BAY DAILY # 2 will be out of service during CSD relay 15:00 19:00 4 -- PENDING
OF INDIA OF INDIA 05-14 05-14
709 CHITORGARH) commissioning.
LIMITED LIMITED
POWER GRID POWER GRID 765 KV 240MVAR B/R-I M/BAY CB
CSD RELAY COMMISSIONING of Bus Reactor- I,Main
CORPORATION CORPORATION 712 CHITORGARH(765 KV 2018- 2018-
342 BAY DAILY CB,BR#1 remain service through Tie Bay ,during 10:00 14:00 4 -- PENDING
OF INDIA OF INDIA 240MVAR B/R-I M/BAY CB 712 05-15 05-15
CSD relay commissioning
LIMITED LIMITED CHITORGARH)
POWER GRID POWER GRID 765 KV 240MVAR B/R-I T/BAY CB
CSD RELAY COMMISSIONING of Bus Reactor- I,Main
CORPORATION CORPORATION 711 CHITORGARH(765 KV 2018- 2018-
343 BAY DAILY CB,BR#1 remain service through Tie Bay ,during 15:00 19:00 4 -- PENDING
OF INDIA OF INDIA 240MVAR B/R-I T/BAY CB 711 05-15 05-15
CSD relay commissioning
LIMITED LIMITED CHITORGARH)
POWER GRID POWER GRID
ICT02 SOHAWAL (400KV)
CORPORATION CORPORATION AMP of ICT-2 / Erection , Testing & Commissioning 2018- 2018-
344 ICT (POWERGRID) DAILY 09:30 17:30 56 -- PENDING
OF INDIA OF INDIA of 72.5 Tertiary System 05-01 05-03
(PGICT4000071)/315
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 SOHAWAL (400KV)
CORPORATION CORPORATION Construction of remaining portion of Firewall 2018- 2018-
345 ICT (POWERGRID) DAILY 09:30 17:30 296 -- PENDING
OF INDIA OF INDIA between Bus Reactor-2 & ICT-1 & AMP of ICT-1 05-05 05-17
(PGICT4000070)/315
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION PANKI-2 MAIN BAY, at 2018- 2018-
346 BAY CONTINUOUS For CT retrofitment work 09:00 17:00 152 -- PENDING
OF INDIA OF INDIA Kanpur(BAY 4001080) 05-17 05-23
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION FATEHPUR-2 MAIN BAY, at 2018- 2018-
347 BAY CONTINUOUS For CT retrofitment work 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA Kanpur(BAY1081) 05-16 05-16
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 BAGHPAT (400KV)
CORPORATION CORPORATION AMP WORKS & its associated bays no 401 & 209 2018- 2018-
348 ICT (POWERGRID) DAILY 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA will be also in outage 05-07 05-07
(PGICT4000072)/500
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 BAGHPAT (400KV)
CORPORATION CORPORATION AMP WORKS & its associated bays no 410 & 211 2018- 2018-
349 ICT (POWERGRID) DAILY 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA will be also in outage 05-08 05-08
(PGICT4000075)/500
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 MANESAR (400KV)
CORPORATION CORPORATION 2018- 2018-
350 ICT (POWERGRID) DAILY AMP WORKS 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA 05-09 05-09
(PGICT4000055)/500
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 MANESAR (400KV)
CORPORATION CORPORATION 2018- 2018-
351 ICT (POWERGRID) DAILY AMP WORKS 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA 05-16 05-16
(PGICT4000056)/500
LIMITED LIMITED
POWER GRID POWER GRID
ICT04 BALLABGARH-PG (400KV)
CORPORATION CORPORATION S/D required for replacement of Turret Gasket for 2018- 2018-
352 ICT (POWERGRID) CONTINUOUS 10:00 18:00 32 -- PENDING
OF INDIA OF INDIA arresting Oil leakage 05-01 05-02
(PGICT4000024)/500
LIMITED LIMITED
POWER GRID POWER GRID
ICT03 BALLABGARH-PG (400KV)
CORPORATION CORPORATION S/D required for replacement of Turret Gasket for 2018- 2018-
353 ICT (POWERGRID) DAILY 10:00 18:00 32 -- PENDING
OF INDIA OF INDIA arresting Oil leakage 05-03 05-04
(PGICT4000021)/500
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 BALLABGARH-PG (400KV)
CORPORATION CORPORATION S/D required for replacement of Turret Gasket for 2018- 2018-
354 ICT (POWERGRID) CONTINUOUS 10:00 18:00 32 -- PENDING
OF INDIA OF INDIA arresting Oil leakage 05-05 05-06
(PGICT4000023)/500
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 BALLABGARH-PG (400KV)
CORPORATION CORPORATION S/D required for replacement of Turret Gasket for 2018- 2018-
355 ICT (POWERGRID) CONTINUOUS 10:00 18:00 32 -- PENDING
OF INDIA OF INDIA arresting Oil leakage 05-07 05-08
(PGICT4000022)/500
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 MANDOLA (220KV) ORING REPLACEMENT WORK BY M/S EMCO TEAM ON
CORPORATION CORPORATION 2018- 2018-
356 ICT (POWERGRID) CONTINUOUS ALL HV,IV,LV BUSHING, TURRETS AND OLTC 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-01 05-02
(PGICT4000051)/500 CHAMBERS
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 MANDOLA (220KV) ORING REPLACEMENT WORK BY M/S EMCO TEAM ON
CORPORATION CORPORATION 2018- 2018-
357 ICT (POWERGRID) CONTINUOUS ALL HV,IV,LV BUSHING, TURRETS AND OLTC 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-03 05-04
(PGICT4000052)/500 CHAMBERS
LIMITED LIMITED
POWER GRID POWER GRID
ICT03 MANDOLA (220KV) ORING REPLACEMENT WORK BY M/S EMCO TEAM ON
CORPORATION CORPORATION 2018- 2018-
358 ICT (POWERGRID) CONTINUOUS ALL HV,IV,LV BUSHING, TURRETS AND OLTC 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-05 05-06
(PGICT4000053)/500 CHAMBERS
LIMITED LIMITED
POWER GRID POWER GRID
ICT04 MANDOLA (220KV) ORING REPLACEMENT WORK BY M/S EMCO TEAM ON
CORPORATION CORPORATION 2018- 2018-
359 ICT (POWERGRID) CONTINUOUS ALL HV,IV,LV BUSHING, TURRETS AND OLTC 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-07 05-08
(PGICT4000054)/500 CHAMBERS
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 GURGAON (400KV)
CORPORATION CORPORATION Disconnector switch 401-89A modification & its 2018- 2018-
360 ICT (POWERGRID) CONTINUOUS 09:00 18:00 57 -- PENDING
OF INDIA OF INDIA associated bays (401 & 206) will be also in outage 05-14 05-16
(PGICT4000029)/315
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 GURGAON (400KV) Disconnector switch 405-89A modification & its
CORPORATION CORPORATION 2018- 2018-
361 ICT (POWERGRID) CONTINUOUS associated bays (405 & 207) will be also in 09:00 18:00 57 -- PENDING
OF INDIA OF INDIA 05-07 05-09
(PGICT4000030)/315 outage.
LIMITED LIMITED
POWER GRID POWER GRID
For rectification in E/S module & installation of PD
CORPORATION CORPORATION 2018- 2018-
362 ICT ICT-IV(PGICT40000152)/500MVA CONTINUOUS sensor at Gurgaon & its associated bays (411 & 09:00 18:00 57 -- PENDING
OF INDIA OF INDIA 05-21 05-23
211) will be also in outage.
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 BHIWADI-PG (400KV)
CORPORATION CORPORATION 2018- 2018-
363 ICT (POWERGRID) DAILY Cap and Tan delta of 33KV Bushing 09:00 11:00 2 -- PENDING
OF INDIA OF INDIA 05-05 05-05
(PGICT4000016)/315
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 BHIWADI-PG (400KV)
CORPORATION CORPORATION 2018- 2018-
364 ICT (POWERGRID) DAILY Cap and Tan delta of 33KV Bushing 09:00 11:00 2 -- PENDING
OF INDIA OF INDIA 05-06 05-06
(PGICT4000017)/315
LIMITED LIMITED
POWER GRID POWER GRID
ICT01 SIKAR (400KV)
CORPORATION CORPORATION Verification of operation of new Digital RTCC panel 2018- 2018-
365 ICT (POWERGRID) DAILY 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA after upgradation. 05-03 05-03
(PGICT4000068)/315
LIMITED LIMITED
POWER GRID POWER GRID
ICT02 SIKAR (400KV)
CORPORATION CORPORATION Verification of operation of new Digital RTCC panel 2018- 2018-
366 ICT (POWERGRID) DAILY 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA after upgradation. 05-04 05-04
(PGICT4000069)/315
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Final testing of CSD Relay of MAIN Bay of 500 MVA 2018- 2018-
367 ICT ICT-3(PGICT40000153)/500 DAILY 09:00 18:00 33 -- PENDING
OF INDIA OF INDIA ICT-3 at Sikar S/s 05-07 05-08
LIMITED LIMITED
POWER GRID POWER GRID
S/D Required for Erection of Bus Isolator and CVT
CORPORATION CORPORATION BUS-1 AT 400 KV 2018- 2018-
368 BUS CONTINUOUS in Bus-I under Series Reactor package work of M/S 10:00 18:00 104 -- PENDING
OF INDIA OF INDIA BALLABHGARH(PGABS4000024) 05-15 05-19
GE
LIMITED LIMITED
POWER GRID POWER GRID
S/D Required for Erection of Bus Isolator and CVT
CORPORATION CORPORATION BUS-II AT 400 KV 2018- 2018-
369 BUS CONTINUOUS in Bus-II under Series Reactor package work of M/S 10:00 18:00 104 -- PENDING
OF INDIA OF INDIA BALLABHGARH(PGABS4000025) 05-21 05-25
GE
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400KV BUS-I Disconnector switch 404-89A & 403-89A 2018- 2018-
370 BUS CONTINUOUS 09:00 18:00 129 -- PENDING
OF INDIA OF INDIA GURGAON(PGABS4000056) modification 05-01 05-06
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400KV BUS-I Disconnector switch 405-89A & 402-89A 2018- 2018-
371 BUS CONTINUOUS 09:00 18:00 129 -- PENDING
OF INDIA OF INDIA GURGAON(PGABS4000056) modification 05-07 05-12
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400KV BUS-I 2018- 2018-
372 BUS CONTINUOUS Disconnector switch 401-89A modification 09:00 18:00 57 -- PENDING
OF INDIA OF INDIA GURGAON(PGABS4000056) 05-14 05-16
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 2018- 2018-
373 BUS BUS-I(PGABS2200051) DAILY AMP WORK 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA 05-25 05-25
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 2018- 2018-
374 BUS BUS-II(PGABS2200052) DAILY AMP WORK 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA 05-26 05-26
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION REACTOR BAGHPAT (400KV) AMP WORKS & its associated bays no 406 will be 2018- 2018-
375 REACTOR DAILY 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA (PGBR4000099)/80.00 also in outage. 05-09 05-09
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION REACTOR MANESAR (400KV) 2018- 2018-
376 REACTOR DAILY AMP WORK 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA (PGBR4000041)/125.00 05-11 05-11
LIMITED LIMITED
POWER GRID POWER GRID
Hisar-2 L/R at bhiwadi For the installation of
CORPORATION CORPORATION 2018- 2018-
377 REACTOR REACTOR(PGLR4000024)/63.00 CONTINUOUS Transformer protection system on line reactor by 09:00 18:00 249 -- PENDING
OF INDIA OF INDIA 05-12 05-22
M/s Sergi India.
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION For the installation of Transformer protection 2018- 2018-
378 REACTOR REACTOR(PGLR4000025)/63.00 DAILY 09:00 19:00 10 -- PENDING
OF INDIA OF INDIA system on line reactor by M/s Sergi India. 05-10 05-10
LIMITED LIMITED
POWER GRID POWER GRID 400kV Future - Bus Reactor Tie
CORPORATION CORPORATION Bay (408 bay) at sikar(400KV IPS tube erection between CB ,CT and isolators of 2018- 2018-
379 BAY DAILY 09:00 18:00 57 -- PENDING
OF INDIA OF INDIA FUTURE - BUS REACTOR TIE BAY Future Line(400kV Bhinmal-Barmer) bay at Bus-1 05-07 05-09
LIMITED LIMITED (408 BAY) AT SIKAR)
POWER GRID POWER GRID
CORPORATION CORPORATION SIKAR (400KV)(POWERGRID)- 2018- 2018-
380 LINE DAILY AMP work of line 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA RATANGARH (400KV)(RRVPN) 1 05-05 05-06
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION BUS-I AT 400KV 2018- 2018-
381 BUS DAILY Busbar relay testing in AMP at 400 kV Sikar S/S 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA SIKAR(PGABS4000020) 05-10 05-10
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION BUS-I AT 400KV IPS tube erection between CB ,CT and isolators of 2018- 2018-
382 BUS DAILY 09:00 18:00 57 -- PENDING
OF INDIA OF INDIA SIKAR(PGABS4000020) Future Line(400kV Bhinmal-Barmer) bay at Bus-1 05-07 05-09
LIMITED LIMITED
POWER GRID POWER GRID
Stringing of jack Bus & Erection of isolators and
CORPORATION CORPORATION BUS-II AT 400KV 2018- 2018-
383 BUS DAILY IPS tube of Future Line(400kV Bhinmal-Barmer) bay 09:00 18:00 81 -- PENDING
OF INDIA OF INDIA SIKAR(PGABS4000021) 05-11 05-14
at Bus-2
LIMITED LIMITED
POWER GRID POWER GRID
For Support Structure & Equipment Erection for
CORPORATION CORPORATION 220KV Bus-I at 2018- 2018-
384 BUS DAILY Bay extension of ICT-III under construction. 09:00 18:00 33 -- PENDING
OF INDIA OF INDIA Fatehabad(PGABS400003) 05-07 05-08
(Rescheduled from 144 OCC.)
LIMITED LIMITED
POWER GRID POWER GRID
BHIWADI-PG (400KV)
CORPORATION CORPORATION Replacement of porcelain insulators with polymer 2018- 2018-
385 LINE (POWERGRID)-HISSAR-PG DAILY 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA insulators 05-22 05-22
(400KV)(POWERGRID) I
LIMITED LIMITED
POWER GRID POWER GRID
HISSAR-PG (400KV)
CORPORATION CORPORATION Replacement of porcelain insulators with polymer 2018- 2018-
386 LINE (POWERGRID)-BHIWANI BBMB DAILY 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA insulators 05-23 05-23
(400KV)(BBMB)
LIMITED LIMITED
POWER GRID POWER GRID
MOGA (400KV)(POWERGRID)-
CORPORATION CORPORATION Replacement of porcelain insulators with polymer 2018- 2018-
387 LINE HISSAR-PG (400KV) DAILY 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA insulators 05-24 05-24
(POWERGRID) 1
LIMITED LIMITED
POWER GRID POWER GRID
HISSAR-PG (400KV)
CORPORATION CORPORATION Replacement of porcelain insulators with polymer 2018- 2018-
388 LINE (POWERGRID)-KAITHAL (400KV) DAILY 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA insulators 05-25 05-26
(POWERGRID) I
LIMITED LIMITED
POWER GRID POWER GRID
For Support Structure & Equipment Erection for
CORPORATION CORPORATION 220KV Bus-II at 2018- 2018-
389 BUS DAILY Bay extension of ICT-III under construction. 09:00 18:00 33 -- PENDING
OF INDIA OF INDIA Fatehabad(PGABS400004) 05-09 05-10
(Rescheduled from 144 OCC.)
LIMITED LIMITED
POWER GRID POWER GRID
For Quad Jack bus Erection above 220KV Bus-I,II
CORPORATION CORPORATION 220KV Bus-I at 2018- 2018-
390 BUS DAILY and Transfer Bus and pipe connection for ICT-III 08:00 20:00 36 -- PENDING
OF INDIA OF INDIA Fatehabad(PGABS400003) 05-15 05-16
under construction. (Rescheduled from 144 OCC.)
LIMITED LIMITED
POWER GRID POWER GRID
For dropper connection and Bus bar stability test
CORPORATION CORPORATION 220KV Bus-I at 2018- 2018-
391 BUS DAILY for ICT-III under construction. (Rescheduled from 09:00 18:00 33 -- PENDING
OF INDIA OF INDIA Fatehabad(PGABS400003) 05-26 05-27
144 OCC.)
LIMITED LIMITED
POWER GRID POWER GRID
For Quad Jack bus Erection above 220KV Bus-I,II
CORPORATION CORPORATION 220KV Bus-II at 2018- 2018-
392 BUS DAILY and Transfer Bus and pipe connection for ICT-III 08:00 20:00 36 -- PENDING
OF INDIA OF INDIA Fatehabad(PGABS400004) 05-15 05-16
under construction. (Rescheduled from 144 OCC.)
LIMITED LIMITED
(a) Replacement of porcelain insulators with
POWER GRID POWER GRID
ICT01 HISSAR-PG (400KV) polymer insulators. (b) 220KV side Jack bus
CORPORATION CORPORATION 2018- 2018-
393 ICT (POWERGRID) DAILY conductor (of R, Y & B-PH)over the ICT-1 to be 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-28 05-29
(PGICT4000086)/315 made twin moose. At present these are single
LIMITED LIMITED
moose.
POWER GRID POWER GRID
For dropper connection and Bus bar stability test
CORPORATION CORPORATION 220KV Bus-II at 2018- 2018-
394 BUS DAILY for ICT-III under construction. (Rescheduled from 09:00 18:00 33 -- PENDING
OF INDIA OF INDIA Fatehabad(PGABS400004) 05-28 05-29
144 OCC.)
LIMITED LIMITED
PUNJAB STATE
TRANSMISSION NAKODAR (400KV)(PSTCL)- 2018- 2018-
395 SLDC Punjab LINE DAILY General Maintenance 10:00 16:00 6 -- PENDING
CORPORATION MAKHU (400KV)(PSTCL) 1 05-23 05-23
LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Replacement of porcelain insulators with polymer 2018- 2018-
396 BUS BUS-I HISAR(PGABS4000070) DAILY 08:00 18:00 130 -- PENDING
OF INDIA OF INDIA insulators 05-21 05-26
LIMITED LIMITED
PUNJAB STATE
NALLAGARH (220KV) Tightening of nut bolts of jumpers, dampers ,
TRANSMISSION 2018- 2018-
397 SLDC Punjab LINE (POWERGRID)-MOHALI (220KV) DAILY suspension clamps and cleaning of Disc insulators 10:00 17:00 7 -- PENDING
CORPORATION 05-25 05-25
(PSTCL) 2 of Tower No 40 to 50
LIMITED
PUNJAB STATE
TALWANDI SABOO TPS (400KV)
TRANSMISSION 2018- 2018-
398 SLDC Punjab LINE (PSPCL)-DHURI (400KV)(PSTCL) DAILY Line jumper/ Nut Bolt tightening 09:00 17:00 32 -- PENDING
CORPORATION 05-28 05-29
2
LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION REACTOR I HISSAR-PG (400KV) Replacement of porcelain insulators with polymer 2018- 2018-
399 REACTOR DAILY 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA (PGBR400003)/50.00 insulators 05-21 05-21
LIMITED LIMITED
PUNJAB STATE
TRANSMISSION KANGRA (132KV)(PSPCL)- Disc cleaning & Jumper tightening and other mtc. 2018- 2018-
400 SLDC Punjab LINE DAILY 10:00 16:00 6 -- PENDING
CORPORATION PATHANKOT (132KV)(PSTCL) to be done 05-28 05-28
LIMITED
PUNJAB STATE
TRANSMISSION NAKODAR (400KV)(PSTCL)- 2018- 2018-
401 SLDC Punjab LINE DAILY General Maintenance 10:00 16:00 6 -- PENDING
CORPORATION MAKHU (400KV)(PSTCL) 2 05-28 05-28
LIMITED
PUNJAB STATE
TRANSMISSION MOGA (400KV)(POWERGRID)- 2018- 2018-
402 SLDC Punjab LINE DAILY General Maintenance 10:00 16:00 6 -- PENDING
CORPORATION NAKODAR (400KV)(PSTCL) 05-30 05-30
LIMITED
PUNJAB STATE
TRANSMISSION MUKTSAR (400KV)(PSTCL)- tightening/checking of jumpers and cleaning of 2018- 2018-
403 SLDC Punjab LINE DAILY 10:00 17:00 7 -- PENDING
CORPORATION MAKHU (400KV)(PSTCL) 1 disc insulators in polluted area 05-31 05-31
LIMITED
POWER GRID POWER GRID
400KV AGRA M/BAY 406 AT
CORPORATION CORPORATION 2018- 2018-
404 BAY BASSI(400KV AGRA M/BAY 406 CONTINUOUS Retrofittment of circuit breaker AT BASSI 08:00 18:00 730 -- PENDING
OF INDIA OF INDIA 05-01 05-31
AT BASSI)
LIMITED LIMITED
POWER GRID POWER GRID
400KV BASSI-I M/BAY 552A at
CORPORATION CORPORATION Retrofittment of circuit breaker at Heerapura GSS 2018- 2018-
405 BAY HEERPURA(RAJ)(400KV BASSI-I CONTINUOUS 08:00 18:00 730 -- PENDING
OF INDIA OF INDIA of RRVPNL (bay belongs to POWERGRID) 05-01 05-31
M/BAY 552A AT HEERPURA(RAJ))
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400KV BUS-1 at New 2018- 2018-
406 BUS DAILY For Isolator Alignments & AMP works. 09:00 17:00 32 -- PENDING
OF INDIA OF INDIA Wanpoh(PGABS4000072) 05-07 05-08
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 400KV BUS-2 at New 2018- 2018-
407 BUS DAILY For Isolator Alignments & AMP works. 09:00 17:00 32 -- PENDING
OF INDIA OF INDIA Wanpoh(PGABS4000073) 05-11 05-12
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Replacement of porcelain insulators with polymer 2018- 2018-
408 BUS BUS-I HISAR(PGABS4000070) DAILY 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA insulators 05-28 05-29
LIMITED LIMITED
PUNJAB STATE
TRANSMISSION MAKHU - BUS BAR 2018- 2018-
409 SLDC Punjab BUS DAILY Perodical/routine Maintenance 09:00 18:00 9 -- PENDING
CORPORATION 1(ABS4000038) 05-28 05-28
LIMITED
PUNJAB STATE
TRANSMISSION MAKHU - BUS BAR 2018- 2018-
410 SLDC Punjab BUS DAILY Perodical/routine Maintenance 10:00 17:00 7 -- PENDING
CORPORATION 2(ABS4000039) 05-29 05-29
LIMITED
PUNJAB STATE
TRANSMISSION ICT01 RAJPURA (400KV)(PSTCL) 2018- 2018-
411 SLDC Punjab ICT DAILY Maintenance of ICT conservator tank 08:00 18:00 10 -- PENDING
CORPORATION (ICT40000128)/500 05-23 05-23
LIMITED
PUNJAB STATE
TRANSMISSION ICT01 MAKHU (400KV)(PSTCL) 2018- 2018-
412 SLDC Punjab ICT DAILY Perodical/routine Maintenance 09:00 17:00 8 -- PENDING
CORPORATION (ICT4000053)/315 05-14 05-14
LIMITED
PUNJAB STATE
TRANSMISSION ICT02 MAKHU (400KV)(PSTCL) 2018- 2018-
413 SLDC Punjab ICT DAILY Perodical/routine Maintenance 09:00 17:00 8 -- PENDING
CORPORATION (ICT4000054)/315 05-15 05-15
LIMITED
PUNJAB STATE
TRANSMISSION ICT01 MUKTSAR (400KV)(PSTCL) 2018- 2018-
414 SLDC Punjab ICT DAILY General Maintenance 09:00 17:00 8 -- PENDING
CORPORATION (ICT4000051)/315 05-01 05-01
LIMITED
PUNJAB STATE
TRANSMISSION ICT01 DHURI (400KV)(PSTCL) 2018- 2018-
415 SLDC Punjab ICT DAILY Protection Testing 09:00 18:00 33 -- PENDING
CORPORATION (ICT4000090)/500 05-02 05-03
LIMITED
PUNJAB STATE
TRANSMISSION ICT03 DHURI (400KV)(PSTCL) 2018- 2018-
416 SLDC Punjab ICT DAILY General Maintenance 09:00 18:00 9 -- PENDING
CORPORATION (ICT40000200)/500 05-04 05-04
LIMITED
PUNJAB STATE
TRANSMISSION ICT02 RAJPURA (400KV)(PSTCL) 2018- 2018-
417 SLDC Punjab ICT DAILY C-wedge clamp installation 09:00 17:00 8 -- PENDING
CORPORATION (ICT40000129)/500 05-02 05-02
LIMITED
PUNJAB STATE
TRANSMISSION ICT02 MUKTSAR (400KV)(PSTCL) 2018- 2018-
418 SLDC Punjab ICT DAILY General Maintenance 09:00 17:00 8 -- PENDING
CORPORATION (ICT4000093)/315 05-03 05-03
LIMITED
POWER GRID POWER GRID
PITHORAGRH (220KV) Laying of OPGW at tower no 366-367-368 to
CORPORATION CORPORATION 2018- 2018-
419 LINE (POWERGRID)-BAREILY-CB GANJ DAILY interconnect Sitarganj-Tanakpur 220KV line. (now 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-01 05-02
(220KV)(UPPTCL) charged at 220KV level)
LIMITED LIMITED
POWER GRID POWER GRID
BAREILY-PG (400KV)
CORPORATION CORPORATION For creation of OPGW joint box for which OPGW to 2018- 2018-
420 LINE (POWERGRID)-KASHIPUR DAILY 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA be lay at tower no 268-269-270 at IIM Kashipur. 05-04 05-06
(400KV)(PTCUL) 1
LIMITED LIMITED
POWER GRID POWER GRID
Laying of OPGW at Tower No 16-17-18 to
CORPORATION CORPORATION TANAKPUR (220KV)(NHPC)- 2018- 2018-
421 LINE DAILY interconnect Bareilly-Pithoragarh CKT-II 400 KV 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA SITARGANJ (220KV)(POWERGRID) 05-01 05-02
(now charged at 220KV level).
LIMITED LIMITED
POWER GRID POWER GRID
To attend the shut down nature defects (Fixing of
CORPORATION CORPORATION TANAKPUR (220KV)(NHPC)- 2018- 2018-
422 LINE DAILY Missing Jumper Bolts, Spacer Damper,cottor 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA SITARGANJ (220KV)(POWERGRID) 05-12 05-13
Pin,Broken Insulator Replacement etc)
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus Reactor-2 , at Construction of remaining portion of Firewall 2018- 2018-
423 REACTOR DAILY 09:30 17:30 296 -- PENDING
OF INDIA OF INDIA Sohawal(PGBR40000125)/80.00 between Bus Reactor-2 & ICT-1 05-05 05-17
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION 2018- 2018-
424 BAY ICT-1 BAY, at Kanpur(BAY1055) CONTINUOUS CB hydraulic mechanism overhauling work 09:00 17:00 80 -- PENDING
OF INDIA OF INDIA 05-07 05-10
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus-2, at 2018- 2018-
425 BUS DAILY AMP Work 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA Lucknow(PGABS4000086) 05-01 05-01
LIMITED LIMITED
POWER GRID POWER GRID
Replacement of 400kV 80Mvar Bus Reactor with
CORPORATION CORPORATION REACTOR 2018- 2018-
426 REACTOR CONTINUOUS 125Mvar Bus Reactor of BHEL make (Dismantling of 09:00 18:00 225 -- PENDING
OF INDIA OF INDIA I(PGBR40000106)/80.00 05-01 05-10
80Mvar and ETC of 125 Mvar Reactor)
LIMITED LIMITED
POWER GRID POWER GRID
REACTOR(B)-II LUCKNOW-Kursi Replacement of 400kV 80Mvar Bus Reactor with
CORPORATION CORPORATION 2018- 2018-
427 REACTOR Road (400KV) CONTINUOUS 125Mvar Bus Reactor of BHEL make (Dismantling of 09:00 18:00 225 -- PENDING
OF INDIA OF INDIA 05-01 05-10
PG(PGBR40000118)/125.00 80Mvar and ETC of 125 Mvar Reactor)
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION BUS-I LUCKNOW-Kursi Road 2018- 2018-
428 BUS DAILY For stringing and connection under STATCOM pkg. 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA (400KV) PG(PGABS400001) 05-18 05-18
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus-2, at 2018- 2018-
429 BUS DAILY For stringing and connection under STATCOM pkg. 09:00 18:00 105 -- PENDING
OF INDIA OF INDIA Lucknow(PGABS4000086) 05-23 05-27
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION SINGRAULI 400KV BUS - Extension of Main Bus 03 for 400 kv Singrauli - 2018- 2018-
430 BUS DAILY 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA III(ABS4000064) Allahabad -3 (New line ) Bay, at Singrauli (NTPC) 05-16 05-16
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION SINGRAULI 400KV BUS - Extension of Main Bus 04 for 400 KV Singrauli - 2018- 2018-
431 BUS DAILY 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA IV(ABS4000065) Allahabad -3( New line ) Bay , at Singrauli(NTPC) 05-17 05-17
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Transfer Bus, Singrauli (NTPC) Extension of Transfer Bus for 400 KV Singrauli - 2018- 2018-
432 BUS DAILY 09:00 18:00 9 -- PENDING
OF INDIA OF INDIA (PGABS4000089) Allahabad #3 (New line) Bay, at Singrauli (NTPC) 05-18 05-18
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus-2, at 2018- 2018-
433 BUS DAILY AMP of 220 KV Bus-2 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA Lucknow(PGABS2200069) 05-04 05-04
LIMITED LIMITED
POWER GRID POWER GRID
ICT-2, 315 MVA , at Agra
CORPORATION CORPORATION 2018- 2018-
434 ICT HVDC(PGICT40000154)/315 DAILY AMP works of ICT & associated bay 08:00 18:00 34 -- PENDING
OF INDIA OF INDIA 05-10 05-11
MVA
LIMITED LIMITED
POWER GRID POWER GRID
ICT-1, 3X105 MVA, at Agra
CORPORATION CORPORATION 2018- 2018-
435 ICT HVDC(PGICT40000155)/315 DAILY AMP works of ICT-1 (315 MVA ) & associated bay 08:00 18:00 58 -- PENDING
OF INDIA OF INDIA 05-12 05-14
MVA
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus - 1 , at Agra Tightening,Cleaning ,alignment & testing of 2018- 2018-
436 BUS DAILY 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA HVDC(PGABS2200070) Isolators & CVT connected to Bus-1 05-15 05-15
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus - 2 , at Agra Tightening,Cleaning ,alignment & testing of 2018- 2018-
437 BUS DAILY 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA HVDC(PGABS2200071) Isolators & CVT connected to Bus-2 05-16 05-16
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus Coupler Bay , at Agra 2018- 2018-
438 BUS DAILY AMP work of bay 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA HVDC(PGABS2200072) 05-17 05-17
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Transfer Bus Bay , at Agra 2018- 2018-
439 BUS DAILY AMP work of bay 08:00 18:00 10 -- PENDING
OF INDIA OF INDIA HVDC(PGABS2200073) 05-18 05-18
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus-1, at Extension of 220 KV Bus-1 for Sarh-1 & Sarh 2 New 2018- 2018-
440 BUS DAILY 09:30 18:00 8 -- PENDING
OF INDIA OF INDIA Fatehpur(PGABS2200074) Line of (UPPTCL) 05-01 05-01
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION Bus-2, at Extension of 220 KV Bus-2 for Sarh-1 & Sarh 2 New 2018- 2018-
441 BUS DAILY 09:30 18:00 8 -- PENDING
OF INDIA OF INDIA Fatehpur(PGABS2200075) Line of (UPPTCL) 05-02 05-02
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION ICT-2 MAIN BAY, at Kanpur(MAIN 2018- 2018-
442 BAY CONTINUOUS CB hydraulic mechanism overhauling work 09:00 17:00 80 -- PENDING
OF INDIA OF INDIA BAY (1058)) 05-11 05-14
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION SVC-1, at 2018- 2018-
443 SVC DAILY AMP Work 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA Kanpur(PGSVC400003) 05-04 05-04
LIMITED LIMITED
POWER GRID POWER GRID
CORPORATION CORPORATION SVC-2, at 2018- 2018-
444 SVC DAILY AMP Work 09:00 17:00 8 -- PENDING
OF INDIA OF INDIA Kanpur(PGSVC400004) 05-05 05-05
LIMITED LIMITED
POWER GRID POWER GRID
ALLAHABAD (400KV)
CORPORATION CORPORATION STRINGING OF 400KV S/C SINGRAULI - ALLD LINE ON 2018- 2018-
445 LINE (POWERGRID)-KANPUR GIS DAILY 08:00 18:00 178 -- PENDING
OF INDIA OF INDIA MULTI CKT PORTION 05-03 05-10
(765KV)(POWERGRID) 1
LIMITED LIMITED
POWER GRID POWER GRID
ALLAHABAD (400KV)
CORPORATION CORPORATION STRINGING OF 400KV S/C SINGRAULI - ALLD LINE ON 2018- 2018-
446 LINE (POWERGRID)-KANPUR GIS DAILY 08:00 18:00 178 -- PENDING
OF INDIA OF INDIA MULTI CKT PORTION 05-03 05-10
(765KV)(POWERGRID) 2
LIMITED LIMITED
BHAKRA BEAS BHAKRA BEAS
BHAKRA LEFT (220KV)(BBMB)- 2018- 2018-
447 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of S/Station equipment. 08:00 17:00 33 -- PENDING
GANGUWAL (220KV)(BBMB) 1 05-07 05-08
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
BHAKRA LEFT (220KV)(BBMB)- 2018- 2018-
448 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of S/station equipment. 08:00 17:00 33 -- PENDING
GANGUWAL (220KV)(BBMB) 2 05-10 05-11
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
BHAKRA LEFT (220KV)(BBMB)- 2018- 2018-
449 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of S/station equipment 08:00 17:00 33 -- PENDING
GANGUWAL (220KV)(BBMB) 3 05-14 05-15
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
GANGUWAL (220KV)(BBMB)- 2018- 2018-
450 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of S/station equipment 08:00 17:00 33 -- PENDING
JAGADHRI (220KV)(BBMB) 05-17 05-18
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
GANGUWAL (220KV)(BBMB)- 2018- 2018-
451 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of S/station equipment 08:00 17:00 33 -- PENDING
GOBINDGARH (220KV)(PSTCL) 05-21 05-22
BOARD BOARD
POWER GRID
KANPUR GIS (765KV)
CORPORATION AMP of Line Equipments and Main bay, at Kanpur 2018- 2018-
452 NRPC LINE (POWERGRID)-LUCKNOW-Kursi DAILY 09:00 17:00 8 -- PENDING
OF INDIA GIS 05-03 05-03
Road (400KV) PG(POWERGRID) II
LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400 kV Main Bus-I at 765 kV Connection/extension of 400 kV BUS I for new 2018- 2018-
453 BUS DAILY 09:00 20:00 11 -- PENDING
Rajasthan PRASARAN GSS Anta(ABS4000074) Chhabra- Dhara LILO line . 04-24 04-24
NIGAM LIMITED
RAJASTHAN
SLDC RAJYA VIDYUT 400 kV Main Bus-II AT 765 kV Connection/extension of 400 kV BUS II for new 2018- 2018-
454 BUS DAILY 09:00 20:00 11 -- PENDING
Rajasthan PRASARAN GSS Anta(ABS4000075) Chhabra- Dhara LILO line 04-23 04-23
NIGAM LIMITED
Haryana
SLDC Vidyut JHAJJAR-CLP (400KV)(CLPHR)- 2018- 2018-
455 LINE DAILY Replacement of porcelain insulators by polymer 08:00 15:00 7 -- PENDING
Haryana Prasaran KABULPUR (400KV)(HVPNL) I 05-03 05-03
Nigam LTD
Haryana
KABULPUR (400KV)(HVPNL)-
SLDC Vidyut 2018- 2018-
456 LINE DEEPALPUR (400KV)(KT JHAJJAR) DAILY Replacement of porcelain insulators by polymer 08:00 15:00 7 -- PENDING
Haryana Prasaran 05-04 05-04
1
Nigam LTD
Haryana
KABULPUR (400KV)(HVPNL)-
SLDC Vidyut 2018- 2018-
457 LINE DEEPALPUR (400KV)(KT JHAJJAR) DAILY Replacement of porcelain insulators by polymer 08:00 15:00 7 -- PENDING
Haryana Prasaran 05-05 05-05
2
Nigam LTD
Haryana To attend the oil leakage, mtc activities,sharp rise
Power in Hydrogen Gas concentration in T/F . Note:-
SLDC ICT01 KABULPUR (400KV) 2018- 2018-
458 Generation ICT CONTINUOUS shutdown already approved in 145th OCC for 09:00 17:00 224 -- PENDING
Haryana (HVPNL)(ICT4000015)/315 04-20 04-29
Corporation 06.04.18 but the same will be availed during the
Limited revised period mentioned above.
Haryana
DEEPALPUR (400KV)(KT JHAJJAR)- Replacement of porcelain insulators by polymer
SLDC Vidyut 2018- 2018-
459 LINE ABDULLAPUR (400KV) DAILY Note:- Now the CLP-Dhanonda D/Ckt has been 08:00 16:00 8 -- PENDING
Haryana Prasaran 04-27 04-27
(POWERGRID) revived on dated 31.03.18
Nigam LTD
Haryana
KABULPUR (400KV)(HVPNL)- Replacement of porcelain insulators by polymer
SLDC Vidyut 2018- 2018-
460 LINE DEEPALPUR (400KV)(KT JHAJJAR) DAILY Note:- Now the CLP-Dhanonda D/Ckt has been 08:00 16:00 8 -- PENDING
Haryana Prasaran 04-28 04-28
1 revived on dated 31.03.18
Nigam LTD
Haryana
KABULPUR (400KV)(HVPNL)- Replacement of porcelain insulators by polymer
SLDC Vidyut 2018- 2018-
461 LINE DEEPALPUR (400KV)(KT JHAJJAR) DAILY Note:- Now the CLP-Dhanonda D/Ckt has been 08:00 16:00 8 -- PENDING
Haryana Prasaran 04-29 04-29
2 revived on dated 31.03.18
Nigam LTD
BHAKRA BEAS BHAKRA BEAS
Bhatinda(PSTCL)-LEHRA 2018- 2018-
462 MANAGEMENT MANAGEMENT LINE DAILY Half yearly maintenance of line. 08:00 17:00 9 -- PENDING
MOHABAT (200KV)(PSTCL) 05-07 05-07
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
BHIWANI BBMB (220KV)(BBMB)- 2018- 2018-
463 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of line 08:00 17:00 9 -- PENDING
BAPOORA(HVPNL) I 05-10 05-10
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
BHIWANI BBMB (220KV)(BBMB)- 2018- 2018-
464 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of line 08:00 17:00 9 -- PENDING
BAPOORA(HVPNL) II 05-11 05-11
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
CHARKHI DADRI (220KV)(BBMB)- 2018- 2018-
465 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of line 08:00 17:00 9 -- PENDING
LULAHIR(HVPNL) S/C 05-07 05-07
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
PANIPAT BBMB (220KV)(BBMB)- 2018- 2018-
466 MANAGEMENT MANAGEMENT LINE DAILY half yearly maintenance of line 08:00 17:00 9 -- PENDING
CHAJJPUR(HVPNL) I 05-07 05-07
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
PANIPAT BBMB (220KV)(BBMB)- 2018- 2018-
467 MANAGEMENT MANAGEMENT LINE DAILY Half yearly maintenance of line. 08:00 17:00 9 -- PENDING
CHAJJPUR(HVPNL) II 05-08 05-08
BOARD BOARD
BHAKRA BEAS BHAKRA BEAS
JALLANDHAR BBMB (220KV) 2018- 2018-
468 MANAGEMENT MANAGEMENT LINE DAILY Half yearly maintenance of substation equipment. 08:00 17:00 9 -- PENDING
(BBMB)-BUTARI(PSTCL) 05-16 05-16
BOARD BOARD