Project: IEEE 14 BUS ETAP Page: 1

12.6.0H
Location: Date: 03-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: IEEE14BUS Config.: Normal

Momentary Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Momentary Duty Device Capability


Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

Bus 1 H_1 1.000 Bus 1 H_1 Bus 1061.446 999.9 1.728 1834.636 2997.514
Bus 2 H_2 1.000 Bus 2 H_2 Bus 1074.583 3027.4 1.731 1859.946 3037.804
Bus 3 H_3 1.000 Bus 3 H_3 Bus 734.182 9.1 1.414 1038.205 1772.351
Bus 4 H_4 1.000 Bus 4 H_4 Bus 880.236 13.3 1.500 1320.089 2228.620
Bus 5 H_5 1.000 Bus 5 H_5 Bus 811.456 12.3 1.484 1204.034 2037.087
Bus 6 L_6 1.000 Bus 6 L_6 Bus 423.199 23.3 1.590 672.839 1121.575
Bus 7 Z_7 1.000 Bus 7 Z_7 Bus 438.351 27.7 1.611 706.105 1173.485
Bus 8 T_8 1.000 Bus 8 T_8 Bus 258.411 47.8 1.659 428.827 707.671
Bus 9 L_9 1.000 Bus 9 L_9 Bus 466.788 25.1 1.599 746.448 1242.627
Bus 10 L_10 1.000 Bus 10 L_10 Bus 348.173 5.3 1.268 441.366 763.646
Bus 11 L_11 1.000 Bus 11 L_11 Bus 279.093 3.6 1.162 324.424 560.099
Bus 12 L_12 1.000 Bus 12 L_12 Bus 220.519 2.8 1.098 242.036 411.625
Bus 13 L_13 1.000 Bus 13 L_13 Bus 314.083 3.7 1.168 366.922 633.874
Bus 14 L_14 1.000 Bus 14 L_14 Bus 252.086 2.9 1.110 279.787 477.884

Method: IEEE - X/R is calculated from separate R & X networks.


Protective device duty is calculated based on total fault current.
The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R.

* Indicates a device with momentary duty exceeding the device capability


Project: IEEE 14 BUS ETAP Page: 2
12.6.0H
Location: Date: 03-11-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: IEEE14BUS Config.: Normal

Interrupting Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.

Bus 1 H_1 1.000 987.971 13352.4

Bus 2 H_2 1.000 930.403 3530.6

Bus 3 H_3 1.000 553.189 11.5

Bus 4 H_4 1.000 695.840 16.5

Bus 5 H_5 1.000 674.759 14.7

Bus 6 L_6 1.000 342.938 28.6

Bus 7 Z_7 1.000 372.246 31.6

Bus 8 T_8 1.000 242.257 49.2

Bus 9 L_9 1.000 359.494 31.9

Bus 10 L_10 1.000 281.674 6.4

Bus 11 L_11 1.000 238.468 4.2

Bus 12 L_12 1.000 189.123 3.1

Bus 13 L_13 1.000 254.121 4.4

Bus 14 L_14 1.000 204.472 3.3

Method: IEEE - X/R is calculated from separate R & X networks.


HV CB interrupting capability is adjusted based on bus nominal voltage
Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is the higher value based on peak current or asymmetrical current.
Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.
* Indicates a device with interrupting duty exceeding the device capability
** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator.
Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.
+ The prefault voltage exceeds the rated maximum kV limit of the circuit breaker - The rated interrupting kA must be derated.